RESOLUTION. ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Watts McGee Addition, Lots 1-43 made
arrangements with Kerr Construction Company for the construction of paving
improvements on certain streets dedicated in said subdivision under the
provisions of said Ordinance prior to the recording of the subdivision plat
of the above -mentioned addition including the following streets:
Albany Avenue from its intersection with the south lip line of 19th
Street to its intersection with the north lip line of 21st Street
known and designated as New Subdivision Sub -Unit Number 08 of Unit
Number 2032.
20th Street from its intersection with the east lip line of Albany
Avenue to its intersection with a line 302.75 feet east of east lip
line of Albany Avenue known and designated as New Subdivision Sub -Unit
Number 09 of Unit Number 2032.
21st Street from its intersection with the east property line of Lot 5
to its intersection with a line 27 feet east of east property line of
Lot 14 known and designated as New Subdivision Sub -unit Number 10 of
Unit Number 2032, and
WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements on said portions of the above -
mentioned streets be and the same are hereby accepted and the City Engineer
be and he is hereby authorized to notify the Developer of Acceptance by the
Lubbock City Council.
SECTION 2. THAT this Resolution shall take effect and be in force
from and after its passage.
Passed by the City Council this 23rd day of jJanuary , 1986.
ALAK HENRY, KATOR
ATTEST:
anette Boyd, City Secretary
APPROVED AS TO CONTENT:
Larry V / Hoffman, C .-y Engineer
APPROVED AS TO FORM:
'Worih Fullingim, Assista#t City
torney
- 2 -
Resolution #2228
CONSOLIDATED FINAL ESTIMATE
WATTS MCGEE ADDITION
Lots 1-43
January 23, 1986
S.Y. Alley
L.F. C&G
S.Y.
Return &
S.Y.
Removal &
Unit &
Paving
L.F.
Drainage
Valley
Pavement
Sub -Unit
Location
6" Base
C & G
Channels
Gutter
Repair
2032-08
Albany Ave. from SLL of 19th
2,513.17
1,397.08
80.80
67.93
86.00
St. to NLL of 21st St.
2032-09
20th St. from ELL of Albany Ave.
1,064.99
613.17
340.46
17.78
to 302.75' E. of ELL of Albany
Ave.
2032-10
21st. St. from EPL of Lot 5 to
1,719.29
868.53
73.93
14.00
27' E. of EPL of Lot 14
TOTAL QUANTITIES
COST ESTIMATE
5,297.45 S. Y. Paving 6" Base
2,878.78 L. F. Curb & Gutter
191.70 S.-Y. Alley Return
85.71 S. Y. Valley Gutter
303.49 S. Y. Drainage Channel
100.00 L. F. C&G Rem. & Pvmt. Repair
5,297.45 2,878.78 495.19 85.71 100.00
@ $6.60
$34,963.17
@ $5.75
$16,552.99
@ $18.75
$3,594.38
@ $19.50
$1,671.34
@ $23.10
$7,010.62
@ $1.00
$100.00
CONTRACT COST $63,892.50
CONSOLIDATED FINAL COST
Unit & Contract Developer
Sub -Unit Cost Cost
2032-08 $27,545.13 $27,545.13
2032-09 $18,605.18 $18,605.18
2032-10 $17,742.19 $17,742.19
TOTAL $63,892.50 $63,892.50