Loading...
HomeMy WebLinkAboutResolution - 082268C - Street Improvements - Pioneer Pavers Inc - GWO 2935 Multiple Locations - 08_22_1968� N RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESSMEN. LEVIED. WHEREAS, the City of Lubbock heretofore passed various street improvement ordinances and resolutions and entered into contract with Pioneer Pavers, Inc. (G.W.O. 2935) for the making and construction of street improvements on portions of numerous streets and/or avenues in said City including among others the following: Avenue V from its intersection with the South Property Line of 38th Street to its intersection with a line 15 feet South of the North Property Line of 39th Street known and designated as Sub -Unit Number 20 of Unit Number 2180. 53rd Street from its intersection with a line 18 feet West of the West Property Line of Avenue J to its intersection with a line 8 feet East of the East Property Line of Avenue L known and designated as Sub -Unit Number 24 of Unit Number 2180. 62nd Street from its intersection with a line 15 feet East of the East Property Line of Indiana Avenue to''its intersection with a line 797.55 feet East of the East Property Line of Indiana Avenue known and designated as Sub -Unit Number 27 of Unit Number 2180. North one-half of 54th Street from its intersection with a line 8 feet West of the West Property Line of Kenosha Avenue to its intersection with a line 3 feet West of the West Property Line of the alley West of Kenosha Avenue known and designated as Part of Sub -Unit Number 28 of Unit Number 2180. 53rd Street from its intersection with a line 13 feet East of the East Property Line of Salem Avenue to its intersection with a line 13 feet West of the West Property Line of Raleigh Avenue known and designated as Sub -Unit Number 30 of Unit Number 2180. Raleigh Avenue from its intersection with the South Property Line of Brownfield Road to its intersection with a line 8 feet North of the North Property Line of Brownfield Drive known and designated as Sub -Unit Number 32 of Unit Number 2180. 21st Street from its intersection with a line 9 feet East of the East Property Line of Slide Road to its intersection with the East Property Line of Lot 24, Bobalet Heights Addition known and designated as Sub -Unit Number 34 of Unit Number 2180. 24th Street from its intersection with a line 9 feet East of the East Property Lin of Slide Road to its intersection with a line 15.3 feet West of the West Property Line of Wayne Avenue known and designated as Sub -Unit Number 35 of Unit Number 218 York Avenue from its intersection with a line 2.5 feet North of the North Property Line of the alley South of 18th Street to its intersection with a line 3 feet South of the North Property Line of 19th Street known and designated as Sub -Unit Number 40 of Unit Number 2180. 56th.Street from its intersection with a line 2 feet East of the East Property Line of Avenue L (North Leg) to its intersection with a line 8 feet West of the West Property Line of Avenue J known and designated as Sub -Unit Number 4 of Unit Number 2182. Dover Avenue from its intersection with a line 10 feet South of the South Property Line of 46th Street (West Leg) to its intersection with a line 16 feet North of the North Property Line of 48th Street (East Leg) known and designated as Sub -Unit Number 6 of Unit Number 2182. AND WHEREAS, the improvements upon the said portions of the abovementioned streets and/or avenues, have been inspected and found to have been constructed in accordance with terms of said contract (G.W.O. 2935). THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned streets and/or avenues be and the same are hereby accepted, and the City Engineer be and he is hereby authorized to direct payment of the City's portion of the cost. II. That the Mayor and City Secretary be, and they are hereby instructed to execute and deliver certificates in evidence of the assessments levied against the parcels of property abutting upon the said portions of the streets and/or avenues listed above and against the owners of such property in accordance with law and in the manner provided in said contract, and the proceedings with reference to said improvements and assessments where such assessments were levied. III. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 22ND ATTESKI v h Lav is Lowe, CUSecretary APPR amuel W. Wahl, C ty fngineer AP D: red 0. Senter, Jr., y tbrney � I CIelm TY OF= l_IJBBOCK POrter 2-6411 P. O. Box 2000 LUBBOCK,TEXAS 7 9 4 0 8 August 22, 1968 Honorable Mayor and City Council Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Pioneer Pavers, Inc., paving contractor, under their contract dated November 9, 1967, designated as G.W.O. 2935 and find the improvements on Avenue V from 38th Street to 39th Street, 53rd Street from Avenue J to Avenue L, 62nd Street from Indiana Avenue to approximately 800 feet East, North one-half of 54th Street from Kenosha Avenue to the alley West of Kenosha Avenue, 53rd Street from Salem Avenue to Raleigh Avenue, Raleigh Avenue from Brownfield Road to Brownfield Drive, 21st Street from Slide Road to Vicksburg Avenue, 24th Street from Slide Road to Wayne Avenue, York Avenue from the alley South of 18th Street to 19th Street, 56th Street from Avenue L to Avenue J, Dover Avenue from 46th Street to 48th Street as listed on the final estimate and assessment sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said streets and/or avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock and issue assignable certificates against property owners for the respective amounts shown on the attached final assessment sheets as being due against them and their respective properties. Your very truly, mue W. Wahl City Engineer CONSLLIDATED FINAL ESTIMATE GWO 2935 Accepted August 22, 1968 UANTITIES L.F.Rein- S.Y. S.Y. S.Y. S.Y. Extra Unit & forced 30" Paving L.F. Alley Valley Re-sur- Aspha Sub -Unit Location Gutter 6" Base C & G Return Gutter facing Gal. 2180-20 Avenue V from the SPL of 1,021.57 597.12 16.00 102., 38th St, to 15' S. of the NPL of 39th St. 2180-24 53rd Street from 18' W. 2,133.63 1,232.60 213., of the WPL of Ave. J to 8' E.of the EPL of Ave.L 2180-27 62nd Street from 15' E. 3,035.26 1,601.20 17.38 of the EPL of Indiana Ave. to 797.55' E. of the EPL of Indiana Ave. Part of 2180-28 N 1/2 of 54th St. from 340.44 197.50 8.00 42.56 8' W.of the WPL of Kenosha Ave. to 3' W.of the WPL of the alley West of Kenosha Ave. 2180-30 53rd Street from 13' E. 2,040.89 1,153.90 204.i of the EPL of Salem Ave. to 13' W.of the WPL of Raleigh Ave. 2180-32 Raleigh Avenue from the 147.40 1,504.48 722.60 10.00 18.64 SPL of Brownfield Rd.to 8' N.of the NPL of Brownfield Dr. 2180-34 21st Street from 9' E. 6,071.73 2,043.10 of the EPL of Slide Road to the EPL of Lot 24, Bobalet Heights Addition 2180-35 24th Street from 9' E.of 3,339.43 1,421.11 the EPL of Slide Road to 15.3' W.of the WPL of Wayne Ave. 2180-40 York Avenue from 2.5' N. 1,439.65 827.54 25.00 of the NPL of the alley S. of 18th St. to 3'S.of the NPL of 19th St. 2182-4 56th Street from 2' E.of 2,519.14 1,165.70 49.61 252.0 the EPL of Ave. L(North Leg) to 81W.of the WPL of Ave. J 3O.1567 Acceptance Date 8-22-68 G.W.O. 2935 FINAL PAVING ASSESSMENT 53RD STREET Sheet No. 1 of 2 CITY OF LUBBOCK Sub -Unit No. 24 of Width 36 Feet From 18' W. of WPL Avenue J to 8' E. of EPL Avenue L Unit No. 2180 Paving Curb & Gutter Blk. $3.9861797 Rate/L.F. $1.9425 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost Cost Cost NORTH SIDE Herbert Kirk 6 Kirk Subdivision 55.00 219.24 106.84 326.08 Herbert Kirk 7 Kirk Subdivision 63.00 251.13 122.38 373.51 Herbert Kirk 8 Kirk Subdivision 63.00 251.13 122.38 373.51 Herbert Kirk 9 Kirk Subdivision 63.00 251.13 122.38 373.51 Herbert Kirk 10 Kirk Subdivision 63.00 251.13 122.38 373.51 J. E. Maisen Beginning at the Southeast corner of Lot 10, Kirk 100.00 398.62 194.25 592.87 Subdivision to the City of Lubbock, Texas; Thence East 100.00 feet; Thence North 132.50 feet; Thence West 100.00 feet to the Northeast corner of said Lot 10; Thence South 132.50 feet to the point of beginning Billy Reed Beginning at a point 100.00 feet East of the 177.00 705.55 343.82 1,049.37 Southeast corner of Lot 10, Kirk Subdivision to the City of Lubbock, Texas; Thence East 195.00 feet; Thence North 132.50 feet; Thence West 195.00 feet; Thence South 132.50 feet to the point of beginning SOUTH SIDE Curtis E. Wilson 8 1 Pattillo Subdivision 47.00 187.35 91.30 278.65 R. L. Suttle 7 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 CONSLLIDATED FINAL ESTIMATE GWO 2935 Accepted August 22, 1968 UANTITIES L.F.Rein- S.Y. S.Y. S.Y. S.Y. Extra Unit & forced 30" Paving L.F. Alley Valley Re-sur- Aspha Sub -Unit Location Gutter 6" Base C & G Return Gutter facing Gal. 2180-20 Avenue V from the SPL of 1,021.57 597.12 16.00 102., 38th St, to 15' S. of the NPL of 39th St. 2180-24 53rd Street from 18' W. 2,133.63 1,232.60 213., of the WPL of Ave. J to 8' E.of the EPL of Ave.L 2180-27 62nd Street from 15' E. 3,035.26 1,601.20 17.38 of the EPL of Indiana Ave. to 797.55' E. of the EPL of Indiana Ave. Part of 2180-28 N 1/2 of 54th St. from 340.44 197.50 8.00 42.56 8' W.of the WPL of Kenosha Ave. to 3' W.of the WPL of the alley West of Kenosha Ave. 2180-30 53rd Street from 13' E. 2,040.89 1,153.90 204.i of the EPL of Salem Ave. to 13' W.of the WPL of Raleigh Ave. 2180-32 Raleigh Avenue from the 147.40 1,504.48 722.60 10.00 18.64 SPL of Brownfield Rd.to 8' N.of the NPL of Brownfield Dr. 2180-34 21st Street from 9' E. 6,071.73 2,043.10 of the EPL of Slide Road to the EPL of Lot 24, Bobalet Heights Addition 2180-35 24th Street from 9' E.of 3,339.43 1,421.11 the EPL of Slide Road to 15.3' W.of the WPL of Wayne Ave. 2180-40 York Avenue from 2.5' N. 1,439.65 827.54 25.00 of the NPL of the alley S. of 18th St. to 3'S.of the NPL of 19th St. 2182-4 56th Street from 2' E.of 2,519.14 1,165.70 49.61 252.0 the EPL of Ave. L(North Leg) to 81W.of the WPL of Ave. J UANTITIES L.F.Rein- S.Y. S.Y. S.Y. S.Y. Extra Unit & forced Paving L.F. Alley Valley Re-sur- Aspha Sub -Unit Location 30"Gutter 6"Base C & G Return Gutter facing Gal. 2182-6 Dover Avenue from 10' S. 2,541.65 1,134.54 of the SPL of 46th St. (West Leg) to 16' N.of the NPL of 48th St.(E.Leg) TOTAL 147.40 25,987.87 12,096.91 59.00 36.02 92.17 771. COST ESTIMATE 147.40 L.F. Reinforced 30" Gutter @ $2.25 $ 331.65 25,987.87 S.Y. Paving 6" Base @ $1.95 50,676.35 12,096.91 L.F. Curb & Gutter @ $1.85 22,379.28 59.00 S.Y. Alley Return @ $7.00 413.00 36.02 S.Y. Valley Gutter @ $7.50 270.15 92.17 S.Y. Resurfacing @ $1.40 129.04 771.00 Gal. Extra Asphalt @ $0.20 154.20 CONTRACT COST $ 74,353.67 COST DISTRIBUTION Property City From Paving Unit & Contract Owner to Extension Sub -Unit Cost Cost Contractor Fund 2180-20 3,229.12 2,173.47 1,055.65 2180-24 6,483.48 6,924.71 -441.23 2180-27 9,011.32 7,785.84 221.03 1,004.45 2180-28 1,144.83 791.19 353.64 2180-30 6,155.26 6,806.12 -650.86 2180-32 4,812.00 4,649.27 162.73 2180-34 15,619.61 14,972.71 646.90 2180-35 9,140.94 8,999.25 141.69 2180-40 4,513.27 3,219.98 1,293.29 2182-4 7,188.72 7,438.74 -250.02 2182-6 7,055.12 6,852.40 202.72 TOTALS $ 74,353.67 70,613.68 2,735.54 1,004.45 30.1586 Acceptance Date 8-22-68 G.W.O. 2935 FINAL PAVING ASSESSMENT AVENUE "V" Sheet No. 1 of 1 CITY OF LUBBOCK Sub -Unit No. 20 of Width 36 Feet From SPL 38th Street to 15' S. of the NFL of 39th Street Unit No. 2180 Paving Curb & Gutter $2.6574531 Rate/L.F. $1.9425 Rate/L.F. Total Owner Lots Addition No. Ft. _ Cost _ Cost Cost EAST SIDE Henry T. Young 10 Godwin Addition of Lot 1, 132.5 * 291.16 257.38 548.54 Block 11, Alta Vista Acres Subdivision Johnny Brooks** 11 Godwin Addition of Lot 1, Block 11, Alta Vista Acres Subdivision WEST SIDE John T. Burns Lot l,less dedicated street right of way Billie Hill** 20 Womack Addition of Lot 2, Block 11, Alta Vista Acres Subdivision Womack Addition of Lot 2, Block 11, Alta Vista Acres Subdivision *Assessment cost was reduced 10% by City Council 1-10-68 **City agreed to purchase paving cert. on 3-14-68 (Item #37) 132.5 * 291.16 127.5 * 280.18 132.5 * 291.16 TOTAL PROPERTY OWNER COST 4 CITY'S SHARE TOTAL FINAL SUB UNIT COST 257.38 548.54 247.67 527.85 257.38 548.54 $ 2,173.47 1,217.11 $ 3,390.58 3O.1567 Acceptance Date 8-22-68 G.W.O. 2935 FINAL PAVING ASSESSMENT 53RD STREET Sheet No. 1 of 2 CITY OF LUBBOCK Sub -Unit No. 24 of Width 36 Feet From 18' W. of WPL Avenue J to 8' E. of EPL Avenue L Unit No. 2180 Paving Curb & Gutter Blk. $3.9861797 Rate/L.F. $1.9425 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost Cost Cost NORTH SIDE Herbert Kirk 6 Kirk Subdivision 55.00 219.24 106.84 326.08 Herbert Kirk 7 Kirk Subdivision 63.00 251.13 122.38 373.51 Herbert Kirk 8 Kirk Subdivision 63.00 251.13 122.38 373.51 Herbert Kirk 9 Kirk Subdivision 63.00 251.13 122.38 373.51 Herbert Kirk 10 Kirk Subdivision 63.00 251.13 122.38 373.51 J. E. Maisen Beginning at the Southeast corner of Lot 10, Kirk 100.00 398.62 194.25 592.87 Subdivision to the City of Lubbock, Texas; Thence East 100.00 feet; Thence North 132.50 feet; Thence West 100.00 feet to the Northeast corner of said Lot 10; Thence South 132.50 feet to the point of beginning Billy Reed Beginning at a point 100.00 feet East of the 177.00 705.55 343.82 1,049.37 Southeast corner of Lot 10, Kirk Subdivision to the City of Lubbock, Texas; Thence East 195.00 feet; Thence North 132.50 feet; Thence West 195.00 feet; Thence South 132.50 feet to the point of beginning SOUTH SIDE Curtis E. Wilson 8 1 Pattillo Subdivision 47.00 187.35 91.30 278.65 R. L. Suttle 7 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 30.1587 Acceptance Date 8-22-68 G.W.O. 2935 FINAL PAVING ASSESSMENT 53RD STREET Sheet No. 2 of 2 CITY OF LUBBOCK Sub -Unit No. 24 of Width 36 Feet From 18' W. of WPL Avenue "J" to 8' E. of EPL Avenue L Unit No. 2180 Paving Curb & Gutter Blk. $3.9861797 Rate/L.F. $1.9425 Rate/L.F. Total. Owner Lots No. Addition No. Ft. Cost Cost Cost SOUTH SIDE CONTD.' Elmer Pattillo 6 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Alva J. Taylor 5 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Jim Pratt 4 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Elmer Pattillo 3 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Elmer Pattillo 2 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Jerry Rex Holloway 1 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Eva Mae Branscum 20 1 Pattillo Subdivision 67.50 269.07 131.12 400.19 Sylvia R. & W. C. Miller,Sr. 19 1 Pattillo Subdivision 49.5 197.32 96.15 293.47 TOTAL PROPERTY OWNER COST $ 6,924.71 CITY'S SHARE - 117.06 TOTAL FINAL SUB UNIT COST $ 6,807.65 30.1588 Acceptance Date 8-22-68 G.W.O. 2935 FINAL PAVING ASSESSMENT 62ND STREET Sheet No. 1 of 2 CITY OF LUBBOCK Sub -Unit No. 27 of Width 36 Feet From 15' E. of EPL Indiana Avenue to 1032' E. of EPL Indiana Avenue Unit No. 2180 Paving Curb & Gutter $3.9861797 Rate/L.F. $1.9425 Rate/L.F. Total Owner Lots Addition No. Ft. Cost Cost Cost NORTH SIDE NO,ASSESSMENT 25 Bryan Park (NO ASSESSMENT) (ESCROW) Weldon Gibbs & Beginning at the Southeast corner of Lot 25, 395.7 1,577.33 768.65 2,345.98 Ken Flagg Bryan Park Addition to the City of Lubbock,, Lubbock County, Texas; Thence North 139.67 feet to the Northeast corner of said Lot 25; Thence S. 85 55'37" E. a distance of 396.00 ft.; Thence East a distance of 0.7 ft.; Thence South a distance of 113.00 ft.; Thence Westerly along the North right of way line of 62nd St, a distance of 395.7 ft. to the point of beginning C. M. Berry Beginning at a point which is 1348.00 feet **120.00 478.34 233.10 711.44 North and 660 ft. East of the Southwest corner of Section 7, Block E-2, Lubbock County, Texas; Thence North a distance of 113.00 ft. to a point which is 20 ft. South of the Southwest corner of Lot 3, Berean Baptist Addition; Thence East a distance of 131.00 feet; Thence S. 23027'02" W. a distance of 123.15 ft.; Thence West a distance of 82.00 ft. to the point of beginning *'Increased in accord with the right of way agreement between the City of Lubbock and C. M. Berry dated July 15, 1968 CONSLLIDATED FINAL ESTIMATE GWO 2935 Accepted August 22, 1968 UANTITIES L.F.Rein- S.Y. S.Y. S.Y. S.Y. Extra Unit & forced 30" Paving L.F. Alley Valley Re-sur- Aspha Sub -Unit Location Gutter 6" Base C & G Return Gutter facing Gal. 2180-20 Avenue V from the SPL of 1,021.57 597.12 16.00 102., 38th St, to 15' S. of the NPL of 39th St. 2180-24 53rd Street from 18' W. 2,133.63 1,232.60 213., of the WPL of Ave. J to 8' E.of the EPL of Ave.L 2180-27 62nd Street from 15' E. 3,035.26 1,601.20 17.38 of the EPL of Indiana Ave. to 797.55' E. of the EPL of Indiana Ave. Part of 2180-28 N 1/2 of 54th St. from 340.44 197.50 8.00 42.56 8' W.of the WPL of Kenosha Ave. to 3' W.of the WPL of the alley West of Kenosha Ave. 2180-30 53rd Street from 13' E. 2,040.89 1,153.90 204.i of the EPL of Salem Ave. to 13' W.of the WPL of Raleigh Ave. 2180-32 Raleigh Avenue from the 147.40 1,504.48 722.60 10.00 18.64 SPL of Brownfield Rd.to 8' N.of the NPL of Brownfield Dr. 2180-34 21st Street from 9' E. 6,071.73 2,043.10 of the EPL of Slide Road to the EPL of Lot 24, Bobalet Heights Addition 2180-35 24th Street from 9' E.of 3,339.43 1,421.11 the EPL of Slide Road to 15.3' W.of the WPL of Wayne Ave. 2180-40 York Avenue from 2.5' N. 1,439.65 827.54 25.00 of the NPL of the alley S. of 18th St. to 3'S.of the NPL of 19th St. 2182-4 56th Street from 2' E.of 2,519.14 1,165.70 49.61 252.0 the EPL of Ave. L(North Leg) to 81W.of the WPL of Ave. J UANTITIES L.F.Rein- S.Y. S.Y. S.Y. S.Y. Extra Unit & forced Paving L.F. Alley Valley Re-sur- Aspha Sub -Unit Location 30"Gutter 6"Base C & G Return Gutter facing Gal. 2182-6 Dover Avenue from 10' S. 2,541.65 1,134.54 of the SPL of 46th St. (West Leg) to 16' N.of the NPL of 48th St.(E.Leg) TOTAL 147.40 25,987.87 12,096.91 59.00 36.02 92.17 771. COST ESTIMATE 147.40 L.F. Reinforced 30" Gutter @ $2.25 $ 331.65 25,987.87 S.Y. Paving 6" Base @ $1.95 50,676.35 12,096.91 L.F. Curb & Gutter @ $1.85 22,379.28 59.00 S.Y. Alley Return @ $7.00 413.00 36.02 S.Y. Valley Gutter @ $7.50 270.15 92.17 S.Y. Resurfacing @ $1.40 129.04 771.00 Gal. Extra Asphalt @ $0.20 154.20 CONTRACT COST $ 74,353.67 COST DISTRIBUTION Property City From Paving Unit & Contract Owner to Extension Sub -Unit Cost Cost Contractor Fund 2180-20 3,229.12 2,173.47 1,055.65 2180-24 6,483.48 6,924.71 -441.23 2180-27 9,011.32 7,785.84 221.03 1,004.45 2180-28 1,144.83 791.19 353.64 2180-30 6,155.26 6,806.12 -650.86 2180-32 4,812.00 4,649.27 162.73 2180-34 15,619.61 14,972.71 646.90 2180-35 9,140.94 8,999.25 141.69 2180-40 4,513.27 3,219.98 1,293.29 2182-4 7,188.72 7,438.74 -250.02 2182-6 7,055.12 6,852.40 202.72 TOTALS $ 74,353.67 70,613.68 2,735.54 1,004.45 30.1586 Acceptance Date 8-22-68 G.W.O. 2935 FINAL PAVING ASSESSMENT AVENUE "V" Sheet No. 1 of 1 CITY OF LUBBOCK Sub -Unit No. 20 of Width 36 Feet From SPL 38th Street to 15' S. of the NFL of 39th Street Unit No. 2180 Paving Curb & Gutter $2.6574531 Rate/L.F. $1.9425 Rate/L.F. Total Owner Lots Addition No. Ft. _ Cost _ Cost Cost EAST SIDE Henry T. Young 10 Godwin Addition of Lot 1, 132.5 * 291.16 257.38 548.54 Block 11, Alta Vista Acres Subdivision Johnny Brooks** 11 Godwin Addition of Lot 1, Block 11, Alta Vista Acres Subdivision WEST SIDE John T. Burns Lot l,less dedicated street right of way Billie Hill** 20 Womack Addition of Lot 2, Block 11, Alta Vista Acres Subdivision Womack Addition of Lot 2, Block 11, Alta Vista Acres Subdivision *Assessment cost was reduced 10% by City Council 1-10-68 **City agreed to purchase paving cert. on 3-14-68 (Item #37) 132.5 * 291.16 127.5 * 280.18 132.5 * 291.16 TOTAL PROPERTY OWNER COST 4 CITY'S SHARE TOTAL FINAL SUB UNIT COST 257.38 548.54 247.67 527.85 257.38 548.54 $ 2,173.47 1,217.11 $ 3,390.58 3O.1567 Acceptance Date 8-22-68 G.W.O. 2935 FINAL PAVING ASSESSMENT 53RD STREET Sheet No. 1 of 2 CITY OF LUBBOCK Sub -Unit No. 24 of Width 36 Feet From 18' W. of WPL Avenue J to 8' E. of EPL Avenue L Unit No. 2180 Paving Curb & Gutter Blk. $3.9861797 Rate/L.F. $1.9425 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost Cost Cost NORTH SIDE Herbert Kirk 6 Kirk Subdivision 55.00 219.24 106.84 326.08 Herbert Kirk 7 Kirk Subdivision 63.00 251.13 122.38 373.51 Herbert Kirk 8 Kirk Subdivision 63.00 251.13 122.38 373.51 Herbert Kirk 9 Kirk Subdivision 63.00 251.13 122.38 373.51 Herbert Kirk 10 Kirk Subdivision 63.00 251.13 122.38 373.51 J. E. Maisen Beginning at the Southeast corner of Lot 10, Kirk 100.00 398.62 194.25 592.87 Subdivision to the City of Lubbock, Texas; Thence East 100.00 feet; Thence North 132.50 feet; Thence West 100.00 feet to the Northeast corner of said Lot 10; Thence South 132.50 feet to the point of beginning Billy Reed Beginning at a point 100.00 feet East of the 177.00 705.55 343.82 1,049.37 Southeast corner of Lot 10, Kirk Subdivision to the City of Lubbock, Texas; Thence East 195.00 feet; Thence North 132.50 feet; Thence West 195.00 feet; Thence South 132.50 feet to the point of beginning SOUTH SIDE Curtis E. Wilson 8 1 Pattillo Subdivision 47.00 187.35 91.30 278.65 R. L. Suttle 7 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 30.1587 Acceptance Date 8-22-68 G.W.O. 2935 FINAL PAVING ASSESSMENT 53RD STREET Sheet No. 2 of 2 CITY OF LUBBOCK Sub -Unit No. 24 of Width 36 Feet From 18' W. of WPL Avenue "J" to 8' E. of EPL Avenue L Unit No. 2180 Paving Curb & Gutter Blk. $3.9861797 Rate/L.F. $1.9425 Rate/L.F. Total. Owner Lots No. Addition No. Ft. Cost Cost Cost SOUTH SIDE CONTD.' Elmer Pattillo 6 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Alva J. Taylor 5 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Jim Pratt 4 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Elmer Pattillo 3 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Elmer Pattillo 2 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Jerry Rex Holloway 1 1 Pattillo Subdivision 60.00 239.17 116.55 355.72 Eva Mae Branscum 20 1 Pattillo Subdivision 67.50 269.07 131.12 400.19 Sylvia R. & W. C. Miller,Sr. 19 1 Pattillo Subdivision 49.5 197.32 96.15 293.47 TOTAL PROPERTY OWNER COST $ 6,924.71 CITY'S SHARE - 117.06 TOTAL FINAL SUB UNIT COST $ 6,807.65 30.1588 Acceptance Date 8-22-68 G.W.O. 2935 FINAL PAVING ASSESSMENT 62ND STREET Sheet No. 1 of 2 CITY OF LUBBOCK Sub -Unit No. 27 of Width 36 Feet From 15' E. of EPL Indiana Avenue to 1032' E. of EPL Indiana Avenue Unit No. 2180 Paving Curb & Gutter $3.9861797 Rate/L.F. $1.9425 Rate/L.F. Total Owner Lots Addition No. Ft. Cost Cost Cost NORTH SIDE NO,ASSESSMENT 25 Bryan Park (NO ASSESSMENT) (ESCROW) Weldon Gibbs & Beginning at the Southeast corner of Lot 25, 395.7 1,577.33 768.65 2,345.98 Ken Flagg Bryan Park Addition to the City of Lubbock,, Lubbock County, Texas; Thence North 139.67 feet to the Northeast corner of said Lot 25; Thence S. 85 55'37" E. a distance of 396.00 ft.; Thence East a distance of 0.7 ft.; Thence South a distance of 113.00 ft.; Thence Westerly along the North right of way line of 62nd St, a distance of 395.7 ft. to the point of beginning C. M. Berry Beginning at a point which is 1348.00 feet **120.00 478.34 233.10 711.44 North and 660 ft. East of the Southwest corner of Section 7, Block E-2, Lubbock County, Texas; Thence North a distance of 113.00 ft. to a point which is 20 ft. South of the Southwest corner of Lot 3, Berean Baptist Addition; Thence East a distance of 131.00 feet; Thence S. 23027'02" W. a distance of 123.15 ft.; Thence West a distance of 82.00 ft. to the point of beginning *'Increased in accord with the right of way agreement between the City of Lubbock and C. M. Berry dated July 15, 1968 30.1588 Acceptance Date 8-22-68 G.W.O: 2935 FINAL PAVING ASSESSMENT 62ND STREET Sheet No. 2 of 2 CITY OF LUBBOCK Sub -Unit No. 27 of Width 36 Feet From 15'. E. of EPL Indiana Avenue to 1032' E. of EPL Indiana Avenue Unit No. 2180 Paving Curb & Gutter $3.9861797 Rate/L.F. $1.9425 Rate/L.F. Total Owner Lots _ _ No. Ft. Cost_ Cost Cost SOUTH SIDE Letha Simpson Beginning at a point which is 1292.00 ft. North and 56.00 ft. East of the Southwest corner of Section 7, Block K-2, Lubbock County, Texas; Thence East a distance of 1032.00 ft.; Thence South 150.00 ft.; Thence West 1032.00 ft.; Thence North 150.00 ft.; to the place of beginning 797.55 3179.18 1549.24 4,728.42 TOTAL PROPERTY OWNER COST $ 7,785.84 CITY'S SHARE 1,676.05 TOTAL FINAL SUB UNIT COST . $ 9,461.89 30.1589 Acceptance Date 8-22-68 G.W.O. 2935 FINAL PAVING ASSESSMENT 53RD STREET Sheet No. 2 of 2 CITY OF LUBBOCK Sub -Unit No. 30 of Width 36.Feet From.13' E. of the EPL of Salem Avenue to 13' W. of the WPL of Raleigh Avenue Unit No. 2180 Paving Curb & Gutter Blk. $3.9861797 Rate/L.F. $1.9425 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost Cost Cost NORTH SIDE CONTD. Robert H. Whitaker 13 6 Sylvan Dell Heights 60.00 239.17 116.55 355.72 Robert H. Whitaker 14 6 Sylvan Dell Heights 60.00 239.17 116.55 355.72 Robert H. Whitaker 15 6 Sylvan Dell Heights 60.00 239.17 116.55 355.72 Charles L. Rice 16 6 Sylvan Dell Heights 60.00 239.17 116.55 355.72 Charles L. Rice 17 6 Sylvan Dell Heights 60.00 239.17 116.55 355.72 Charles L. Rice 18 6 Sylvan Dell Heights 60.00 239.17 116.55 355.72 Charles L. Rice 19 6 Sylvan Dell Heights 60.00 239.17 116.55 355.72 Charles L. Rice 20 6 Sylvan Dell Heights 47.00 187.35 91.30 278.65 TOTAL PROPERTY OWNER COST $ 6,806.12 CITY'S SHARE-343.10 TOTAL FINAL SUB UNIT COST $ 6,463.02