HomeMy WebLinkAboutResolution - 468 - Accept Water & Sewer Improvements - Holloway Co. - Lots 5 & 6, Rip Addition - 04_10_1980RESOLUTION #468 - 4/10/80
RESOLUTION
R%
RESOLUTION ACCEPTING WATER AND.SEWER SYSTEM IMPROVEMENTS FOR LOTS 5 THROUGH 6,
RIP ADDITION.
WHEREAS, the developer of Lots 5 through 6, Rip Addition, have complied with
the provision of the City of Lubbock Code, Chapter 34, Article 2, by providing the
water and sewer improvements for said addition in accordance with paragraph 61 of
said Chapter 34, and
WHEREAS, the total utility cost to the developer is $13,881.77 with the improve
ments constructed by Holloway Contracting Co. having a value of $4,852.25 as
determined by the unit prices established by said Chapter 34, and $9,029.52 cash
paid to the City, with Griffin Properties, the developer, to receive a refund of de-
posit in the amount of $22.25 in accordance with Chapter 34 of the Code of the City
of Lubbock and,
WHEREAS, the construction of the said water and sewer improvements was perfor-
med under the supervision of the City Engineer and completed in accordance with the
City of Lubbock's plans and specifications,
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
1. That the improvements be and the same are hereby accepted as an integral
part of the water and sewer system of the City of Lubbock.
2. That a refund of deposit be made in the amount of $22.25.
3. This resolution shall take effect and be in force from and after its pass
sage.
PASSED AND APPROVED THIS 100DAY OF Apr* , 1980.
'010
BILL McAL I'STER,' Mayor
AT ST:
Ev lyn Gaf a,-. CrItF Set,rdftatij
APPROVED AS TO CONTENT: APPROVED AS TO FORM:
,ec. 0 L�)- x) <:::t�
Wilfd1tW D. Watson, Chief Water C' Attorney
Utilittes Engineer