HomeMy WebLinkAboutResolution - 566 - Approve 1980-81 Transportation Improvements Program, MPO - 07_24_1980:bs RESOLTUION #566 - 7/24/80 WHEREAS, the Metropolitan Planning Organization for the Lubbock Urbanized a, in cooperation with the City of Lubbock, has prepared a Transportation rovement Program with annual element; and WHEREAS, the City Council of the City of Lubbock approves of the priority jects listed by the Metropolitan Planning Organization; NOW THEREFORE: IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the 1980-1981 Transportation Improvement Program with annual element, ttached hereto and incorporated herein by reference for all purposes, is ereby approved by the City Council of the City of Lubbock. sed by the City Council this 24thday of July 1980. BI L McALISTER, MAYOR yn-Gdffta, City SetretV-Treasurer OVED AS TO CONTENT: H. McDaniel, Traffic AS TO FORM: WTJ ineering Director asan M. Tom, Asst. City Attorney COMMISSION STATE DEPARTMENT OF HIGHWAYS ENGINEER -DIRECTOR A sAM wALoaoP. CHAIRMAN AND PUBLIC TRANSPORTATION B L DEBERRY DEWITT C GEEER RAY A BARNHART P. 0. Box 771 Lubbock, Texas„ 79408 July 15, 1980 IN REPLY REFER TO FILE N0, Mr. Larry, J. Cunningham City Manager City of Lubbock P. 0. Box 2000 Lubbock, Texas 79457 Attention: Mr. Bill McDaniel Dear Sir: As you know, the Steering Committee of the Lubbock Urban Transportation Study presently serves, at the joint request of the City of Lubbock and Lubbock County, as the Metropoli- tan Planning Organization (MPO) for the Lubbock Urbanized Area. One of the responsibilities of the MPO is the annual preparation of a Transportation Improvement Program with annual element (TIP/AE). Preparation of this program has been a cooperative effort by members of our department, Mr. Edgar Chance and Mr. Coy Biggs of Lubbock County, and Messrs. Jim Bertram, Denzel Percifull, Don Jennings, Bill McDaniel, and John Wilson of the City of Lubbock. The TIP/AE is an annual listing of priority projects for a five - year period. The annual element of this program shows the year considered likely to be implemented during the period of September 1, 1980 to August 31, 1981. Any project expected to be implemented within the time period must be a part of the annual element in order to be eligible for Federal funds. Funding amounts shown for.transit items do not express" a commitment for expenditure of funds, but establishes fund eligibility for transit projects. Mr. Larry J. Cunningham VZ -R+ z• d7 2. July 15, 1980 Two copies of the TIP/AE are enclosed. We would appreciate City Council review, suggestions for any necessary revisions, and approval of this program. If there are any questions, please let us know. Very r4Wal;, s, Georg Jr. District Engineer District Five GYJ:kas enclosures xc: Bill McDaniel Y - . f_iw•�t 'N•4 _ . �r b�.yyr3 ice• n TRANSPORTATION IMPROVEMENT PROGRAM FOR LUBBOCK URBANIZED AREA FY 1981 (September 1, 1980 - August 31, 1981) TABLE OF CONTENTS Five-year program of projects -for streets and highways Annual element for streets and highways Five-year program of projects for transit Annual element for transit Breakdown for federal participation Items discussed in Attachment A Page 1 5 7 8 9 10 . July, 1980 TRANSPORTATION IMPROVEMENT PROGRAM FOR LUBBOCK URBANIZED AREA FY 1981 (September 1, 1980 - August 31, 1981) Streets 6 Highways Element The Transportation Improvement Program (TIP) is a staged program developed in cooperation with the City of Lubbock, Lubbock County, State Department of Highways and Public Transportation, and local transit operators. The TIP is in agreement with the transportation plan of the Lubbock Urban Transportation Study. This program follows_ the "3-C"-134 planning process outlined in United States Code 23, "Highways", and also the rules and regulations set forth in the September 17, 1975, Federal Register. The streets and highways element of the transportation improvement program consists of the following projects recommended for advance- ment during -the period,*1980 - 1985. Project Estimated Cost I. H. Extension, N. Loop 289 to S. Loop 289 Investigation Planning Expenses Loop 289, Completely around City of Lubbock Elimination of roadside obstacles Investigation Planning Expense $ 150,000. Construction $ 1,500,000. $ 75,000. $ 1,650,000. 19th Street, Raleigh Avenue to W. Loop 289 Investigation Planning Expense $ 84,000. Construction $ 1,696,000. $ 1,780,000. Avenue A, 35th Street to 45th Street Widen to construct continuous left turn lane Investigation Planning Expense $ 20,000. Construction $ 210,000. $ 230,000. Quaker Avenue,'82nd Street to 98th Street $ 950,000 University Avenue, 4th Street to 19th Street Investigation Planning Expense $ 10,000. Avenues K and L, 28th Street to 37th Street Construction $ 270,000. Traffic Signal Improvement $ 5,000. $ 275,000. Quirt Avenue, 50th Street to 52nd Street Street Revision $ 35,000. July, 1980 US 62 (19th Street) at Avenue S 50th Street at US 84 (Avenue Q) Intersection Revisions $ ? 200,000. University Avenue and Indiana Avenue Permanent Pavement Markings $ 25,000. 82nd Street at Slide Road Traffic Signal $ 35,000. E. 50th Street at Quirt Avenue Traffic Signal $ 30,000. Avenue A'at Broadway Signal modification $ 20,000. Traffic Engineering Study Street Segment Capacity $ 25,000. Feasibility Study for Digital Traffic System $ 30,000. US 84 (Clovis Road), N. Loop 289 to Avenue Q near 3rd Street $ 2,250,000. 4th Street (FM 2255), Indiana Avenue to / W. Loop 289 $ 2,125,000. 4th Street (FM 2255), US 82 (Brownfield Highway) to Indiana Avenue $ 420,C00. I. H. Extension, N. Loop 289 to S. Loop 289 ROW Purchase $ 53,400,000. Quaker Avenue, Loop 289 to 16th Street $ 1,165,000. Quaker Avenue, S. Loop 289 to 82nd Street $ 850,000. 34th Street, 29th Drive to.Milwaukee Avenue $ 850,000. Avenue H, widening from 30th Street to 34th Street Purchase ROW $ 260,000. Indiana Avenue at 34th Street ROW for Intersection Revision $ 175,000. University Avenue, 6th Street to 16th Street Traffic Signal Improvement $ 180,000. (-%Tuly, 1980 Loop 289 at N. Quirt Avenue Traffic Signal $ 75,000. 4th Street (FM 2255) at Brownfield Road Traffic Signal $ 100,000. Clovis Road at Indiana Avenue Traffic Signal $ 40,000. Juniper Avenue near 31st Street Provide RR protective devices $ 70,000. Indiana Avenue near Clovis Road (US 84) Provide planking and signalization for RR crossing $ 75,000. E. 34th Street at Quirt Avenue Grade Separation or Interchange $ -� University Avenue, 4th-Street (US 82) to 19th Street (US 62) Construction $ 750,000. Frankford Avenue, Spur 327 to 82nd Street $ 520,000. Slide Road, 19th Street to 28th Street $ 950,000. Avenue H, US 87 (Amarillo Highway) to 3rd Street $ 150,000. 82nd Street, US 87 (Tahoka Road) to Elgin Avenue $ 2,000,000. Quaker Avenue, Loop 289 to US 84 $ 950,000. 4th Street at Slide Road Intersection improvement $ 500,000. Frankford Avenue at Spur 327 Traffic Signal $ 45,000. Frankford Avenue (FM 2528), Ursuline Street to 4th Street (FM 2255) $ 2,130,000. 50th Street, University Avenue to Gary Avenue $ 450,000. Indiana Avenue, 95th Street to 103rd Street Construction on east half of street $ 300,000. Funding required to be determined by consultant study presently underway. July, 1980 Frankford Avenue (FM 2528) at 4th Street (FM 2255) Signal Installation $ 40,000. N. Quirt Avenue at FM 2641 Traffic Signal $ 35,000. US 62, E. Loop 289 to US 87 (Avenue A) $ 1,600,000. US 82 (Parkway Drive), E. Loop 289 to US 87 (Avenue A) $ 1,500,000. Avenue Q, 50th Street to 1400' NW of Traffic Circle $ 850,000. 34th Street, 1400' SE of Cemetery Curve to Avenue A $ 1,020,000. Indiana Avenue, 34th Street to 50th Street - widen ROW and Construction $ 1,750,000. 29th Drive, 34th Street to Dover Avenue $ 188,000. Municipal Drive, Quirt Avenue to Guava Avenue $ 620,000. 19th Street at Brownfield Highway ROW for interchange $ 5,390,000. 4th Street at -Tech Freeway ROW for interchange $ 4,620,000. University Avenue, Erskine Avenue to 4th Street Avenue A, Erskine Avenue to Broadway Traffic Signal Improvements ��$ 150,000. TOTAL $ 93,913,000. This five-year program of $93,913,000 shows estimated expenditure of $53,400,000 for right-of-way costs on Interstate 27. Does not include funds for providing interchange at intersection of East 34th Street and Quirt Avenue. Funding required to be determined by consultant study presently underway. ssifi- 7 A T ANNUAL ELEMENT - STREETS'AND HIGHWAYS TRANSPORTATION IMPROVEMENT PROGRAM September 1, 1980 - August 31,'1981 Funding p Projects Cost Federal State Local I. H. Extension, N. Loop 289 to S. Loop 289 Investigation Planning Exp. 75,000. ion Loop 289, completely around City of Lubbock Elimination of roadside obstacles - Investigation Planning Exp. 150,000. Construction 1,500,000. 11650,000. 19th Street, Raleigh Avenue to W. Loop 289 Investigation Planning Exp. 84,000. Construction 1,696,000. 1,780,000. Avenue A, 35th Street to 45th Street Widen to construct continuous left turn lane Investigation Planning Exp. 20,000. Construction 210,000. 230,000. Quaker Avenue, 82nd Street to 98th Street 950,000. University Avenue, 4th Street to 19th Street Investigation Planning Exp. 10,000. Avenues K and L, 28th Street to 37th Street Construction 270,000. TSM Traffic Signal Improvement 52000. 275,000. Quirt Avenue, 50th Street to 52nd Street Street Revision TSM 35,000. 67,500. 71500. 1,485,000 165,000. 11,335,000. , 445,000. 172,500. 57,500. 95010 10,000. 275,000. 35 1000. 0 .assifi- �tion Projects US 62 (19th Street) at Avenue S 50th Street at US 84 (Avenue Q) • Intersection Revisions ►U University Avenue and Indiana Avenue Permanent Pavement Markings 82nd Street at Slide Road Traffic Signal E. 50th Street at Quirt Avenue Traffic Signal Avenue A at Broadway Signal modification ction Traffic Engineering Study 2 Street Segment Capacity .ction Feasibility Study for Digital .2 Traffic System TOTALS I 0 E July, 1980' z Funding ' Cost Federal State Local 200,000. 200,000. 25,000. 189750. 6,250. i TSM 35,000. 351000. TSM 30,000. 30,000. TSM 20,000. 20,000. TSM 25,000. 25,000. TSM 30,000. 24,000. 61,000. 5,370,000. 3,127,750. 6819000. 1,561,250. • July, 1980 TRANSPORTATION IMPROVEMENT PROGRAM FOR LUBBOCK URBANIZED AREA FY 1981 (September 1, 1980 - August 31, 1981). Transit Element The transit element of the. Transportation Improvement Program consists of the following projects -recommended for advancement during the period 1980 - 1985. These projects are supported by the Transportation System Management Element. Funding Projects Cost Federal State Local Share Operating Assistance (FY 1979 Amendment) TX-05-4050-01 48,894 24,447 24,447 Operating Assistance (FY 1980) TX-05-4085 1,096,036 548,018 548,018 Operating Assistance (FY 1981) 1,323,166 661,583 661,583 Capital Improvement (FY 1981) 2,707,619 2,166,095 351,991 189,533 Operating Assistance (FY 1982) 1,482,792 .741,396 741,396 Capital Improvement (FY 1982) 1,311,035 11,048,828 170,435 91,772 Operating Assistance (FY 1983) 1,648,728 824,364 824,364 Operating Assistance (FY 1984) 1,834,576 917,288 917,288 Operating Assistance. (FY 1985) 1,8751,450 937,725 937�,725 TOTALS 13,3281,296 7,869,744 522,426 4,936,126 July, 1980 ANNUAL ELEMENT -TRANSIT TRANSPORTATION IMPROVEMENT PROGRAM FY 1981 (September 1, 1980 - August 31, 1981) Classifi- Funding cation Projects Cost Federal State Local Shar Section Operating Assistance 5 (FY 1979 Amendment)• TX-05-4050-01 48,894 24,447 24,447 Section Operating Assistance 5 (FY 1980) TX-05-4085 1,096,036 548,018 5489018 Section Operating Assistance 5 (FY 1981) 1,323,166 661,583 661,583 Section Capital Improvement' 5 (FY 1981) 2,707,619 2,166,095 3519991 189,533 TOTALS _ 5,175,715 39400,143 3519991 1,423,58.1 July, 1980 t TYPE PROJECT FAI FAU FAP Section 112 Section 152 Section 402 BREAKDOWN OF FEDERAL PARTICIPATION TOTAL COST 75,000. 1,8052000. 230,000. 30,000. 1,650,000. 25,000. TOTALS $ 3,815,000 FEDERAL SHARE 167,500. 1,3532750. 172,500. 24,000. 1,4852000. 25,000. $ 3,127,750. July, 1980 The following subjects are discussed in Attachment A: Actions taken on TSME projects in the FY 1980 TIPME Streets and Highways Projects Transit Projects Transportation for the Elderly and Handicapped Project budgets for grant applications Section 5 - Operating Assistance FY 1980 Section 5 - Operating Assistance FY 1981 Section 5 - Capital.Improvement FY 1981 u ATTACHMENT A To avoid duplication and repetition, this packet will be used as an attachment to both the Trans- portation Improvement Program and the Transpor- tation System Management Element. July, 1980 TABLE OF CONTENTS Page Actions taken on TSM projects in the FY 1980 TIP/AE Streets and Highways Projects 1 Transit Projects 3 Transportation for the elderly and handicapped 4 Project budgets for grant applications Section 5 -- FY 1980 Operating Assistance 5 Section 5 -- FY 1981 Operating Assistance 7 Section 5 -- FY 1981 Capital Improvement 9 July, 1960 Actions taken on TSM Projects in the Annual Element of the FY 1980 TIP Streets and Highways Projects Fourteen TSM projects were set up in the annual element of the FY 1980 TIP. Five of the projects were for the installation of new traffic signals. Two of the projects were for the improvement and modern- ization of existing traffic signals. One project was for improvement and modernization of five signals along University Avenue to provide an interconnected signal system. Two projects provided for the revision of existing streets to provide for more efficient traffic movement. One project concerned energy conservation, particularily in regard to encouraging ride sharing. The last three projects were Engineering Studies. One study was for the purpose of studying street segment capacities along three arterials, one study involved intersection capacities at selected intersections and the third study involved.a consideration of alternatives to eliminate major alignment. and railroad crossing problems at the intersection of East 34th Street and Quirt Avenue. Installation of Traffic Signals Projects Status 82nd Street at Slide Road To be carried over to FY 1981 TIP S. Quirt Avenue and Loop 289 Expected to be underway by 9-1-80 19th Street at Frankford Avenue Expected to be underway by 9-1-80 E. 50th Street at Quirt Avenue To be carried over to FY 1981 TIP 13th Street at Slide Road Complete Improvement of existing traffic signals Avenue A at 19th Street Complete Avenue A at 17th Street Complete University Ave., 6th Street to The City of Lubbock is negotiating 16th Street with Texas Tech University for additional ROW to widen this street. Any traffic signal work is imprac- tical until ROW negotiations are complete. This project will be dropped from the annual element and added later when additional ROW is secured. Revision of existing streets Guava Avenue at 4th Street Complete Quirt Avenue from 50th Street To be carried over to FY 1981 TIP to 52nd Street Energy Conservation This task was set up to encourage ride sharing. It was revised'to provide for a vehicle occupancy survey. This survey.will be completed by September 1980 and will'be used as part of the monitoring process for development of an Energy Conservation Plan. Engineering Studies Street Segment Capacity Study of Grade Separation or Interchange Alternatives at East 34th Street and Quirt Avenue Intersection Capacity, This project will -be carried over to the FY 1981 TIP Complete This study was revised to permit a study of the feasibility.of in- stalling a digital traffic computer for controlling the Lubbock Traffic Signal system. To be carried over to the FY 1981 TIP. Eight of the TSM projects in the annual element of the.FY 1980 TIP are expected to be complete or underway by September 1,"'1980. Five of the projects will be carried over to the next fiscal year and one project will be dropped from the annual element. 2. July, 1980 } Actions taken on TSM Projects in the FY 1980 TIP/AE Transit Section Section 5 Operating Assistance Grant (FY 1979) The Lubbock Transit Department has received $428,000 (Grant TX-05-4050) in operating assistance for FY 1979. Section 5 Operating Assistance Grant (Amendment FY 1979) The Lubbock Transit Department has requested payment in the amount of $26,447 (Grant'TX-05-4050-01) under this amendment. These funds have not yet been received. Section 5 Capital Improvement Grant (FY 1979) Section-5-Capital Improvement Grant (Amendment FY 1979) Section 5 Capital Improvement Grant (FY 1980) Phase II All of the above capital improvement grants have been incor- porated into one project (TX-05-0039-02). Procurement of equipment under this project has begun but will not be completed until late in 1981. The Lubbock Transit Department has received $264,123 to date through this grant application. Section 5 Operating Assistance Grant (FY 1980) The Lubbock Transit Department has received $380,935.25 (Grant TX-05-4085) in operating assistance for FY 1980. Section 5 Operating Assistance Grant (FY 1981) Payment under this grant has been requested (TX-05-4101) but has not yet been processed by UMTA. July, 19b0 ELDERLY b HANDICAPPED' In accordance with regulations promulgated through Section 504 of the rehabilitation act, the City developed and subsequently submitted a Transition Plan to UMTA Regional Offices in November of•1979. That document describes how Lubbock's Citibus public transportation system will reach accessibility standards by September 2, 1980 when eighteen lift equipped buses will replace various inaccessible vehicles now in service. While the new buses will technically fulfill federal accessibility requirements, (I fleet lift equipped), it is felt that there are many other special transportation needs among this affected class which cannot be met by the current fixed route transit system. Due primarily to this community perception (which was previously demonstrated through the CFIT transportation system), the City of Lubbock has ordered two lift equipped vans to be placed in the special demand -response service for individuals with various handicaps. The City is confident that with three vehicles a more efficient and viable system can be obtained. I Duly, l:;�v SECTION III - EXHIBIT A PROJECT BUDGET For the Period: October 1, 1979 to September 30, 1980 Transit Operator: Transit.Manaoement Company of Lubbock Designated Recipient: City of Lubbock, Texas 0) a. Operating Expenses Salaries-Permanent.Employees Salaries -Part -Time Employees Stab.i 1 i ty Pay Retirement Social Security Group Insurance Workman's Compensation Motor Vehicle Supplies Minor Tools Office Supplies Educational Supplies Photographic Supplies Postage ' Other Office Supplies Maintenance Motor Vehicles Maintenance Office Furniture Maintenance Other Equipment Maintenance Building Utilities Electric Utilities Telephone Professional Services Boards & Commissions Advertising S Promotion Rent Land Liability Insurance Surety Bonds Other Insurance Travel, Dues, and Training SUB -TOTAL OPERATING EXPENSES INDIRECT COSTS (6,46%) b, . Contract Costs Ma intenance.'Vahicles Transportation Traffic Promotion Ins. S Safety General S Administrative Taxes S Licenses Operating Rents Cost of Working'Capital Management Fee '. SUB -TOTAL CONTRACT COSTS $ 45,501 8,674 800 3,028 3,370 19268 170 350 50 1,800 -0- -0- 200 1.750 300 100 400 -0- 360 96o 10,000 900 27,500 17000 282 11 112,900 1,400 223,07-IT 225.325 679,620 4,040 29,200 36,320 48,950 48,116 8,000 68 , 8o0 5 l�l .371 5. ' I July, 1980 `. Total Operating and Contract Costs $1,385,856 (2) Less Eliminations: a. Non -Mass Transportation Expenses - Charter 47,750 b. Other Exclusions UMTA Section 9 - Technical Study 25,000 72,750 (3) Eligible Operating Expenses (4) Less Farebox Revenue 217,070 (5) Net Project Cost (6) Local Share: City of Lubbock 385,868 University Student Funds 162,150 .. LOCAL SHARE - - - (7) Net Expenses Advanced on Operations Before Applying UMTA Funds (8) UMTA Funds Requested Prepared by: John L. Wilson cvaj Title: Transit Coordinator Date: November 19, 1979 $ 72,750 (2) $1,313,106 (3) $ 217,070- (4) 1,096,036 (5) $ 548,018 (6) $ 54810.18 (7) $ 548,018 (8) 1 _Y 1980 1 StCTION III - EXHIBIT A PROJECT BUDGET For the Period: October 1, 1980 to September 30, 1981 Transit Operator: Transit Management Company of Lubbock Designated Recipient: City of Lubbock, Texas (1) a. Operating Expenses Salaries -Permanent Employees $ 63,377 Salaries -Part Time Employees -0- Stability Pay 705 Retirement 4,728 Social Security 4,166 Group Insurance 1,845 Workmen's Compensation 210 Motor Vehicle Supplies 4,480 Minor Tools -0- Office Supplies 4,250 Educational Supplies 1,500 Photographic Supplies_ 400 Postage 360 Other Office Supplies 2,000 Vaintenance - Motor Vehicles -0- Maintenance - Office Furniture 100 Maintenance - Other Equipment 500 Utilities - Electric -496 Utilities - Telephone 1,800 Professional Services 23,500 Boards & Commissions 1,080 Advertising E Promotion 36,000 Rent - Land -0- Liability Insurance -0- Surety Bonds 12 Other Insurance 132,000 Dues, Travel, Training 2,750 SUB -TOTAL OPERATING EXPENSES $ 286,259 INDIRECT COSTS (6.46%) $ 18,492 b. Contract Costs Labor 666,322 Fringe Benefits 128,347 Services 82,643 Materials b Supplies 556,822 Utilities 13,467 Casualty & Liability Costs 3,500 7. Taxes Miscellaneous Expense Interest Expense Leases S Rentals SUB -TOTAL CONTRACT COSTS Total Operating and Contract Costs (2) Less Eliminations: -a. Non -"ass Transportation Expenses - Charter b. Other Exclusions UMTA Section 9 - Technical Study (3) Eligible Operating Expenses (4) Less Farebox Revenue (5) Net Project Costs (6) Local Share City of Lubbock University Student Funds Secondary Tech Contract Senior Citizen Shopper LOCAL SHARE (7) Net Expenses Advanced on Operations Before applying UMTA Funds (8) UMTA Funds Requested Prepared By: John L. Wilson Title: Transit Coordinator Date: (.►..,July , 1980 14,009 12,900 10,800 5,68o S 1,494,490 $ 1 :799,241 (1) 85,875 40,000 125, 75 $ 125,875 (2) $ 1,673,306 (3) S. 350.200 (4) 1 ,323,166 (5) 461,732 185,946 10,370 3,535 $ 661,583 (6) $ 661,583 (7) $ 661,583 (8) July, 1980 CAPITAL GRANT FY 1981 ESTIMATED PROJECT COST 1) Purchase of 16 new 39-45 passenger diesel powered Advanced Design Buses RTS-I1 (16 x $145,000) $2,320,000. 2) Purchase of 2 engine assemblies (2 x $30,856) 61,712 3) Purchase of 16 spare wheels - (16 x $110) 1,760 4) Purchase of Land - (39,000 sq. ft. x $2/sq. ft.) 78,000 TOTAL PROJECT COST 2,461,472 Contingencies (10%) 246,147 Total Project Costs 2,707,619 Financing Breakdown: City of Lubbock (7%) 189,533 State of Texas Share (13%) 351,991 Federal Share (BO%) 2,166,095 TOTAL PROJECT COSTS $2,707,611