HomeMy WebLinkAboutResolution - 293 - Accept Paving Improvements- LAP Inc- Lots 221-242, Lubbock Indutrial Park Add - 10_11_1979RESOLUTION #293 - 10/1
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION" OF A STREET
AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provi-
sions of City Ordinance 1331, the subdivider of Briercroft Addition,
Lots 221 through 242, made arrangements with Lubbock Asphalt Products,
Inc. for theconstruction of paving improvements on a certain street
dedicated in said subdivision under the provisions of said Ordinance
prior to the recording of the subdivision plat of Briercroft Addition
including the following street:
57th Street from its intersection with the West Lip Line of Avenue
S to its intersection with the cul-de-sac west of Avenue S, known
and designated as New Subdivision sub -unit Number 74 of Unit
Number 2024.
AND WHEREAS, the construction of the above improvements on the
abovementioned street was performed under the supervision of the
City Engineer, and said improvements have been completed and have
been inspected and found to have been constructed in accordance with
City specifications and in accordance with the provisions of City
Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned
street be and the same are hereby accepted and the City Engineer be
and he is hereby authorized to direct the payment of the City's
portion of the cost and to release escrow money.
II
This resolution shall take effect and be inforce from and
after its passage.
PASSED AND APPROVED THIS llth DAY OF OCTOBER, 1979.
Najoorrlz West, MTor
APPROVED AS TO CONTENT:
. -t�s
W i fo D Watson, City Engineer
APPROVED AS TO FORM:
011n C. Ross, Jr., City Attorney
Tied to Reso #293
10-11-79
QUANTITIES
Unit &
Sub -Unit
N.S.
2024-74
COST ESTIMATE
CONSOLIDATED FINAL ESTIMATE
BRIERCROFT ADDITION
LOTS 221 through 242
ACCEPTED OCTOBER 11, 1979
S.Y. L.F.,
Alley C & G
S.Y. Return S.Y. Removal
Paving L.F. & Drainage Valley and
Location 6" Base C & G Channel Gutter Repair
57th Street from
the W.L.L. of
Avenue S to the
cul-de-sac West
of Avenue S.
Developer Quantities 1689.40 992.90 709.39 52.54 147.20
City Park Depart-
ment Quantities 10.00 234.01
TOTAL 1689.40 1002.90 943.40 52.54 147.20
1689.40
S.Y.
Paving 6" Base
@$
4.50
1002.90
L.F.
Curb .& Gutter
@$
4.50
943.40
S.Y.
Alley Return & Drainage
@$
22.00
Channel
52.54
S.Y.
Valley Gutter
@$
22.00
147.20
L.F.
of C & G Removal and Repair
@$
5.75
CONTRACT COST
COST DISTRIBUTION
Unit & Contract Property Owner
Sub -Unit Cost Cost
NS 2024-74 $34,872.43 $29,679.21
City to
Contractor
$5,193.22
$ 7,602.30
$ 4,513.05
$20,754.80
$ 1,155.88
$ 846.40
$34,872.43