Loading...
HomeMy WebLinkAboutResolution - 1343 - Accept Paving Improvements - RC Co - Alley Return, South Side Brownfield Highway - 03_31_198361 RESOLUTION 1343 - 3/31/83 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF AN ALLEY RETURN AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the suvdivider of Cope Addition Lot No. 3 made arr- angements with Robins Concrete Construction for the construction of paving improvements on a certain alley return dedicated in said subdivision. under the provisions of said Ordinance prior to the recording of the subdivision plat of Cope Addition Lot No. 3 including the following alley return. Alley return construction on the south side of Brownfield Highway, west of Oxford Avenue, on the west side of said Lot 3 Cope Addition known and designated as new sub -division sub -unit 20 of Unit No. 2029. AND WHEREAS, the construction of the above improvements on the above - mentioned alley return was performed under the supervision of the City Engineer, and said improvements have been completed and have been in- spected and found to have been constructed in accordance with City spec- ifications and in accordance with the provisions of City Ordinance 1331. THEREFORE,.BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned alley return be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's por- tion of the cost, if any. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 31st DAY 0 ch 3 5�; f 1 McA ister, Mayor ZA TEST: s velyn Gaff a, City S cr ary APPR VED AS TO CONTENT: i-i f Don J nnings City Engineer APPROVED AS TO FORM: ohn Ross, Jr. City Attorney h CONSOLIDATED FINAL ESTIMATE Cope Addition Lot No. 3 UANTITIES Unit & L.F. S.Y. L.F. C & G Removal Sub -Unit Location C,& G Alley Ret. & Pvmt. Repair NS 2029-20 Alley return on:the South side of Brown- field Highway; West of Oxford Avenue, on the west side of Lot #3 Cope Addition 20.47 24.47 32.05 COST ESTIMATE 20.47 L.F. Curb & Gutter @ $5.70 $116.68 24.47 S.Y. Alley Return @$26.00 $636.22 32.05 L.F. C & G Removal & Pavement Repair @ $6.00 $192.30 CONTRACT COST $945.20 COST DISTRIBUTION Unit & Contract Property Sub -Unit Cost Owner Cost N.S. 2029-20 $945.20 $945.20 4 A