HomeMy WebLinkAboutResolution - 1662 - CO#4 To Contract - Mccullough Contracting - WWO 11606 - 04_12_1984RESOLUTION 1662 - 4/12/84 Amends Reso. 922; 9/24/81 P JWF::rm RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 4 to be entered into by and between said City and McCullough Contract- ing Company on an existing contract concerning W.W.O. 11606, attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 12th day of ATTEST: Evelyn GaTfgd, Ci c e ary-Treasurer APPROVED AS TO CONTENT: sZ')_ it r D. Watson- hief ngineer, Water tilities APPROVED AS TO FORM: J. W7 Fullingim, Assistant ty Attorney 762-64„ P.O. Box 2000 Certificate of Acceptance Gentlemen: LUBBOCK. TEXAS 79457 In accordance with paragraph 42, Section II, of the Specifications for Water Distribution Mains, Pump Sta. No. 9.to A th St. & Chicago Ave., Water Treatment Plant to Pump Sta. No. 4, Memphis Ave., 82nd St. to 98th St., WWO 11606, you are hereby notified of the acceptance of this project by the City Council of the City of Lubbock on April 12, 1984. Final payment was authorized at the same meeting and is included with this notice. Yours very truly, Y Wil rd D. Watson Chief Water Utilities Engineer McCULLOUGM ASSOCIATES INC. P.O. Box 957 Murfreesboro, Tennessee 37130 615/896-1577 AFFIDAVIT This is to certify McCullough Contracting C Wany, a Division, of McCullough Associates, Inc., bas''paid all bills for material, labor, supplies, and services and no suits are pending in regards to the Water Distribution Mains, Project No. W.W.O. 11606 for the City of Lubbock, Texas, campleted by McCullough Contracting Company. December 1 1 Date Signed To: McCullough Contracting Company. P. 0. Box 957 Murfreesboro, Tennessee 37130 Original Amount of the Contract Change Order #1 (Retainage 10% to 5%) Change Order #2 Amended Amount of Contract Change Order #3 Amended Amount of Contract Change Order #4 Amended Amount of Contract Change Order No. 4 Water Distribution Mains -Pgmp S ta. No. 9 to 4th St. & Chicago'Ave. Water Treatment Plant to Pump Sta. No. 4 Memphis Ave. 82nd St. to 98th Street W. W. 0. 11$06 $2,995,046.90 NONE $ 1,213.60 $2,996,260.50 $ 11,146.03 $3,007,406.53 $ 13,613.93 $3,021,020.46 WHEREAS, it is desirable to make changes in the plans and specifications for this project; THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages gained, the Owner and the Contractor agree to the change shown herein and in the attached exhibits and data and the Owner and the Contractor agree that the original contract between them shall be modified and amended to the extent herein indicated. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this the 12th day of April, 1984. McCullough Contracting Company CITY OF LUBBOCK OWNER ci6fsk.7�[/ BY Mayo ATTEST: ty Secretary RECOMMENDED FOR APPROVAL: r Chie-r,fiineer, Water'Utilities Engr. Attachment of Change Order No.4 McCullough Contracting Company W.W.O. 11606 EXPLANATION OF CHANGE 1. Realign grade by relaying 45° bend due to unknown storm sewer at station 2+00. 2. Encountered concrete blocking on existing water line at station 5 + 60. 3. Had to have pipe cut in half and install two 5 degree grade adapters. 4. Resetting 84" R.C.P. concrete box over Venturi meter. 5. Had to remove concrete bedding under existing 42" water line. 6. G.H.A. had to cut off two feet of standard joint to make tie-in line up. 7. Lost time due to City not completely closing values. 8. 8" AC line encroachment on south side of Municipal Drive. 9. 6" AC water break in front of Public Works on Municipal Drive. 10. Pump Station #7 By -Pass line. 11. 24" and 20" Tie-in @ Municipal Drive and Quirt Avenue, 12. 12" C.I. Water Line in Quirt Avenue @ Municipal Drive, 13. Reroute of 30" line across Municipal Drive due to angle of crossing with existing 39" well supply line. BREAKDOWN OF CHANGE (1) 6/2/82 - Realign grade by relaying 45° bend due to unknown Storm Sewer at Station 2+00+ on our line and grade. Labor: Foreman, One Operator, Three Laborers for 3 hours $112.50 Expenses for Foreman, Two Laborers for 0.30 days @ $20/day each 18.00 Fringe @ 20% of Labor Equipment: 22.50 LS 5800 Backhoe, Case 580, Lazer, Ford Pickup for 3 hours 144.00 Diesel Fuel and Grease 15.00 Subtotal for Item (1) $ 312.00 -2- (2) 6/10-15/82 - Encountered concrete blocking on existing water line at Station 5+60+ on our line and grade. City welded joints of existing line after we exposed same because City wanted to break out blocking in lieu of going deeper. Labor: Foreman, One Operator, Three Laborers for 26.5 tours Expenses for Foreman and Two Laborers for 3 days @ $20/day each Fringe @ 20% of Labor Equipment: Cat 215 Backhoe, ESP22 Crane, Ford Pickup for 26 1/2 hrs. Diesel Fuel and Grease $ 975.00 180.00 195.00 1,318.38 40.00 Subtotal for Item (2) $2,708.38 (3) 6/15/82 - Had to have pipe cut in half and install two 5` Grade Adaptors in order to break pipe back up on a grade that would hit out close enough to make the tie-in at Station 6+75. This occurred because of having to make so many grade changes back down the line to get over or under formerly unknown existing utilities. Materials and Fabrication: G-H-A Invoice No. 311519 G H-A Invoice No. 311518 G-H-A Invoice No. 311514 Labor: Foreman, One Operator, Three Laborers for 4 hours Expenses for Foreman and Two Laborers for,0.5 day @ 20/day each Fringe @ 20% of Labor Equipment: Cat 215 Backhoe, ESP22 Crane, Ford Pickup for 4 hours Subtotal for Item (3) $ 208.00 $ 317.00 $ 317.00 $ 152.00 $ 30.00 $ 30.40 $ 199.00 $1,253.4C -3- . (4) 6/23/82 - City concerned over size of 84" concrete box over Venturi after we had installed lower section. We had to remove this section and reset five days later. Labor: Foreman, One Operator, Two Laborers for 4 hours Expenses for Foreman, Two Laborers for 0.50 day @ $20/day each Fringe @ 20% of Labor Equipment: HSP22 Crane, Ford Pickup for 4 hours Diesel Fuel and Grease $ 134.00 30.00 26.80 109.00 20.00 Subtotal for Item (4) (5) 7/7/82 - Had to remove concrete bedding under existing 42 " water line at Station 6+26+ on our line and grade. Labor: Foreman, One Operator, Four Laborers for 3 hours 127.50 Expenses for Foreman and Two Laborers for 0.30 day @ $20/day each 18.00 Fringe @ 20% of Labor 25.50 Equipment: Cat 215 Backhoe, HSP22 Crane, Ford pickup for 3 hours 149.25 Diesel Fuel and Grease 10.00 Subtotal for Item (5) (6) 7/8/82 - G-H-A had to cut off two feet of standard joint in order to make the tie-in line up. Materials and Fabrication: G-H-A Invoice No. 331525 490.00 Labor: Foreman, One Operator, Two Laborers for 7 hours 234.50 Expenses for Foreman, Two Laborers for 0.8 day @$20/day ea. 48.00 Fringe @ 20% of Labor 46.90 $ 319.80 $ 330.25 -4- Equipment: Cat 215 Backhoe, HSP22 Crane, Ford.Pickup for 7 hrs. $ 348.25 Diesel Fuel and Grease 25.00 Subtotal for Item (6) $1,192.65 (7) 7/9-10/82 - Water was not completely shut off when we broke into existing 42" at Station 6+75. Lost 8 hours in down time and cleanup. Labor: Foreman, One Operator, Three Laborers for 8 hours 291.00 Expenses for Foreman and Two Laborers for 1 day @ $20/day each 60.00 Fringe @ 20% of Labor 58.20 Equipment: Cat 215 Backhoe, HSP22 Crane, Ford Pickup for 8 hours 398.00 Diesel Fuel and Grease 20.00 Subtotal for Item (7) Total of Items (1) - (7) Profit and Overhead @ 15% Total Items (1) - (7) (8) On October 5, 1982 at 10:00 am, an 8" Asbestos Cement Water Line encroached on our ditch for the 30" R.C.C.P. Water Line. This line had been located by city personnel as being several feet northwest of its actual location. This resulted in our breaking the 8"line during excavation. We were shut down for the rest of the day and on a stand-by status for 7 hours to assist the city until the line was repaired. This also resulted in the 30" line being flooded which caused a significant amount of mud to enter the 30" line which took 4 hours to remove. Additional Cost Incurred by McCullough Contracting: Labor: Foreman - 11 hours @ $12.50/hour $ 137.50 Operators- 2 each for 11 hours @ $7.50/hour 165.00 Laborers - 3 each for 11 hours @ $5.25/hour 173.25 Labor 475.75 Fringe @ 20% 95.15 $ 827.20 $6,943.68 1,041.55 $79985.23 Subtotal for Labor 570.90 -5- Equipment: LB 5800 Backhoe 1.25 Day @ $275/day $ 343.75 CAT 950 Loader 1.25 Day @ $125/day 156.25 Chevy 2 Ton Dump 1.25 Day @ $92/day 115.00 Lazer.1.25 Day @ $23/d-ay 28.75- Tool Trailer 1.25 Day @ $3/day 3.75 Ford Pickup 1.25 Day @ $28/day 35.00 3" Pump 1.25 Day @ $3/day 3.75 Equipment 686.25 Fuel & Grease 20.00 Subtotal for Equipment $ 706.25 Total 1,277.15 Profit and Overhead @ 15% 191.55 Total for Item (8) 1*468.70 (9) On October 22, 1982 at 10:00 AM, we broke a 6" Asbestos Cement Water Line which had not been located after having been advised that there were no utilities, other than telephone, in the imme- diate vicinity. After breaking the line, city personnel took 5 hours to determine how to cut off line. Crew shut down but remained on stand-by status with expectations of resuming work when water was shut off. Crew was down for 7 hours. Additional Cost Incurred by McCullough Contracting: Labor: Superintendent - 4 hours @ $14.42/hour 57.68 Foreman - 7 hours @ $12.50/hour 87.50• Operator - 7 hours @ $7.50/hour 52.50 Laborers - 2 each 7 hours @ $5.25/hour average 73.50 Labor 271.18 Fringe @ 20% 54.24 Subtotal for Labor Equipment: LB 5800 Backhoe-0.75 day @ $275/day 206.25 Ford Pickup-0.75 day @ $28/day 21.00 Lazer -0.75 day @ $23/day 17.25 Pontiac Car-0.50 day @ $20/day 10.00 Equipment 254.50 Fuel & Oil 15.00 Subtotal for Equipment Total Profit and Overhead @ 15% Total for Item (9) 325.42 269.50 594.92 89.24 684.16 -6- 10. Pump Station No. 7 - 24" Bypass line - Due to the flanged outlet not existing as shown on plans, Gifford -Hill -American had to make a dry tap on line. McCullough furnished labor and equipment to assist G.H.A. in making tap and necessary changes in grade to .. make the line fit. Additionally, we were directed to turn the check valve around from its originally installed position. The additional work involving McCullough is as follows: (a) Project Superintencent's time in working out problems and details for revisions - 12 hours. (b) Turn around check valve - Superintendent and two laborers with rented crane - 4.5 hours. (c) Preparing pit for G.H.A. to make a dry tap on the existing line. Operator and laborer with Case 580 - 8 hours. (d) Pumping down gravity line so that G.H.A. could make the dry tap - Two laborers and rented pump - 2 hours. (e) Extra time involved in order to insure proper vertical alignment by installing two 5 degree grade adaptors - Superintendent and two laborers with rented crane - 4 hours. (f) Additional bedding required because of dry tap being made on top of pipe. Additional Cost Incurred by McCullough Contracting: Labor: Superintendent - 20.5 hours @ $14.42/hour $ 295.61 Operator - 8 hours @ $8.50/hour 68.00 Laborers.- 29 total hours @ $5.25/hour average 152.25 Labor 515.86 Fringe @ 20% 103.14 Subtotal for Labor 619.00 Equipment: Pontiac Car - 2.5 days @ $20/day 50.00 35 Ton Crane with operator-8.5 hours @ $70/hour 595.00 Case 580-1 day @ $60/day 60.00 2" pump (rented)-1 day @ $24/day 24.00 Ford Pickup-1 day @ $24/day 24.00 Equipment 753.00 Fuel & Oil 20.00 Subtotal for Equipment 773.00 Materials: 1" Gravel - 2 loads - P.A. #019021 346.36 3 cubic yards concrete @ $53/C.Y. 159.00 3 hours welding by G.H.A. @ $35/hour Invoice #331564 105.00 2 each 5 degree grade adaptors Invoice #311571 474.00 Materials 1,084.36 Total 2,476.36 Profit and Overhead @ 15% 371.44 Total for Item (10) $2,847.80 -7- 11. Location of the 24" Stubout and 20" Stubout in Quirt Avenue and Municipal Drive was not as shown on plans. This resulted in G.A.A. making two dry taps on new 30" line and plugging and blocking existing outlets, and shutdown time on equipment and personnel. Additional Cost Incurred by McCullough Contracting: Labor: Foreman-10 hours @ $12.50/hour Operators-25 hours @ $7.50/hour average Laborers-12 hours @ $5.25/hour average Labor Fringe @ 20% Subtotal for Labor Equipment: LB 5800 Backhoe-1.75 day @ $275/day Case 580 Backhoe - 2 days @ $60/day Ford Pickup - 1 day @ $28/day CAP 950 Loader- 1 day @ $125/day Equipment Fuel & Oil Subtotal for Equipment Materials: Approximately 20 CY Fill Sand @ $5.27/Ton @ 1.3 Ton/CY 8 hrs. welding by G.H.A., Invoice #331568 4 1/2 hours welding by G.H.A., Invoice # 331569 Materials Total Profit and Overhead @ 15Z Total for Item (11) 12. 12" Cast Iron Water Line in Quirt Ave. & Municipal Drive Labor - Foreman-8 hrs. @ $12.50/hr. Operator - 1 ea. for 9 hrs. @ $7.50/hr. Laborers - 4 ea. for 9 hrs. @ $5.00/hr. Fringe @ 20% Subtotal for Labor Equipment - LB 5800 - 1 day @ $275/day Chevy 2 Tn. Dump - 1 day @ $92/day Lazer- 1 day @-$23/day Tool Trailer - day @ $3/day Ford Pickup - 1 day @ $28/day Rented Pump -Ticket attached Diesel Fuel and Grease Subtotal for Equipment $ 125.00 187.50 63.00 375.50 75..10 $ 450.60 481.25 120.00 28.00 125.00 754.25 40.00 794.25 137.00 280.00 157.50 574.50 1,819.35 272.90 2,092.25 100.00 67.50 180.00 347.50 69.50 275.00 92.00 23.00 3.00 28.00 46.20 $467.20 25.00 417.00 492.20 0 Materials - 2 ea. 30" - 5° Grade Adaptors @ $278.00 $ 556.00 1 ea. 12" Pipe Sleeve @ $115.23 115.23 1 ea. 12" Dresser Coupling @ $125.76 125.76 5 LF 12" D.I. Pipe @ $13.98 69.90 Subtotal for Materials 866.89 $ 1,776.09 Profit & Overhead @ 15% 266.41 Total Item (12) 2,042.50 13. Reroute of 30" line across Municipal Drive due to angle of crossing with existing 39" well supply line. Labor - Superintendent - 2 hrs. @ $14.42/hr. 28.84 Foreman - 8 hrs. @ $12.50/hr. 100.00 Operators - 2 ea. for 9 hrs. @ $7.50/hr. 135.00 Laborers - 7 ea. for 9 hrs. @ $5.25/hr. (average) 330.75 594.59 Fringe @ 20% 124.44 Subtotal for Labor $ 713.51 Equipment - LB 5800 Backhoe - 1 day @ $275.00/day 275.00 CAT 950 Loader - 1 day @ $125.00/day 125.00 Chevy 2 Tn. Dump - 1 day @ $92.00/day 92.00 Lazer - 1 day @ $23.00/day 23.00 Tool Trailer - 1 day @ $3.00/day 3.00 Ford Pickup - 1 day @ $28.00/day 28.00 Pontiac Car - 1/4 day @ $20/day 5.00 551.00 Diesel Fuel & Grease 50.00 Subtotal for Equipment $ 601.00 Materials - 3° Grade Adaptor 278.00 5° Bevel on TX 67 101.00 379.00 1,693.51 Profit & Overhead @ 15% 254.03 Total Item (13) 1,947.:54 Total requested by Contractor (Items 1 - 13) $ 19,068.18 Amount agreed by Contractor and City Staff for .recommended Change to Contract $ 13,613.93 MONTHLY ESTIMATE Page 1 CITY OF LUBBOCK Water Distribution Mains, Pump Sta. No. 9 to 4th St. & Project: Chicago Ave., Water Treatment Plant to Pump Sta. No 4 Project No. W.W.n. 11606 Memphis Ave. 82nd St. to 98th St. Contractor:-McCt111- ugh rontrarting Company Estimate No. 14 & Final Address: P . 0. Box 957 Contract S $ 3 , 021, 020.46 Murfreesboro, Tennessee 37130 Estimate Period From July 1 , 19 n to April 12 , 19 84 On First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 1. 54" approved Class 150 pipe L.F. 20.19 1655 11()_40 $ 215,812.00 furnished and installed including fittings an embedment complete in place, 8-10' cutper linear foot; 2. 54" approved Class 150 pipe L.F. 2742 3082 1 furnished and installed including fittings and embedment, complete in place, 10-12' cutper linear foot: 3. 54" approved L.F. 208 373 140.80 52,518.40 furnished and installed including fittings and embedment complete in lace 12-14 cut er linear foot; 4. 54" approved Class 150 Ripe L.F. 454 313 45.6.23.20 furnished and installed including fittings and embedment, complete in place. 14-16' cut er linear foot* 5. 48" approved Class 150 RiRe 20 11 furnished and installed including fittings and embedment, complete in place, 10-1 cut, per linear foot; MONTHLY ESTIMATE Page 2 CITY OF LUBBOCK Water Distribution Mains, Pump Sta. No. 9 to 4th St. & Project: Chicago Ave., Water Treatment Plant to Pump Sta. No. 4, Memphis Ave. 82nd St. to 98th St. Contractor: _ t-rij 1 nigh Contracting Comnany Project No. W.W.O. 11606 Estimate No. 14 & Final Address: P . 0. Box 957 Contract $ $ 3, 021, 020.46 Murfreesboro, Tennessee 37130 Estimate Period From July 1, , 19 83 to —_ April 12 , 19 84 On First estimate and final estimate use actual work dates ITEM - UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 6. 48" approved Class 150 pipe L.F. 27 53 E 200.00 10 600.00 furnished and installed including fittings and embedment, complete in place, - -1 cut, per linear foot; 7. 48" approved Class 150 pipe L.F. 25 30 > 200.00 6,000.00 furnished and installed including ittings_and embedment complete in place, 14-16' cut, per linear foot; S. " 16 200.00 3,200.00 furnished and instalied including fittings embedment complete in Place, 16-18' cut perlinear foot; 9. 36" approved Class 150 nine T1. V. 61 228 12,631.20 furnished and in" • al e including fittings and embedment complete in Place 6-8' cutper linear foot; 4 10. 36" approved Class 150 PjPe L.F. 2034 3246 5 56.00 181,776.00 furnished and installed includiniz fittings .and embedmentV com lete in lace 8-10' cutper linear foot; Page 3 MONTHLY.. ESTIMATE CITY OF LUBBOCK ' Water Distribution Mains, Pump Sta. No. 9 to 4th St. & P rect: Chicago ave., Water Treatment Plant to Pump Sta. No. 4, Profit No. Memphis Ave. 82nd St. to 98th St. Contractor: McGul lough Contracting Company Estimate No. 14 &Final Address: P. 0. Box 957 Contract $_ Murfreesboro, Tennessee 37130 Estimate Period From July 1 , 19 n to _ April .1984 on First estimate and final estimate use actual work dates W.W.O. 11606 ITEM - UNIT OF MEASURE PROJECT EST.OUANTITIES WORK DOME ON CONTRACT CONTRACT PRICE AMOUNT L1. 36" approved Class 150 pipe L.F. 568 307 60 0 18 -573.50 furnished and installed including fittings and embedment complete in place, 10-12 cut, per linear foot; .2. 36" approved Class 150 pipe L.F. 612 293 62.20 18-974-60 furnished and installed including fittings and embedment complete -in place, 12-14' cutper linear foot: .3. 36" approved Class 150 DiRe L.F. 613 368 IS 65.: 0 furnished and installed including fittings and embedment, complete in place, 14-16T cut, per linear foot; 4. 36" approved Class 150 pipe 72 88.30 6,357.60 furnished and ins- alled including fittings --and embedment, complete in place, 16-18' cutper linear foot: .5. 30" approved Class 150-Di-De L.F. 688 323 furnished and installed including fittings and embedment complete in lace 4-6' cutper linear foot: MONTHLY ESTIMATE Page 4 CITY OF LUBBOCK' Water Distribution Mains, Pump Sta. No. 9 to 4th St. & Project: Chicago Ave.. Water Treatment Plant to Puma Sta, No 4. -Chicago Ave. 57nd St. to t. Contractor: McCullough Contracting Company Project No. W.W.O. 11606 Estimate No. 14 & Final Address: P. 0. Box 957 Contract$ $ .. 3,021,020.46 Murfreesboro, Tennessee 37130 Estimate Period From July ' 1 , 19 83 to April 12 , lg 84 On Fist estimate and final estimate use actual work dates ITEM - UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 16. 30" aPProved Class 150-PiRe L.F. 22 19,321 39.90 770,907.90 furnished and installed including fittings and embedment, complete in place, 6-8' cut er linear foot: U. 30" approved Class 150 nine L.F. 7,737 9 238.46 40.30 372 furnis ed and installed includinsz fittin s and embedment complete in place, 8-10' cutper linear foot; L8. 30" approved Class 150 pipe L.F.2,433 43.70 106 322.10 furnished and installed including fittings and embedment, complete in place, 10-12 cut, per linear foot; .9. 30" approved Class 150 nine L.F. 310 338 15 176.20 furnished and installed including embedment com to in place._--�' 12-14' cutper linear foot: :0. 24" approved C1ass.150 a .F 9 976 305,265.60 furnished and installed including fittings and embedment co=plet6 in lace 6-8' cut, per linear foot-, MONTHoLY ESTIMATE Water, Distribution Mains, Pump Sta. NTo �9�toU4B q . Project: Chicago Ave., Water Treatment Plant to Pump Sta. , No. 4, Memphis Ave. 82nd St. to 98th St. Contractor: Mr^Cnt 7 nlagh Contracting Company Page 5 Project No. W.W.O. 11606 Estimate No. 14 & Final Address: P . 0. Box 957 Contract $ S 3, 021, 020.46 Murfreesboro, Tennessee 37130 Estimate Period From July 1 , 19 83 to April-- 12 , 19 84 On First estimate and final estimate Use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK CONE ON CONTRACT CONTRACT PRICE AMOUNT 21. 20" approved C1ass.150 pipe L.F. 63 80.28 55.00 4,415.40 furnished and installed including fittings and embedment, complete in place, cut, per linear foot; 22. 12" a roved Class 150 a 2,720.80 37 819.12 furnished and installed including fittings -and embedment, complete in place, per linear foot; t 10" approved 42 Pipe furnished and installed including fittings and embedment complete in place, per linear foot; ?4. 12" approved 39.40 1,418.40 furnished and installed includings fittings and embedment complete in place, per linear foot • '.5. 8" approved iron' i e L.F. 48 28 15.00 420.00 furnished and installed' including fittin s.and embedment, com lete itilace per linear foot; MONTHLY ESTIMATE Page 6 CITY OF LUBBOCK ' Water Distribution Mains, Pump Sta. No. 9 to 4th St. & Project: ChicaEo Ave., Water Treatment Plant to Pump Sta. No. 4 'memphis Ave. bZnd St. to 98th St. Project No. W.W.O. 11606 Contractor: McCullough Contracting Company Estimate No. 14 & Final Address: P . 0. Box 957 Contracts $ 3,021,020.46 Murfreesboro, Tennessee 37130 Estimate Period From July 1, , 19 83 to April 12 .19 84 On First estimate and final estimate use actual work dates ITEM - UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 26. 4" A ate valve and box I $ 250.00- 250.00 furnished and installed complete in place, per each; 27, 10" Rate valve and box Each 1 1 furnished and installed complete in place, per each; 28. 12" gate valve and box, Each 3 3 $ 600.0 furnished and installed complete in place, per each; 29. 6" air and vacuum relief Each 7 3 valve assemblies and boxes including piping, valve and fittings complete in place, per each; 30. 14 x 10 inch tapping sleeve Each I 3,000.00 and taUing valve -:-and box furnished and installed including wet tie-in complete in place, per each; �- 31. 12 x 10 inch to yinjz sleeve Each 2 2 2,400.00 4,800.00 and tapping valve and box furnished and installed including wet tie-in complete in place, -per each; ' MONTHLY ESTIMATE Page 7 ' CITY OF LUBBOCK - Water Distribution Mains, Pump Sta. No. 9 to 4th St. & Project; Chicago Ave., Water Treatment Plant to Pump Sta. No. 4, Project No. W.W.O. 11606 Memphis Ave. 82nd St. to 98th St. Contractor: _ McCullough Contracting Company Estimate No. 14 & Final Address: P . 0. Box 957 contract,; $ 3, 021, 020.46 Murfreesboro, Tennessee 37130 Estimate Period From Julv 1- 7 ' , 19LU to April 12 , 19,R4 On First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 32. 10 x 8 inch tapping sleeve Each 0 s 2,200.00 0.00 and tapping valve and box 'furnished and installed including wet tie-in, complete in place, per each; 33. 14 x 10 inch tapping saddle 1 $ 2,800.00 and tapping valve and box furnished and installed including wet tie-in complete in place, per each; 34. 18" flanged butterfly yAlyp Each 1 17,500.00 7,500.00 and special concrete box as shown on Plans including coupling, furnished and installed complete in place, per each; 45. 20" flanged butterfly 1 S 5 00.0 and 66" R.C.P. coupling, furnished and installed complete in place, per each; 16. 24" flanged butterfly valve Each 2 2 6,600.00 13 200.00 and 72" R.C.P. box including coupling, furnished and installed, complete in place, per each; MONTHLY ESTIMATE P age 8 CITY OF LUBBOCK* - 'Water Distribution Mains, Pump Sta. No. 9 to 4th St. & Project: _Chicago Ave. Water Treatment Plant to Pump Sta.No 4 Memphis Ave. 82nd St. to 98th St. Contractor: McCullough Contracting Company Project No. W.W.O. 11606 Estimate No. 14 & F{nal Address: P . 0. Box 957 Contract S $ 3, 021, 020.46 Murfreesboro, Tennessee 37130 Estimate Period From July 1, , 19 83 to April 12 , i9 84 On First estimate and rinai estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 37. 30" flan ed'butterfl valve Each •5 5 $11 000.00 $ 55 000.00 and 84" R.C.P. box including coupling, furnished and installed, complete in place, per each; 38. 54" flanged butterfly valve Each 1 $30,000.00 30,000.00 and 102" R.C.P. box including coupling, furnished and installed, complete in place, per each; 0. 24" direct bury flanged Each 2 2 $ i, inn nh 6,600.00 butterfly valves and boxes furnished and installed complete in place, per each; f0. 36" direct bury flanged Each 1 butterfly valve furnished and installed complete in place, per ach• .1. Boring for 48" a 307 76.00 including furnishing and installing 36" Class 150 pie in bore (Quaker Ave. & U.S.w in place, per linear 2. 48" encasement furnished and L.F. 287 287 26 978.00 installed in bore (Ouaker Ave, & U.S. Highway 84 complete in place, per linear foot; f, Project: MONTHLY ESTIMATE CITY OF LUBOCK' 'Water Distribution Mains, Pump Sta. No. 9 to 4t St. & ChieAvn AvP_ _ WArpr Tvantrnont pl not to D..e " Qte Mrs I Memp Contractor: Address: P . 0. Box 95 7 Murfreesboro, Tennessee 37130 Page 9 Project No. W.W.O. 11606 Estimate No. 14 & Final Contract$ $ 3,021,020.46 Estimate Period From July 1 , 19 83 to April 12 , 19 84 on First estimate and float estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. OUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT �3. Boring including 21" encasemen L.F. 97 97 86 00 $ 8,342.00 and 12" Class 150 cast iron furnished and installed in bore Frankford Ave. and Erskine St. complete in place, per linear foot; F4. Boring for 42" encasement L.F. 350 350 S 70 QDL 24 ,500.00 including furnishing and installing Class 150 pipe n ore complete in place, per linearfoot; 6. 42" encasement furnished L.F. 310 350 87.00 30,450.00 and installed in bore complete in place, per linear oot; �6. Concrete base for Paving S.Y. 1,242 1,532.33 S 20, 30,646.60 re air complete in place, per squareyard; .7. 36" Flanged Butterfly Valve Each 1 1 S 7,500.00 7,500.00 installed furnished by Owner including furnishing and installing 84" R.C.P. box, coupling and all other necessary appertenances, complete in place, per each; Page 10 MONTHLY hb U MATE CITY OF LUBBOCK Water Distribution Mains, Pump Sta. No. 9 to 4th St. & Project: Chicago Ave., Water Treatment Plant to Pump Sta. No. 4, Proi=No. W.W.O. 11606 Memphis Ave. 82nd St. to 98th St. Contractor: McCullough Contracting Company Estimate No. 14 & Final Address: P. 0. Box 957 Contract$ $ 3,021,020.46 Murfreesboro, Tennessee 37130 Estimate Period From July 1 , 19 83 to April 12 , 19 84 On First estimate and anal estimate use actual work dates ITEM UNIT OF PROJECT WORK DONE: I CONTRACT MEASURE EST. QUANTITIES ON CONTRACT PRICE AMOUNT 48. 24" Insert Check Valve Each 1 furnished by Owner, to be installed, including furnishin and installing 84" R.C.P. valve box and all other necessary appurtenances, complete in place, per each; .49. 24" x 18" Tap on Gifford Rill Each 1 1 P-303 cylinder pipe including tapping Saddle, 18" Flanged tapping valve, wet ties and other incidentals necessary for a complete installation in Place, Per each• 50. 36" Insert type venturi tube Each 1 .and flow transmitter, furnished and installed including signal lines from the transmitter to the Public Works control room coupling, 84" R.C.P. manhole for meter box, and all other incidentals necessary for a complete installation in place, per .each; Change Order No. 2 1,213.60 Change Order No. 3 11,146.03 Change Order No. 4 13,613.93 APPROVE. • i' For En ''s Of fire Total Amount of Work Done ....... S 3, 013, 687.02 Less I % Retained ............. S Difference .. ...... .........S 3,013,687.02 Less Special Deduction ......... . $ 4gg da s 5S250?.00/Day Less LiquiNateg- D�iriaO .... .... $ 12, 250.00 less Previous Payments........... S 2,970,072.36. Amount Due this Estimate......... 3 _ 31, 364.66 Ca1CUlat10"S by.*0 EnQi ee. Date " c'u`keo b ' Dep d Date ci..etor Date 't 714 OCT 22 ISO 81-40A-714-1016 Consider Chan e'Order on public works contracts awarded after SeRtember 1, (27) 1981, reducing amount of retainage on monthly estimates. The Legislature recently passed a bill whereby any contract over $400,000 awarded *See Reso. 922 after August 31, 1981, involving payments on the retainage, would be required to dated 9/24/81 comply with certain requirements affecting the retainage. If retainage is over for Orig Contract 5%, the retainage must be placed in a special interest -bearing account and the monies placed in the account plus the interest earned is to be paid to the contrac *See Reso. 982 dated 12/10/81 The proposed Change Order would reduce the retainage to 5%, thus complying with .for Change Ord. the law. Those contracts affected are: No. 2 Reso 925 - 25 wells in the Sandhills Well Field (High Plains Drilling *See Reso. 1191 Company) dated,8/26/82 for Chg. Ord.- Reso 923 - Treatment Plant expansion and Pump Station construction No. 3, (Cooper Construction Company) *See Reso.-1662 Reso 922 - Water Distribution lines (McCullough Construction Company) dated 4/12/84 for Chg. Ord. Reso 912 - Terminal Storage Reservoir (Malvon Construction Company) No. 4 The motion was made by Councilman Brown, seconded by Councilwoman Baker to *See•CC.Minutes of approve the above referenced Change Orders affecting the referenced contractors. 4/12/84 #39 Motion carried: 5 Yeas; 0 Nays. Project.accepted final'payment authorized. 81-40A-714-1017 Consider accepting well collector lines, Wells 231-240, and authorize final (28) payment to contractor. This is a routine acceptance. The motion was made by Councilwoman Baker, seconded by Councilman Aderton to accept the construction of the well collector lines, stated above, and to authorize final payment to the contractor. Motion carried: 5 Yeas; 0 Nays. (See Reso 856, June 25, 1981) 81-40A-714-1018 Consider a resolution authorizing the for to request a rehearing before the 0 RA1 Texan Water rnmmiaaion