HomeMy WebLinkAboutResolution - 3463 - Accept Paving Improvements-Caprock Highway Construction-1990 Maintenance Program - 10_11_1990 (2)JWF:dw RESOLUTION Resolution # 343 October 11, 1990 Item #14 RESOLUTION ACCEPTING PAVING IMPROVEMENTS ON A PORTION OF CITY STREETS AS DESCRIBED BELOW: WHEREAS, the City of Lubbock awarded a contract March 14, 1990, authorizing the construction of street maintenance improvements by Caprock Highway Construction Company, on a portion of the following: 1990 Maintenance Program List of Streets Improved Street From To 34th St. Louisville Ave. Brownfield Hwy. 34th St. Ave. "L" Ave. "Q" 34th St. Ave. "Q" Ave. "U" 50th St. Ave. fluff University Ave. Erskine Ave. "Q" I-27 Erskine I-27 Ash Ave. Indiana Ave. 82nd St. S. to City Limits Kent St. University Ave. Railroad ROW Quaker Ave. 4th St. 19th St. Quaker Ave. Clovis Road N. to City Limits Quirt Ave. 24th St. Idalou Road Quirt Ave. Loop 289 82nd St. Slide Road 13th St. 19th St. Slide Road Brownfield Hwy. 29th Dr. University Ave. 98th St. S. to City Limits 82nd St. Quaker Ave. Indiana Ave. 1st St. Guava Ave. Elder Ave. 1st St. Ave. "P" RR @ Ave. "K" 2nd St. Ave. "M" W. to Cul-de-sac 2nd St. Ave. "Q" Clovis Road 2nd St. Guava Ave. Zenith Ave. 3rd St. Ave. "M" Ave. "H" 3rd St. Ave. "P" Ave. "Q" 6th St. Quaker Ave. Raleigh Ave. 8th St. Quirt Ave. Zenith Ave. loth St. RR tracks Ave. "G" 13th St. Ave. fluff University Ave. 13th St. Ave. "A" Date Ave. 16th St. Ave. "X" 250, E. of Ave. "X" 23rd St. Peoria Ave. Quaker Ave. 24th St. Quaker Ave. V.G. W. of Nashville Street From To 26th St. University Ave. Flint Ave. 29th Dr. 34th St. Brownfield Hwy. 31st St. Quaker Ave. Vicksburg Ave. 36th St. Toledo Ave. Utica Ave. 42nd St. Indiana Ave. Quaker Ave. 44th St. Ave. "X" University Ave. 45th St. Ave. "X" University Ave. 46th St. Ave. "U" University Ave. 47th St. Gary Ave. Indiana Ave. 54th St. Elgin Ave. Gary Ave. 60th St. Gary Ave. Indiana Ave. 69th St. Slide Road Loop 289 70th St. Slide Road Albany Ave. 71st St. Ave. "W" 250' E. of Ave. "W" 87th St. Memphis Ave. Nashville Ave. 93rd St. Memphis Ave. Nashville Ave. Ash Ave. 13th St. S. to End of pavement Ave. "F" 9th St. Main St. Ave. "F" Broadway 13th St. Ave. "L" 13th St. 19th St. Ave. "L" 29th St. 50th St. Ave. "L" 4th St. N. to RR tracks Ave. "M" 2nd St. 4th St. Ave. "N" 29th St. 30th St. Ave. "Q" 2nd St. Clovis Road Ave. "R" 2nd St. Clovis Road Ave. "W" 22nd St. 34th St. Ave. "W" 34th St. 35th St. Ave. "W" 66th St. Loop 289 Ave. "X" 44th St. 46th St. Ave. "Y" 16th St. 19th St. Baylor St. Ave. "U" Ave. "Q" Boston Ave. 35th St. 42nd St. Brownfield Dr. Quaker Ave. Salem Ave. Canton Ave. 50th St. 52nd St. Cherry Ave. 4th St. N. of Cornell St. Date Ave. Broadway 14th St. Elder Ave. 1st St. 2nd St. Flint Ave. 19th St. 34th St. Gary Ave. 47th St. 50th St. Gary Ave. 50th St. Monterey Dr. Knoxville Ave. 34th St. 50th St. Marshall St. N. Ave. "N" Dead end @ RR tracks Memphis Ave. 60th St. Loop 289 Municipal Dr. Quirt Ave. Loop 289 Nashville Ave. 34th St. 49th St. Nashville Ave. 87th St. 93rd St. Paris Ave. 15th St. 16th St. Paris Ave. 2nd St. 4th St. Raleigh Ave. 4th St. 6th St. Sherman Ave. Auburn St. Baylor St. — 2 — Street From To Toledo Ave. 31st St. 34th St. Toledo Ave. 34th St. 36th St. Vernon Ave. Broadway 13th St. Vicksburg Ave. Brownfield Hwy. 34th St. Walnut Ave. Broadway Parkway Dr. Parking Lots Auditorium/Coliseum Parking Lots Fire Station #1 Parking Lot AND WHEREAS, the improvements upon the said portions of the City streets have been inspected and found to have been constructed according to the approved plans and specifications; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements on said portions of the City streets BE and the same are hereby accepted and the City Street Superintendent BE and he is hereby authorized to direct the final payment to the Contractor in the amount of $17,210.60. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this 11th day of ATTEST: i Ranet a Boy , City Se eta y APPROVED AS TO CONTENT: Don J nings treet Superintendent APP VED AS TO FORM: A ' % . t / " - . . " 6�A% � jQA' " J. Worth Fullingim, Assif ant City Att : ney October , 1990. C. c B. C. Mc I N, MAYOR — 3 — A196 � 343 MONTHLY ESTIMATE CITY OF LUBBOCK Project: _ 1990 Maintenance Program Project No. 10546 Contractor: Caprock Highway Construction Co Estimate No. Final Address: Route 1, Box 414 Contract $ 1 , 649,614.79 Wolfforth, Tex. 79382 Change + 97,770.70 , Estimate Period From September 22 19 90 to September 28 Order I11 747, 385.49100 On First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. OUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 1. AC-5 Polymerized as halt + % Gals. * 205,_184 210,412.0 $ 195,683.16 latex by volume 2% by wei ht application of 0.28 gallons/S.Y. for course #1 to the existing surface includincr furnish' —cleaning, 2. AC-5 polymerized asphalt + 3% G * ' 277 , 71 6.() T 264,325.0 $ 0.87 $ 229, 962.75 latex by volume 2% by weicTht)- application of 0.38 gallons/S.Y for course #2 to the existincr _surface including furnishing cleaning, and !qMlvincr, per gal 3. AC-5 pol-ymparized as hal + 36,745.0 $ 0.73 $ 26,823.85 latex by volume 2% by weight) - application of 0.28 allons S Y (pre -coated Gr. No. 4 crushed stone orgravel) aviolied existing surface including cleaning, furnishing,and aPplying, Per g-allon. 4. Surface aggregate (THD P B * 9, 4 7 5 .0 No. 4 re -coated crushed graveL Stoc i e 9,475.0 28.25 with a minimum of 90% crushed antities faces; crashed stone meeting sliver count and soundness plied 9,366.5 9.25 including loading,freight, antities lcading, spreading, broomin blading and rolling (one hour Jhused - 108.5 28.25 per 1000 S.Y.) pgr cubic yard antities APPROVED: F'w Fn 't ( + c• Tuts! Amount of Work Done ....... 5 Less 5 % Retained ............. S Difference ....... ... :... .. J Less Special Deduction ........... S Less Liquidated Dainage . . . . . . . s Less Previous Payments . . . . . . . S .. Amount Due this Estimate......... S C:if it l,l ti f1f15 lY Engineer Date Checwea h . Dept. Head Date Director .ate _ .� _ MONTHLY ESTIMATE CITY OF LUBBOCK Project: 1990 Maintenance Program Project No. 10546 Contractor: Caprock Highway Construction Co. Estimate No. Final Address: Route 1, Box 414 Contract $ 1 , 649,614.79 Wolfforth, Tex. 79382 Estimate Period From September 22 , 1990 to _ September 28 , 19 90 On First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 5. Surface a eaate (THD P.B. Gr. * 1;1 , 786,. 0 11 786.0 28.25 No. 2 Special precoated crushe - gravel with a minimum of 90% Quantities crushed faces- i3recyated stone meeting sliver count and APPlied 11,389.0 $ 8.25 $ 93,959.25 soundness test) includincr Quantities loading, freight, unload' spreading, broaning, blading Unused - 397.0 28.25 and rolling (one hour Per 1000 Quantities S.Y.) per cubic yard. 6. Patching with Black Base 2,832.9 56,374.71 cluding removal and disipasal off asphalt surface caliche base, and subgrade if soft or un- stable to a depth of 4'-" and replacin with 3" of black bas and 1 "' of "C" Hot Mix, complete in place per 7. Patching with Black -Base S.Y.* 13,500.0 .14 991 .8 408,526-55 cludin as and subgrade if soft or un- stable to a depth of 7 "' and re lacin with 6" of black and 1 "' of Type "C" Hot Mix, complete in place M APPROVED: F'n. Fnrr'% e Tut:;l r";rnount of Work Done ....... Less 5 % Retained ............. S Difference . . . . . . . . . . . . . . . . . ..S Less Special Deduction ........... S Less Lirluidated Damage ......... S Less Previous Payments. ......... S C OC 111.ihnns hy. Engineer Date ctiecwea try: Dept. Head Date Director Date I it"(,due`this Estimate.. MONTHLY ESTIMATE CITY OF* LUBBOCK Project: 1990 Maintenance Program Contractor: Caprock Highway Construction Co. Address: Route 1, Box 414 Wolfforth, Tex. 79382 Project No. 10546 Estimate No. Final Contract $ 1 , 649,614.79 Estimate Period From September 22 , 1990 to September 28 , 1EP0 On First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 8. Patching with 3 sack cement S.Y. 500.0 stabilized caliche base includ- ing removal and disposal of asphalt surface caliche base and subgrade if soft and un- stable to a depth of 7 "' and replacing with 6" of 3 sack cement stabilized 1 , i t of "t " com- plete in place Pgr S 9. Patch with 1 "' of "C" * 1 0 5 0.0 2,003.1 pavement with approved crushed stone or approved crushed grAye including removal and dispQsal of existing rime and tack coat complete in place per S.Y. 10. Curb and - " 200.0 420.2 $ 4 622.20 (3,000 psi/7 day, 3 If —wide — separate gutter or s G, including removal and dis- posal subgrade preparation, complete in place with location as directed by the Engineer, r linear foot. APPROVED: F'n, Fn� 't ( ,. e Total Amount of Work Done .. . ., Less 5 °� Retained ....... .. . $ Diffeience . . . . . . . . . . Less Special Deduction . ......... S Less Lirauidated Damage ......... S Less Previous f aynients. . . . . . . . . . eS Amot;nt Due this Estimate..... . .. u��_ (',orwahnns ov, Engineer Date Dept. Head Date Director ., Date _ Checuetl by• ..;.Jj.. MONTHLY ESTIMATE CITY OF LUBBOCK Project: 1990 Maintenance Proctram Contractor: Caprock Highway Construction Co. Address: Route 1 , Box 414 Wolfforth, Tex. 79382 Estimate Period From September 22 19 90 to September 28 On First estimate and final estimate use actual work dates Project No. 10546 Estimate No. Final Contract $ 1 , 649, 614.79 1990 ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 11. Valley Gutter: 8" reinforced S Y 1,000.0 514.3 27.00 13.886.10 concrete (3,000 Psi/7 days), 6x6-6 6 wire valley ter, including removal and disposal, subgrade preparation, corrplete inplace with location as directed by the Engineer, r S.Y. 12. AC-5 Asphalt Rubber, 22% 5,714.0 4,625.0 3.00 $ 13 875.00 granulated rubber (by wei ht application of 0.40 gallon/S.Y. course #1 applied to the existing surface; includes furnishing, cleaning and mixing and applying at locations designated by the Engineer, per gallon. 13. AC-5 Asphalt Rubber, 2% Gals. 4,286.0 5 610.0 $ 3.00 16,830.00 granulated rubber (by weight),, application of 0 course #2 applied to the existing surface; includes furnishing, cleaning and mixing and applying at.locations designated by the Engineer, per gallon. APPROVED: Fo, Fnq,'a rn e Tot-il Amount of Work Done ........, Less 5 % Retained ............. S Difference . . . . . . . . . . . . . . . . . . s Less Special Deduction ........... S Less Liquidated Damage .. ....... S Less Previous Pay.-nents . .. ..S Amount Due this Estimate......... $ t:i f it 1,11111115 ley Engineer Date Cthecwea Iry• Dept. Head Date oir Date MONTHLY ESTIMATE CITY OF` LUBBOCK Project: 1990 Maintenance Program Project No. 10546 Contractor: Caprock Highway Construction Co. Estimate No. Final Address: Route 1, Box 41 4 Contract $ 1 , 649,614 .79 Wolfforth, Tex. 79382 Chang2 ,-)rder + 97,770.70 If $1,747,385.49 Estimate Period From September 22 , 1990 to September 28 , 1990 on First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST, nUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 14 . In- lace Type "C" hot mix A. C ton 373.0 3 2 9 $ 50.00 $ 16,460.00 for overlay of existing urf c with avvroved crushedgravel; mix design as approved b in- cluding tack coat required hand work at residential drive- ways, and necessary equipment; complete in place at locations designated by the Engineer, r ton. See Cost Breakdown Sheets: Permanent Maintenance Fund #1442-553101-c514 Departmeital Fund ##1 11-533101- 531 Auditori /Coliseum d 0#1 91-552101- 529 APPROVED: yo F "' Fn"''s'"'" a Tot.il Amount of Work Done . . . . . . . � 1,767,012.92 Less 5 "ir Retained ............. S —0— ............... ... c 1,767,012.92 Less Special Deduction ......... S Less Lir)uidated Damage ...... ... 5 Less Previous Payments . ...... ...S 1 ,749,802.32 Amount Due this Estimate. .. . .. ... $ - 17,210.60 C'Uy: PAY —Difference Engineer bate / (j `� Checwea try: Dept. Head Date ;;~actor Date 1990 Maintenance Program #Cost Breakdown September 22, 1990 to September 28, 1990 Charge Account No. 1442=553101=9514'- Item No. 1 - 1st Course Asphalt 52,553.0 Gallons @ $0.93/Gal. $ 48,874.29 Item No. 2 - 2nd Course Asphalt 58,813.0 Gallons @ $0.87/Gal. $ 51,167.31 Item No. 3 - Single Course Asphalt 28,485.0 Gallons @ $0.73/Gal. $ 20,794.05 Item No. 4 - 2nd Course Rock Stockpile Quantities 8,830.0 C.Y. @ $28.25/C.Y. $ 249,447.50 Item No. 5 - 1st Course Rock - Stockpile Quantities 10,881.0 C.Y. @ $28.25/C.Y. $ 307,388.25 Item No. 6 - 3" Black Base Patching 2,832.9 S.Y. @ $19.90/S.Y. $ 56,374.71 Item No. 7 - 6" Black Base Patching 11,379.4 S.Y. @ $27.25/S.Y. $ 310,088.65 Item No. 9 - 1'-z" Hot Mix Patching 788.3 S.Y. @ $8.50/S.Y. $ 6,700.55 Item No. 10 - Curb and Gutter Patching 420.2 L.F. @ $11.00/L.F. $ 4,622.20 Item No. 11 - Valley Gutter Patching 514.3 S.Y. @ $27.00/S.Y. $ 13,886.10 Item No. 12 - 1st Course Asphalt Rubber 4,625.0 Gallons @ $3.00/Gal. $ 13,875.00 Item No. 13 - 2nd Course Asphalt Rubber 5,610.0 Gallons @ $3.00'/Gal. $ 16,830.00 Item No. 14 - Hot Mix Overlay 329.2 Tons@ $50.00/Ton $ 16,460.00 .Total Work: This Estimate $1,116,508.61 Less: Retained $ -0- Less: Amount Paid on Previous Estimates $1,105,904.55 Amount Due: This Estimate $ 10,604.06 1990 Maintenance Program ##Cost Breakdown September 22, 1990 to September 28, 1990 .Charge Account No. 1111-533101-4531 Item No. 1 - 1st Course Asphalt 140,429.0 Gallons @ $0.93/Gal. Item No. 2 - 2nd Course Asphalt 183,367.0 Gallons @ $0.87/Gal. Item No. 3 - Single Course Asphalt 8,260.0 Gallons @ $0.73/Gal. Item No. 4 - 2nd Course Rock Applied Quantities 8,721.5 C.Y. @ $9.25/C.Y. Unused Quantities 108.5 C.Y. @ $28.25/C.Y. Item No. 5 - 1st Course Rock Applied Quantities 10,484.0 C.Y. @ $8.25/C.Y. Unused Quantities 397.0 C.Y.--@ $28.25/C.Y. Item No. 7 - 6" Black Base Patching 2,811.1 S.Y. @ $27.25/S.Y. Item No. 9 - 1'1" Hot Mix Patching 1,159.8 S.Y. @ $8.50/S.Y. Total Work: This Estimate Less: Retained Less: Amount Paid on Previous Estimates Amount Due: This Estimate $ 130,598.97 $ 159,529.29 $ 6,029.80 $ 80,673.88 - $ 3,065.13 $ 86,493.00 - $ 11,215.25 $ 76,602.47 $ 9,858.30 $ 535,505.33 $ -0- $ 528,898.79 $ 6,606.54 1990 Maintenance Program ###Cost Breakdown September 22, 1990 to September 28, 1990 Charge Account No. 1491-552101-9529 Item No. 1 - 1st Course Asphalt 17,430.0 Gallons @ $0.93/Gal. Item No. 2 - 2nd Course Asphalt 22,145.0 Gallons @ $0.87/Gal. Item No. 4 - 2nd Course Rock 645.0 C.Y. @ $37.50/C:Y. Item No. 5 - 1st Course Rock 905.0 C.Y. @ $36.50/C.Y. Item No. 7 - 6" Black Base 801.3 S.Y. @ $27.25/S.Y. Item No. 9 - 12" Hot Mix Patching 55.0 S.Y. @ $8.50/S.Y. Total Work: This Estimate Less: Retained LessY Amount Paid on Previous Estimates Amount Due: This Estimate $ 16,209.90 $ 19,266.15 $ 24,187.50 $ 33,032.50 $ 21,835.43 A• A,'-? C f% $ 114,998.98 $ -0- $ 114,998.98 $----_0_----