HomeMy WebLinkAboutResolution - 1311 - Contract - Three T Painting Co - Cleaning_Painting, Ground Storage Tank - 01_27_1983JWF: js
RESOLUTION
RESOLUTION 1311 - 1/27/83
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and di-
rected to execute for and on behalf of the City of Lubbock a Contract to be
entered into by and between said City (as owner) and Three T Painting Co. of
Midland, Texas, for cleaning and painting interior of 1.1 million gallon
ground storage reservior attached herewith which shall be spread upon the
minutes of the Council and as spread upon the minutes of this Council shall
constitute and be a part of this Resolution as if fully copied herein in
detail.
Passed by the City Council this 27th day of January 1983.
' AL -HENRY , yor o Tem
I_ -
ATTEST:
Evelyn Gaffga, City Secr ar Treasurer
APPROVED AS TO CONTENT:
c
Guy Wi Tkon, Water Utilities Engineer
APPROVED AS TO FORM:
J. W r h Fullingim, Asst. City #ttorney
BID PROPOSAL
BID FOR LUMP SUM CONTRACTS
Lubbock, Texas
lanuary.27,. 1983
Proj . No. 20-6072- 42319
Proposal of Three "T" Painting Company (hereinafter
called "Bidder")
To.the Honorable Mayor and City Council
City of Lubbock, Texas .(hereinafter called Omer)
Gentlemen:
The Bidder, in compliance with your invitation for bids for Clewing
and Painting One Ground Storage Tank at the Lubbock Water Treatment Plant
having carefully examined the plans, specifications, instructions to bidders,
notice to bidders and all other related contract documents and the site of
•the proposed work, and being familiar with all of the conditions surrcxrnding .
the construction of the proposed project including the av dlability of mat— .
,erinis and labor, hereby proposes to furnish all labor, materials, aacl supplies;
and to construct the project in accordance with the plans, specifications and
-contract documents, within the time set forth therein and at the price stated
below.- The price to cover all expenses incurred in performing the work required
under the contract documents, of which this proposal is to be a part, is as .
follows:
Clean and paint interior' of one 1.1 million gallon gmd tank ixxc2nding .
all labor and materials, complete as specified for the ls=p sum of
Eighteen Thousand and Eight Hundred Dollars Q 18,800.00 - }
.(Amount :shall be shown in both words and figures. ZU case of distrepancyr
the amount shown is words shall govern.)
Bidder 'hereby agrees to -commence the work on the above �proj ect ea or '
before. A- date • to be specified in' a written '"Notice to Proceed" 'of £lie Owner
and. ta.f . 7, complete the project on or before 2iircli 31., 1.983 for as st:ipnlated:•
in the specifications and other contract• documents. ' Bid&e= hereby; further- agrees
to pay to Owner .as liquidated damages • the sum of *300.00 far • eaclr consecutive cal:
endar -day in excess of the time' set forth hereimabove for coqpletion of this
proj eat, all as more fully set forth in the general condit%ns of the contract
documents. ,•
Bidder understands and agrees that this bid proposal shall be completed and
submitted in accordance with instruction number 20 of the General Tustructions to
'Bidders.
The undersigned Bidder hereby declares that he has vis3.ted the site of
• the work and has carefully examined the plans, specifications. and contract
documents pertaining to the work covered by this bid, and he further agrees to
commence work- on or before the date specified in the written notice to proceeds,
and to substantially complete the work on which he has bid; as provided in the
contract documents.
Inclosed.with this proposal is a Cashier's Check or Certified Check for •.
Nine Hundred- and• F"orty Dollars Dollars • Q 940 . on )
= or Proposal Bond in the sum of.
Dollars ($ ) , which it is agreed shall be ,
collected and retained by the Owner. as liquidated damages :En the event the
proposal is accepted by the. Owner and the undersigned fat3s to execute the
necessary. -contract documents -and the required bond (if any) with the Owaes
within ten (10) days after the date of receipt of written notification of
acceptance of said proposal; otherwise said check or bond shall be returned to.
the undersigned upon demand.
Bidder. understands and agrees that the contract to be executed by Bidder
shall be bound and include all contract documents made avai3.able to him for
his inspection in accordance with the Notice to Bidders.
Three "T" Painting Company
Contractor
BY:
D.S. Ke ley
Owner
(Seal if Bidder is.a Corporation)
ATTEST:
Secretary