Loading...
HomeMy WebLinkAboutResolution - 874 - Accept Water & Sewer Improvements - Holloway Co - Lots 300-391 LCCE Addition - 07_23_1981RESOLUTION 874 - 7/23/81 RESOLUTION RESOLUTION ACCEPTING WATER AND SEWER SYSTEM IMPROVEMENTS FOR LOTS 300 THROUGH 391, LAKERIDGE COUNTRY CLUB ESTATES ADDITION. WHEREAS, the developer of Lots 300 through 391, Lakeridge Country Club Estates Addition have complied with the provision of the City of Lubbock Code, Chapter 34, Article 2, by providing the water and sewer improvements for said addition in accordance with paragraph 61 of said Chapter 34, and WHEREAS, the total utility cost to the developer is $239,009.40 with the improvements constructed by Holloway Contracting Company having a value of $224,213.63 as determined by the unit prices established by said Chapter 34, and $14,795.77 cash paid to the City, with Lakeridge Country Club Estates the developer to receive a refund of $10,450.07 in accordance with Chapter 34 of the Code of the City of Lubbock and, WHEREAS, the construction of the said water and sewer improvements was performed under the supervision of the Water Utilities Engineer and completed in accordance with the City of Lubbock's plans and specifications, NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: 1. That the improvements be and the same are hereby accepted as an integral part of the water and sewer system of the City of Lubbock. 2. That the refundable cost in the amount of $10,450.07 be made in accordance with said Chapter 34. 3. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 23rd AT EST c :Evelyn G ,fga,y City te e y ZAPROaVEDS 0,-CO NT : 4 Wil or Di.': Watson, Chief Water Utili 'es�!Engineer �APPROVED AS TO FORM: ( , "I e4trt� City' Atto-'ney DAY OF July 19 81 00,0 Bilfl McAlister, Mayor _ APPROVED 1/28/82 (RESOLUTION 847, 6/18/82) GWO 11:0558 TO: W. D. Turner Construction Company 3002 50th Street Lubbock, Texas 79413 Gentlemen: WHEREAS, it is desirable to make changes in the plans and specifications for this project, being namely the addition of construction on the Texas Tech Parking Lot between 5th Street and 6th Street. Original Amount of Contract G.W.O. 11,558 $841,511.65 Increased by Change Order No. 1 $ 23,415.00 Total Amount of Contract $864,926.65 Completion for this Change Order ---April 15, 1982 THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages gained, the Owner and the Contractor agree to the change shown herein and in the revised plans. The Owner agrees to pay the Contractor the amount of increase in cash. The Contractor agrees to proceed with construction and to adhere to applicable specifications, under the direction of the Engineer. Furthermore, the parties agree that the original contract between the Owner and the Contractor shall be modified to the extent herein indicated, including one (1) attachment. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this 28th day of January, 1982. W. D. Turner Construction Company (Contractor) By 4-nj 1 16021� u onstruct on Company Title: CITY OF LUBBOCK (Owner) By Attest: C . L9 Al Henry =, May Vlro Tem Evelyn Ga fga, City S c ary RECOMMENDED FOR APPROVAL Don Jen4EO, Ci Engineer Larry ningham, C ty Manager APPROVED AS TO FORM: n C. Ross, Jr., City Attorney G.W.O. 11,558 Attachment for Change Order No. 1 January 28, 1982 Estimated Quantities Contract Cost 330 L.F. C & G Removal @ $9.00/L.F. $ 2,970.00 20 S.Y. Concrete Slab Removal @ $50.00/S.Y. 1,000.00 254 L.F. Special C & G @ $12.50 3,175.00 278 L.F. C & G @ $10.00 2,780.00 290 S.Y. Paving & Base Removal @ $9.00/S.Y. 2,610.00 40 C.Y. Topsoil Backfill @ $20.00 C.Y. 800.00 210 S.Y. 6' Wide Sidewalk @ $26.00/S.Y. 5,460.00 50 S.Y. Pavement Patching @ $24.00/S.Y. 1,200.00 5 S.Y. New Paving @ $24.00/S.Y. 120.00 275 L.F. of Retaining Wall (6") @ $12. 0 3,300.00 $ 23,415.00