Loading...
HomeMy WebLinkAboutResolution - 1178 - CO#1 To Contract-RWE Inc-Remote Control Facilities, Bailey County Well Field - 08_12_1982JWF:cl RESOLUTION RESOLUTION 1178 - 8/12/82 (Amends Reso 924, 9/24/81 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock Change Order No. 1 to a Contract heretofore entered into by and between said City and Row -Wall Electric, Inc. for the installation of remote control facilities at Bailey County Well Field pursuant to W.W.O. 11609 to increase the number of wells from 120 to 143 and extend Contract time to November 15, 1982, attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 12th I ATTEST: Elvelyn Ga ga, City S t y-Treasurer APPROVED AS TO CONTENT: r Wi r D. Watson, Chief Water tilities Engineer APPROVED AS TO FORM: V L J. rth Full ngim, Asst. City A rney day of Au u t ,1982. i LL MEALISTER, MAYOR RESOLUTION 1178 - 8/12/82 CHANGE ORDER NO. 1 Remote Control Facilities Bailey County Well Field City of Lubbock, Texas TO: ROW -WALL ELECTRIC, INC. P. 0. BOX 1914 LUBBOCK, TEXAS 79408 General description of work included in the original contract: Install remote control facilities for 120 wells in the City's Bailey County Well Field using one-way FM radio channel for communication between the central control point and the individual well sites. Original Amount of Contract $ 197,975.00 Change Order No. 1 ADD 46,126.40 Adjusted Contract Amount $__244,101.40 Construction Time Extended to Q Nov. 15, 1982 WHEREAS, it is desirable to make changes in the work to be constructed under this project. THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage gained, the Owner and the Contractor agree to the changes indicated below and further agree that the.amount of the contract and the construction time shall be adjusted by the amounts shown above. 1. Increase the number of wells provided with remote control facilities from 120 to 143. ADD` $ 43,556.80 2. Provide and install a stand-by transmitting unit at the central control point. ADD $ 2,927.00 3. Furnish 4 printed -circuit boards for maintenance of the facilities. ADD $ 449.60 4. Reduce the number of Hand -Off -Automatic switches installed in'existing starters from 50 to 20 units. DEDUCT $ 807.00 5. Construction time to be extended to November 15, 1982, to allow time for delivery and installation of equipment included in this Change Order. 6. Retainage on the work completed under the original contract to be reduced to $1,000 until final completion of the project. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this 12th day of August , 1982. ----------------------------------------------------------------------------- RECOMMENDED: PARKHILL, SMITH & COOPER, INC., Consulting Engineers B� ,Project Engineer,-�?/2-,-1982 APPROVED: ROW -WALL ELECTRIC, INC., Contractor By Vice -President , Sept. 2082 APPROVED: CITY OF LUBBOCK, TEXAS, Owner By , NIAY0P, , . AUG 12 JgR