HomeMy WebLinkAboutResolution - 913 - Contract - Mcgraw Edison Company - 3 Substation Transformers - 09_10_1981MR:cl
RESOLUTION
BID 6045
RESOLUTION 913 - 9/10/81
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Contract betweei
the City of Lubbock and McGraw -Edison Company for 3 substation transformers,
attached herewith which shall be spread upon the minutes of the Council and as
spread upon the minutes of this Council shall constitute and be a part of this
Resolution as if fully copied herein in detail.
Passed by the City Council this 10th day of September ,1981.
r �
BILL McALISTER, MAYOR
ATTEST
lvelyn� ffga, Cit a tary-Treasurer
f APPROVED AS TO CONTENT:
Carroll McDonald, Director of Electric Utilities
APPROVED AS TO FORM:
�4 A'.�/ ) I e��-
David W. Reagan, Assi;Ant City Attorney
P. ,SOi,JTIOii .913 - 9%10/01
'" •� 1Q t981 CITY SECRETARY TREASURER BID 6045
AD�ER�I'L'MNT .
FOR e
15/20/25 MVA
TRANSFORMER
Sealed bids will be received in the office of Floyd Nesbitt, City Pur-
chasing Director, Lubbock, Texas, prior to •4:00 P .M. on
November 5 , 1980,.and publicly opened immediately there-
after on the same date for:
15/20/25 MVA Transformer
complete in accordance with specifications #SE-0007-1-101780 and -the Instruc-
tions to 'Bidders. '
It is the sole responsibility of the Bidder to insure that his bid is
actually in the office of Floyd Nesbitt prior to the above described closing
time.
The advertisement for bids is by the City of Lubbock, Texas, for'its
municipally owned electric utility, Lubbock Power and Light. Any reference to
Lubbock Power and Light shall be construed to mean the City of Lubbock, Texas.
U
• INSTRUCTIONS TO BIDDERS
A. All bids must be quoted on the white document entitled "Ctty•of Lubbock
Request for Quotation". -Such document must be signed by the Bidder.
B.. These specifications #SE-0007-1-101'780 must accompany and be attached to
all bids. Such specifications will form a part of the contract entered
into between the City of Lubbock`and the successful Bidder.
C. Each bid shall be enclosed in a sealed envelope, addressed to Floyd
Nesbitt, City Purchasing Director; Lubbock, Texas, and endorsed on the
outside of the envelope in the following manner:
(a) Bidder's name
(b) ;Proposal for:
15/20/25 MVA.Transformer
D. Proposals may be withdrawn and resubmitted at any time prior to the time
set for the opening of the bids, but no proposal may be withdrawn or
altered thereafter.
E. The City of Lubbock reserves the right to reject any and all'bids, or
parts of bids, and to waive irregularities and informalities in any bid
submitted.
F. Each bidder shall thoroughly and fully inform himself of all factors
.which would affect the prosecution and completion of the work and cost
thereof. It shall be understood and agreed that all such factors have
been investigated and considered in the preparation of every proposal
submitted.' There shall be no subsequent financial adjustment to any
contract awarded which is based on- the lack of such prior information or
its effect on the cost of the work.
G. All sheets of the Instructions to Bidders, proposal forms, Contract
Agreement, General Conditions,.and Specifications shall be bound and
contained together -when submitted and filed with the City of Lubbock,
Texas. Such sheets shall be part of the contract awarded.
H. Exceptions to the specifications shall be kept to a minimum, however, if
exceptions are taken by the Bidder to the specifications, they shall be
clearly and completely noted on a separate attachment. Exceptions taken
elsewhere shall not be considered as a part of the bid or subsequent
contracts. If any conflict arises between the specifications and the
Bidder's proposal (other than exceptions duly noted), the specifications
shall govern.
i
GEA'ERAL.CONDITIONS '
A. The contract awarded to the successful Bidder shall be construed by
and governed by the laws -of the State of Texas.
B. No payments made or certificates given shall be considered as conclusive
evidence of the.performance of the Contract, either wholly or in part,
nor shall any certificate or payment be construed.as acceptance of
defective materials, parts, systems, or work. Neither the final payment
• nor certificate nor any provision in the Contract shall relieve the
Bidder of responsibility for faulty materials or workmanship, and he
shall remedy any defects due thereto and pay for any damage to other
materials or work resulting therefrom, which -shall appear within a period
of one year from the date the system is placed in commercial operation.
M
• CONTRACT AGREEMENT ,
(EQUIPMENT) .
THIS AGREEMENT, made and entered into this 2_ day of September
19 81, by and between The City of Lubbock, Texas acting through its Mayor and
City Council thereunto duly authorized so to do, Party of the First Part, and
hereinafter called the Purchaser, andMcG-raw-EdisM_ to.; -Power Systems Groun, a
_jorporation of TPxat , Party of the Second Part, and
hereinafter called the Contractor.
WITNESSETH:
THAT WHEREAS, the Purchaser has caused to be prepared, in accordance with
law, specifications, plans, and other contract documents for the work herein
described, and has approved and adopted said documents, and has caused to be
published, in the manner and for the time required by law, an advertisement
for and in connection with acquiring 15/20/25 MVA Transformer in accordance
with the terms of this Contract; and
WHEREAS, the. said. Contractor, in .response to such advertisement, has
submitted to the Purchaser, in the manner and at the time specified, a sealed
proposal in accordance with the terms of said advertisement; and
WHEREAS, -the Purchaser, in the manner prescribed by law, has publicly
opened, examined, and canvassed the proposals submitted in response to the
published invitation therefor, and as a result of such canvass has determined
and declared the aforesaid Contractor to be the best bidder for the said work
and. has duly awarded to the said Contractor a contract therefor, for the sum
or sums named in the Contractor's proposal, a copy thereof being attached to
and made a part of this Contract.,
NOW THEREFORE, --in consideration of the-compensation'to be paid to the
Contractor and of the --mutual agreements herein contained, the Parties to these
presents have agreed and hereby agree, the Purchaser for itself.and•its successors,
and"the Contractor for itself, himself, or themselves,-or..its, his, or their
successors and assigns, or its, his, or their. -executors and administrators, as
follows:
ARTICLE I. That the Contractor shall. (a).furnish all. materials,
supplies and equipment specified and required to be incorporated in and form a
permanent part of the completed work; (b) provide and perform all necessary
work; and, in a good, substantial, and workmanlike manner and in accordance
with the provisions of the General Conditions, and the Instructions to Bidders,
(which are attached hereto and made a part hereof) and in conformity with the
Specifications Number SE-0007-1-101780.; (c) execute and complete all work
included in and covered by the Purchaser's official award of this Contract to
the said Contractor, such award being based on the acceptance -by the Purchaser
of the Contractor's proposal, or part thereof, as follows:
15/20/25 MVA Transformer
• ,
ARTICLE II. That the Purchaser shall pay to the Contractor•for the
performance -of the work embraced in this'Contract, and the Contractor will
`.:accept as full compensation therefor, the sum (subj-ect to adjustment at pro-
vided by the Contract) of Five hundred sixty five thousand nine hundred '
plus escalation ($_565.900.00 )
for all work covered by and included in the Contract award and designated in the foregoing Article I.
ARTICLE III. The Contractor shall proceed with the work•to be performed
under the provisions of this Contract on, or within ten (10) days following,
the date of public acceptance of the Contractor's proposal'by the Purchaser.
Contractor shall not delay the start of the work to be performed under the
provisions of this Contract except by written order from the Purchaser.
Contractor shall complete said work by six months after receipt of order.
IN.WITNESS WHEREOF, the Parties hereto have executed this Contract as of
day and.year first written.
_ CITY OF LUBBOCK
BY:
B1Lr MEALISTER, MAYOR
ATTEST:
Evelyn Ga fga, City e e y-Trea surer
APPROVED AS TO CONTENT:
I 4-do
Carroll McDonald, Director of Electric Utilities
APPROVED AS TO FORM:
Ze
40016Z �Z . J,
David W. Reagan, Assifit City Attorney
PARTY OF THE SECOND PART (CONTRACTOR)
McGRAW-EDISON c/o C. B. Anderson -Co.
BY:
• Signature of Officer .
ATTEST:
Secretary. Title
{~! NOTE:.. This Contract must -be signed by the President or Vice President of the
Contractor's firm and attested by the Secretary of the firm. If the Contract-
• is to be signed by any person other than the President or Vice President, then
a Board Resolution authorizing said person td sign and bind the firm must be
Included with each copy of the Contract.
' RZSOL'UTIOi; . 913 - 9110131
`. ? l0 Iola%, CITY SECRETARY TREASURER ;AID 6045
ADVERTIS)a ENT
• FOR s
15/20/25 MVA
TRANSFORMER
Sealed bids will be received in the office of Floyd Nesbitt, City Pur-
chasing Director, Lubbock, Texas, prior to •4:00 P M. on
November 5 , 1980,.and publicly opened immediately there-
after on the same date for:
15/20/25 MVA Transformer
complete in accordance with specifications #SE-0007-1-101780 and -the Instruc-
tions to'Bidders. '
It is the sole responsibility of the Bidder to insure that his bid is
actually in the office of Floyd Nesbitt prior to the above described closing
time.
The advertisement for bids is by the City of Lubbock, Texas, for its
municipally owned electric utility, Lubbock Power and Light. Any reference to
Lubbock Power and Light shall be construed to mean the City of Lubbock, Texas.
i
'f
• INSTRUCTIONS TO BIDDERS '
A. All bids must be quoted on the white document entitled "CJ.ty of Lubbock
Request for Quotation". -Such document must be signed by the Bidder.
B. These specifications #SE-0007-1-3001780 must accompany and be attached to
all bids. Such specifications will form a part of the contract entered
into between the City of Lubbock and the successful Bidder.
C. Each bid shall be enclosed in a sealed envelope, addressed to Floyd
Nesbitt, City Purchasing Director, Lubbock, Texas, and endorsed on the
outside of the envelope in the following manner:
(a) Bidder's name
(b) Proposal for:
15/20/25 MVA Transformer
D. Proposals may be withdrawn and resubmitted at any time prior to the time
set for the opening of the bids, but no proposal may be withdrawn or
altered thereafter.
E. The City of Lubbock reserves the right to reject any and all bids, or
parts of bids, and to waive irregularities and informalities in any bid
submitted.
C�
F. Each bidder shall thoroughly and fully inform himself of all factors
which would affect the prosecution and completion of the work and cost
thereof. It shall be understood and agreed that all such factors have
been investigated and considered in the preparation of every proposal
submitted. - There shall be no subsequent financial adjustment to any
contract awarded which is based on- the lack of such prior information or
its effect on the cost of the work.
G. All sheets of the Instructions to Bidders,�proposal forms, Contract
Agreement, General Conditions, -and Specifications shall be bound and
contained together -when submitted and filed with the City of Lubbock,
Texas. Such sheets shall be part of the contract awarded.
H. Exceptions to the specifications shall be kept to a minimum, however, if
exceptions are taken by the Bidder to the specifications, they shall be
clearly and completely noted on a separate -attachment. Exceptions taken
elsewhere shall not be considered as a part of the bid or subsequent
contracts. If any conflict arises between the specifications and the
Bidder's proposal (other than exceptions duly noted), the specifications
shall govern.
'7
GENERAL CONDITIONS
A. The contract awarded to the successful Bidder shall be construed by
and governed by the laws -of the State of Texas.
B. No payments made or certificates given shall be considered as conclusive
evidence of the.performance of the Contract, either wholly or in part,
nor shall any certificate or payment be construed.as acceptance of .-
defective materials, parts, systems, or work. Neither the final payment
nor certificate nor any provision in the Contract shall relieve the
Bidder of responsibility for faulty materials or workmanship, and he
shall remedy any defects due thereto and pay for any damage to other
materials or work resulting therefrom, which -shall appear within a period
of one year from the date the system is placed in commercial operation.
CONTRACT AGREEMENT
i (EQUIPMENT)
THIS AGREEMENT, made and entered into this 24 day of September
19 81, by and between The City of Lubbock, Texas acting through its Mayor and
City Council thereunto duly authorized so to do, Party of the First Part, and
hereinafter called the Purchaser, andMcG-rayu-Edison X6,: -Power Systems Group, a
Corporation of To-_Ya-, , Party of the Second Part, and
hereinafter called the Contractor. - _-
WITNESSETH:
THAT WHEREAS, the Purchaser has caused to be prepared, in accordance with
law, specifications, plans, -and other contract documents for the work herein
described, and has approved and adopted said documents, and has caused to be
published, in the manner and for the time required by law, an advertisement
for and in connection with acquiring 15/20/25 MVA Transformer in accordance
with the terms of this Contract; and
WHEREAS, the.said- Contractor, in _response to such advertisement, has
submitted to the Purchaser, in the manner and at the time specified, a sealed
proposal in accordance with the terms of said advertisement; and
WHEREAS, -the Purchaser, in the manner prescribed by law, has publicly
opened, examined, and canvassed the proposals submitted in response to the
published invitation therefor, and as a result of such canvass has determined
and declared the aforesaid Contractor to be the best bidder for the said work
and has duly awarded to the said Contractor a contract therefor, for the sum
or sums named in the Contractor's proposal, a copy thereof being attached to
and made a part of this Contract..
NOW THEREFORE, - in consideration of the -compensation to be paid to the
Contractor and of the -.mutual agreements herein contained, the Parties to these
presents have agreed and hereby agree, the Purchaser for itself .and. its successors,
and -the Contractor for itself, himself, or themselves, -or -.its, his, or their
successors and assigns, or its, his, or their. -executors and administrators, as
follows:
ARTICLE I. That the Contractor shall. (a).furnish all.materi.als,
supplies and equipment specified and required to be incorporated in and form a
permanent part of the completed work; (b) provide and perform all necessary
work; and, in a good, substantial, and workmanlike manner and in accordance
with the provisions of the General Conditions, and the Instructions to Bidders,
(which are attached hereto and made a part hereof) and in conformity with the
Specifications Number SE-0007-1-101780; (c) execute and complete all work
included in and covered by the Purchaser'-s official award of this Contract to
the said Contractor, such award being based on the acceptance by the Purchaser
of the Contractor's proposal, or part thereof, as follows:
15/20/25 MVA Transformer
1
ARTICLE II. That the Purchaser shall pay to the Contractor'for the
performance of the work embraced in this'Contract, and the Contractor will
Accept as full compensation therefor, the sum (subject to adjustment at pro-
vided by the Contract) of Five hundred sixty five thousand nine hundred '
plus escalation ($_ _565,900.00 )
for all work covered by and included in the Contract award and designated in ,
the foregoing Article I.
ARTICLE III. The Contractor shall proceed with the work -to be performed
under the provisions of this Contract on, or within ten (10) days following,
the date of public acceptance of the Contractor's proposal by the Purchaser.
Contractor shall not delay the start of the work to be performed under the
provisions of this Contract except by written order from the Purchaser.
Contractor shall complete said work by six months after receipt of order.
IN WITNESS WHEREOF, the Parties hereto have executed this Contract as of
day and -year first written.
CITY OF LUBBOCK
BY:
B L cALISTER, MAYOR
`ATTEST:
elyn`Ga fga, City e e -Treasurer
APPROVED AS TO CONTENT:
Carroll McDonald, Director of Electric Utilities
APPROVED AS TO FORM:
/, J
David W. Reagan, AssifitaA City Attorney
PARTY OF THE SECOND PART (CONTRACTOR)
McGRAW-EDISON c/o C. B. Anderson. Co.
W. I. May
Signature Officer
ATTEST:
Marketing Manager,
ZG u__L.J POWER PRODUCTS MARKETING
Secretary." Title
{ ~' NOTE:. This Contract must -be signed by the President or Vice President of the
Contractor's firm and attested by the Secretary of the firm. If the Contract
is to be signed by any person other than the President or Vice President, then
a Board Resolution authorizing said person td sign and bind the firm must be
included with each copy of the Contract.
• C E R T I F I C A T E
I, William R. Rawson,'duly qualified and acting
Secretary of McGRAW-EDISON COMPANY, a Delaware corporation,
do hereby certify that the following is a true and exact
copy of an excerpt from the minutes of a meeting of the
Board of Directors of this corporation held February 14,
1973, at which a quorum was present at all times authorized
to transact business on behalf of the corporation pursuant,
to the Articles of. Incorporation and the By -Laws of the
corporation; and that said resolution is in full force and
effect:
RESOLVED, that the Secretary or an Assistant
Secretary be and is hereby directed to certify from
time to time the designation by the Chairman of the
Board or President of the Company and the appropriate
divisional president of _.various divisional representa-
tives whose signature upon bids, contracts, bonds,
affidavits and related documents requiring the signa-
ture of the corporation with respect to the ordinary
course of the business of a division, shall duly bind
the corporation; and any of such representatives shall
have authority to certify or attest the document and
affix the corporate seal, but no one of them may.both
sign and certify or attest the document..
In accordance with the foregoing resolution, I do
hereby certify that the following persons have been desig-
nated from the division specified below:
Group: McGRAW-EDISON POWER SYSTEMS GROUP
Without Limitation as to Dollar Amount:
F. M. McKenna W. F. Oberschelp
J. M. Cross T. Shkordoff
B. L. Gunn
Not in Excess of $1,000,000:
D.
E.
Cragen
P.
J.
Komaromy
D.
J.
DiFilippo
W.
I.
May
J.
M.
Glenn
W.
F.
Motz
M.
Hervieux
R.
M.
Webler
W.
N.
Isberg
L.
K.
Wendahl
R.
B.
Kalich
Not in Excess of $250,000:
L. E. Barwick D. H. Woodford
R. H. Draeger W. E. Rowland
Y. G. Fournier D. A. Zalar
L. R. Guidry L. J. Zogran
D. N. Keirstead
IN WITNESS WHEREOF, I have s K m ha nd'the
seal of the corporation this 8th day f October, 1981.
c et: ry (�
..i. - x -_ '^`� ......�_u.riawr....a__.a" . -... nw.,..�...,_w......Y rvw.+...>. ,..r.., �yy.LwY; ��J.a-rdlwww+�xF,�._..r ytLr�3• .w�.a iNi�.»+-.,w Lu u.�i..�-w..a.... n...,w .,� .a.�r.+..... ,. _ _�_, .
i
• f
1 » '
PLANS SPECIFICATION
FOR
POWER TRANSFORMER
LUBBOCK POWER b LIGHT CO.
LUBBOCK, TEXAS
C_
f
+ i LUBBOCK POWER b LIGHT
POWER TRANSFORMER
General Requirements:
Each bidder shall submit written evidence•of his qualifications to Lubbock _
Power & Light Electric Distribution Department, in duplicate, not less than
10 days before the advertised date of bid opening, unless this evidence has
been supplied on previous bidding with the City of Lubbock. Such evidence
shall include all information necessary to certify that the bidder:
1.. Maintains a permanent'place of business.
2. Does not anticipate change in ownership, or major policy during the actual
delivery time for these transformers.
3. Has adequate plant and equipment available to do the work properly and .
expeditiously with normal manufacturing periods.
4. Has adequate organization and qualified manpower available to efficiently
prosecute the work.
5. Has adequate technical knowledge and practical experience. `
6. Has adequate financial status to meet the funding obligations incident
to the work.
7. Has no just or proper claims pending against him regarding the quality
of performance of his work.
8. The prime manufacturer of materials and equipment quoted has designed
and manufactured equipment similar to the type described in these specif-
itations for at least five years. He shall supply a users list and
substantiate his claim of satisfactory operation in users system.
In the event that certain material shortages unique to other manufacturers
or.•other related appurtenances which affect the delivery specified or whichi
will affect the technical make-up of the transformers, -the bidder shall ,
.be required to notify the City of Lubbock Purchasing Department immediately:
A possible•post facto change in the purchase arrangement could result in ,
voiding the bid by the city council- of Lubbock, Texas:..`
Where as the delivery time stated in the bid - is one basis for determining
the successful bidder by evaluation, the 'City of Lubbock may at its option ,
require a reduction of one per cent .per month from the original total contract
price or final payment to be paid to the bidder by Lubbock Power E Light,
as a penalty clause. Exception to the penalty may be made in the form of
written permission to extend delivery time each month of overrun and shall
only be granted by the. purchasing•agent for the City of Lubbock on the advice
of Lubbock Power- b• Light.
Proposals may be withdrawn, altered, and resubmitted at any time before
time set for opening the bid. Proposals may not be withdrawn, altered, or
resubmitted after bid opening.
The -City of Lubbock reserves._the right to accept the bid which,_in.it's•.
judgment, is the lowest and/or best bid; to reject any and all bids, and to
waive irregularities and informalities in any bid that is submitted. Bids =
received after specified time of closing will be returned unopened.
Al -I bidders shall attach to the bid a copy of their current pricing policy.
This pricing policy will remain. in effect for the term of this bid. Alternate
pricing is acceptable; such as bidding transformers at a firm -price in addition
to a bi-d based on an escalation clause. If the prices are subject to an escala-
.--tion clause, the base indices to be used are to be the indices in effect at
the time these specifications were released to the bidders.
The key indices are to be taken from the U.S: Department of Labor, Bureau
of Labor Statistics, Monthly Labor Review publication. The locations will be:
a. Petroleum products, refined '(WPI code 05-7) Table 27 693.3
b. Aluminum sheet, plate E foil (SIC 3353);Table 30 .158.2
c. Steel mill products (WPI code 10-13) Table 27 301.0
d. Nonferrous metals (WPI code 10-2) Table 27 289.0
e. Copper and copper products Table 28 211.7
f. -Average hourly earnings - (final)
:Electrical equipment (SIC 36) Table 17
Bids will be evaluated on the basis of compliance with specifications,
..price, delivery and experience with bidders product.and local service.
Special, consideration will be given to the bids'with the best delivery.
EQUIPMENT SPEC1FUATIONS
POWER TRANSFORMER
1.0 General
1.1 Purchaser. The potential purchaser, for equipment covered by these
specifications, is Lubbock Power E Light, headquartered in Lubbock,
Texas.
1.1.1 All mail communications, addressed to Lubbock Power and Light,
should be sent.to the attention of Neville Davidson, Electric
Distribution, Box 2000, Lubbock,.Texas 79457.
.1.1.2 -All questions referred to Lubbock Power S Li-ght by telephone,
should be directed to Neville Day.idson, telephone number A.C.
806-763-9381, Ext. 2570.
1.2 Utilization of Equipment
1.2.1 The equipment covered by these specifications is to be used
as a step down between Lubbock Power & Light's 69KV transmission
and 12.50 distribution.
1.2.2 The substation is located in the City of Lubbock. Such
locations shall--be-herein set forth as "paint of destination".
Delivery shall be made to a railroad siding selected in
advance by LPEL. Bidder shall notify LPEL in advance of '
shipping date so such siding may be designated.
2.0 General Specifications
•12.1 Materials and Workmanship: All materials shall be -new material" of
high quality which shall give long life and reliable operation.. Parts
subjected to high -temperature shall be of such design that serious•
deformations shall not occur within the normal life of the'equipment.
All equipment shall be modern in design and shall not have been in
prior service except as required by factory tests. The workmanship
shall be of high quality in every detail.
2.2 Electrical Equipment: All. electrical equipment furnished under these
specifications shall be designed, constructed,. and rated in accordance
with the Standards of the I.E.E.E., U.S.A.S.I,. A.S.T.M., N.E.M.A.,
A.N.S.I., E.E.I., and shall pass temperature and voltage tests as re-
commended therein. In selecting capacities of equipment, it shall be
assumed that the equipment-may'be operated continuously.at conditions
of maximum power requirements unless otherwise stated. Under these -
..conditions -of maximum stress and power requirements, deleterious
effects. shal I not exceed those permitted by the most stringent.of
the above applicable standards. '
2.3 Equipment Drawings: Preliminary drawings showing principal dimensions
of the equipment shall be submitted with each copy of the Bidder's'
proposal at -the time the bids are opened. Five copies of each drawing
required to show detailed arrangements of equipment, foundation plans,
foundations bolt locations, pipe connection locations, principle
dimensions, weight with and without oil, and wiring shall be submitted
by the Seller to LP&L for signature and approval within 45 calendar
days after the date that the contract is awarded.
2.3.1 Drawings and catalog cuts shall be provided by the Seller where
specified or -directed; provided, however, --the Seller will not
be required to supply drawings which will disclose propriety
design or confidential manufacturing information. Bidder shall
submit with his bid .a .listing of any types of specifications,
or drawings which.he will consider to be proprietory..
2.3.2 .The Seller shall submit five"(5) copies of*all catalog cuts
and 'f ive -(5) sets -of prints of al l other drawings to LP&L
for checking and signature. The drawings and catalog cuts
shall be accompanied by a letter of transmittal. The trans-
mittal letter shall include a list of the numbers and dates
of the drawings submitted, the contract number and the item
number. Drawings shall be complete, and shall bear the date,
the name, and number of the project, drawing number, and the
Seller's stamp of approval. One set of the Seller's drawings
will be returned to the Seller, marked with corrections to be
made, if any; the other set will be retained by LP&L._
The Seller shall then submit one reproducible set and one set
of prints of corrected, drawings to LPEL. All changes made by
the Seller after such drawings have teen checked by-LP&L.shall
be resubmitted in the same manner.
-2- 1& 1.
2:3.3 All work done by the Seller on items or portions of -items; for
which drawings are required, before he has received copies. of
such drawings signed by LP&L, shall be at the Seller's risk.
2.1 A. Review of the Seller's .drawings .shalI not relieve the Seller
of any responsiblity. The Seller shall remain responsible
• for agreement and conf ormi ty 'of his working - drawings with the
contract drawings and specifications.
2.4 Packing and Shipment
2.4.1 All equipment shall be carefully packed to prevent damage in
shipment. The seller shall be responsible for the safe arrival
of the equipment and shall replace or repair at his own expense
any equipment lost or damaged prior to its delivery at the
point of destination specified herein.' Oil for the transformer
shall be.del.ivered in.barrels, or in bulk hauling equipment.
2.4.2- All•units and -containers shall have external identification
indicating procurement contract number, installation locations
and the appropriate unit number. All equipment shall be thor-.
oughly protected for shipment.
•2.4.3 For-all•transformers shipped by rail the Seller shall install
a•vibration recorder on the rail car transporting the trans-
former which shall maintain an adequate record of vibration
and bumping during transit.. Recorder must be available for.
inspection by LP&L's agent, prior to removal of recorder from
rail car, as a condition of acceptance of delivery by Owner..
2.4.4 No equipment, purchased hereunder, shall be shipped prior to
receipt in writing, by Seller, of "Notice to Ship" as issued .
by LP&L. Such "Notice to -Ship" shall not be issued earlier
than 60 days prior to proposed shipping date. Seller shall
notify LP&L in sufficient time, before proposed shipping date,
so that "Notice to Ship" -can be appropriately issued.
2.5 Tools and Accessories: The Seller shall furnish one complete •set.
of all specified maintenance tools and all usual accessories, lubri-
cating devices, gauges, etc., as required for reliable and safe opera-
tion. Tools -shall be new and of first-class quality. ' Tools shall be
shipped in a container marked to identify the use of the tools con-
tained.
2.6 Operating instructions: The Seller shall furnish with the de
livered equipment four copies of instruction books covering all phases
.of operation of the equipment. These instruction books shall be ill-
ustrated with cuts and drawings to describe adequately the construction
and the adjustment of the various parts of the equipment and to faci-
Vitate the ordering of spare and renewal parts.
2.7* Field Tests: When specified, field tests of equipment to check its
j performance for -comparison with guarantees -will be conducted -in a
manner mutually agreed to by LP&L and the"Seller and in accordance -
_3_ `
t
with the latest rules of A.S.M.E. and I.E.E.E. ..In addition to other ,
guarantees quoted herein, it is understood that -all equipment furnished
by the Seller is guaranteed to operate satisfactorily without undue
wear, excessive vibration, excessive noise, excessive lubrication or;
undue attention required from its operating personnel. In event of
failure of the equipment to.meet its guarantees, including the operative
guarantees, the Seller shall furnish at his own expense, all labor,
parts, tools; -etc., required.for correcting the defective equipment.
All additional costs which are incurred by LP&L due to additional
tests or originally defective equipment shall be paid by the Seller.'.
2.8 Repair and/or Replacement of Defective Portions: The Seller shall
provide the following minimum Warranty. The Seller shall be responsible
for a period of one year from and after the date of final acceptance
by the Purchaser of the work covered by the contract, for any repairs
or replacements caused by defective materials, workmanship or equipment,
assuming normal and proper use and maintenance, which in the judgment
of LP&L shall become necessary during such period. Final acceptance
shall occur upon satisfactory performance and meeting of guarantees
during -performance testing.. However, if performance testing is delayed
due.to no fault of the. Seller, then the Warranty period shall extend
one year fromthirty (30) days after the work covered by this contract
Is ready for testing. If certain portions are shown to be defective
within the original warranty period, then the warranty period on those
portions shall be extended one year fromandafter such time that all
defects are corrected. The Seller shall undertake with due diligence
to make the aforesaid repairs and/or replacements within ten (10) days
after receiving written notice that such repairs or replacements are
necessary. If the Se ller shall neglect to begin such repairs or replacements
within. this period, -or in case of emergency, where in the judgment of
LPEL delay would cause serious loss or damage, the repairs and/or replace-
ments may be made by the Purchaser and charged to the Seller.
The foregoing minimum Warranty is exclusive and in lieu of all other -
warranties -whether written, oral, or implied, including any warranty .
of merchantability of -fitness for purpose. The Seller shall also include
provisions for warranty extension above the one year minimum. This
-will include conditions, price and terms of extended warranty. At .
the option of the owner, the bid may be evaluated using a price adjustment
to reflect the extended warranty.
2.9 Equipment to be Supplied: The equipment shall be delivered as completely lo
engineered, fabricated, assembled, inspected, and tested units ready
for: installation and connection of external wiring. The Seller may
elect at his -discretion to ship* high voltage bushings, radiators, other
appurtenances, etc., in separate containers for simplified field installa-
tion. Each bidder's proposal shall list all items that are so scheduled,
including oil and nitrogen filling cylinders.
2.10 Service conditions: The equipment will be located in a substation area
- approximately 3300 feet above sea level. KVA ratings shall .be based
on a300 feet above sea level. The ambient temperature may vary between_
-30 to +110° Fahrenheit.
2.11 Material, Equipment and Services Provided by Others: The followi�g
material, equipment, and services are not included in this contract..
1. Foundation and leveling channels _
.2. Unloading of equipment.at railsidin.g '
3. Erection of equipment
2.12 Workmanship': - Al 1 work 'shall be performed and completed in a thorough
workmanlike manner and shall follow the best, modern practice in the
manufacture of high quality apparatus, not withstanding'any omissions
from this specification. All parts shall be made accurately to Amer-
ican Standard gauges where applicable, for mai.ntenance of replacement
and repairs. All special gauges and templates necessary for field
erection shall remain the property of LPGL. .
2.13 Inspection: _
.2.13.1 Inspection of the.apparatus-may, at the discretion of the
Owner.be_at'the Seller's .factory.'. The equipment shall not
be prepared for, shipment or.,shipped before LPEL.has either
inspected the equipment or waived.inspection.'. The waiving
of inspection shall in no way relieve the Seller:of there-
sponsibility of furnishing apparatus'in accordance with these '
specifications..
The costs of -all factory performance tests shall be borne by..
the Seller. _
2.3 3.2 Inspectors representing LP&L-shall be given every facility
to inspect the work during all stages of.manufacture, testing,
and shipment, and they shall have free access at all times
during working hours to all parts of the Seller's factory in-
volved in the manufacture of material covered by -these speci-
fications.- Copies of all Seller's specifications or orders
for material, fabrication, testing, shipping, or other data
that are requested by LP&L to enable its inspector to keep
in close touch with every step in the manufacture of the
apparatus shall be furnished promptly at the time such requests
for such data are first issued. In case of revisions, additions,
cancellations, thereto, LP&L shall either be notified in writing.
or given revised copies of said order or specification.
2.13.3 LP&L shall not be deemed to have given final acceptance of
equipment until sufficient tests have been made to determine that all of the'•requirements of this specificationhavebeen
meta Such tests shall be made within two months of the date
that the unit is completely installed and ready for use. If
• inspection or tests show any deficiency of equipment or any
part thereof, not to be as represented or specified, LP&L
may refuse acceptance until the Seller has corrected such de-
ficiencies at his expense. -
2.14 Certified Test Reports:
2.14.1 Certified copies of test'reports involving.all performance
-5-
. •
_
tests made on the transformer units shall be furnished toy.
LP&L, regardless of whether or not LP&L has been present.at
' ..
the test. These test reports shall show that the trans,fo.rmer
units complied with these specifications and with -all ippli-
cable standards.
2.15 Field
Testing:.".'
2.15.1
Installation: The Seller shall delegate such representative(s)
to the job site as shall be qualified -to supervise the-iris-taii-
ation of the transformer unit, and/or re -assembly of any items*
or appurtenances that were removed for shipment; filling with
oil, and purging with nitrogen bottles.
2.15.2
The Seller shall supervise all necessary tests required to
initially place the "transformer units in operation, and he
shall be responsible for all changes on the transformers
which may result from manufacturing discrepancies and de-
ficiencies. If required to make the transformers conform
to the specifications,.the Seller's representative shall be
available for services to LP&L until the transformer units
are completely.installed, tested and operate to LP&L's.satis-
faction.
• 2.15.3
Performance tests to be rrade. in the field shall be -made at'.
times and under conditions to be mutually agreed upon by LP&L
and the Seller. _
2.16 Applicable Documents: All electrical design materials tested .and con-
structed shall confc-rm to,.'
the latest standards of ANSI, IEEE, NEMA,
.ASME, and other applicable standards.
2.17 Codes and Government Regulations: All -design materials, test and con-
. structioh shall conform to the National Electrical Code and the
National Electrical -Safety Code, and to all the applicable codes, laws
and' regulations of government entities having jurisdiction, including
but not limited to the above codes.
2.18 Finish: All steel surfaces to be painted shall be thoroughly cleaned
and shall receive a phosphatizing treatment or equivalent prior to the
application of paint. External and internal surfaces shall be coated
with at least one coat of corrosion resistant paint and a minimum of
—two coats of finish paint shall be applied to surfaces exposed to the
weather. All transformer units shall have a uniform finish of sky gray.
A suitable amount of finish paint shall-be•provided with -the unit for
touch up purposes after installation. All tank compartments, radiators,
etc., shall be thoroughly pressure tested after welding, but before
painting, to eliminate pressure leaks of nitrogen gas, either during
shipment, or after installation.
2.19 Tools: --See 2.5 .
-6-
2.20 Special.Test Data: ;
•2.20.1 The successful bidder shall submit impulse A est data and
temperature rise test data on a transformer of the -same,
voltzge class and approximate KVA rating.
2.20.2 The following additional specific test data shall be furnished
for the transformer included herein, from tests performed in
accordance with U.S.A.S.1. test Code C 57-12.90-1968 or,latest
revision thereof:
a. Resistance measurements on all windings on the rated
voltage connection of the unit and the tap extremes of
one unit.
b. Ratio tests on the unit, on the rated voltage connections
and on all tap connections.
c. Polarity and phase relation tests on the unit on the rated
voltage connection:
d. No load loss on the unit on rated voltage connections.'-.
e. Exciting current on the unit on the rated voltage connec-
tion. -
f. Impedance and load loss at rated current on the rated -
voltage connection of the unit, and on the tap extremes•
of the unit.
g. Temperature rise tests on the unit for-55° C, FA/FA
rating if not already available, as provided in 2.20.1
above.
Note: The test listed in Item- •.e.a�L �., above, may be waived
if such test data can be furnished for similar equipment units'
of the same voltage class and approximate KVA ratings pre-
viously manufactured and tested by bidder'(indicate date of
such tests).
2.21 Service: Prices quoted in the Proposal must include services required
for field inspection and also include supervision, where required, for
servicing and adjustment of equipment before being placed into service.
The servicing and adjustment of equipment will be by LP&L, under the
supervision of the Seller. All equipment furnished under these speci-
fications.shall be checked in the field by the Seller after it is
assembled. The checks shall be of such breadth as is necessary to
demonstrate accuracy for meters, instruments and relays; prove proper
operation of all control and protective devices; proper operation of
control circuits; proper operation of various mechanical features
such as,,doors and switch operations; prove.proper in resistance;
and to show that each item of equipment may be safely placed in service.
The Seller shall correct any defect found after field assembly in a
manner satisfactory to LP&L before final acceptance of the equipment is
given and shalI assist in placing the equipment in service.
-7-
2.,22 Delivery: Bid consideration will be given (during bid evaluations) 1
to quoted delivery date, and expected reasonable ability of bidder to
meet such delivery dates.
j
2.23 Bidder's Specifications: The Bidder shall include with his Proposal!
all technical data on the transformer he.proposes to furnish that is -
necessary for the Purchaser to establish that these Specifications are
met.
2.24 Evaluation of Bids: Bidders shall supply, along with price and delivery,
core losses and winding losses. Losses quoted will be guaranteed
losses accurate within the tolerances listed in ANSI-057.12-. Bids
will be evaluated on the basis of $3.547 per watt of core loss and .
$2.397 per watt of winding loss. Test results for core loss, winding
loss, and impedance will be furnished for the unit. A $10.00 per
watt penality for total KVA ordered will be charged where testing
confirms the unit to be above guaranteed losses. No monetary credit
will be -given for test values better than those given in the bid.
2.25-Extended.Warranty: In accordance with.Section 2.8, the seller shall
provide a statement of their standard warranty along with the options
for warranty extension. At the option of the owner, a price adjustment'
may be provided to reflect an extended warranty. If this option is'
utilized by the owner, the price adjustment shall not exceed one percent
per extended warranty year...
C i =
F 3.0 Detail-ed Specifications i
Quantity
One (1), Manufacturers standard design, triple rated, three phase
transformer, 60H2; oil filled, OA/FA/FA;-rating of-15,000/
20,000/25,000 KVA, based on 550 C rise with full rating
tap changer under load equipment. The transformer to
be furnished complete with all accessories, mounting
brackets, oil valves and connections, etc., for -full -
OA/FA/FA rating requirements; all circuitry and controls
shall be furnished for the tap changer to operate auto-
matically or manually.
1. CAPACITY:, (Based on 550 C rise at 3300 ft. above sea
level).
Self -Cooled Rating 15,000 KVA
Force Air Cooled Rating 20,000 KVA
Force Air Cooled Rating 25,000 KVA
2. VOLTAGE:
High Side Winding 67,000 Volts
Low Side Winding-, 12,470 Volts
3. IMPEDANCE:,
Minimum 9.0% on a 15,000 KVA base. (Highest practicable
impedance above 9% preferred without price adder.)
4. H I GH .SIDE .TAPS
(Four full capacity no load taps shall be provided
..In the high voltage winding per NEMA standards,
approximately as follows);
A 70,600 Volts
B - 68,800 Volts
C (Rated) 67,000 Volts
D 65,200 Volts
E 63,400 Volts
(All no load taps shall be externally operated by
a manual tap changer located -on the side of the tank,
complete with position indicator.)
5. CONNECTIONS:
High Side Connected Delta
Low Side Connected Wye
6. TAP CHANGER UNDER LOAD:
_ (Low side tap changing under load equipment shall_
• be provided as follows):
_8_
Tap Range Above Normal 10%
Tap Range Below Normal 10%
Taps Above Normal � 16
Taps Below Normal 16.
7. WINDING INSULATION:
High Side - Voltage Class BIL 69.KV
BIL 350 KV
Low Side - Voltage Class BIL 12.5 KV
BIL 110 KV
8: BUSHINGS:
.(All high side bushing will be cover mounted)
Manufacturers standard arrangement.
..'High Side --Voltage Class 69 KV
BIL 350 KV
(All low side bushing will be mounted)
Low Side - Voltage Class 12.5 KV
BIL 110 KV
XO - BIL 110 KV
3.1 General `.
3..1.1 General Scope: These specifications describe power transformer•.
units to'be manufactured in accordance with applicable ANSI and'
NEMA Standards. ANSI C 57.12-1968 and the latest supplements*,
thereof shall be the requirements of this section, except in such
cases where specific requirements of this'specifications conflict ,
with these standards. In such cases, the requirements of this
specification shall take precedence.
3.2 Ratings
Transformer shall be OA/FA/FA with all fans and automatic control for
the OA/FA/FA rating, furnished hereunder.
3.3 Transformer unit shall be designed for continuous self -cooled operation
at,specified OA rating. Transformer shall be oil insulated. Winding
temperature rise by resistance will not exceed 55 C, and hottest -spot
.winding temperature rise will not exceed 65°.C, when operated at either
15, 20, or 25 MVA rating, ,above standard ambient.
3.4 Three Phase and 60 Hertz: The power transformer•included in these specs
fications shall be three phase, single tank unit, designed for operation;
at 60 Hertz.
3.5 Impedance: Standard impedance val.ues.at rated voltage and 550C self-.
cooled KVA ratings shall be in accordance with ANSI C57.12.10 1965,
except that highest practicable impedance (without price adder) would
be preferred. (In any case, the impedance Is not to be below 9.0%)
3.6 Audible Sound Levels: Transformer units shall be so designed that the
average -sound level with -all fans running at full load will not exceed
the values in accordance.with accepted industry practice, and in no
case should the average sound 'level exceed 80 decibels.
3.7 Over Voltage Rating -Requirements: Transformers shall be capable of
TIT —Delivering rated output in KVA at 5 percent above the output
voltage rating of the transformer and
(2) Operating at 10 percent above the output voltage rating of the
transformer at no-load, without exceeding the specified temperature
rise-.
_10_
3.8 LTC Equipment ,
3.8.1 LTC or TCUL (Load Tap Changing or Tap Changing Under Load)
equipment shall.be furnished as specified. LTC equipment shall
provide plus and minus 10 percent Voltage Regulation at -the low
voltage transformer terminals in 5/8 percent steps for in phase
voltage regulation..`
The equipment will•also be designed to withstand full voltage
short circuit conditions and also to initiate and complete any -
desired tap change under full voltage short circuit conditions..
3.8.2 Solid State Static Control system for voltage adjustment shall
be furnished, with "First House" voltage control, to be set by
purchaser, to prevent output voltage from exceeding a pre-set
level..
3.8.3 The load tap changing equipment shall be housed in a separate
oil -filled compartment, with its oil being completely separate
from the transformer.tank.oil. This separate compartment shall
include all standard NEMA accessories, such as magnetic type _
liquid level filter press input and drain "globe" valves, oil
sampling valve, etc., the same as are required for the transformer
tank, itself. Inspection door to this compartment shall be
provided with an_oil.tight seal, with gaskets made of such material
as not to deteriorate under service conditions.
j� 3.8.4 A suitable thermal magnetic circuit breaker shall be provided
`--`� for connection of LTC operating equipment to a 120/240 volt,
single phase, 60 Hertz power source, for LTC motor, heaters,
and lights.
3.8.5 -All necessary automatic load tap changer equipment for•either
maintaining constant,.load, or load compensated voltage, on the
low voltage terminals shall be provided. Tap changer controls
shall include voltage sensing devices, tap changing counter,
regulator supply breakers, and other equipment as required for
operation (excluding externally supplied 120/240 volt single
phase control power). The necessary -internal current transformers
for line drop compensation, shall -be included.
3.8.6 Evidence shall be submitted which indicates that the load tap
changing equipment shall have an expected life of at least
300,000 operations..
-11-
3.8.6 The LTC equipment'shall be'equipped with all necessary devices,
to accomplish operation of the tap changer.
.3.8.7 The following additional accessories shall be included:
a. Tap Position Indicator, Electric reset
b. Remote Control-Auto/Manual/Off Controls with a remote positioh
indicator, raise and lower switch.
c. Automatic -Manual selector switch
d. Raise=Lower switch
e. Means of Manual operation
f. Hinged cover for tap changing compartment
` g.`.Heater for mechanism
h. Light and 120.v. recpt
3.9 Tank
3.9.1 All separate tank units shall -be provided with positive pressure,.
inert gas seal equipment, nitrogen or equivalent. Spare gas
cylinders,•of sufficient capacity to purge, and charge all
�- units for operation, shall be shipped with transformer. The
1 1 gas cylinders will be stamped as follows: Property of Lubbock
Power and Light.
3.10 69KV Bushing Connects
3.10.1 All transformer.bushings shall be -equipped with four -hole NEMA
pads, -to -accommodate -either copper or aluminum terminals,
3.11: Space Heaters
Thermostatically controlled space heaters shall be provided in'quantity
and capacity required to maintain the temperature inside all control
cubicles above dew point temperature for the condi-tions of operation.
A suitable thermal -magnetic. circuit breaker shall be provided for
connection of the heaters to a 120 volt, single phase, 60 Hertz power
source. -
3.12 Transformer Accessories
The transformer shall be furnished with sealed tank, the required amount
of oil, and the accessories listed below: .
1. Controls for low velocity fans with automatic control .from winding
temperature.
2. Three station type arrestors, sky gray color, 60 KV, G.E. Thyrite,
or Westinghouse Auto valve or approved equal-, mounted on the trans
former and rated for•69 KV-grounded-neutral service.
-12-
• 3. Ypper filter press connections and globe valves, for each compartment.
4. Drain (Globe -Valve) and sampling valves, for each compartment. ;
5." Dial type -top oil, thermometer with alarm contacts.
6: Cover mounted "pressure relief device with self -resealing resetting
with mechanical -signal for indication of device operation and with
alarm contacts.
7. Inert gas preservation equipment, for each compartment with alarm
contacts, and initial charging gas cylinders.
.8. Vacuum pressure gauge and bleeder, or relief valve.
9. Lifting lugs or eyes .for cover, core and tank.
10. -Sealed tank construction with welded cover....
11. Sky Gray USA No.-70-tank finish
12. 'Wiring terminals for external 10, 240 Volt control power for fans
and/or FA/FA equipment, tap changing under load equipment motor,
and alarm contact terminals, in an enclosure suitable for outdoor
installation.
13.' Junction box and/or terminals for control and alarm circuit cable
connections.
14. Name plate.
15. Tank grounding pads, on two sides of transformer, and one pad on
--top of.the transformer near the neutral bushing, complete with
connectors to clamp 14/0 Std. copper.
16. Jacking facilities..
17. Base designed for skidding in any direction. Provisions for
pulling in direction to center line segments.
18. Magnetic liquid 1 evel gauge with low level alarm contacts.
19. One or more hand holes or manholes in cover.
20. Can of touch-up paint. '
21. All gauges will be mounted at.eye level..
3.14 Special Features
3.4 4.1 In addition to standard features, the transformer included
hereunder shall be provided with a fault pressure, or sudden
pressure relay which shall be mounted on the transformer
(with suitable range for adjustment of pressure.if applicable);
-Con't-.
_ 13:
• 7 n '
s j
complete with standard voltage and current contacts, two normally
open contacts and two normally closed contacts, and with'terminal
block for external cable connectibns.
3.14.2
- It is anticipated that the transformer will be shipped.•with6ut
oil, because of weight considerations, and that oil of acceptable
'
grade, and In sufficient quantity (Plus 'two extra barrels of
oil) will be shipped separately. In such event, the transformer
shall be sealed and filled with inert gas, under sufficient
gas pressure to assure a detectable pressure reading -on gauges,,' -
at the time of delivery. Transformer can then be filled with
oil, through drain valves in each compartment, and gas bled
off as filling is accomplished. However, should detectable
gas pressure not be present', upon delivery, Seller shall provide
such additional gas, as Seller shall determine, to adequately
purge all compartments and/or, dry out all internal components,
prior to insertion of oil by LP&L.
3.15 Short
Circuit Capability
3.15.1
All windings will be mechanically and thermally self -protected
in accordance with ANSI Standard.0 57-.12.00 (1968 *Sec. 10.4)
3.15.2
The Seller shall show evidence of;mechanical short circuit
capability. •The following test applied to a transformer of.`
.similar design and rating will be considered evidence of .
adequate design. -
Application of six short-circuit tests, with a maximum of two '
fully offset current faults, per phase. Each test shall be
of-10-cycle duration. Applied voltage shall not exceed 105% '
of rated tap voltage nor be- allowed-to.drop- more - than 5% below
rated tap voltage.
-..If the above test has not been applied•to a transformer of
similar rating and design to the -transformer quoted, the Seller
will state in the quotation evidence to show adequate mechanical
design. If the Seller has tested and approved.a transformer
of similar rating and design according to the above test, or
Seller's test, Seller should -state in --his quotation the "pass -
fail" criteria used.
The above required evidence shall include acceptable.short
circuit test results on similar units.for at. least a five year
period. =
3.16 Oil Specifications
3.16.1
General: Insulating oil sufficient quanitty to adequately
.in
fill each transformer, including two (2) extra 55 gallon drums,
shall be furnished and shipped separately in standard size
drums (or may be shipped in a tank=truck, if prior arrangement
can be made with LP&L before each shipment). The oil to be
{
used in the transformer shall be pure insulating oil of proper
_
-
dielectric strength; -unmixed with any other substance; uncon- '
-14-
taminated by shipping container residue; and prepared and
' refined especially for use in high -voltage transformers..
The quality of oil, and the specific quality control tests
to be made, shall be in accordance with latest ASTM specifications.
The Seller shall furnish LPEL with the name of the oil manufacturer
and test specifIcations. for the oil- furnished... The dielectric
r strength of the oil when tested between.one inch discs placed
0.10 inches apalrt, shall be a minimum of 22,000 volts when drawn
from the shipping containers; and shall be minimum of 28,000
volts after dehydration and'purification, if tested again -
as the oil is being inserted into the transformer. It shall
also meet a minimum test of 30,000 volts when drawn from the
sampling device'in the bottom globe valve, after it has been
in the transformer for a period of 48 hours.
3.17 15KV Bushing Connectors
The 15KV bushings will be mounted on the side of the transformer into
a low voltage air filled junction box as shown on the attached drawing.
The junction box will have removable panels for easy access by personnel
to install four (4) 250 MCM copper conductor per phase and four (4)
4/0 bare -copper to the XQ bushing. All connectors required for a
complete installation are included in these specifications.
4.0 Quantity
Three _
-15-
rsas coning 1<repartment
CITY OF LUBBOCK
*' O. Box 2900
'.�• Lubbock, Texas 79457
Telephones:
762.6411
Ext. 216S - 2166 - 2167
fi! GRRW— EDI soul ,
PwESMs
R -CYriA
1�' '. B. Anderson Company
P. 0. Box 1836
Amarillo, Texas 79105
CITY of LueeocK
REQUEST FOR QUOTATION
THIS IS NOT AN ORDER
Mailed tf1..17_gn
No 6045
(Number most appear on ALL
correspondence)
Closing 003 PX1.
Date 11-5-90
am L J VE
cetstiemar
Please quote tts on articles listed below. The right is reserved to accept or reject
all or part of your offer, and to accept the offer the City considers the most advantageous. SIDE
Alternates acceptable if in the City'a opinion the necessary requirements are met. Any
shoos as to quantity to secure a better price are welcome.
Tie" eclumns to be filled is by fire Quoting
:sr auAwrmy UNIT DESCRIPTION BRAND UNIT TOTAL
re. I I I I PRICE I NET PRICE I DELIVERY
3 1 1 15/20/25 XVA Substation Transformers I M.E.
67000-12470 volt with LTC
LF&L Spec #3E-000i-1-101780 attached I M . E .
188,65 565,90 26 wee
ubj ect
Iscalat
199,96 599,90 26 wee:
rices
firm
Bids will be received by the Director of Purchasing at room 103 City Hall until the exact date and time specified above.
Each bid must be sealed in a seperate envelope, addressed to Floyd P. Nesbett, Director of Purchasing, City of Lubbock, Box 2000, Lubbock,
Texas 79457. and have BID NUMBER and CLOSING DATE MARKED ON OUTSIDE OF ENVELOPE.
It shall be the responsibility of each bidder to insure delivery of bids in accordance with said closing date and time. The City of Lubbock, its
Agents. Officials and employees shall not be responsible for delay in the receipt of bids submitted by mail.
ALL BIDS MUST BE QUOTED F.O.B. LUBBOCK. Pricing Escalated r, fi rm—see abo
Net 30 Days (firm unless otherwise stated)
Terms % Minimum of 15 days from receipt of merchandise must be allowed on all ash discounts.
Shipment will be made from Canonsburg. PA
For Additional Information, Contact Mr. Joe Graha mp (506) 762-6411 s Ext, 2551
The undersigned herebY offers to furnish and deliver the articles or services as specified above at the prices and terms stated and in strict accordance
with the specifications and General Conditions of Bidding on reverse side hereof. all of which arm made put this offer.
Date October 29 , 19 80
Signed By 2ple A. C. Linder
ALL BIDS MUST BE SIGNED.