Loading...
HomeMy WebLinkAboutResolution - 3356 - Accepts Street Improvements - Kerr Construction - Project #9474, 82Nd St - 04_26_1990Resolution # 3356 April 26, 1990 Item #14 DGV:da RESOLUTION A RESOLUTION ACCEPTING STREET IMPROVEMENTS AS LISTED BELOW: WHEREAS, the City of Lubbock heretofore entered into a Contract with Kerr Construction Company for the making of street improvements in said City including among others the following: 82nd Street Strip Paving Improvements. WHEREAS, the construction of the above improvements was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with the terms of said Contract, Project No. 9474; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements above -mentioned BE and the same are hereby accepted and the City Engineer BE and he is hereby authorized to direct the final payment to the Contractor in the amount of $14,843.48. SECTION 2. THAT this Resolution shall take effect and be in force from and after its passage. Passed by the City Council this ATTEST: anette boya, APPROVEQ AS TO CONTENT: tary rry Hertel, Citq Enginee APPROVED AS TO FORM: D nald G. Vandiver, First Assistan City Attorney 26th day of April , 1990. B. C. MdMINN, MAYOR ►2 33 Glo Original Contract $285,518.65 Change Order No. 1 $ 15,600.00 MONTHLY ESTIMATE New contract $301,118.65 CITY OF` LUBBOCK Project: 82nd Street Strip Paving Improvements Contractor: Kerr Construction Co., Inc. Address:- P.O. Box 888 Lubbock. TX 79408 Estimate Period From April 1 19 90 to April 16 On First estimate and final estimate use actual work dates Project No. 9474 Estimate No. Final Contract $ 285,518.65 11990 ITEM UNIT OF MEASURE PROJECT EST.OUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 1. 2" A.C. surface on 3" A.S. S.Y. 22,000 $11,40 $246,856.17 Base and 6" Caliche Sub -base 2. Resurfacing S.Y. 38 -0- 3.30 3. Stockpile Existing Base' S.Y. 18,630 18 630.00 1.25 4. 3 Sack Cement Stabilized C.Y. 100 -0- Caliche 5. Concreto Driveway Adjustment S.Y. 12 48.89 $16.25 $ 794.46 6. Asphalt Parking Lot or S.Y. 200 266.11 $ 1,796.24 Driveway Adjustment 7. Corru ated 24" Metal Pipe L.i. 135 135.00 $24.00 $ 3,240.00 Culverts 8. Gravel Driveway Adjustment S.Y. 385 1,340.54 $ 3.95 $ 5,295.13 9. Change Order No. 1 Lump Sum 100% 15,600.00 APPROVED: ( � �� J�GLtJI 41 /4 -io v-"' F TotJ Ainoutlt of Work Done . . . 296,869.50 . r, Less 5 "0 Retained ............. S Difference ............... ... s296,869.50 Less Special Deduction . ......... S Less Li(luidated Damage .. .... ... 5 Less PreViQUs Payments . ......... S 282, 026.02 Amot,nt Due this Estimate......... $ 14,843 .48 C' Uri.ttinn5 hy: �Ml!« ✓ �C�� Engineer Date 16_ Checwen hy• bie,Dt. Head Date 1� / J orrect� Date