Loading...
HomeMy WebLinkAboutResolution - 330 - CO#1 To Contract - Hunter Co. - Renovation, Landwer House - 11_08_1979LGB : bs RESOLUTION #330 - 11/8/79 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 1 with Hunter Construction Co. adding $2,335.00 to the contract amount for the renovation of Landwer House, attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 8th ATTEST: Evelyn Gaf ga City c e y-Treasurer ';APPROVED AS TO F.09M.,. Leon G, Bean, Assistant City Attorney day of APPROVED AS TO CONTENT: Lawrench Banks, Administrative Assistant to Community Facilities November '- 7-)) f I''I � :M ` '."- . .1979. CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ AIA DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: LANDWER HOUSE RENOVATION (name, address) LUBBOCK. TEXAS TO (Contractor): 1sJ.D.HUNTER CONSTRUCTION CO.1 5205-34TH STREET LUBBOCK, TEXAS CHANGE ORDER NUMBER: 1 INITIATION DATE: OCTOBER 25, 1979 ARCHITECT'S PROJECT NO: N/A CONTRACT FOR: RENOVATION AND GENERAL CONSTRUCTION JCONTRACT DATE: OCTOBER 25, 1979 You are directed to make the following changes in this Contract: ALTERNATE #1 AS PER PLANS SHEET 20F8 WHICH STATES: REMOVAL OF EXISTING ROOF TILES WILL BE PERFORMED BY THE CONTRACTOR AS PART OF THIS CONTRACT... COST TO THE OWNER +$1000.00(ONE THOUSAND DOLLARS) ALTERNATE #2 AS PER PLANS SHEET 10178 WHICH STATES: INSTALLATION OF 2" GAS SERVICE LINE FROM METER(SEE SITE PLAN SHEET 1OF8 ) TO 6" I.P.GAS SERVICE TAP, 640.0' FROM N.E. CORNER OF MAIN HOUSE, WILL BE PERFORMED BY THE CONTRACTOR AS PART OF THIS CONTRACT... COST TO THE OWNER +$1,335.00 (ONE THOUSAND THREE HUNDRED THIRTY FIVE DOLLARS ) Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $ 99,897.00 Net change by previously authorized Change Orders ................................... $ 0 The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... $ 99,897.00 The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) 0ftX@tXXIXkcOC"KXA) by this Change Order......................................................... $ +2 335. 00 The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ 102,232.00 The Contract Time will be)(;K&M&9*k& KkW (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is UNCHANGED Authorized: RON.D. BEARD/ D..NOWAK J.D.HUNTER_CONSTRUCTION _CITY OF LUBBOCK A Z305 AVENUE T/ \ CONTRACTOR OWNER Add== _ Address li Address MEI AIA DOCUMENT G701 CHANGE ORDER APRIL 1978 EDITION AIA® • © 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 J'c�G701 �78 r �C�/