Loading...
HomeMy WebLinkAboutResolution - 1055 - CO#1 To CDWO 8017 - Kerr Co - Additional Quantities, BHAC Parking Lot - 03_25_1982RESOLUTION 1055 - 3/25/82 I U4 1 - 1a- RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 1 to C.D.W.O. 8017, with Kerr Construction Company, a copy of which is attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 25th day o arch, 19 f LOP, BI cAL STER, MAYOR ~ATTEST:. f Evelyn Ca ga, ity Aedf' ry "APPR VED TO CONTENT: Don Je,,ffningsXity Engineer APPROVED AS TO FORM: ,9,4 "i a. , --�' hn C. Ross, Jr., Cit Attorney RESOLUTION 1055 - 3/25/82 rtVry C r-Pr.TDRY.TRFASURER TO: Kerr Construction Company Box 888 Lubbock, Texas 79408 Gentlemen: WHEREAS, it is desirable to make changes in the plans and specifications for C.D.W.O. 8017, being namely the additional quantities for the Berl Huffman Athletic Complex Parking Lot: Original Amount of Contract C.D.W.O. 8017 $269,127.10 Increased by Change Order No. 1 $ 43,133.30 Total Amount of Contract $312,260.40 Completion for this Change Order --Same as Original Contract. THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages gained, the Owner and the Contractor agree to the change shown herein and in the revised plans, the Owner agrees to pay the Contractor the amount of in- crease in cash. The Contractor agrees to proceed with construction and to adhere to applicable specifications, under the direction of the Engineer. Furthermore, the parties agree that the original contract between the Owner and the Contractor shall be modified to the extent herein indicated, including one (1) attachment:. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this 25th day of March, 1982. Kerr Construction Company (Contractor) By Title: L Kerr Construction om ny CITY OF LUBBOCK (Owner) By Attest: ill McAlister, Mayor Evelyn Ga fga, City Secr ary RECOMMENDED FOR APPROVAL Don Jognings,00tity Engineer Larry unningham, C Manager APPROVED AS,TTOO�FORM: t1 l ""' n C. Ross, Jr., City Attorney MAR �'�,19a2 C.D.W.O. 8017 CHANGE ORDER NO. 1 Quantity Bid Total Item & Unit Description of Item Price Amount 2 6,670 S.Y. 1-1/2" compacted T.H.D. Type "C" $::595 $ 39,686.50 A.C. paving with crushed stone aggregate, including subgrade pre- paration, 6" of caliche base, and prime and tack coat as required, complete in place, per square yard; 3 84 L.F. 6" Concrete curb and gutter of 30" $ 5.20 $ 436.80 wide separate gutter, including sub - grade preparation, complete in place, per linear foot; 5 140 S.Y. Reinforced Concrete (3000 #/7 day $21.50 $ 3,010.00 high early type) valley gutters including subgrade preparation, complete in place with location as directed by the Engineer, per square yard; Total Increase for Change Order No. 1 $ 43,133.30 Original Contract Amount $269,127.10 New Contract Amount $312,260.40