Loading...
HomeMy WebLinkAboutResolution - 1255 - CO#1 To Contract - Kerr Co - 1982 Assessment Paving Program - 11_11_1982rA RESOLUTION 1255 - 11/11/82 01 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of LUbbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 1 to the 1982 Assessment Paving Program (G.W.O. 11,593), with Kerr Construction Company, a copy of which is attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this llth Day of November, 1982. Bil McAlister, Mayor ATTEST: , Evelyn G fga, CityS r ary APPROVED AS TO CONTENT: Don J pings City Engineer APPROVED AS TO FORI4: hn Ross Jr., City Attorney TO: Kerr Construction Company Box 888 Lubbock, Texas 79408 Gentlemen: WHEREAS, it is desirable to make changes in the plans and specifications for G.W.O. 11,593, being namely the additional quantities for the Municipal Garage Parking Lot Paving. Original Amount of Contract G.W.O. 11,593 $559,700.60 Increased by Change Order No. 1 $139,914.00 Total Amount of Contract $699,614.60 Completion for this Change Order -- Same as Original Contract. THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages gained, the Owner and -the Contractor agree to the change shown herein and in the revised plans, the Owner agrees to pay the Contractor the amount of in- crease in cash. the Contractor agrees to proceed with construction and to adhere to applicable specifications, under the direction of the Engineer. Furthermore, the parties agree that the original contract between the Owner and the Contractor shall be modified to the extent herein indicated, including one (1) attachment. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this llth day of November 1982. rr Construction Company (Contractor) ///� By Xi/�% �'���'�/ Title: V/ Kerr Construction Company. CITY OF LUBBOCK (Owner) By Attest: B 11 McAlister, Mayor RECOMMENDED FOR APPROVAL UN Don J nings, ity Engineer APPROVED AS TO FORM: L ohn C. Ross, Jr., City A torney Evelyn Gaf ga, City 07 / Item 3 5 GWO 11,593 CHANGE ORDER NO. 1 Quantity Bid & Unit Description of Item Price 15,910 S.Y. Paving: 1-1/2" compacted T.H.D. $6.15 Type "C" A.C. Paving with crushed stone or crushed gravel with a minimum of 85% crushed faces, in- cluding subgrade preparation, 9" of caliche base, prime and tack coat, complete in place, per square yard 640 L.F. Curb and Gutter: 6" concrete curb $5.50 and gutter or 30" wide separate gutter, including subgrade prepara- tion, complete in place, per linear foot 1,814 S.Y. Valley Gutters: Reinforced Concrete $21.25 (3,000 #/7 day high early type cement) valley gutters including subgrade pre- paration, complete in place with loca- tion as directed by engineer, per square yard Total $97,846.50 $ 3,520.00 $35,547.5Q Total Increase for Change Order. No. 1 $139,914.00 Original Contract Amount $559,700.60 New Contract Amount $699,6.14.00