Loading...
HomeMy WebLinkAboutResolution - 2010-R0616 - Contract 9874 Talon/LPE For Water Well Plugging Services - 12/15/2010Resolution No. 2010-RO616 December 15, 2010 Item No. 5.21 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 98741JOC 11 -013 -FM for Water Well Plugging Phase II, by and between the City of Lubbock and Talon/LPE, Ltd of Amarillo, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on December 15, 2010 ��X A�--- TOM MARTIN, MAYOR ATTEST: Rebe a Garza, CitySecreta APPROVED AS TO CONTENT: )ILJO� Marsha Reed, P.E. Chief Operating Officer APPROVED AS TO FORM: 4 C ad Weaver. Assistant City Attorney sj:ccdocs RES.Contract-Talon LPE, Ltd 11.19.10 Resolution No. 2010—RO61 Contract No.9876 City of Lubbock Job Order This Job Order is governed by all terms and conditions of the Contract referenced below which is hereby incorporated by reference. Owner: Wesley Everett, Director of Facilities Management for — Water Well Plugging Phase II NJPA Contract Number: TX04-061980-TAIL, National Joint Powers alliance (NJPA), Indefinite Quality Construction Contract. Contract Job Order Number: 11 -013 -FM Date of Contract: September 25, 2008 Job Order Date: November 19, 2010 Contractor: Talon/LPE Summary and Description of Statement of Work attached hereto: The scope of work includes plugging 25 previously identified water wells, removal of 4 submersible or turbine pumps, removal of 14 steel doghouse structures, and the demolition of one brick building. Talon Job Order Nuinber: 010389.00 hereto attached. and Insurance Requirements per Exhibit A, attached. Value of Pre -Priced Work: $147,004.83 Value of Non -Pre -Priced work: $ 00.00 Payment and Performance Bonds: $3,769.73 Total Fixed Price stipulated sum for this Job Order (Job Order Sum): $150,774.56 Notice to Proceed Date for this Job Order: To be issued after City Council approval Expected Completion Date for this Job Order: to be determined after City Council approval. Liquidated Damages (if different than set forth in Agreement): $25 per day CONTRACTOR: Talon/LPE By: PRIN119 .AME: 13RIDGER HOWARD TITLE: PROJECT MANAGER COMPLETE ADDRESS: Company: Talon/LPE Address: 921 N. Bivins Street City, State, Zip: Amarillo, Texas 79107 L �EVal-� Wesley Everett, Director of Facilities CITY OF LUBBOCK, TEXAS (OWNER) Tom Martin, Mayor ATTEST: Reber a Garza, City Secretary APPR D AS T FORM: Assistant City Attorney Contractor's Price Proposal - Detail Continues.. Work Order Number: 010389.00 Work Order Title: City of Lubbock - Well Plugging Phase II Section - 02 11 02213 0004 CY Native Soil/Dirt- Common $753.76 Quantity Unit Price Factor Total Installation 47.00 x 12.83 x 1.2500 753.76 12 02616 0019 EA Asphalt Placement For Small Repair Areas, Cold Mix Modified, Up To 3 Tons $1,138.89 Quantity Unit Price Factor Total Installation 100 x 911.11 x 1.2500 1,138.89 Subtotal for Section - 02 $10,570.23 Section - 03 13 03640 0003 CF Pressure Injected Cementitious Grout $116,263.68 Quantity Unit Price Factor Total Installation 6,809.00 x 13.66 x 1.2500 116,263.68 Subtotal for Section - 03 $116,263.68 Proposal Total $150,774.56 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total Is due to rounding. Subcontractor Listing Page 2 of 2 EZIQC - Buy Board 11/16/2010 Contractor's Price Proposal - Summary Date: November 16, 2010 Re: IOC Master Contract* Work Order #: Owner PO #: Title: Area 1-1- TAL 010389.00 City of Lubbock - Well Plugging Phase II Contractor: Talon/LPE Proposal Value: $150,774.56 Section - 01 $23,940.65 Section - 02 $10,570.23 Section - 03 $116,263.68 Proposal Total $150,774.56 Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total Is due to rounding. Contractor's Price Proposal - Summary Page 1 of 1 EZIQC - Buy Board 11/16/2010 Contractor's Price Proposal - Detail Date: November 16, 2010 Re: IQC Master Contract #: Area 1-1- TAL Work Order #: 010389.00 Owner PO M Line Total Title: City of Lubbock - Well Plugging Phase 11 Contractor: Talon/LPE Proposal Value: $150,774.56 Contractor's Price Proposal - Detail Page 1 of 2 EZ/QC - Buy Board 11/16/2010 Sect Item Mod. UOM Description Line Total Labor Equip. Material (Excludes) Section - 01 1 01590 0228 WK 36" Wide, 1/8 CY Bobcat, With Full -Time Operator $5,682.08 Quantity Unit Price Factor Total Installation 3.00 x 1,515.22 x 1.2500 5,682.08 2 01590 0327 WK 1/2 To 5/8 CY, 65 HP, Loader -Backhoe, With Full -Time Operator $6,740.18 Quantity Unit Price Factor Total Installation 3.00 x 1,797.38 x 1.2500 6,740.18 3 01590 0904 WK 1-1/2 Ton Flat Bed Truck, 4 x 2, With Full -Time Truck DriverNote: Includes $5,812.39 hydraulic tiltbed. Quantity Unit Price Factor Total Installation 3.00 x 1,549.97 x 1.2500 5,812.39 4 01590 0911 WK 1/2 To 3/4 Ton Light Duty Truck, 4 x 2 Conventional PickupNote: With full-time $5,099.74 truck driver Quantity Unit Price Factor Total Installation 3.00 x 1,359.93 x 1.2500 5,099.74 5 01590 0999 EA Bobcat Delivery, Mobilization And DemobilizationNote: Use for bobcat, lifts up to $116.33 35' or similar sized equipment Includes delivery fee, delivery, set-up and return. Quantity Unit Price Factor Total Installation 100 x 93.06 x 1.2500 116.33 8 01590 1001 EA Backhoe, Dozer Or Roller Up To 250 HP Delivery, Mobilization And $489.93 DemobilizationNote: Use for backhoe, dozer, roller, loader, excavator, lifts over 40' to 60' or similar sized equipment Includes delivery fee, delivery, set-up and return. Quantity Unit Price Factor Total Installation 100 x 391.94 x 1.2500 489.93 $23,940.65 Subtotal for Section - 01 Section - 02 7 02111 0009 CCF Demo Steel Framed Building With Bulldozer/Excavator Remove Building $2,436.00 Quantity Unit Price Factor Total Installation 112.00 x 17.40 x 1.2500 2,436.00 8 02111 0015 CCF Demo Masonry Building With Bulldozer/Excavator Remove Building $224.93 Quantity Unit Price Factor Total Installation 1152 x 15,62 x 1.2500 224.93 9 02112 0091 CF Demo Reinforced Concrete Building Foundation $3,676.65 Quantity Unit Price Factor Total Installation 772.00 x 3.81 x 1.2500 3,676.65 10 02115 0040 HR Hourly Office Work For Both For Reports Required For EPANote: Includes title $2,340.00 searches, well survey data, drawing site drawings. filing preliminary work with EPA for feedback, prepare on CAP -A and CAP -B plans, etc. Hours not to be used in association with other tasks performed. Quantity Unit Price Factor Total Installation 40.00 x 46.80 x 1.2500 2,340.00 Contractor's Price Proposal - Detail Page 1 of 2 EZ/QC - Buy Board 11/16/2010