RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF ALLEYS, STREETS, AND/OR AVE-
NUES AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF
ASSESSI2ENTS LEVIED.
WHEREAS, the City of Lubbock heretofore passed various street improvement
ordinances and resolutions and entered into contract with Kerr Construction Compa-
ny G.W.O. 10,976 and G.W.O, 10,976-A, for the making and construction of street
and/or alley improvements on portions; of numerous alleys, streets and/or avenues
in said City including among others the following:
82nd Street from its intersection with a line 30.00 feet East of the East property
line of Quaker Avenue to its intersection with the center line of Memphis Avenue
known and designated as Sub -Unit Number 2 of Unit Number 2237.
AND WHEREAS, the improvements upon the said portions of the abovementioned
alleys, streets and/or avenues, have been inspected and found to have been con-
structed in accordance with terms and specifications of the City as found in G.W.O.
10,976 and G.W.O. 10,976-A.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned alleys, streets
and/or avenues be and the same are hereby accepted, and the City Engineer be and
he is hereby authorized to direct payment of the City's portion of the cost.
II.
That the Mayor and City Secretary be, and they are hereby instructed to exe-
cute and deliver certificates in evidence of the assessments levied against the
parcels of property abutting upon the said portions of the alleys, streets and/or
avenues listed above and against the owners of such property in accordance with
law and in the manner provided in said contract, and the proceedings with reference
to said improvements and assessments where such assessments were levied.
This resolution shall take effect and be in force from and after its passage.
PASSED AND APPROVED THIS 22ND DAY OF
Evelyn Gaff ga,,-City Secret y
4
APPROVED AS TO:CONTENT:
Don Je,#hings/City Engineer
JANUARY, 1981.
Bill McAlister, Mayor
APPROVED AS TO FORM:
ui� ::�_7 *-"
J n C. Ross, Jr., City Attorney
CONSOLIDATED FINAL ESTIMATE ,
G.W.O. 10,976
Accepted Jan. 22, 1981
QUANTITIES
S.Y. S.Y. S.Y. C.Y. C.Y. C.Y.
Paving Paving Alley Re- Compac- Struc- Cement Culvert
9" Black 6" Cali- L.F. turn & S.Y. ted Em- tural Stab. L.F. Headwalls
Unit & Base the Base C,& G Drainage Resur- bankmentExcava- Backfill R.C.P.
Sub -Unit Location Channels facing tion
2237-2 82nd St. from 30' E. of the
E.P.L. of Quaker Ave. to
the center line of Memphis
Ave. 24,077.64 67.80 _�108.46 548.10 7.33 54,993.00 246.72 90.11 150.00 LUMP SUM
vim..
C . LW
r%
COST ESTIMATE
24,077.64
S.Y. Paving 9" Black Base
@
$
15.65
$
376,815.07
67.80
S.Y. Paving 6" Caliche'Base
@
$
5.45
$
369.51
5,108.46
L.F. Curb and Gutter
@
$
6.75
$
34,482.11
548.10
S.Y. Alley Return &
Drainage Channel
@
$
21.50
$
11,784.15
7.33
S.Y. Resurfacing
@
$
4.25
$
31.15
54,993.00
C.Y. Compacted Embankment
@
$
4.65
$
255,717.45
246.72
C.Y. Structural Excavation
@
$
5.50
$
1,356.96
90.11
C.Y. Cement Stabilized
Backfill
@
$
45.00
$
4,054.95
150.00
L.F. Reinforced Concrete Pipe
@
$
52.50
$
7,875.00
LUMP SUM
Culvert Headwalls
@
$1,990.00
$
1,990.00
CONTRACT COST
$
694,476.35
COST DISTRIBUTION
Unit &
Contract City to
Prepaid
Property
Owner Ar-tual
Sub -Unit
Cost Contractor
Paving
Assessment Cost City Co:
2237-2
$694,476.35 $694,476.35
$15,225.50
$26,511.56 $652;239.:
NOTE: $90,298.04'Due Contractor for acceptance
of
this Unit
$604,178.31 Previously paid to Contractor
on
monthly
estimates