Loading...
HomeMy WebLinkAboutResolution - 2228 - Accept Paving Improvements-Keer Construction-Lots 1-43, Watts Mcgee Addition - 01_23_1986Resolution #2228 January 23, 1986 Agenda Item #27 JWF:js IM11110100111 RESOLUTION. ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Watts McGee Addition, Lots 1-43 made arrangements with Kerr Construction Company for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above -mentioned addition including the following streets: Albany Avenue from its intersection with the south lip line of 19th Street to its intersection with the north lip line of 21st Street known and designated as New Subdivision Sub -Unit Number 08 of Unit Number 2032. 20th Street from its intersection with the east lip line of Albany Avenue to its intersection with a line 302.75 feet east of east lip line of Albany Avenue known and designated as New Subdivision Sub -Unit Number 09 of Unit Number 2032. 21st Street from its intersection with the east property line of Lot 5 to its intersection with a line 27 feet east of east property line of Lot 14 known and designated as New Subdivision Sub -unit Number 10 of Unit Number 2032, and WHEREAS, the construction of the above improvements on the above - mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements on said portions of the above - mentioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to notify the Developer of Acceptance by the Lubbock City Council. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 23rd day of jJanuary , 1986. ALAK HENRY, KATOR ATTEST: anette Boyd, City Secretary APPROVED AS TO CONTENT: Larry V / Hoffman, C .-y Engineer APPROVED AS TO FORM: 'Worih Fullingim, Assista#t City torney - 2 - Resolution #2228 CONSOLIDATED FINAL ESTIMATE WATTS MCGEE ADDITION Lots 1-43 January 23, 1986 S.Y. Alley L.F. C&G S.Y. Return & S.Y. Removal & Unit & Paving L.F. Drainage Valley Pavement Sub -Unit Location 6" Base C & G Channels Gutter Repair 2032-08 Albany Ave. from SLL of 19th 2,513.17 1,397.08 80.80 67.93 86.00 St. to NLL of 21st St. 2032-09 20th St. from ELL of Albany Ave. 1,064.99 613.17 340.46 17.78 to 302.75' E. of ELL of Albany Ave. 2032-10 21st. St. from EPL of Lot 5 to 1,719.29 868.53 73.93 14.00 27' E. of EPL of Lot 14 TOTAL QUANTITIES COST ESTIMATE 5,297.45 S. Y. Paving 6" Base 2,878.78 L. F. Curb & Gutter 191.70 S.-Y. Alley Return 85.71 S. Y. Valley Gutter 303.49 S. Y. Drainage Channel 100.00 L. F. C&G Rem. & Pvmt. Repair 5,297.45 2,878.78 495.19 85.71 100.00 @ $6.60 $34,963.17 @ $5.75 $16,552.99 @ $18.75 $3,594.38 @ $19.50 $1,671.34 @ $23.10 $7,010.62 @ $1.00 $100.00 CONTRACT COST $63,892.50 CONSOLIDATED FINAL COST Unit & Contract Developer Sub -Unit Cost Cost 2032-08 $27,545.13 $27,545.13 2032-09 $18,605.18 $18,605.18 2032-10 $17,742.19 $17,742.19 TOTAL $63,892.50 $63,892.50