Loading...
HomeMy WebLinkAboutResolution - 2010-R0532 - Contract 9513 Hardin & Associates Consulting LLC Backflow Prevention - 10/28/2010Resolution No. 2010-RO532 October 28, 2010 Item No. 5.11 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Amendment to a Professional Services Agreement, by and between the City of Lubbock and Hardin & Associates, LLC, and all related documents. Said Agreement is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this ATTEST: Rebe ca Garza, City Secretary APPROVFD AS TO CONTENT: ffia.�t�a-- #'�) j j Marsha Reed, P.E., Chief Operating Officer APPROVED AS TO FORM: Am i s, Assis t City orney asiccdocs.Reso Hardin &Assoc. 10.12.10 October 28 TOM MARTIN, MAYOR , 2010. Resolution No. 2010-RO532 STATE OF TEXAS § COUNTY OF LUBBOCK AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT This amendment to Agreement is entered into this 28 'h day of October , 2010 between the City of Lubbock, a Texas municipal corporation (hereinafter called "the City") and Hardin & Associates, LLC. (the "Consultant"), a Texas corporation. WHEREAS, the Consultant and the City have previously entered into Agreement dated April 19, 2010, Resolution No. 2010-RO203 (hereinafter called "the Agreement"); and WHEREAS, this Amendment to the Agreement adds scope to the original agreement and the City and the Consultant hereby desire to amend said agreement; and WHEREAS, the Agreement and this Amendment to the Agreement provide for Professional Services for conducting backflow prevention customer service inspections (CSIs) as required by the Texas Commission on Environmental Quality (TCEQ), and providing CSI Compliance Reinspection to ensure customer compliance to the City of Lubbock Cross -Connection Control Backflow Prevention Program and Ordinance; and WHEREAS, the purpose of this amendment is to extend the Agreement to allow Hardin & Associates Consulting, LLC. to continue assisting the City in: 1) conducting backflow prevention customer service inspections (CSIs) as required by the Texas Commission on Environmental Quality (TCEQ), and 2) providing CSI Compliance Reinspections to ensure customer compliance to the City of Lubbock Cross -Connection Control Backflow Prevention Program and Ordinance; and WHEREAS, the original scope specified conducting 1,760 CSIs and this Amendment to the Agreement will add an additional 2,000 CSIs to be conducted and 550 CSI compliance reinpections to be conducted; and WHEREAS, this Amendment to the Agreement extends the time for the original Agreement and shall expire on September 30, 2011; and WHEREAS, after completion of the initial Agreement term and amendment, the Agreement may be renewed for a period not to exceed one year per renewal with no more than two renewal periods, under the same terms and conditions and at the sole discretion of the City; and WHEREAS, this Amendment to the Agreement will add $300,930 to the maximum amount payable of this contract, thus increasing the maximum amount payable from $243,640, and establishing a new maximum amount payable for this contract at $544,570; and WHEREAS, the added cost is necessary to conduct 2,000 additional backflow prevention customer service inspections as required by the TCEQ and 550 CSI compliance reinpections to ensure customer compliance to the City of Lubbock Cross - Connection Control Backflow Prevention Program and Ordinance. NOW THEREFORE, the City and the Consultant hereby agree to amend the Agreement as follows: 1) That "Attachment A" of the Agreement is hereby substituted and replaced with the Attachment "A-1" that is attached hereto. 2) That "Attachment B" of the Agreement is hereby substituted and replaced with the Attachment "B-1" that is attached hereto. 3) That "Attachment C" of the Agreement is hereby substituted and replaced with the Attachment "C-1" that is attached hereto. 4) This amendment to the Agreement shall be effective upon execution. The remainder of the Agreement shall remain in full force and affect except as changed herein. IN WITNESS WHEREOF, the parties have executed this Agreement by their duly authorized representatives as of this 28th day of October , 2010. CITY OF LUBBOCK g- ,..-14t; e — TOM MARTIN, MAYOR ATTEST: PO Rebecbe Garza, City Secretary APPROVED AS TO CONTENT: Aubrey A. Spear . ., irect4oWater Resources APPROVED AS TO FORM: r Amy , Assist Ci Atto y HARDIN & ASSOCIATES CONSULTING, LLC By: Name: , Title: Resolution No. 2010-RO532 EXHIBIT A-1 SCOPE OF SERVICES (CONTRACT EXTENSION) BACKFLOW PROTECTION PROGRAM CONSULTING HARDIN & ASSOCIATES CONSULTING, LLC The purpose of this scope of services is for the contract extension between Hardin & Associates Consulting, LLC (HAC) and the City of Lubbock to allow HAC to continuing assisting the City in 1) conducting backflow prevention customer service inspections (CSIs) as required by the Texas Commission on Environmental Quality (TCEQ), and 2) Providing CSI Compliance Reinspections to ensure customer compliance to the City of Lubbock Cross -Connection Control Backflow Prevention Program and Ordinance. BACKGROUND HAC has been working with the City of Lubbock to ensure that the City obtains compliance to the TCEQ regulations that mandate that all public water suppliers have a program to require backflow prevention devices be installed to protect against contamination of public water supplies. This rule became effective January 1, 1996, is found in the Texas Administrative Code, Title 30, and Chapter 290, which states as follows: §290.46 0) Customer Service Inspections. A customer service inspection certificate shall be completed prior to providing continuous water service to new construction, on any existing service either when the water purveyor has reason to believe that cross -connections or other potential contaminant hazards exist, or after any material improvement, correction, or addition to the private water distribution facilities. Any customer service inspection certificate form which varies from the format found in §290.47(d) of this title (relating to Appendices) must be approved by the executive director prior to being placed in use. §290.44 Water Distribution. (h). (1). No water connection from any public drinking water supply system shall be made to any establishment where an actual or potential contamination or system hazard exists without an air gap separation between the drinking water supply and the source of potential contamination. .... Under these conditions, additional protection shall be required at the meter in the form of a backflow prevention device ... on those establishments handling substances deleterious or hazardous to the public health. The water purveyor need not require backflow protection at the water service entrance if an adequate cross -connection control program is in effect that includes an annual inspection and testing by a certified backflow prevention device tester. It will be the responsibility of the water purveyor to ensure that these requirements are met. (Emphasis added) The TCEQ began full enforcement of these regulations and evaluates public water systems for compliance through its annual public water system inspection program. All systems found without a program or with an inadequate program may risk potential enforcement action in the form of fines each day from the TCEQ until an approved program is in place. 1 MAJOR TASKS The major tasks that will be performed by Hardin & Associates Consulting, LLC (HAC) include the following: Task 1 - Project Management HAC will assign a senior Business Consultant Practice (BCP) leader as Project Manager for preparation of the Cross -Connection Control Backflow Prevention Program. Their responsibilities will include leading the project efforts, preparing schedule, insuring that the project is completed in accordance with the Scope of Work, coordinating inspector schedules and serving as the key contact between the City of Lubbock and HAC staff. Project Management will include the development of new CSI Compliance Reinspection Form and template Customer Notification Letter for use during the CSI Compliance Reinspection. Task 2 — Identification of Backflow/Cross-Connection Devices Continue to assist City staff with identifying and developing an approach designed to help identify the types and number of possible water utility connections that could require annual inspection and testing that will meet the TCEQ mandated backflow inspection schedule. This will require a listing (provided by City of Lubbock staff) of water and sewer customer accounts that have or potentially will need the backflow prevention devices. All appropriate accounts will be reviewed by HAC to determine the type of account and possible risk associated with potential cross -connection. 2.1. Conduct in the field CSI inspections for the purpose of compliance, validation and staff training. CISs include Lead Swabs and associated inspection forms 2.2. Enter data from CSI inspections into cross -connection software 2.3. Conduct cross -connection control water use survey inspections (these will be approved on a case by case basis by COL). Task 3 —Conduct CSI Compliance Reinspections to ensure customer compliance. Provide assistance to city staff with CSI Compliance Reinspections. These reinspections will determine customer compliance to the City of Lubbock's Backflow Prevention and Cross - Connection Control program. HAC inspectors will conduct reinspections from the initial CSI inspection documents as well as utilizing a new CSI Compliance Reinspection Form that will track the actions completed by a customer to achieve compliance. This process includes the initial CSI Compliance Reinspection as well as a follow up inspection to secure customer compliance to the City Code of Ordinance. 3.1. Conduct in the field CSI Compliance Reinspections for the purpose of compliance 3.2. Enter and track all HAC inspector CSI Compliance Reinspections documents 3.3. Provide City Staff with updated HAC tracking database of all CSI Compliance Reinspections and pending actions for use by city staff for enforcement recommendations. 2 Resolution No. 2010-RO532 EXHIBIT B-1 PAYMENT OF FEES BACKFLOW PROTECTION PROGRAM CONSULTING HARDIN & ASSOCIATES CONSULTING, LLC The City shall pay HAC for services set forth in Exhibit A on an hourly rate basis and per inspection basis as indicated in the attached schedule below. Each task shall be paid on a Not -to - Exceed basis as follows: Task 1: Project Management (hourly) $ 11,180 Task 2: CSI / Backflow Inspections $220,000 2.1. Customer Service Inspections (CSIs) (per inspection) $210,000 2.2. CIS Data Management (hourly) $ 5,000 2.3. Cross -Connection Surveys (upon City approval) (hourly) $ 5,000 Task 3: CSI Compliance Reinspections $ 69,750 3.1. Conduct in the field CSI Compliance Reinspections (hourly) $ 68,750 3.2. CSI Compliance Reinspections data entry (hourly) $ 1,000 Total Contract Amount $300,930 *All tasks associated with this contract are scheduled to be accomplished by September 30, 2011. 3 Backflow Cross - Connection Water Use CSI Control Sr Per Survey Compliance Sub Program and PM PM TA PIC SAM DM Inspection Inspection Reinspections Tasks Tasks Ordinance $125 $95 $75 $125 $95 $25 $105 $125 (hourly) $125 (hourly) Cost 1 Project 52 40 4 4 S11,180 Management 2 Backflow Inspections Customer 2.1 Service 2,000 S210,000 Inspections 9.1 Data 200 55,000 Management Cross - 2.3 Connection 4U $5,000 Water Use Survey Conduct in the field CSI 3 3.1 Compliance 550 S68,750 Reinspections (hour) CSI Compliance 3.2 Reinspections 40 S1,000 data entry (hourly) 3 Resolution No. 2010-RO532 EXHIBIT C-1 RATE SCHEDULE BACKFLOW PROTECTION PROGRAM CONSULTING HARDIN & ASSOCIATES CONSULTING, LLC COMPENSATION Senior Project Manager $125.00 Project Manager $95.00 Technical Advisor $75.00 Principal In Charge $125.00 Senior Account Manager $95.00 Data Entry Clerk $25.00 Inspection Se ices Ins ecticin atc Performing CSI Inspection 7PeerEforn-iingCSI $105.00 per inspection Performing Water Use SurveyInspection $125.00 per hour Compliance Reins ections $125.00 per hour *These costs include all labor, per diem, materials and other cost associated with this assignment. 4