HomeMy WebLinkAboutResolution - 2022-R0435 - Change Order 1 to Contract 16592 with Tom's Tree PlaceResolution No. 2022-RO435 Item No. 5.12 October 25, 2022 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 01 to that certain Contract No. 16592 b and between the City of Lubbock and West Texas Service, Inc. dba Tom's Tree Place, for the 14t' Street plaza and east green project as per RFP 21-16592-MA, and related documents. Said Change Order No. 01 is attached hereto and incorporated in this resolution as if fully set forth: herein and shall be included in the minutes of the City Council. Passed by the City Council on ATTEST: Re ecca Garza, City Sec tary APPROVED AS TO CONTENT: Erik Rejino, Assistant City Manager APPROVED AS TO FORM: Pellieisure, Assistant City Attorney October 25, 2022 ccdocs/RES.ChgOrd#1-Contract 16592 Toms tree place 10.13.22 Office of Purchasing and Contract Management Change Order Contract No: 16592 Contractor: West Texas Service, Inc. dba Tom's Tree Place Change Order No: 1 Contract Title: 14th Street Plaza and East Green Project Bid/RFP No: 22-16592-MA Project No: 92715 & 92716 "Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid. Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages as necessary): CCR 002 Addition of Security Infrastructure -- 0 days requested $64,848.75 TOTAL THIS CO $64,848.75 Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $944,500.00 B. AMOUNT OF THIS CHANGE ORDER: Note: Council approval required if (+/-) $50,000 $64,848.75 COST CENTER: 92754 1 ACCOUNT: 9226.40000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A) +6.87% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D) $64,848.75 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): (25% maximum) +6.87% G. NEW CONTRACT AMOUNT (A-E): $1 009 348.75 H. CONTRACT DURATIION INCREASE 0 Da s I. DATE OF SUBSTANTIAL COMPLETION r February 14 2023 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of, of resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. �u ifI o/ ti �Lti (3) Owner's Representative Date OAW� &Wlno (5) Capital Project Manager (7) MaAiv f — L� Council Date/October 25, 2022 1 o <3laa Date Sheet and the 10'25. 2022 Date (8) City le Agenda Item #: 5.12 /v. IZ• Z Z Date Date 0-)3_}� Date 10/25/2022 Date Resolution #! 2022-RO435 PUR45 (Rev 08/2018) DocuSign Envelope ID: 1DDED5B5-54D9-4631-93A5-3126DFFEDFOF Parkhill CONSTRUCTION CHANGE REQUEST #002 DATE: 9/21 /2022 City of Lubbock 14'" St. Plaza CONTRACT DATE: 8/8/2022 ®Architect ARCHITECT'S PROJECT ®Contractor NUMBER: 5616.21 OWNER'S PROJECT NUMBER: ®other Tom's Tree Place 9: 21:'2022 Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description: (Written description of the work) Provide pricing to install conduit as shown on the attached L-104A >ubmitted By: Brent Clifford Attachments: L-104A CONTRACTOR'S RESPONSE: ®Add to / ❑ Credit ❑Credit / ❑Deduct Contract Sum East Contingency ❑ Owner ❑ CMAR ❑ Credit / ❑Deduct Allowance TOTAL CCR Attachment: Breakdown Additional days requested for this CCR: 0 if not under $ 64,848.75 sidewalk (Name of Allowance) $ 64,848.75 CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon receipt of approved document by the Contractor, the Contractor shall proceed with the change(s) described above. If CCR is changing the Contract Sum or GMP by cost or time, an official Change Order on AIA G701 will be executed and distributed. Approved Additional Time By: Date: (Signature) Parkhill.com DocuSign Envelope ID: 1DDED5B5-54D9-4631-93A5-3126DFFEDFOF V. toms TREE PLACE CITY OF LUBBOCK 14TH AND AVE L LUBBOCK, TX Date 10/4/2022 Ordered By: CITY OF LUBBOCK PO Number: 14TH ST PLAZA - EAST GREEN Home Telephone: Mobile Telephone: Email: CCR 002 TTP Salesperson: Toby Rowin, RLA Tom's Tree Place 5104 34th Street Lubbock, Texas 79410 806.799.3677 - Voice 806.799.8743 - Fax www.tomstreeplace.com Quantity Description Comments Size Unit Cost Line Total CCR 001 210 Demo Existing Concrete Sidewalk Sq Ft $3.00 1 $1,000.00 $100.00 $630.00 $1,000.00 $300.00 1 Jackhammer Flowable Fill off Sides of Existing J-Boxes LS 3 Drill Holes to Accommodate 4"-Pipe and Sealant around Pipe Openings Each 800 Ditching and Breaking Through Existing Concrete Footings 4" Sch 40 PVC Pipe LF $10.00 $8,000.00 1020 LF $12.00 $12,240.00 210 Colored Sidewalk Repair LF $7.25 $1,522.50 1 Bore Under 15th Street into Planter As Shown on Plans LPDHQ-Assuming No Unforseen Obstacles Prohibiting Boring Operation. Possible Depth of 7-Ft. 1 Bore Hole to Contain (3) 4" Pipes Piping/Ditching to Follow Back of Sidewalk as Closely as Possible, NOT Under Sidewalk $15,000.00 $15,000.00 $38,692.50 I Materials Total Installation Total $26,156.25 Subtotal $64,848.75 Tax @ 0.00% $0.00 Final Total $64,848.75 Parkhill Lubbock aya�re.� IM{�wt lit4itli TaM Site Annotation East Green CCR-002 L-104A