Loading...
HomeMy WebLinkAboutResolution - 2184 - Accept Paving Improvements - Kerr Contruction - Lots 1-10 Sewell Addition - 11_14_1985Resolution #2184 :- November 14, 1985 Agenda Item #21 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in conformance with the paving requirements provisions of City Ordinance 1331, the subdivider of Sewell Addition, Lots 1-10 made arrangements with Kerr Construction Company for the construction of paving improvements on a certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above mentioned addition including the following street: 17th Street from its intersection with the west property line of West Loop 289 thence westward to Cul-de-sac west of Loop 289 known and designated as New Subdivision Sub=Unit Number 17 of Unit Number 2032. Alley paving from its intersection with the east property line of Iola Avenue thence eastward approximately 540 feet then north to 17th Street and designated as New Subdivision Sub -Unit Number 41 of Unit Number 2032. AND WHEREAS, the construction of. the.above improvements on.the above.. mentioned street .was 'performed under, the supervision of the City Erigirieer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in, accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the above mentioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to notify the Developer of acceptance by the Lubbock City Council. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 14TH DAY OF ?%IMTVMRFR 1 QgrI ATTEST: Ranette Bo\d, City Secretary APPROVED AS TO CONTENT: a � Larry V. ffman, Director f Transportation APPROVED AS TO FORM: o n Ross, Jr., City Attorn CONSOLIDATED FINAL ESTIMATE Sewell Addition - Lots 1-10 Accepted November'14th,1985 QUANTITIES S.Y. S.Y. S.Y. S.Y. L.F. C & G Unit & Paving L.F. Alley Valley Drainage Removal and Sub -Unit Location 6" Base C & G Return Gutter Slab Pavement Repai: 2032-17 17th St. from WPI. of W. Loop 289 to W. end of Cul-de-sac W. of Loop 289 3,260.28 1529.50 2032-41 Alley paving from EPL of Iola Ave. east 540', then N. to 17th St. 18.00 COST DISTRIBUTION Unit & Construction Developer .Sub -Unit Cost Cost 2032-17 2032-41 TOTAL $31,490.00 $21,250.00 $52,740.00 LUMP SUM CONTRACT $31,490.00 $21,250.00 $52,740.00 45.32 902.87 92.00