HomeMy WebLinkAboutResolution - 913 - Contract - Mcgraw Edison Company - 3 Substation Transformers - 09_10_1981MR:cl RESOLUTION BID 6045 RESOLUTION 913 - 9/10/81 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Contract betweei the City of Lubbock and McGraw -Edison Company for 3 substation transformers, attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 10th day of September ,1981. r � BILL McALISTER, MAYOR ATTEST lvelyn� ffga, Cit a tary-Treasurer f APPROVED AS TO CONTENT: Carroll McDonald, Director of Electric Utilities APPROVED AS TO FORM: �4 A'.�/ ) I e��- David W. Reagan, Assi;Ant City Attorney P. ,SOi,JTIOii .913 - 9%10/01 '" •� 1Q t981 CITY SECRETARY TREASURER BID 6045 AD�ER�I'L'MNT . FOR e 15/20/25 MVA TRANSFORMER Sealed bids will be received in the office of Floyd Nesbitt, City Pur- chasing Director, Lubbock, Texas, prior to •4:00 P .M. on November 5 , 1980,.and publicly opened immediately there- after on the same date for: 15/20/25 MVA Transformer complete in accordance with specifications #SE-0007-1-101780 and -the Instruc- tions to 'Bidders. ' It is the sole responsibility of the Bidder to insure that his bid is actually in the office of Floyd Nesbitt prior to the above described closing time. The advertisement for bids is by the City of Lubbock, Texas, for'its municipally owned electric utility, Lubbock Power and Light. Any reference to Lubbock Power and Light shall be construed to mean the City of Lubbock, Texas. U • INSTRUCTIONS TO BIDDERS A. All bids must be quoted on the white document entitled "Ctty•of Lubbock Request for Quotation". -Such document must be signed by the Bidder. B.. These specifications #SE-0007-1-101'780 must accompany and be attached to all bids. Such specifications will form a part of the contract entered into between the City of Lubbock`and the successful Bidder. C. Each bid shall be enclosed in a sealed envelope, addressed to Floyd Nesbitt, City Purchasing Director; Lubbock, Texas, and endorsed on the outside of the envelope in the following manner: (a) Bidder's name (b) ;Proposal for: 15/20/25 MVA.Transformer D. Proposals may be withdrawn and resubmitted at any time prior to the time set for the opening of the bids, but no proposal may be withdrawn or altered thereafter. E. The City of Lubbock reserves the right to reject any and all'bids, or parts of bids, and to waive irregularities and informalities in any bid submitted. F. Each bidder shall thoroughly and fully inform himself of all factors .which would affect the prosecution and completion of the work and cost thereof. It shall be understood and agreed that all such factors have been investigated and considered in the preparation of every proposal submitted.' There shall be no subsequent financial adjustment to any contract awarded which is based on- the lack of such prior information or its effect on the cost of the work. G. All sheets of the Instructions to Bidders, proposal forms, Contract Agreement, General Conditions,.and Specifications shall be bound and contained together -when submitted and filed with the City of Lubbock, Texas. Such sheets shall be part of the contract awarded. H. Exceptions to the specifications shall be kept to a minimum, however, if exceptions are taken by the Bidder to the specifications, they shall be clearly and completely noted on a separate attachment. Exceptions taken elsewhere shall not be considered as a part of the bid or subsequent contracts. If any conflict arises between the specifications and the Bidder's proposal (other than exceptions duly noted), the specifications shall govern. i GEA'ERAL.CONDITIONS ' A. The contract awarded to the successful Bidder shall be construed by and governed by the laws -of the State of Texas. B. No payments made or certificates given shall be considered as conclusive evidence of the.performance of the Contract, either wholly or in part, nor shall any certificate or payment be construed.as acceptance of defective materials, parts, systems, or work. Neither the final payment • nor certificate nor any provision in the Contract shall relieve the Bidder of responsibility for faulty materials or workmanship, and he shall remedy any defects due thereto and pay for any damage to other materials or work resulting therefrom, which -shall appear within a period of one year from the date the system is placed in commercial operation. M • CONTRACT AGREEMENT , (EQUIPMENT) . THIS AGREEMENT, made and entered into this 2_ day of September 19 81, by and between The City of Lubbock, Texas acting through its Mayor and City Council thereunto duly authorized so to do, Party of the First Part, and hereinafter called the Purchaser, andMcG-raw-EdisM_ to.; -Power Systems Groun, a _jorporation of TPxat , Party of the Second Part, and hereinafter called the Contractor. WITNESSETH: THAT WHEREAS, the Purchaser has caused to be prepared, in accordance with law, specifications, plans, and other contract documents for the work herein described, and has approved and adopted said documents, and has caused to be published, in the manner and for the time required by law, an advertisement for and in connection with acquiring 15/20/25 MVA Transformer in accordance with the terms of this Contract; and WHEREAS, the. said. Contractor, in .response to such advertisement, has submitted to the Purchaser, in the manner and at the time specified, a sealed proposal in accordance with the terms of said advertisement; and WHEREAS, -the Purchaser, in the manner prescribed by law, has publicly opened, examined, and canvassed the proposals submitted in response to the published invitation therefor, and as a result of such canvass has determined and declared the aforesaid Contractor to be the best bidder for the said work and. has duly awarded to the said Contractor a contract therefor, for the sum or sums named in the Contractor's proposal, a copy thereof being attached to and made a part of this Contract., NOW THEREFORE, --in consideration of the-compensation'to be paid to the Contractor and of the --mutual agreements herein contained, the Parties to these presents have agreed and hereby agree, the Purchaser for itself.and•its successors, and"the Contractor for itself, himself, or themselves,-or..its, his, or their successors and assigns, or its, his, or their. -executors and administrators, as follows: ARTICLE I. That the Contractor shall. (a).furnish all. materials, supplies and equipment specified and required to be incorporated in and form a permanent part of the completed work; (b) provide and perform all necessary work; and, in a good, substantial, and workmanlike manner and in accordance with the provisions of the General Conditions, and the Instructions to Bidders, (which are attached hereto and made a part hereof) and in conformity with the Specifications Number SE-0007-1-101780.; (c) execute and complete all work included in and covered by the Purchaser's official award of this Contract to the said Contractor, such award being based on the acceptance -by the Purchaser of the Contractor's proposal, or part thereof, as follows: 15/20/25 MVA Transformer • , ARTICLE II. That the Purchaser shall pay to the Contractor•for the performance -of the work embraced in this'Contract, and the Contractor will `.:accept as full compensation therefor, the sum (subj-ect to adjustment at pro- vided by the Contract) of Five hundred sixty five thousand nine hundred ' plus escalation ($_565.900.00 ) for all work covered by and included in the Contract award and designated in the foregoing Article I. ARTICLE III. The Contractor shall proceed with the work•to be performed under the provisions of this Contract on, or within ten (10) days following, the date of public acceptance of the Contractor's proposal'by the Purchaser. Contractor shall not delay the start of the work to be performed under the provisions of this Contract except by written order from the Purchaser. Contractor shall complete said work by six months after receipt of order. IN.WITNESS WHEREOF, the Parties hereto have executed this Contract as of day and.year first written. _ CITY OF LUBBOCK BY: B1Lr MEALISTER, MAYOR ATTEST: Evelyn Ga fga, City e e y-Trea surer APPROVED AS TO CONTENT: I 4-do Carroll McDonald, Director of Electric Utilities APPROVED AS TO FORM: Ze 40016Z �Z . J, David W. Reagan, Assifit City Attorney PARTY OF THE SECOND PART (CONTRACTOR) McGRAW-EDISON c/o C. B. Anderson -Co. BY: • Signature of Officer . ATTEST: Secretary. Title {~! NOTE:.. This Contract must -be signed by the President or Vice President of the Contractor's firm and attested by the Secretary of the firm. If the Contract- • is to be signed by any person other than the President or Vice President, then a Board Resolution authorizing said person td sign and bind the firm must be Included with each copy of the Contract. ' RZSOL'UTIOi; . 913 - 9110131 `. ? l0 Iola%, CITY SECRETARY TREASURER ;AID 6045 ADVERTIS)a ENT • FOR s 15/20/25 MVA TRANSFORMER Sealed bids will be received in the office of Floyd Nesbitt, City Pur- chasing Director, Lubbock, Texas, prior to •4:00 P M. on November 5 , 1980,.and publicly opened immediately there- after on the same date for: 15/20/25 MVA Transformer complete in accordance with specifications #SE-0007-1-101780 and -the Instruc- tions to'Bidders. ' It is the sole responsibility of the Bidder to insure that his bid is actually in the office of Floyd Nesbitt prior to the above described closing time. The advertisement for bids is by the City of Lubbock, Texas, for its municipally owned electric utility, Lubbock Power and Light. Any reference to Lubbock Power and Light shall be construed to mean the City of Lubbock, Texas. i 'f • INSTRUCTIONS TO BIDDERS ' A. All bids must be quoted on the white document entitled "CJ.ty of Lubbock Request for Quotation". -Such document must be signed by the Bidder. B. These specifications #SE-0007-1-3001780 must accompany and be attached to all bids. Such specifications will form a part of the contract entered into between the City of Lubbock and the successful Bidder. C. Each bid shall be enclosed in a sealed envelope, addressed to Floyd Nesbitt, City Purchasing Director, Lubbock, Texas, and endorsed on the outside of the envelope in the following manner: (a) Bidder's name (b) Proposal for: 15/20/25 MVA Transformer D. Proposals may be withdrawn and resubmitted at any time prior to the time set for the opening of the bids, but no proposal may be withdrawn or altered thereafter. E. The City of Lubbock reserves the right to reject any and all bids, or parts of bids, and to waive irregularities and informalities in any bid submitted. C� F. Each bidder shall thoroughly and fully inform himself of all factors which would affect the prosecution and completion of the work and cost thereof. It shall be understood and agreed that all such factors have been investigated and considered in the preparation of every proposal submitted. - There shall be no subsequent financial adjustment to any contract awarded which is based on- the lack of such prior information or its effect on the cost of the work. G. All sheets of the Instructions to Bidders,�proposal forms, Contract Agreement, General Conditions, -and Specifications shall be bound and contained together -when submitted and filed with the City of Lubbock, Texas. Such sheets shall be part of the contract awarded. H. Exceptions to the specifications shall be kept to a minimum, however, if exceptions are taken by the Bidder to the specifications, they shall be clearly and completely noted on a separate -attachment. Exceptions taken elsewhere shall not be considered as a part of the bid or subsequent contracts. If any conflict arises between the specifications and the Bidder's proposal (other than exceptions duly noted), the specifications shall govern. '7 GENERAL CONDITIONS A. The contract awarded to the successful Bidder shall be construed by and governed by the laws -of the State of Texas. B. No payments made or certificates given shall be considered as conclusive evidence of the.performance of the Contract, either wholly or in part, nor shall any certificate or payment be construed.as acceptance of .- defective materials, parts, systems, or work. Neither the final payment nor certificate nor any provision in the Contract shall relieve the Bidder of responsibility for faulty materials or workmanship, and he shall remedy any defects due thereto and pay for any damage to other materials or work resulting therefrom, which -shall appear within a period of one year from the date the system is placed in commercial operation. CONTRACT AGREEMENT i (EQUIPMENT) THIS AGREEMENT, made and entered into this 24 day of September 19 81, by and between The City of Lubbock, Texas acting through its Mayor and City Council thereunto duly authorized so to do, Party of the First Part, and hereinafter called the Purchaser, andMcG-rayu-Edison X6,: -Power Systems Group, a Corporation of To-_Ya-, , Party of the Second Part, and hereinafter called the Contractor. - _- WITNESSETH: THAT WHEREAS, the Purchaser has caused to be prepared, in accordance with law, specifications, plans, -and other contract documents for the work herein described, and has approved and adopted said documents, and has caused to be published, in the manner and for the time required by law, an advertisement for and in connection with acquiring 15/20/25 MVA Transformer in accordance with the terms of this Contract; and WHEREAS, the.said- Contractor, in _response to such advertisement, has submitted to the Purchaser, in the manner and at the time specified, a sealed proposal in accordance with the terms of said advertisement; and WHEREAS, -the Purchaser, in the manner prescribed by law, has publicly opened, examined, and canvassed the proposals submitted in response to the published invitation therefor, and as a result of such canvass has determined and declared the aforesaid Contractor to be the best bidder for the said work and has duly awarded to the said Contractor a contract therefor, for the sum or sums named in the Contractor's proposal, a copy thereof being attached to and made a part of this Contract.. NOW THEREFORE, - in consideration of the -compensation to be paid to the Contractor and of the -.mutual agreements herein contained, the Parties to these presents have agreed and hereby agree, the Purchaser for itself .and. its successors, and -the Contractor for itself, himself, or themselves, -or -.its, his, or their successors and assigns, or its, his, or their. -executors and administrators, as follows: ARTICLE I. That the Contractor shall. (a).furnish all.materi.als, supplies and equipment specified and required to be incorporated in and form a permanent part of the completed work; (b) provide and perform all necessary work; and, in a good, substantial, and workmanlike manner and in accordance with the provisions of the General Conditions, and the Instructions to Bidders, (which are attached hereto and made a part hereof) and in conformity with the Specifications Number SE-0007-1-101780; (c) execute and complete all work included in and covered by the Purchaser'-s official award of this Contract to the said Contractor, such award being based on the acceptance by the Purchaser of the Contractor's proposal, or part thereof, as follows: 15/20/25 MVA Transformer 1 ARTICLE II. That the Purchaser shall pay to the Contractor'for the performance of the work embraced in this'Contract, and the Contractor will Accept as full compensation therefor, the sum (subject to adjustment at pro- vided by the Contract) of Five hundred sixty five thousand nine hundred ' plus escalation ($_ _565,900.00 ) for all work covered by and included in the Contract award and designated in , the foregoing Article I. ARTICLE III. The Contractor shall proceed with the work -to be performed under the provisions of this Contract on, or within ten (10) days following, the date of public acceptance of the Contractor's proposal by the Purchaser. Contractor shall not delay the start of the work to be performed under the provisions of this Contract except by written order from the Purchaser. Contractor shall complete said work by six months after receipt of order. IN WITNESS WHEREOF, the Parties hereto have executed this Contract as of day and -year first written. CITY OF LUBBOCK BY: B L cALISTER, MAYOR `ATTEST: elyn`Ga fga, City e e -Treasurer APPROVED AS TO CONTENT: Carroll McDonald, Director of Electric Utilities APPROVED AS TO FORM: /, J David W. Reagan, AssifitaA City Attorney PARTY OF THE SECOND PART (CONTRACTOR) McGRAW-EDISON c/o C. B. Anderson. Co. W. I. May Signature Officer ATTEST: Marketing Manager, ZG u__L.J POWER PRODUCTS MARKETING Secretary." Title { ~' NOTE:. This Contract must -be signed by the President or Vice President of the Contractor's firm and attested by the Secretary of the firm. If the Contract is to be signed by any person other than the President or Vice President, then a Board Resolution authorizing said person td sign and bind the firm must be included with each copy of the Contract. • C E R T I F I C A T E I, William R. Rawson,'duly qualified and acting Secretary of McGRAW-EDISON COMPANY, a Delaware corporation, do hereby certify that the following is a true and exact copy of an excerpt from the minutes of a meeting of the Board of Directors of this corporation held February 14, 1973, at which a quorum was present at all times authorized to transact business on behalf of the corporation pursuant, to the Articles of. Incorporation and the By -Laws of the corporation; and that said resolution is in full force and effect: RESOLVED, that the Secretary or an Assistant Secretary be and is hereby directed to certify from time to time the designation by the Chairman of the Board or President of the Company and the appropriate divisional president of _.various divisional representa- tives whose signature upon bids, contracts, bonds, affidavits and related documents requiring the signa- ture of the corporation with respect to the ordinary course of the business of a division, shall duly bind the corporation; and any of such representatives shall have authority to certify or attest the document and affix the corporate seal, but no one of them may.both sign and certify or attest the document.. In accordance with the foregoing resolution, I do hereby certify that the following persons have been desig- nated from the division specified below: Group: McGRAW-EDISON POWER SYSTEMS GROUP Without Limitation as to Dollar Amount: F. M. McKenna W. F. Oberschelp J. M. Cross T. Shkordoff B. L. Gunn Not in Excess of $1,000,000: D. E. Cragen P. J. Komaromy D. J. DiFilippo W. I. May J. M. Glenn W. F. Motz M. Hervieux R. M. Webler W. N. Isberg L. K. Wendahl R. B. Kalich Not in Excess of $250,000: L. E. Barwick D. H. Woodford R. H. Draeger W. E. Rowland Y. G. Fournier D. A. Zalar L. R. Guidry L. J. Zogran D. N. Keirstead IN WITNESS WHEREOF, I have s K m ha nd'the seal of the corporation this 8th day f October, 1981. c et: ry (� ..i. - x -_ '^`� ......�_u.riawr....a__.a" . -... nw.,..�...,_w......Y rvw.+...>. ,..r.., �yy.LwY; ��J.a-rdlwww+�xF,�._..r ytLr�3• .w�.a iNi�.»+-.,w Lu u.�i..�-w..a.... n...,w .,� .a.�r.+..... ,. _ _�_, . i • f 1 » ' PLANS SPECIFICATION FOR POWER TRANSFORMER LUBBOCK POWER b LIGHT CO. LUBBOCK, TEXAS C_ f + i LUBBOCK POWER b LIGHT POWER TRANSFORMER General Requirements: Each bidder shall submit written evidence•of his qualifications to Lubbock _ Power & Light Electric Distribution Department, in duplicate, not less than 10 days before the advertised date of bid opening, unless this evidence has been supplied on previous bidding with the City of Lubbock. Such evidence shall include all information necessary to certify that the bidder: 1.. Maintains a permanent'place of business. 2. Does not anticipate change in ownership, or major policy during the actual delivery time for these transformers. 3. Has adequate plant and equipment available to do the work properly and . expeditiously with normal manufacturing periods. 4. Has adequate organization and qualified manpower available to efficiently prosecute the work. 5. Has adequate technical knowledge and practical experience. ` 6. Has adequate financial status to meet the funding obligations incident to the work. 7. Has no just or proper claims pending against him regarding the quality of performance of his work. 8. The prime manufacturer of materials and equipment quoted has designed and manufactured equipment similar to the type described in these specif- itations for at least five years. He shall supply a users list and substantiate his claim of satisfactory operation in users system. In the event that certain material shortages unique to other manufacturers or.•other related appurtenances which affect the delivery specified or whichi will affect the technical make-up of the transformers, -the bidder shall , .be required to notify the City of Lubbock Purchasing Department immediately: A possible•post facto change in the purchase arrangement could result in , voiding the bid by the city council- of Lubbock, Texas:..` Where as the delivery time stated in the bid - is one basis for determining the successful bidder by evaluation, the 'City of Lubbock may at its option , require a reduction of one per cent .per month from the original total contract price or final payment to be paid to the bidder by Lubbock Power E Light, as a penalty clause. Exception to the penalty may be made in the form of written permission to extend delivery time each month of overrun and shall only be granted by the. purchasing•agent for the City of Lubbock on the advice of Lubbock Power- b• Light. Proposals may be withdrawn, altered, and resubmitted at any time before time set for opening the bid. Proposals may not be withdrawn, altered, or resubmitted after bid opening. The -City of Lubbock reserves._the right to accept the bid which,_in.it's•. judgment, is the lowest and/or best bid; to reject any and all bids, and to waive irregularities and informalities in any bid that is submitted. Bids = received after specified time of closing will be returned unopened. Al -I bidders shall attach to the bid a copy of their current pricing policy. This pricing policy will remain. in effect for the term of this bid. Alternate pricing is acceptable; such as bidding transformers at a firm -price in addition to a bi-d based on an escalation clause. If the prices are subject to an escala- .--tion clause, the base indices to be used are to be the indices in effect at the time these specifications were released to the bidders. The key indices are to be taken from the U.S: Department of Labor, Bureau of Labor Statistics, Monthly Labor Review publication. The locations will be: a. Petroleum products, refined '(WPI code 05-7) Table 27 693.3 b. Aluminum sheet, plate E foil (SIC 3353);Table 30 .158.2 c. Steel mill products (WPI code 10-13) Table 27 301.0 d. Nonferrous metals (WPI code 10-2) Table 27 289.0 e. Copper and copper products Table 28 211.7 f. -Average hourly earnings - (final) :Electrical equipment (SIC 36) Table 17 Bids will be evaluated on the basis of compliance with specifications, ..price, delivery and experience with bidders product.and local service. Special, consideration will be given to the bids'with the best delivery. EQUIPMENT SPEC1FUATIONS POWER TRANSFORMER 1.0 General 1.1 Purchaser. The potential purchaser, for equipment covered by these specifications, is Lubbock Power E Light, headquartered in Lubbock, Texas. 1.1.1 All mail communications, addressed to Lubbock Power and Light, should be sent.to the attention of Neville Davidson, Electric Distribution, Box 2000, Lubbock,.Texas 79457. .1.1.2 -All questions referred to Lubbock Power S Li-ght by telephone, should be directed to Neville Day.idson, telephone number A.C. 806-763-9381, Ext. 2570. 1.2 Utilization of Equipment 1.2.1 The equipment covered by these specifications is to be used as a step down between Lubbock Power & Light's 69KV transmission and 12.50 distribution. 1.2.2 The substation is located in the City of Lubbock. Such locations shall--be-herein set forth as "paint of destination". Delivery shall be made to a railroad siding selected in advance by LPEL. Bidder shall notify LPEL in advance of ' shipping date so such siding may be designated. 2.0 General Specifications •12.1 Materials and Workmanship: All materials shall be -new material" of high quality which shall give long life and reliable operation.. Parts subjected to high -temperature shall be of such design that serious• deformations shall not occur within the normal life of the'equipment. All equipment shall be modern in design and shall not have been in prior service except as required by factory tests. The workmanship shall be of high quality in every detail. 2.2 Electrical Equipment: All. electrical equipment furnished under these specifications shall be designed, constructed,. and rated in accordance with the Standards of the I.E.E.E., U.S.A.S.I,. A.S.T.M., N.E.M.A., A.N.S.I., E.E.I., and shall pass temperature and voltage tests as re- commended therein. In selecting capacities of equipment, it shall be assumed that the equipment-may'be operated continuously.at conditions of maximum power requirements unless otherwise stated. Under these - ..conditions -of maximum stress and power requirements, deleterious effects. shal I not exceed those permitted by the most stringent.of the above applicable standards. ' 2.3 Equipment Drawings: Preliminary drawings showing principal dimensions of the equipment shall be submitted with each copy of the Bidder's' proposal at -the time the bids are opened. Five copies of each drawing required to show detailed arrangements of equipment, foundation plans, foundations bolt locations, pipe connection locations, principle dimensions, weight with and without oil, and wiring shall be submitted by the Seller to LP&L for signature and approval within 45 calendar days after the date that the contract is awarded. 2.3.1 Drawings and catalog cuts shall be provided by the Seller where specified or -directed; provided, however, --the Seller will not be required to supply drawings which will disclose propriety design or confidential manufacturing information. Bidder shall submit with his bid .a .listing of any types of specifications, or drawings which.he will consider to be proprietory.. 2.3.2 .The Seller shall submit five"(5) copies of*all catalog cuts and 'f ive -(5) sets -of prints of al l other drawings to LP&L for checking and signature. The drawings and catalog cuts shall be accompanied by a letter of transmittal. The trans- mittal letter shall include a list of the numbers and dates of the drawings submitted, the contract number and the item number. Drawings shall be complete, and shall bear the date, the name, and number of the project, drawing number, and the Seller's stamp of approval. One set of the Seller's drawings will be returned to the Seller, marked with corrections to be made, if any; the other set will be retained by LP&L._ The Seller shall then submit one reproducible set and one set of prints of corrected, drawings to LPEL. All changes made by the Seller after such drawings have teen checked by-LP&L.shall be resubmitted in the same manner. -2- 1& 1. 2:3.3 All work done by the Seller on items or portions of -items; for which drawings are required, before he has received copies. of such drawings signed by LP&L, shall be at the Seller's risk. 2.1 A. Review of the Seller's .drawings .shalI not relieve the Seller of any responsiblity. The Seller shall remain responsible • for agreement and conf ormi ty 'of his working - drawings with the contract drawings and specifications. 2.4 Packing and Shipment 2.4.1 All equipment shall be carefully packed to prevent damage in shipment. The seller shall be responsible for the safe arrival of the equipment and shall replace or repair at his own expense any equipment lost or damaged prior to its delivery at the point of destination specified herein.' Oil for the transformer shall be.del.ivered in.barrels, or in bulk hauling equipment. 2.4.2- All•units and -containers shall have external identification indicating procurement contract number, installation locations and the appropriate unit number. All equipment shall be thor-. oughly protected for shipment. •2.4.3 For-all•transformers shipped by rail the Seller shall install a•vibration recorder on the rail car transporting the trans- former which shall maintain an adequate record of vibration and bumping during transit.. Recorder must be available for. inspection by LP&L's agent, prior to removal of recorder from rail car, as a condition of acceptance of delivery by Owner.. 2.4.4 No equipment, purchased hereunder, shall be shipped prior to receipt in writing, by Seller, of "Notice to Ship" as issued . by LP&L. Such "Notice to -Ship" shall not be issued earlier than 60 days prior to proposed shipping date. Seller shall notify LP&L in sufficient time, before proposed shipping date, so that "Notice to Ship" -can be appropriately issued. 2.5 Tools and Accessories: The Seller shall furnish one complete •set. of all specified maintenance tools and all usual accessories, lubri- cating devices, gauges, etc., as required for reliable and safe opera- tion. Tools -shall be new and of first-class quality. ' Tools shall be shipped in a container marked to identify the use of the tools con- tained. 2.6 Operating instructions: The Seller shall furnish with the de livered equipment four copies of instruction books covering all phases .of operation of the equipment. These instruction books shall be ill- ustrated with cuts and drawings to describe adequately the construction and the adjustment of the various parts of the equipment and to faci- Vitate the ordering of spare and renewal parts. 2.7* Field Tests: When specified, field tests of equipment to check its j performance for -comparison with guarantees -will be conducted -in a manner mutually agreed to by LP&L and the"Seller and in accordance - _3_ ` t with the latest rules of A.S.M.E. and I.E.E.E. ..In addition to other , guarantees quoted herein, it is understood that -all equipment furnished by the Seller is guaranteed to operate satisfactorily without undue wear, excessive vibration, excessive noise, excessive lubrication or; undue attention required from its operating personnel. In event of failure of the equipment to.meet its guarantees, including the operative guarantees, the Seller shall furnish at his own expense, all labor, parts, tools; -etc., required.for correcting the defective equipment. All additional costs which are incurred by LP&L due to additional tests or originally defective equipment shall be paid by the Seller.'. 2.8 Repair and/or Replacement of Defective Portions: The Seller shall provide the following minimum Warranty. The Seller shall be responsible for a period of one year from and after the date of final acceptance by the Purchaser of the work covered by the contract, for any repairs or replacements caused by defective materials, workmanship or equipment, assuming normal and proper use and maintenance, which in the judgment of LP&L shall become necessary during such period. Final acceptance shall occur upon satisfactory performance and meeting of guarantees during -performance testing.. However, if performance testing is delayed due.to no fault of the. Seller, then the Warranty period shall extend one year fromthirty (30) days after the work covered by this contract Is ready for testing. If certain portions are shown to be defective within the original warranty period, then the warranty period on those portions shall be extended one year fromandafter such time that all defects are corrected. The Seller shall undertake with due diligence to make the aforesaid repairs and/or replacements within ten (10) days after receiving written notice that such repairs or replacements are necessary. If the Se ller shall neglect to begin such repairs or replacements within. this period, -or in case of emergency, where in the judgment of LPEL delay would cause serious loss or damage, the repairs and/or replace- ments may be made by the Purchaser and charged to the Seller. The foregoing minimum Warranty is exclusive and in lieu of all other - warranties -whether written, oral, or implied, including any warranty . of merchantability of -fitness for purpose. The Seller shall also include provisions for warranty extension above the one year minimum. This -will include conditions, price and terms of extended warranty. At . the option of the owner, the bid may be evaluated using a price adjustment to reflect the extended warranty. 2.9 Equipment to be Supplied: The equipment shall be delivered as completely lo engineered, fabricated, assembled, inspected, and tested units ready for: installation and connection of external wiring. The Seller may elect at his -discretion to ship* high voltage bushings, radiators, other appurtenances, etc., in separate containers for simplified field installa- tion. Each bidder's proposal shall list all items that are so scheduled, including oil and nitrogen filling cylinders. 2.10 Service conditions: The equipment will be located in a substation area - approximately 3300 feet above sea level. KVA ratings shall .be based on a300 feet above sea level. The ambient temperature may vary between_ -30 to +110° Fahrenheit. 2.11 Material, Equipment and Services Provided by Others: The followi�g material, equipment, and services are not included in this contract.. 1. Foundation and leveling channels _ .2. Unloading of equipment.at railsidin.g ' 3. Erection of equipment 2.12 Workmanship': - Al 1 work 'shall be performed and completed in a thorough workmanlike manner and shall follow the best, modern practice in the manufacture of high quality apparatus, not withstanding'any omissions from this specification. All parts shall be made accurately to Amer- ican Standard gauges where applicable, for mai.ntenance of replacement and repairs. All special gauges and templates necessary for field erection shall remain the property of LPGL. . 2.13 Inspection: _ .2.13.1 Inspection of the.apparatus-may, at the discretion of the Owner.be_at'the Seller's .factory.'. The equipment shall not be prepared for, shipment or.,shipped before LPEL.has either inspected the equipment or waived.inspection.'. The waiving of inspection shall in no way relieve the Seller:of there- sponsibility of furnishing apparatus'in accordance with these ' specifications.. The costs of -all factory performance tests shall be borne by.. the Seller. _ 2.3 3.2 Inspectors representing LP&L-shall be given every facility to inspect the work during all stages of.manufacture, testing, and shipment, and they shall have free access at all times during working hours to all parts of the Seller's factory in- volved in the manufacture of material covered by -these speci- fications.- Copies of all Seller's specifications or orders for material, fabrication, testing, shipping, or other data that are requested by LP&L to enable its inspector to keep in close touch with every step in the manufacture of the apparatus shall be furnished promptly at the time such requests for such data are first issued. In case of revisions, additions, cancellations, thereto, LP&L shall either be notified in writing. or given revised copies of said order or specification. 2.13.3 LP&L shall not be deemed to have given final acceptance of equipment until sufficient tests have been made to determine that all of the'•requirements of this specificationhavebeen meta Such tests shall be made within two months of the date that the unit is completely installed and ready for use. If • inspection or tests show any deficiency of equipment or any part thereof, not to be as represented or specified, LP&L may refuse acceptance until the Seller has corrected such de- ficiencies at his expense. - 2.14 Certified Test Reports: 2.14.1 Certified copies of test'reports involving.all performance -5- . • _ tests made on the transformer units shall be furnished toy. LP&L, regardless of whether or not LP&L has been present.at ' .. the test. These test reports shall show that the trans,fo.rmer units complied with these specifications and with -all ippli- cable standards. 2.15 Field Testing:.".' 2.15.1 Installation: The Seller shall delegate such representative(s) to the job site as shall be qualified -to supervise the-iris-taii- ation of the transformer unit, and/or re -assembly of any items* or appurtenances that were removed for shipment; filling with oil, and purging with nitrogen bottles. 2.15.2 The Seller shall supervise all necessary tests required to initially place the "transformer units in operation, and he shall be responsible for all changes on the transformers which may result from manufacturing discrepancies and de- ficiencies. If required to make the transformers conform to the specifications,.the Seller's representative shall be available for services to LP&L until the transformer units are completely.installed, tested and operate to LP&L's.satis- faction. • 2.15.3 Performance tests to be rrade. in the field shall be -made at'. times and under conditions to be mutually agreed upon by LP&L and the Seller. _ 2.16 Applicable Documents: All electrical design materials tested .and con- structed shall confc-rm to,.' the latest standards of ANSI, IEEE, NEMA, .ASME, and other applicable standards. 2.17 Codes and Government Regulations: All -design materials, test and con- . structioh shall conform to the National Electrical Code and the National Electrical -Safety Code, and to all the applicable codes, laws and' regulations of government entities having jurisdiction, including but not limited to the above codes. 2.18 Finish: All steel surfaces to be painted shall be thoroughly cleaned and shall receive a phosphatizing treatment or equivalent prior to the application of paint. External and internal surfaces shall be coated with at least one coat of corrosion resistant paint and a minimum of —two coats of finish paint shall be applied to surfaces exposed to the weather. All transformer units shall have a uniform finish of sky gray. A suitable amount of finish paint shall-be•provided with -the unit for touch up purposes after installation. All tank compartments, radiators, etc., shall be thoroughly pressure tested after welding, but before painting, to eliminate pressure leaks of nitrogen gas, either during shipment, or after installation. 2.19 Tools: --See 2.5 . -6- 2.20 Special.Test Data: ; •2.20.1 The successful bidder shall submit impulse A est data and temperature rise test data on a transformer of the -same, voltzge class and approximate KVA rating. 2.20.2 The following additional specific test data shall be furnished for the transformer included herein, from tests performed in accordance with U.S.A.S.1. test Code C 57-12.90-1968 or,latest revision thereof: a. Resistance measurements on all windings on the rated voltage connection of the unit and the tap extremes of one unit. b. Ratio tests on the unit, on the rated voltage connections and on all tap connections. c. Polarity and phase relation tests on the unit on the rated voltage connection: d. No load loss on the unit on rated voltage connections.'-. e. Exciting current on the unit on the rated voltage connec- tion. - f. Impedance and load loss at rated current on the rated - voltage connection of the unit, and on the tap extremes• of the unit. g. Temperature rise tests on the unit for-55° C, FA/FA rating if not already available, as provided in 2.20.1 above. Note: The test listed in Item- •.e.a�L �., above, may be waived if such test data can be furnished for similar equipment units' of the same voltage class and approximate KVA ratings pre- viously manufactured and tested by bidder'(indicate date of such tests). 2.21 Service: Prices quoted in the Proposal must include services required for field inspection and also include supervision, where required, for servicing and adjustment of equipment before being placed into service. The servicing and adjustment of equipment will be by LP&L, under the supervision of the Seller. All equipment furnished under these speci- fications.shall be checked in the field by the Seller after it is assembled. The checks shall be of such breadth as is necessary to demonstrate accuracy for meters, instruments and relays; prove proper operation of all control and protective devices; proper operation of control circuits; proper operation of various mechanical features such as,,doors and switch operations; prove.proper in resistance; and to show that each item of equipment may be safely placed in service. The Seller shall correct any defect found after field assembly in a manner satisfactory to LP&L before final acceptance of the equipment is given and shalI assist in placing the equipment in service. -7- 2.,22 Delivery: Bid consideration will be given (during bid evaluations) 1 to quoted delivery date, and expected reasonable ability of bidder to meet such delivery dates. j 2.23 Bidder's Specifications: The Bidder shall include with his Proposal! all technical data on the transformer he.proposes to furnish that is - necessary for the Purchaser to establish that these Specifications are met. 2.24 Evaluation of Bids: Bidders shall supply, along with price and delivery, core losses and winding losses. Losses quoted will be guaranteed losses accurate within the tolerances listed in ANSI-057.12-. Bids will be evaluated on the basis of $3.547 per watt of core loss and . $2.397 per watt of winding loss. Test results for core loss, winding loss, and impedance will be furnished for the unit. A $10.00 per watt penality for total KVA ordered will be charged where testing confirms the unit to be above guaranteed losses. No monetary credit will be -given for test values better than those given in the bid. 2.25-Extended.Warranty: In accordance with.Section 2.8, the seller shall provide a statement of their standard warranty along with the options for warranty extension. At the option of the owner, a price adjustment' may be provided to reflect an extended warranty. If this option is' utilized by the owner, the price adjustment shall not exceed one percent per extended warranty year... C i = F 3.0 Detail-ed Specifications i Quantity One (1), Manufacturers standard design, triple rated, three phase transformer, 60H2; oil filled, OA/FA/FA;-rating of-15,000/ 20,000/25,000 KVA, based on 550 C rise with full rating tap changer under load equipment. The transformer to be furnished complete with all accessories, mounting brackets, oil valves and connections, etc., for -full - OA/FA/FA rating requirements; all circuitry and controls shall be furnished for the tap changer to operate auto- matically or manually. 1. CAPACITY:, (Based on 550 C rise at 3300 ft. above sea level). Self -Cooled Rating 15,000 KVA Force Air Cooled Rating 20,000 KVA Force Air Cooled Rating 25,000 KVA 2. VOLTAGE: High Side Winding 67,000 Volts Low Side Winding-, 12,470 Volts 3. IMPEDANCE:, Minimum 9.0% on a 15,000 KVA base. (Highest practicable impedance above 9% preferred without price adder.) 4. H I GH .SIDE .TAPS (Four full capacity no load taps shall be provided ..In the high voltage winding per NEMA standards, approximately as follows); A 70,600 Volts B - 68,800 Volts C (Rated) 67,000 Volts D 65,200 Volts E 63,400 Volts (All no load taps shall be externally operated by a manual tap changer located -on the side of the tank, complete with position indicator.) 5. CONNECTIONS: High Side Connected Delta Low Side Connected Wye 6. TAP CHANGER UNDER LOAD: _ (Low side tap changing under load equipment shall_ • be provided as follows): _8_ Tap Range Above Normal 10% Tap Range Below Normal 10% Taps Above Normal � 16 Taps Below Normal 16. 7. WINDING INSULATION: High Side - Voltage Class BIL 69.KV BIL 350 KV Low Side - Voltage Class BIL 12.5 KV BIL 110 KV 8: BUSHINGS: .(All high side bushing will be cover mounted) Manufacturers standard arrangement. ..'High Side --Voltage Class 69 KV BIL 350 KV (All low side bushing will be mounted) Low Side - Voltage Class 12.5 KV BIL 110 KV XO - BIL 110 KV 3.1 General `. 3..1.1 General Scope: These specifications describe power transformer•. units to'be manufactured in accordance with applicable ANSI and' NEMA Standards. ANSI C 57.12-1968 and the latest supplements*, thereof shall be the requirements of this section, except in such cases where specific requirements of this'specifications conflict , with these standards. In such cases, the requirements of this specification shall take precedence. 3.2 Ratings Transformer shall be OA/FA/FA with all fans and automatic control for the OA/FA/FA rating, furnished hereunder. 3.3 Transformer unit shall be designed for continuous self -cooled operation at,specified OA rating. Transformer shall be oil insulated. Winding temperature rise by resistance will not exceed 55 C, and hottest -spot .winding temperature rise will not exceed 65°.C, when operated at either 15, 20, or 25 MVA rating, ,above standard ambient. 3.4 Three Phase and 60 Hertz: The power transformer•included in these specs fications shall be three phase, single tank unit, designed for operation; at 60 Hertz. 3.5 Impedance: Standard impedance val.ues.at rated voltage and 550C self-. cooled KVA ratings shall be in accordance with ANSI C57.12.10 1965, except that highest practicable impedance (without price adder) would be preferred. (In any case, the impedance Is not to be below 9.0%) 3.6 Audible Sound Levels: Transformer units shall be so designed that the average -sound level with -all fans running at full load will not exceed the values in accordance.with accepted industry practice, and in no case should the average sound 'level exceed 80 decibels. 3.7 Over Voltage Rating -Requirements: Transformers shall be capable of TIT —Delivering rated output in KVA at 5 percent above the output voltage rating of the transformer and (2) Operating at 10 percent above the output voltage rating of the transformer at no-load, without exceeding the specified temperature rise-. _10_ 3.8 LTC Equipment , 3.8.1 LTC or TCUL (Load Tap Changing or Tap Changing Under Load) equipment shall.be furnished as specified. LTC equipment shall provide plus and minus 10 percent Voltage Regulation at -the low voltage transformer terminals in 5/8 percent steps for in phase voltage regulation..` The equipment will•also be designed to withstand full voltage short circuit conditions and also to initiate and complete any - desired tap change under full voltage short circuit conditions.. 3.8.2 Solid State Static Control system for voltage adjustment shall be furnished, with "First House" voltage control, to be set by purchaser, to prevent output voltage from exceeding a pre-set level.. 3.8.3 The load tap changing equipment shall be housed in a separate oil -filled compartment, with its oil being completely separate from the transformer.tank.oil. This separate compartment shall include all standard NEMA accessories, such as magnetic type _ liquid level filter press input and drain "globe" valves, oil sampling valve, etc., the same as are required for the transformer tank, itself. Inspection door to this compartment shall be provided with an_oil.tight seal, with gaskets made of such material as not to deteriorate under service conditions. j� 3.8.4 A suitable thermal magnetic circuit breaker shall be provided `--`� for connection of LTC operating equipment to a 120/240 volt, single phase, 60 Hertz power source, for LTC motor, heaters, and lights. 3.8.5 -All necessary automatic load tap changer equipment for•either maintaining constant,.load, or load compensated voltage, on the low voltage terminals shall be provided. Tap changer controls shall include voltage sensing devices, tap changing counter, regulator supply breakers, and other equipment as required for operation (excluding externally supplied 120/240 volt single phase control power). The necessary -internal current transformers for line drop compensation, shall -be included. 3.8.6 Evidence shall be submitted which indicates that the load tap changing equipment shall have an expected life of at least 300,000 operations.. -11- 3.8.6 The LTC equipment'shall be'equipped with all necessary devices, to accomplish operation of the tap changer. .3.8.7 The following additional accessories shall be included: a. Tap Position Indicator, Electric reset b. Remote Control-Auto/Manual/Off Controls with a remote positioh indicator, raise and lower switch. c. Automatic -Manual selector switch d. Raise=Lower switch e. Means of Manual operation f. Hinged cover for tap changing compartment ` g.`.Heater for mechanism h. Light and 120.v. recpt 3.9 Tank 3.9.1 All separate tank units shall -be provided with positive pressure,. inert gas seal equipment, nitrogen or equivalent. Spare gas cylinders,•of sufficient capacity to purge, and charge all �- units for operation, shall be shipped with transformer. The 1 1 gas cylinders will be stamped as follows: Property of Lubbock Power and Light. 3.10 69KV Bushing Connects 3.10.1 All transformer.bushings shall be -equipped with four -hole NEMA pads, -to -accommodate -either copper or aluminum terminals, 3.11: Space Heaters Thermostatically controlled space heaters shall be provided in'quantity and capacity required to maintain the temperature inside all control cubicles above dew point temperature for the condi-tions of operation. A suitable thermal -magnetic. circuit breaker shall be provided for connection of the heaters to a 120 volt, single phase, 60 Hertz power source. - 3.12 Transformer Accessories The transformer shall be furnished with sealed tank, the required amount of oil, and the accessories listed below: . 1. Controls for low velocity fans with automatic control .from winding temperature. 2. Three station type arrestors, sky gray color, 60 KV, G.E. Thyrite, or Westinghouse Auto valve or approved equal-, mounted on the trans former and rated for•69 KV-grounded-neutral service. -12- • 3. Ypper filter press connections and globe valves, for each compartment. 4. Drain (Globe -Valve) and sampling valves, for each compartment. ; 5." Dial type -top oil, thermometer with alarm contacts. 6: Cover mounted "pressure relief device with self -resealing resetting with mechanical -signal for indication of device operation and with alarm contacts. 7. Inert gas preservation equipment, for each compartment with alarm contacts, and initial charging gas cylinders. .8. Vacuum pressure gauge and bleeder, or relief valve. 9. Lifting lugs or eyes .for cover, core and tank. 10. -Sealed tank construction with welded cover.... 11. Sky Gray USA No.-70-tank finish 12. 'Wiring terminals for external 10, 240 Volt control power for fans and/or FA/FA equipment, tap changing under load equipment motor, and alarm contact terminals, in an enclosure suitable for outdoor installation. 13.' Junction box and/or terminals for control and alarm circuit cable connections. 14. Name plate. 15. Tank grounding pads, on two sides of transformer, and one pad on --top of.the transformer near the neutral bushing, complete with connectors to clamp 14/0 Std. copper. 16. Jacking facilities.. 17. Base designed for skidding in any direction. Provisions for pulling in direction to center line segments. 18. Magnetic liquid 1 evel gauge with low level alarm contacts. 19. One or more hand holes or manholes in cover. 20. Can of touch-up paint. ' 21. All gauges will be mounted at.eye level.. 3.14 Special Features 3.4 4.1 In addition to standard features, the transformer included hereunder shall be provided with a fault pressure, or sudden pressure relay which shall be mounted on the transformer (with suitable range for adjustment of pressure.if applicable); -Con't-. _ 13: • 7 n ' s j complete with standard voltage and current contacts, two normally open contacts and two normally closed contacts, and with'terminal block for external cable connectibns. 3.14.2 - It is anticipated that the transformer will be shipped.•with6ut oil, because of weight considerations, and that oil of acceptable ' grade, and In sufficient quantity (Plus 'two extra barrels of oil) will be shipped separately. In such event, the transformer shall be sealed and filled with inert gas, under sufficient gas pressure to assure a detectable pressure reading -on gauges,,' - at the time of delivery. Transformer can then be filled with oil, through drain valves in each compartment, and gas bled off as filling is accomplished. However, should detectable gas pressure not be present', upon delivery, Seller shall provide such additional gas, as Seller shall determine, to adequately purge all compartments and/or, dry out all internal components, prior to insertion of oil by LP&L. 3.15 Short Circuit Capability 3.15.1 All windings will be mechanically and thermally self -protected in accordance with ANSI Standard.0 57-.12.00 (1968 *Sec. 10.4) 3.15.2 The Seller shall show evidence of;mechanical short circuit capability. •The following test applied to a transformer of.` .similar design and rating will be considered evidence of . adequate design. - Application of six short-circuit tests, with a maximum of two ' fully offset current faults, per phase. Each test shall be of-10-cycle duration. Applied voltage shall not exceed 105% ' of rated tap voltage nor be- allowed-to.drop- more - than 5% below rated tap voltage. -..If the above test has not been applied•to a transformer of similar rating and design to the -transformer quoted, the Seller will state in the quotation evidence to show adequate mechanical design. If the Seller has tested and approved.a transformer of similar rating and design according to the above test, or Seller's test, Seller should -state in --his quotation the "pass - fail" criteria used. The above required evidence shall include acceptable.short circuit test results on similar units.for at. least a five year period. = 3.16 Oil Specifications 3.16.1 General: Insulating oil sufficient quanitty to adequately .in fill each transformer, including two (2) extra 55 gallon drums, shall be furnished and shipped separately in standard size drums (or may be shipped in a tank=truck, if prior arrangement can be made with LP&L before each shipment). The oil to be { used in the transformer shall be pure insulating oil of proper _ - dielectric strength; -unmixed with any other substance; uncon- ' -14- taminated by shipping container residue; and prepared and ' refined especially for use in high -voltage transformers.. The quality of oil, and the specific quality control tests to be made, shall be in accordance with latest ASTM specifications. The Seller shall furnish LPEL with the name of the oil manufacturer and test specifIcations. for the oil- furnished... The dielectric r strength of the oil when tested between.one inch discs placed 0.10 inches apalrt, shall be a minimum of 22,000 volts when drawn from the shipping containers; and shall be minimum of 28,000 volts after dehydration and'purification, if tested again - as the oil is being inserted into the transformer. It shall also meet a minimum test of 30,000 volts when drawn from the sampling device'in the bottom globe valve, after it has been in the transformer for a period of 48 hours. 3.17 15KV Bushing Connectors The 15KV bushings will be mounted on the side of the transformer into a low voltage air filled junction box as shown on the attached drawing. The junction box will have removable panels for easy access by personnel to install four (4) 250 MCM copper conductor per phase and four (4) 4/0 bare -copper to the XQ bushing. All connectors required for a complete installation are included in these specifications. 4.0 Quantity Three _ -15- rsas coning 1<repartment CITY OF LUBBOCK *' O. Box 2900 '.�• Lubbock, Texas 79457 Telephones: 762.6411 Ext. 216S - 2166 - 2167 fi! GRRW— EDI soul , PwESMs R -CYriA 1�' '. B. Anderson Company P. 0. Box 1836 Amarillo, Texas 79105 CITY of LueeocK REQUEST FOR QUOTATION THIS IS NOT AN ORDER Mailed tf1..17_gn No 6045 (Number most appear on ALL correspondence) Closing 003 PX1. Date 11-5-90 am L J VE cetstiemar Please quote tts on articles listed below. The right is reserved to accept or reject all or part of your offer, and to accept the offer the City considers the most advantageous. SIDE Alternates acceptable if in the City'a opinion the necessary requirements are met. Any shoos as to quantity to secure a better price are welcome. Tie" eclumns to be filled is by fire Quoting :sr auAwrmy UNIT DESCRIPTION BRAND UNIT TOTAL re. I I I I PRICE I NET PRICE I DELIVERY 3 1 1 15/20/25 XVA Substation Transformers I M.E. 67000-12470 volt with LTC LF&L Spec #3E-000i-1-101780 attached I M . E . 188,65 565,90 26 wee ubj ect Iscalat 199,96 599,90 26 wee: rices firm Bids will be received by the Director of Purchasing at room 103 City Hall until the exact date and time specified above. Each bid must be sealed in a seperate envelope, addressed to Floyd P. Nesbett, Director of Purchasing, City of Lubbock, Box 2000, Lubbock, Texas 79457. and have BID NUMBER and CLOSING DATE MARKED ON OUTSIDE OF ENVELOPE. It shall be the responsibility of each bidder to insure delivery of bids in accordance with said closing date and time. The City of Lubbock, its Agents. Officials and employees shall not be responsible for delay in the receipt of bids submitted by mail. ALL BIDS MUST BE QUOTED F.O.B. LUBBOCK. Pricing Escalated r, fi rm—see abo Net 30 Days (firm unless otherwise stated) Terms % Minimum of 15 days from receipt of merchandise must be allowed on all ash discounts. Shipment will be made from Canonsburg. PA For Additional Information, Contact Mr. Joe Graha mp (506) 762-6411 s Ext, 2551 The undersigned herebY offers to furnish and deliver the articles or services as specified above at the prices and terms stated and in strict accordance with the specifications and General Conditions of Bidding on reverse side hereof. all of which arm made put this offer. Date October 29 , 19 80 Signed By 2ple A. C. Linder ALL BIDS MUST BE SIGNED. UNSIGNED BIDS %ILL BE RETURNED.