HomeMy WebLinkAboutResolution - 2010-R0341 - Professional Services Agreement For Water Line W/Parkhill, Smith & Cooper, Inc. - 07/22/2010Resolution No. 2010-RO341
July 22, 2010
Item No. 5.10
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, a Professional Services Agreement for
construction management of water transmission and pumping facilities related to Treated
Water Line, Segment G-1 and Segment G-2, by and between the City of Lubbock and
Parkhill, Smith & Cooper, Inc. and related documents. Said Agreement is attached hereto
and incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council on July 22, 2010
��17tt�
TOM MARTIN, MAYOR
ATTEST:
Rebec a Garza, City Secretary
APPROVED AS TO CONTENT:
Marsha Reed, P.E., Chief Operations Officer
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vwxcdocs. RES.PSA-Parkhill Smith & Cooper-LAH
July 6, 2010
Contract: 9637
Resolution No. 2010-RO341
PROFESSIONAL SERVICES AGREEMENT
This Professional Services Agreement ("Agreement") is entered into this 22nd day
of July , 2010, by and between the City of Lubbock (the "City" or "Owner"),
a Texas home rule municipal corporation, and Parkhill, Smith & Cooper, Inc. (the "Engineer"),
a Texas corporation.
WITNESSETH
WHEREAS, Engineer has substantial skill and experience in the design and
construction management of water transmission and pumping facilities (the "Activities");
WHEREAS, Engineer has demonstrated competence and qualifications to perform the
Services, as defined below, and will perform the Services for a fair and reasonable price;
WHEREAS, the City desires to contract with Engineer to perform services related to the
Activities and Engineer desires to provide the services related to same.
NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency
of which is hereby acknowledged, the City and Engineer agree as follows:
ARTICLE I
Services
1.01 Engineer shall conduct all activities and within such time frames, as set forth on Exhibit
"A", "Scope of Services", and Exhibit `B", "Payments to Engineer", attached hereto
(the "Services") for a Not -to -Exceed amount of $ 1,077,800. Engineer shall have no
liability for defects in the Services attributable to Engineer's reliance upon or use of
data, design criteria, drawings, specifications, or other information prepared by City and
furnished to Engineer by City.
Page 1 of 39
1.02 Engineer shall perform only work related to Treated Water Line, Segment G-1, as
described in Exhibit "A", until provided written notice to proceed by City with other
tasks set forth in Exhibit "A". In the event such notice shall occur after:
October 31, 2010 — Treated Water Line, Segment G-2
the time for performance by Engineer for such tasks shall be extended the same amount
of days as such notice occurs subsequent to the respective dates. The City Council of
the City of Lubbock hereby delegates the authority to provide the prescribed Notice(s)
to Proceed to the Director of Water Utilities, or his designee.
ARTICLE II
Compensation and Term
2.01 The consideration to be paid for the Services to be provided the City as described in
Article I shall be as indicated in attached Exhibit "B". This amount shall be invoiced to
the City monthly as work is performed and based on the applicable hourly rate schedule
of the respective firm at the time services are rendered.
2.02 In the event City disputes any invoice item, City shall give Engineer written notice of
such disputed item within ten (10) days after receipt of such invoice and shall pay to
Engineer the undisputed portion of the invoice on or before thirty one (3 1) days after its
receipt. If City fails to pay any invoiced amounts when due, interest will accrue on each
unpaid amount at the rate in effect on September 1 of the fiscal year in which the
payment becomes overdue, the rate in effect on September 1 being equal to the sum of
Page 2 of 39
(i) one ( 1 % ); and (ii) the prime rate as published in the Wall Street Journal on the first
day of July of the preceding fiscal year that does not fall on a Saturday or Sunday, or
the maximum amount allowed by law, if less, from the date said payment is overdue
until paid according to the provisions of the Agreement. Interest shall not be charged
on any disputed invoice item finally resolved in City's favor. Payment of interest shall
not excuse or cure any default or delay in payment of amounts due.
2.03 This Agreement shall expire on December 31, 2012. Additionally, the City may
terminate this Agreement by providing written notice to Engineer at least thirty (30)
days prior to the effective date of termination as provided in such notice. In the event
this Agreement is so terminated, the City shall pay Engineer only for services actually
performed by Engineer up to and including the date the Engineer is deemed to have
received the City's notice of termination.
2.04 Except for City's payment obligation, neither City nor Engineer shall be considered in
default of this Agreement for delays in performance caused by circumstances beyond
the reasonable control of the non-performing party (herein called a "force majeure
event") for the period of such delay, so long as the affected party exercises due
diligence to relieve or remove such force majeure event. For purposes of this
Agreement, such circumstances include, but are not limited to; unusually severe
weather conditions; floods; earthquakes; fire; epidemics; war, riots, and other civil
disturbances; strikes, lockouts, work slowdowns, and other labor disturbances;
sabotage; judicial restraint; and inability to procure permits, licenses, or authorizations
from any local, state, or federal agency for any of the supplies, materials, accesses, or
services required to be provided by either City or Engineer under this Agreement.
Page 3 of 39
Should such circumstances occur, the non-performing party shall, within a reasonable
time of being prevented from performing, give written notice to the other party
describing the circumstances preventing continued performance and the efforts being
made to resume performance of this Agreement.
ARTICLE III
Independent Contractor
3.01 It is understood and agreed that Engineer is to perform the Services in a sound and
professional manner and exercising the degree of care, skill and diligence in the
performance of the Services as is exercised by a professional engineer under similar
circumstances at the time such Services are performed. City shall not be responsible for
discovering deficiencies or defects in the performance of the Services by Engineer. NO
OTHER WARRANTY, EXPRESSED OR IMPLIED, IS INCLUDED IN THIS
AGREEMENT OR IN ANY DRAWING, SPECIFICATION, REPORT, OR OPINION
PRODUCED PURSUANT TO THIS AGREEMENT. Further, Engineer is and shall be
considered at all times an independent contractor under this Agreement and/or in its
service, hereunder. During the performance of the Services under this Agreement,
Engineer and Engineer's employees or its approved subcontractors will not be
considered, for any purpose, employees or agents of the City within the meaning or the
application of any federal, state or local law or regulation, including without limitation,
laws, rules or regulations regarding or related to unemployment insurance, old age
benefits, workers compensation, labor, personal injury or taxes of any kind.
Page 4 of 39
4.01
ARTICLE IV
Events of Default/Remedies
a. City's Defaults/Engineer's Remedies. In the event the City shall default in the
performance of any term or provision of this Agreement for any reason other than
failure by Engineer to perform hereunder, Engineer may, if said default shall be
continuing after five (5) days notice of such default is deemed received by the City,
exercise any right or remedy available to it by law, contract, equity or otherwise.
b. Engineer's Defaults/City's Remedies. In the event Engineer shall default in the
performance of any term or provision of this Agreement for any reason other than
failure by the City to perform hereunder, the City may, if said default shall be
continuing after five (5) days notice of such default is deemed received by Engineer,
exercise any right or remedy available to it by law, contract, equity or otherwise,
including without limitation, specific performance and/or the right to terminate this
Agreement without additional notice. The remedies set forth herein are cumulative and
not exclusive, and may be exercised concurrently.
ARTICLE V
Insurance/Indemnity
5.01 a. Insurance. Engineer shall procure and carry, at its sole cost and expense through the
life of this Agreement and for a period not to exceed 3 years following the termination
or expiration of this Agreement, insurance protection as hereinafter specified, in form
and substance satisfactory to City, carried with an insurance company authorized to
transact business in the state of Texas, covering all aspects and risks of loss of all
Page 5 of 39
operations in connection with this Agreement, including without limitation, the
indemnity obligations set forth herein.
Engineer shall obtain and maintain in full force and effect commercial general
liability, professional liability and automobile liability coverage with insurance carriers
admitted to do business in the state of Texas. The insurance companies must carry a
Best's Rating of A -VII or better. The policies will be written on an occurrence basis,
subject to the following minimum limits of liability:
Commercial General Liability:
Combined Single Limit:
Professional Liability:
Combined Single Limit:
Automobile Liability:
Combined Single Limit for any auto:
$1,000,000
$2,000,000 per occurrence
$4,000,000 annual aggregate
$500,000 Per Occurrence
The City shall be listed as a primary additional insured with respect to the Automobile
Liability and Commercial General Liability and shall be granted a waiver of
subrogation under those policies. Engineer shall provide a Certificate of Insurance to
the City as evidence of coverage. The Certificate shall provide 30 days notice of
cancellation. A copy of the additional insured endorsement and waiver of subrogation
attached to the policy will be included in the Certificate.
Engineer shall elect to obtain worker's compensation coverage pursuant to
Section 406.002 of the Texas Labor Code. Further, Engineer shall maintain said
coverage throughout the term of this Agreement and shall comply with all provisions of
Page 6 of 39
Title 5 of the Texas Labor Code to ensure that the Engineer maintains said coverage.
The Engineer may maintain Occupational Accident and Disability Insurance in lieu of
Worker's Compensation. In either event, the policy must be endorsed to include a
waiver of subrogation in favor of the City of Lubbock.
If at any time during the life of the Agreement or any extension hereof, Engineer
fails to maintain the required insurance in full force and effect, Engineer shall be in
breach hereof and all work under the Agreement shall be discontinued immediately.
b. Indemnification. Having considered the potential liabilities that may exist during
the performance of the Services, the benefits of the Project, and the Engineer's fee for
the Services, and in consideration of the promises contained in this Agreement,
Engineer agrees to provide the indemnities set forth herein.
Engineer shall indemnify and hold City and City's elected officials, officers, agents,
employees and independent contractors harmless, to the fullest extent permitted by law, from
and against any and all claims, demands, damages, costs, liabilities and expenses, and
including reasonable attorney's fees, as a result of, related to or arising from Engineer's
negligent acts, errors, or omissions.
The indemnity provided herein shall survive the expiration or termination of this
Agreement for a period not to exceed three years.
Page 7 of 39
ARTICLE VI
Probable Construction Cost
6.01 Engineer's opinions of probable Construction Cost provided for herein are to be made
on the basis of Engineer's experience and qualifications and represent Engineer's best
judgment as an experienced and qualified professional generally familiar with the
industry. However, since Engineer has no control over the cost of labor, materials,
equipment, or services furnished by others, or over the Contractor's methods of
determining prices, or over competitive bidding or market conditions, Engineer cannot
and does not guarantee that proposals, bids, or actual Construction Cost will not vary
from opinions of probable Construction Cost prepared by Engineer.
ARTICLE VII
Miscellaneous
7.01 Engineer shall exercise usual and customary professional care in efforts to comply with
all laws, statutes, regulations, ordinances, rules and any other legal requirement in effect
at the time Services are performed.
7.02 Any notice required by this Agreement shall be deemed to be properly served, if (i)
provided in person or by telephonic facsimile; or (ii) deposited in the United States mail
by certified letter, return receipt requested, addressed to the recipient at recipient's
address shown below, subject to the right of either party to designate a different address
by notice given in the manner just described. Notice shall be deemed to be received
when delivered if provided in person or by telephonic facsimile or, if deposited in the
United States mail, as set forth above, three (3) days after depositing such notice in the
Page 8 of 39
United States mail, as set forth above.
For City:
Marsha Reed, P.E., Chief Operating Officer
P.O. Box 2000
Lubbock, Texas 79457
Facsimile: (806) 775-2051
W/ copy to:
Aubrey Spear, P.E.
P.O. Box 2000
Lubbock, Texas 79457
Facsimile: (806) 775-3344
For Engineer:
John S. Kelley, P.E.
4222 85th Street
Lubbock, Texas 79423
Facsimile: (806) 473-3500
7.03 THIS AGREEMENT IS TO BE CONSTRUED UNDER TEXAS LAW WITHOUT
REGARD TO CONFLICT OF LAW RULES THAT WOULD DIRECT
APPLICATION OF THE LAWS OF ANY OTHER JURISDICTION. THE
OBLIGATIONS OF THE PARTIES CREATED BY THIS AGREEMENT ARE
PERFORMABLE, AT LEAST IN PART, IN LUBBOCK COUNTY, TEXAS.
VENUE FOR ANY ACTION BROUGHT PURSUANT TO THIS AGREEMENT, OR
ACTIVITY CONTEMPLATED HEREBY, SHALL EXCLUSIVELY BE IN
LUBBOCK COUNTY, TEXAS.
7.04 This Agreement represents the entire and sole agreement between the City and Engineer
with respect to the subject matter hereof and supersedes any and all prior negotiations,
understandings, representations or other agreements, whether written or oral. This
Page 9 of 39
Agreement may not be modified or amended except in writing and duly executed by
each party hereto.
7.05 Nothing contained herein shall be construed to imply a joint venture, joint enterprise,
partnership or principal — agent relationship between Engineer and the City.
7.06 If any provision of this Agreement is declared invalid or unenforceable, such provision
shall be deemed modified to the extent necessary to render it valid and enforceable so
long as said modification is reasonably within the intent the parties as originally
expressed. In the event such provision may not be so modified, the unenforceability or
invalidity of any provision shall not affect any other provision of this Agreement, and
this Agreement shall continue in force and effect as if such provision had not been
included in this Agreement.
7.07 Any and all documents, drawings and specifications prepared by Engineer as part of the
Services hereunder, shall become the property of the City when Engineer has been
compensated as set forth in Section 2.01, above. However, such Documents are not
intended or represented by Engineer to be suitable for reuse by City or others on any
other project. Any such reuse or modification without written verification or adaptation
by Engineer, as appropriate for the specific purpose intended, will be at City's sole risk
and without liability or legal exposure to Engineer or to Engineer's consultants. Rights
to intellectual property developed, utilized, or modified in the performance of the
Services shall remain the property of Engineer.
Any files delivered in electronic media may not work on systems and software different
than those with which they were originally produced. Engineer makes no warranty as
to the compatibility of these files with any other system or software. Because of the
Page 10 of 39
potential degradation of electronic medium over time, in the event of a conflict between
the sealed original drawings / hard copies and the electronic files, the sealed drawings /
hard copies will govern.
7.08 A waiver by either City or Engineer of a breach of this Agreement must be in writing to
be effective. In the event either party shall execute and deliver such waiver, such
waiver shall not affect the waiving party's rights with respect to any other or subsequent
breach.
7.09 Except as otherwise provided herein, neither City nor Engineer may assign or
subcontract any part of the Services under this Agreement, in whole or in part, without
the written consent of such assignment by the non -assigning party. City and Engineer
each bind itself or himself, their legal representatives and permitted assigns in respect to
all provisions of this Agreement.
7.10 Nothing in this Agreement shall be construed to provide any rights or benefits
whatsoever to any party other than City and Engineer.
7.11 Engineer represents and warrants to City that it has taken all actions necessary to
authorize the party executing this Agreement to bind, in all respects, Engineer to all
terms and provisions of this Agreement, and that such person possesses authority to
execute this Agreement and bind Engineer hereto.
7.12 Engineer shall not be responsible for: (1) construction means, methods, techniques,
sequences, procedures, or safety precautions and programs in connection with the
project to which the Services design (the "Project"); (2) the failure of any contractor,
subcontractor, vendor, or other Project participant, not under contract to Engineer, to
fulfill contractual responsibilities to the City or to comply with federal, state, or local
Page 11 of 39
laws, regulations, and codes; or (3) procuring permits, certificates, and licenses required
for any construction unless such responsibilities are specifically assigned to Engineer in
Exhibit "A", Scope of Services.
7.13 Anything herein to the contrary notwithstanding, title to, ownership of, and legal
responsibility and liability for any and all pre-existing contamination shall be
determined in accordance with all applicable statutes, regulations, rules, orders and
ordinances.
7.14 The performance of City hereunder shall be at all times conditioned upon the
appropriation of sufficient funds by the City Council of the City of Lubbock. In the
event that such funds are not so appropriated by the City Council, such shall not be
considered a breach of this Agreement by the City.
7.15 City and Engineer agree that any dispute between them arising out of or related to this
Agreement shall be submitted to non-binding mediation prior to exercising any other
rights under law, unless the parties mutually agree otherwise.
7.16 The authority to act as Owner representative, as contemplated herein, is hereby
delegated by the City Council of the City to the Director of Water Utilities, or his
designee.
ARTICLE VIII
Definitions
8.01 Wherever used in this Agreement, including exhibits hereto, the below
described terms shall have the meaning prescribed herein.
1. Addenda --Written or graphic instruments issued prior to the opening of Bids which
clarify, correct, or change the Bidding Documents.
Page 12 of 39
2. Additional Services --Any services not included within Exhibit A as Basic Services,
but determined to be necessary and mutually agreed upon and to be performed for or
furnished to City by Engineer.
3. Agreement --This Agreement between City and Engineer, including the Exhibits
attached hereto.
4. Asbestos --Any material that contains more than one percent of asbestos and is
friable or is releasing asbestos fibers into the air above current action levels established by
the United States Occupational Safety and Health Administration.
5. Basic Services --The services to be performed for or furnished to City by Engineer in
accordance with Exhibit A of this Agreement.
6. Bid --The offer or proposal of the bidder submitted on the prescribed form setting
forth the prices for the Work to be performed.
7. Bidding Documents --The advertisement or invitation to Bid, instructions to bidders,
the Bid form and attachments, the Bid bond, if any, the proposed Contract Documents, and
all Addenda, if any.
8. Change Order --A document recommended by Engineer, which is signed by
Contractor and City to authorize an addition, deletion or revision in the Work, or an
adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date
of the Construction Agreement.
9. City-- City of Lubbock, Texas, being sometimes also referred to as "Owner"
10. Construction Agreement or Contract --The entire and integrated written agreement
between the City and Contractor concerning the Work.
11. Construction Cost --The cost to City of those portions of the Services designed or
specified by Engineer. Construction Cost does not include costs of services of Engineer or
other design professionals and consultants, cost of land, rights-of-way, or compensation for
damages to properties, or City's costs for legal, accounting, insurance counseling or auditing
services, or interest and financing charges incurred in connection with the Services, or the
cost of other services to be provided by others to City.
12. Construction Period-- A time starting with the Contractor's notice -to -proceed with
facility construction and terminating once the Contractor has fulfilled the terms of the
construction contract with the Owner.
13. Contract Documents --Documents that establish the rights and obligations of the
parties engaged in construction and include the Construction Agreement between City and
Contractor, Addenda (which pertain to the Contract Documents), Contractor's Bid (including
documentation accompanying the Bid and any post -Bid documentation submitted prior to
Page 13 of 39
the notice of award) when attached as an exhibit to or otherwise incorporated in the
Construction Agreement, the notice to proceed, the bonds, appropriate certifications, the
General Conditions, the Supplementary Conditions, the Specifications and the Drawings as
the same are more specifically identified in the Construction Agreement, together with all
written amendments, Change Orders, Work Change Directives, Field Orders, and Engineer's
written interpretations and clarifications issued on or after the Effective Date of the
Construction Agreement. Approved Shop Drawings submitted by the Contractor and any
ancillary reports and drawings prepared by OWNER approved consultants are not Contract
Documents.
14. Contractor-- The entity that will be contracted with by the Owner to construct
facilities designed by the Engineer.
15. Direct Expenses --All expenses incurred directly by Engineer in connection with the
performing of Basic Services which are included in lump sum payments as indicated in
Exhibit B and for which City shall pay Engineer as part of the lump sum payments due as
indicated in Exhibit B, to include but not limited to fax, reproduction, travel, telephone,
meals and lodging, CAD charges, field supplies, models, renderings, photos, and postage.
16. Documents --Data, reports, Drawings, Specifications, Record Drawings, and other
deliverables, whether in printed or electronic media format, provided or furnished in
appropriate phases by Engineer to City pursuant to this Agreement.
17. Drawings --That part of the Contract Documents prepared or approved by Engineer
which graphically shows the scope, extent, and character of the Work to be performed by
Contractor. Shop Drawings are not Drawings as so defined.
18. Engineer's Consultants --Individuals or entities having a contract with Engineer to
furnish services with respect to the Services as Engineer's independent professional
associates, consultants, subcontractors, or vendors. The term Engineer, as used in and for all
purposes of this Agreement, includes Engineer's Consultants.
19. General Conditions --That part of the Contract Documents which sets forth terms,
conditions, and procedures that govern the Work to be performed or furnished by Contractor
with respect to the Services.
20. Hazardous Environmental Condition --The presence at the Site of Asbestos, PCB's,
Petroleum, Hazardous Waste, or Radioactive Materials in such quantities or circumstances
that may present a substantial danger to persons or property exposed thereto in connection
with the Work.
21. Peer Reviewer-- Licensed engineer under separate contract with the Owner
designated to review draft and final engineering and construction documents,
correspondence and discussions during the design and construction process. Peer reviewer
will provide expert opinion and suggestions for improvement regarding the process that they
participate in.
Page 14 of 39
22. Reimbursable Expenses --The expenses incurred directly by Engineer in connection
with the performing of Additional Services for the Services for which City shall pay
Engineer as indicated in Exhibit B, to include but not limited to fax, reproduction, travel,
telephone, meals and lodging, CAD charges, field supplies, models, renderings, photos, and
postage.
23. Resident Project Representative --The authorized representative of Engineer, if any,
assigned to assist Engineer at the Site during the Construction Phase. The Resident Project
Representative will be Engineer's agent or employee and under Engineer's supervision. As
used herein, the term Resident Project Representative includes any assistants of Resident
Project Representative agreed to by City. The duties and responsibilities of the Resident
Project Representative are as set forth in Exhibit C.
24. Samples --Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work will be judged.
25. Site --Lands or areas indicated in the Contract Documents as being furnished by City
upon which the Work is to be performed, rights-of-way and easements for access thereto,
and such other lands furnished by City which are designated for use of Contractor.
26. Specifications --That part of the Contract Documents consisting of written technical
descriptions of materials, equipment, systems, standards, and workmanship as applied to the
Work and certain administrative details applicable thereto.
27. Substantial Completion --The time at which the Work (or a specified part thereof)
has progressed to the point where, in the opinion of Engineer, the Work (or a specified part
thereof) can be utilized for the purposes for which it is intended. The terms "substantially
complete" and "substantially completed" as applied to all or part of the Work refer to
Substantial Completion thereof.
28. Supplementary Conditions --That part of the Contract Documents which amends or
supplements the General Conditions, if any.
29. Work --The entire completed construction or the various separately identifiable parts
thereof required to be provided under the Contract Documents with respect to the Services.
Work includes and is the result of performing or furnishing labor, services, and
documentation necessary to produce such construction and furnishing, installing, and
incorporating all materials and all equipment into such construction, all as required by the
Contract Documents.
Page 15 of 39
IN WITNESS WHEREOF, the parties have executed this Agreement by their duly
authorized representatives as of the date first written above.
PARKHILL, SMITH & COOPER, INC.
JA A �� -
JOAN S. KELLEY, P.b., FIRM PRINCIPAL
CITY OF LUBBOCK
TOM MARTIN, MAYOR
ATTEST:
Rebec arza, City Secretary
APPROVED AS TO CONTENT:
Marsha Reed, P.E. Chie Operati Officer
APP D TO FO
Mitch Satterwhite, Assistant City Attorney
Page 16 of 39
Resolution No. 2010—R0341
EXHIBIT A, Part 1 -- BASIC SERVICES
LAKE ALAN HENRY TREATED WATER LINE
Construction: Phase Services
A. Upon completion of the bid or negotiation phase services, ENGINEER will proceed with the performance of
construction phase services as described below. ENGINEER will endeavor to protect OWNER in providing
these services however, it is understood that ENGINEER does not guarantee the Contractor's performance,
nor is ENGINEER responsible for supervision of the Contractor's operation and employees. ENGINEER
shall not be responsible for the means, methods, techniques, sequences or procedures of construction selected
by the Contractor, or any safety precautions and programs relating in any way to the condition of the
premises, the work of the Contractor or any Subcontractor. ENGINEER shall not be responsible for the acts
or omissions of any person (except its own employees or agents) at the Project site or otherwise performing
any of the work of the Project. Upon written authorization from OWNER, ENGINEER shall:
1. General Administration of Construction Contract. Consult with OWNER and act as OWNER's
representative as provided in the General Conditions.
2. Communications. Establish communication procedures with the OWNER and contractor. Submit
monthly reports of construction progress. Reports will describe construction progress in general terms and
summarize project costs, cash flow, construction schedule and pending and approved contract modifications.
Establish and maintain a project documentation system consistent with the requirements of the construction
contract documents. Monitor the processing of contractor's submittals and provide for filing and retrieval of
project documentation. Produce monthly reports indicating the status of all submittals in the review process.
Review contractor's submittals, including, requests for information, modification requests, shop drawings,
schedules, and other submittals in accordance with the requirements of the construction contract documents
for the projects. Monitor the progress of the contractor in sending and processing submittals to see that
documentation is being processed in accordance with schedules.
3. Resident Project Representative (RPR). Provide the services of RPR's at the Site on a full-time
basis (as described in Exhibit C) to assist the ENGINEER and to provide more extensive observation of
Contractor's work. Duties, responsibilities, and authority of the RPR are as set forth in Exhibit C. The
furnishing of such RPR's services will not extend ENGINEER's responsibilities or authority beyond the
specific limits set forth elsewhere in this Agreement. The performance of the RPR is not included in the
ENGINEER's basic fee and may be performed by the ENGINEER, by agreement with the OWNER, in
which case compensation shall be determined by applicable portions of Exhibit B.
4. Selecting Independent Testing Laboratory. The Contractor will select and pay for an Independent
Testing Laboratory and the Resident Project Representative (RPR) will coordinate the testing and reporting
per Exhibit C.
5. Pre -Construction Conference. Assist OWNER in conducting pre -construction conference(s) with the
Contractor(s), review construction schedules prepared by the Contractor(s) pursuant to the requirements of
the construction contract, and prepare a proposed estimate of monthly cash requirements of the Project from
information provided by the Construction Contractor.
6. Baselines and Benchmarks. Baselines and benchmarks will be provided by others, and are not
included in this scope of work.
Page 17 of 39
7. Visits to Site and Observation of Construction, In connection with observations of Contractor's work
in progress while it is in progress:
a. Make two site visits per month to each construction contract, in order to observe as an
experienced and qualified design professional the progress and quality of the Work. The construction
contract duration beginning at the Notice to Proceed and ending at Final Completion is 14 months for
Segment G-1 and 18 months for Segment G-2. Such visits and observations by ENGINEER, and the
Resident Project Representative, if any, are not intended to be exhaustive or to extend to every aspect of
Contractor's work in progress or to involve detailed inspections of Contractor's work in progress beyond
the responsibilities specifically assigned to ENGINEER in this Agreement and the Contract Documents,
but rather are to be limited to spot checking, selective sampling, and similar methods of general
observation of the Work based on ENGINEER's exercise of professional judgment as assisted by the
Resident Project Representative, if any. Based on information obtained during such visits and such
observations, ENGINEER will determine in general if Contractor's work is proceeding in accordance
with the Contract Documents, and ENGINEER shall keep OWNER informed of the progress of the
Work.
b. ENGINEER shall not, during such visits or as a result of such observations of Contractor's work
in progress, supervise, direct, or have control over Contractor's work, nor shall ENGINEER have
authority over or responsibility for the means, methods, techniques, sequences, or procedures of
construction selected by Contractor, for safety precautions and programs incident to Contractor's work,
or for any failure of Contractor to comply with Laws and Regulations applicable to Contractor's
furnishing and performing the Work. Accordingly, ENGINEER neither guarantees the performance of
any Contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in
accordance with the Contract Documents.
8. Defective Work. Recommend to OWNER that Contractor's work be disapproved and rejected while
it is in progress if, on the basis of such observations, ENGINEER believes that such work will not produce a
completed Project that conforms generally to the Contract Documents or that it will prejudice the integrity of
the design concept of the completed Project as a functioning whole as indicated in the Contract Documents.
9. Clarifications and Interpretations; Field Orders. Issue necessary clarifications and interpretations
of the Contract Documents as appropriate to the orderly completion of Contractor's work. Such clarifications
and interpretations will be consistent with the intent of and reasonably inferable from the Contract
Documents. ENGINEER may issue Field Orders authorizing minor variations from the requirements of the
Contract Documents.
10. Change orders and Work Change Directives. Process contract modifications and negotiate with the
contractor on behalf of the OWNER to determine the cost and time impacts of these changes. Prepare
change order documentation for approved changes for execution by the OWNER. Documentation of field
orders, where cost to OWNER is not impacted, will also be prepared. Investigations, analyses, studies or
design for substitutions of equipment or materials, corrections of defective or deficient work of the contractor
or other deviations from the construction contract documents requested by the contractor and approved by the
Owner are an additional service. Substitutions of materials or equipment or design modifications requested
by the OWNER are an additional service.
11 Shop Drawings and Samples. Review and approve or take other appropriate action in respect to
Shop Drawings and Samples and other data which Contractor is required to submit, but only for conformance
with the information given in the Contract Documents and compatibility with the design concept of the
completed Project as a functioning whole as indicated in the Contract Documents. Such reviews and
Page 18 of 39
approvals or other action will not extend to means, methods, techniques, sequences or procedures of
construction or to safety, precautions and programs incident thereto.
12. Substitutes and "or -equal." Evaluate and determine the acceptability of substitute or "or -equal"
materials and equipment proposed by Contractor.
13. Inspections and Tests. Require such special inspections or tests of Contractor's work as deemed
reasonably necessary, and receive and review all certificates of inspections, tests, and approvals required by
Laws and Regulations or the Contract Documents. ENGINEER's review of such certificates will be for the
purpose of determining that the results certified indicate compliance with the Contract Documents.
14. Disagreements between OWNER and Contractor. Render formal written decisions on all claims of
OWNER and Contractor relating to the acceptability of Contractor's work or the interpretation of the
requirements of the Contract Documents pertaining to the execution and progress of Contractor's work. In
rendering such decisions, ENGINEER shall be fair and not show partiality to OWNER or Contractor and
shall not be liable in connection with any decision rendered in good faith in such capacity.
15. Applications for Payment. Based on ENGINEER's observations as an experienced and qualified
design professional and on review of Applications for Payment and accompanying supporting
documentation:
a. Determine the amounts that ENGINEER recommends Contractor be paid. Such
recommendations of payment will be in writing and will constitute ENGINEER's representation to
OWNER, based on such observations and review, that, to the best of ENGINEER's knowledge,
information and belief, Contractor's work has progressed to the point indicated, the quality of such work
is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a
functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called
for in the Contract Documents and to any other qualifications stated in the recommendation), and the
conditions precedent to Contractor's being entitled to such payment appear to have been fulfilled in so
far as it is ENGINEER's responsibility to observe Contractor's work. In the case of unit price work,
ENGINEER's recommendations of payment will include final determinations of quantities and
classifications of Contractor's work (subject to any subsequent adjustments allowed by the Contract
Documents).
16. Contractor's Completion Documents.
a. Receive and review maintenance and operating instructions, schedules, and guarantees.
b. Receive bonds, certificates, or other evidence of insurance not previously submitted and
required by the Contract Documents, certificates of inspection, tests and approvals, Shop Drawings,
Samples, annotated record drawings, and other data which are to be assembled by Contractor in
accordance with the Contract Documents to obtain final payment.
c. ENGINEER shall transmit these documents to OWNER.
17. Substantial Completion. Promptly after notice from Contractor that Contractor considers the entire
Work ready for its intended use, in company with OWNER and Contractor, conduct an inspection to
determine if the Work is Substantially Complete. If after considering any objections of OWNER,
ENGINEER considers the Work Substantially Complete, ENGINEER shall deliver a certificate of
Substantial Completion to OWNER and Contractor.
Page 19 of 39
18. Final Notice of Acceptability of the Work. Conduct a final inspection to determine if the completed
Work of Contractor is acceptable so that ENGINEER may recommend, in writing, final payment to
Contractor. Accompanying the recommendation for final payment, ENGINEER shall also provide a notice in
the form attached hereto as Exhibit D (the "Notice of Acceptability of Work") that the Work is acceptable to
the best of ENGINEER's knowledge, information, and belief and based on the extent of the services provided
by ENGINEER under this Agreement.
B. Duration of Construction Phase. The Construction Phase will commence with the execution of the first
Construction Agreement for the Project or any part thereof and will terminate upon written recommendation
by ENGINEER for final payment to Contractors. If the Project involves more than one prime contract,
Construction Phase services may be rendered at different times in respect to the separate contracts.
C. Limitation of Responsibilities. ENGINEER shall not be responsible for the acts or omissions of any
Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing or
furnishing any of the Work. ENGINEER shall not be responsible for failure of any Contractor to perform or
furnish the Work in accordance with the Contract Documents.
19. Revise the construction drawings in accordance with the information furnished by construction
Contractors reflecting changes in the Project made during construction. Ten half sized, 2 full sized, and one
reproducible full size set of prints of "record Drawings" shall be provided by Engineer to OWNER. One
electronic copy of the "Record Drawings" will be furnished.
20. Post -Construction Phase. Engineer shall provide post -construction phase services during the one
year period after substantial completion for each construction contract. The Post -Construction Phase
includes, providing assistance in connection with the testing and adjusting of Project equipment or systems;
Assisting OWNER in training OWNER's staff to operate and maintain Project, equipment, and systems;
Assisting OWNER in developing procedures for control of the operation and maintenance of, and record
keeping for Project equipment and systems; visiting the Project with the OWNER to observe any apparent
defects in the Work, assist OWNER in consultations and discussions with Contractor concerning correction
of any such defects, and make recommendations as to replacement or correction of Defective Work, if
present; and in company with OWNER or OWNER'S representative, provide an inspection of the Project
within one month before the end of the Correction Period to ascertain whether any portion of the Work is
subject to correction for up to one year from substantial completion.
21. Operation and Maintenance manuals. Engineer will prepare the Designer's suggested Operations
and Maintenance Manual for the project. The manual will cover normal and contingency operations
instructions. The manual is intended to supplement O&M manuals from the equipment suppliers and not be
a comprehensive O&M manual for the entire project. The manual will include the designer's suggested
operation and maintenance activities, test data, curves, and maintenance schedules. Hard copies and
electronic copies will be furnished.
Page 20 of 39
Resolution No. 2010—RO341
EXHIBIT A, PART 2 — ADDITIONAL SERVICES
LAKE ALAN HENRY TREATED WATER LINE
Additional Services Requiring OWNER's Authorization in Advance
A. If authorized in writing by OWNER, ENGINEER shall furnish or obtain from others Additional
Services of the types listed below. These services will be paid for by OWNER as indicated in Article 1 of the
Agreement.
1. Providing design and/or construction surveys and staking to enable ENGINEER to perform its
services and Contractor to perform his work, and any type of property surveys or related engineering services
needed for the transfer of interests in real property; and providing other special field surveys.
2. Soil and foundation investigations, including field and laboratory tests, borings, related engineering
analysis and recommendations.
3. Preparation of applications and supporting documents (in addition to those furnished under Basic
Services) for private or governmental grants, loans or advances in connection with the Project; preparation or
review of environmental assessments and impact statements; review and evaluation of the effects on the
design requirements for the Project of any such statements and documents prepared by others; and assistance
in obtaining approvals of authorities having jurisdiction over the anticipated environmental impact of the
Project.
4. Services to make measured drawings of or to investigate existing conditions or facilities, or to verify
the accuracy of drawings or other information furnished by OWNER.
5. Services resulting from significant changes in the scope, extent, or character of the portions of the
Project designed or specified by ENGINEER or its design requirements including, but not limited to, changes
in size, complexity, OWNER's schedule, character of construction, or method of financing; and revising
previously accepted studies, reports, Drawings, Specifications, or Contract Documents when such revisions
are required by changes in Laws and Regulations enacted subsequent to the Effective Date of this Agreement
or are due to any other causes beyond ENGINEER's control.
6. Services required as a result of OWNER's providing incomplete or incorrect Project information.
7. Providing renderings or models for OWNER's use.
8. Undertaking investigations and studies including, but not limited to, detailed consideration of
operations, maintenance, and overhead expenses; the preparation of feasibility studies, cash flow and
economic evaluations, rate schedules, and appraisals; assistance in obtaining financing for the Project;
evaluating processes available for licensing, and assisting OWNER in obtaining process licensing; detailed
quantity surveys of materials, equipment, and labor; and audits or inventories required in connection with
construction performed by OWNER.
9. Furnishing services of ENGINEER's Consultants for other than Basic Services.
10. Services during out-of-town travel required of ENGINEER other than for visits to the Site or
OWNER's office.
Page 21 of 39
11. Preparing for, coordinating with, participating in and responding to structured independent review
processes, including, but not limited to, construction management, cost estimating, project peer review, value
engineering, and constructibility review requested by OWNER; and performing or furnishing services
required to revise studies, reports, Drawings, Specifications, or other Bidding Documents as a result of such
review processes.
12. Preparing additional Bidding Documents or Contract Documents for alternate bids or prices
requested by OWNER for the Work or a portion thereof.
13. Determining the acceptability of substitute materials and equipment proposed during the Bidding or
Negotiating Phase when substitution prior to the award of contracts is allowed by the Bidding Documents.
14. Assistance in connection with Bid protests, rebidding, or renegotiating contracts for construction,
materials, equipment, or services.
15. Providing Construction Phase services beyond the Contract Times set forth in Exhibit A, Part 1,
Paragraph A.7.a.
16. Providing assistance in resolving any Hazardous Environmental Condition in compliance with
current Laws and Regulations.
17. Preparing to serve or serving as a consultant or witness for OWNER in any litigation, arbitration or
other dispute resolution process related to the Project.
18. Providing more extensive services required to enable ENGINEER to issue notices or certifications
requested by OWNER.
19. Services in connection with Work Change Directives and Change Orders to reflect changes
requested by OWNER so as to make the compensation commensurate with the extent of the Additional
Services rendered.
20. Services in making revisions to Drawings and Specifications occasioned by the acceptance of
substitute materials or equipment other than "or -equal" items; and services after the award of the
Construction Agreement in evaluating and determining the acceptability of a substitution which is found to
be inappropriate for the Project or an excessive number of substitutions.
21. Services resulting from significant delays, changes, or price increases occurring as a direct or
indirect result of materials, equipment, or energy shortages.
22. Additional or extended services during construction made necessary by (1) emergencies or acts of
God endangering the Work, (2) an occurrence of a Hazardous Environmental Condition, (3) Work damaged
by fire or other cause during construction, (4) a significant amount of defective, neglected, or delayed work
by Contractor, (5) acceleration of the progress schedule involving services beyond normal working hours, or
(6) default by Contractor.
23. Services in connection with any partial utilization of any part of the Work by OWNER prior to
Substantial Completion.
24. Evaluating an unreasonable claim or an excessive number of claims submitted by Contractor or
others in connection with the Work.
Page 22 of 39
25. Other services performed or furnished by ENGINEER not otherwise provided for in this
Agreement.
26. Reimbursable expenses associated with providing additional services.
Page 23 of 39
Resolution No. 2010—RO341
EXHIBIT A, PART 3 — OWNER'S RESPONSIBILITIES
LAKE ALAN HENRY TREATED WATER LINE
RESPONSIBILITIES OF OWNER: OWNER shall perform the following within a reasonable time, except in
the event a specific time period has otherwise been prescribed for such task, wherein such specific time shall be
applicable.
Designate in writing a person to act as OWNER's representative with respect to the services to be
rendered under this AGREEMENT. Such person shall have authority to transmit instructions, receive
information, interpret and clarify OWNER's policies and decisions with respect to ENGINEER's
services for the Project.
2. Assist ENGINEER by placing at ENGINEER's disposal all available non -confidential information
pertinent to the Project including previous reports and any other data relative to construction of the
Project. Notwithstanding anything to the contrary herein, ENGINEER's reliance upon any report or data
prepared by a party other than OWNER shall be at the sole risk of ENGINEER.
3. Arrange for access to and make all provisions for ENGINEER to enter upon public and private property
as required for ENGINEER to perform services under this AGREEMENT.
4. Examine all studies, reports, sketches, drawings, specifications, proposals and other documents
presented by ENGINEER, obtain advice of an attorney, insurance counselor and other consultants as
OWNER deems appropriate for such examination and render in writing decisions pertaining thereto
within a reasonable time so as not to delay the services of ENGINEER.
5. Furnish approvals and permits from all governmental authorities having jurisdiction over the Project and
such approvals and consents from others as may be necessary for completion of the Project, unless
previously required to be provided by ENGINEER.
6. Provide such accounting, independent cost estimating and insurance counseling services as may be
required by OWNER for the Project, such legal services as OWNER may require with regard to legal
issues pertaining to the Project including any that may be raised by Contractor(s), such auditing service
as OWNER may require to ascertain how or for what purpose any Contractor has used the moneys paid
under the construction contract, and such inspection services as OWNER may require to ascertain that
Contractor(s) are complying with any law, rule, regulation, ordinance, code or order applicable to their
furnishing and performing the work.
7. Attend the pre-bid conference, bid opening, preconstruction conferences, construction progress and
other job related meetings and substantial completion inspections and final payment inspections.
8. Give prompt written notice to ENGINEER whenever OWNER observes or otherwise becomes aware of
any development that affects the scope or timing of ENGINEER's services, or any defect or
nonconformance of the work of any Contractor.
9. Furnish, or direct ENGINEER to provide, Additional Services as stipulated in Exhibit A, Part 2 of this
AGREEMENT or other services, as deemed to be required by OWNER.
Page 24 of 39
10. The OWNER reserves the right to direct substantial revision of the Plans and Specifications after
approval by the OWNER as OWNER may deem necessary, but in such event the OWNER shall pay
ENGINEER just and equitable compensation for services rendered in making such revisions and such
shall be considered Additional Services hereunder. OWNER shall not be obligated to pay ENGINEER
for said revisions should they be necessary as a result of the design and/or Contract Documents being in
any manner defective or deficient.
11. Bear all costs incident to compliance with the requirements of OWNER'S responsibilities.
Page 25 of 39
Resolution No. 2010—RO341
EXHIBIT B
PAYMENTS TO THE ENGINEER
LAKE ALAN HENRY TREATED WATER LINE
PAYMENTS TO THE ENGINEER — Lake Alan Henry Treated Water Line
OWNER shall pay ENGINEER for services set forth in Exhibit A — Scope of Services, Basic
Services as follows:
a. On an hourly rate basis per the attached schedules, as applicable for personnel of the respective
firm, at a Not to Exceed amount of $ 1,077,800 based on the following distribution of
compensation:
Lake Alan Henry Treated Water Pipeline — Construction Contracts G-1 and G-2
Construction Contract G-1
• Construction Phase Basic Services $ 154,600
• Resident Project Representation $ 289,100
Construction Contract G-2
• Construction Phase Basic Services $ 256,800
• Resident Project Representation $ 377,300
?. OWNER shall pay ENGINEER for services rendered, including Authorized Additional Services as
follows:
1) For labor on an hourly rate basis per the attached schedules, as applicable for personnel of
the respective firm. Sub -consultant will be billed on the basis of cost times a factor of
1.03.
2) For reimbursable expenses, on the basis of cost times a factor of 1.05.
3) Estimates of man-hours and hourly rates for which the Not -to -Exceed fee is based are as
shown on the attached tables entitled "Fee Estimating Sheets":
Page 26 of 39
Parkhill, Smith & Cooper, Inc.
Client: City of Lubbock
Project: Lake Alan Henry Water Supply Project
Agreement Date:
Classification Hourly Rate
PROFESSIONAL LEVEL VII
Engineer VII
Architect VII
Landscape Architect VII
Interior Designer VII
PROFESSIONAL LEVEL VI
Engineer VI
Architect VI
Landscape Architect VI
Interior Designer VI
PROFESSIONAL LEVEL V
Engineer V
Architect V
Landscape Architect V
Interior Designer V
Hourly Rate Schedul
Classification Hourly Rate
175.00 PROFESSIONAL LEVEL II 90.00
Intern (Architect) II
Interior Designer 11, Intern (Interiors) 11
Technologist II
Resident Project Representative II
Landscape Architect II
150.00
PROFESSIONAL LEVEL 1 80.00
Intern (Architect) I
Intern (Interiors) I
Technologist I
Resident Project Representative 1
135.00
PROFESSIONAL LEVEL IV 115.00
Engineer IV
Architect IV, Intern (Architect) IV
Landscape Architect IV
Interior Designer IV
Technologist IV
Resident Project Representative IV
PROFESSIONAL LEVEL III
Engineer 1/11, III
Architect III, Intern (Architect) III
Landscape Architect III
Intern (Landscape Architect) III
Interior Designer III
Technologist III
Resident Project Representative III
Expenses
SUPPORT STAFF III
Engineering Technician III
CADD III
Administrative Secretary III
Project Assistant 1/11
SUPPORT STAFF II
Accounting Clerk
CADD
Clerical
Engineering Technician II
Administrative Secretary II
100.00 SUPPORT STAFF I
Architectural Student
Engineering Student
Interiors Student
Landscape Architecture Student
Accounting Clerk Trainee
CADD Trainee
Clerical Trainee
75.00
70.00
40.00
Reimbursement for expenses, as listed below, incurred in connection with the Additional Services, will be at cost plus five percent for
items such as:
1. Maps, photographs, postage, toll telephone, reproductions, printing, equipment rental, and special supplies related to the services.
2. Rented vehicles, local public transportation and taxis, travel, and subsistence.
3. Special or job specific fees, insurance, permits, and licenses applicable to the work services.
4. Outside computer processing, computation, and proprietary programs purchased for the services.
Rate for professional staff for legal proceedings or as expert witnesses will be a rate one and one-half times the Hourly Rates specified
above.
Excise and gross receipts taxes, if any, will be added as an expense.
The foregoing Schedule of Charges is incorporated into the agreement for the services provided, effective January 1, 2010 through
December 31, 2012.
Page 27 of 39
FEE ESTIMATING SHEET
PROJECT:
Lub LAHTwL
JOB NO.: 01-2772-10
TASK:
G-�c
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP
ENG
ENG ARCHINT EIT
CADD OPT
CLERICAL
TASK
01
03
03 06 07
14
18
Trips
$175.00
$135.00
$115.00 $90.00
$75.00
$75.00
TOTAL
Segment G-1 CPS
Project Setup
8
8
4
20
Preconstruction Conference
1
4
8
12
4
28
Monthly progress meetings (14)
14
28
56
56
28
168
Bi -weekly team meetings (28)
28
56
56
28
168
Monthly billing
14
7
21
Site visits during construction
124
12
56
56
124
Submittal review and processing
8
80
120
80
288
Review/ respond to RFI's
16
80
40
40
176
Review and Process pay estimates
14
28
8
50
Develop punch list items
2
16
24
40
Final walk-thni
1
8
8
16
Project Closeout
4
16
24
8
52
Record Drawings
8
24
80
112
BUDGET SUBTOTALS: HOURS/
Trips- 142
122
406
448
80
20-7-T----1263
SALARY
[$21,350
$54,810
$40,320
$6,000
$15,525 1
$138,005
Page 28 of 39
FEE ESTIMATING SHEET PROJECT:
LubLAHTWL
JOB NO.: 01-2772-10
TASK:
G -IC
REIM BURSABLES
REIMBURSABLE CONSULTANT COSTS
SUBTOTAL
511 Structural Consultant
512 M ech/Elec Consultant
513 Environ/Civil Consultant
514 Architectural Consultant
515 Testing Consultant (Verification Testing Budget)
$10,000
515 Surveying Consultant
518 Other Consultant
TOTAL REIM BURSABLE CONSULTANTS
$10,000
REIM B URSAB LE EXPENSES
521 Travel
Motel Days
Men @ /M and ay
=
Air Travel Air Fare @
Men @ /Man
=
Parking Days Q
/Day
=
Car Rental Days Q
/Day
=
M ileage 25 M iles @
$0.500
@ P' 142 Trips
=
$1,775.00
SUBTOTAL
$1,775
522 Reproductions
B lackl i ne Prints
34" x 22"
Shts @
$0.70 @
Sets =
36" x 24"
Shts Q
$0.78 @
Sets =
42" x 30
Shts @
$1.15 @
Sets =
Other
sf @
$0.15 Q
Sets =
Printing:
8-V2" x 11" B&W 1000
Originals Q
$0.08 /Sht Q 1
Sets =
$80.00
8-1/2" x 11" Color
Originals Q
$0.50 /Sht @
Sets =
V x 17" B&W
Originals @
$0.18 /Sht Q
Sets =
1T x 17" Color
Originals @
$1.00 /Sht @
Sets =
Binding Cost
Sets Q
$2.50 /Set
=
Laminating
Shts Q
$2.00 /Sht
=
Scan to file
Burn to CD/DVD 2
CD/DVD @
$13.50 /each
=
$27.00
Scan Specs 500
Originals @
$0.15 /Sht
=
$75.00
Scan Drawings 50
Originals @
$1.50 /Sht
=
$75.00
SUBTOTAL
IF$257
523 Models/Renderings/Photos
500 Shots@ $0.50 /Shot
7$250
524 Telephone 250 Calls @
$2.00 /Call
$500
525 M eals 28 Days Q
8
Men Q $10.00 /M anday
$2,240
526 Field Supplies
528 Postage 10 Mailings@
$25.00 /Mailing
$250
529 Publications
530 M isc Reimbursable Exp
531 Fax 500 Peg as @
$1.00
$500
532 Temporary Personnel
533 Drafting Supplies
534 Office Supplies
535 CADD 80 Hours @
/Hour
536 Field Equip Rental
537Interior Design Items
539 NM Gross Receipt Tax
547 Computer Supplies
TOTAL REIM BURSABLE EXPENSES
$5,772
Markup on Reimbursables $ 789
Labor from Previous Page $ 138,005
Total Fee G-1 CPS $ 154,600
Page 29 of 39
FEE ESTIMATING SHEET PROJECT: Lub LAHTwL JOB NO.: 042772-10 TASK: G -1R
SALARY CATEGORY OF PERSONNEL
RATE PER HOUR
FP ENG ENG RPR EIT CADD OPT CLERICAL
TASK
01 03 03 11 07 14 18
Trips
$175.00 $135.00 $115.00 $100.00 $90.00 $75.00 $75.00
TOTAL
Segment G-1 RPR
Full-time observation (50hr/wk, 56 wks)
2800
2,800
BUDGET SUBTOTALS: HOURS/ Trips -2800
2800
SALARY
$280,000
1 $280,000
Page 30 of 39
FEE ESTIMATING SHEET
PROJECT:
LubLAHTWL JOB NO.: 01-2772-10
TASK: G-1R
REIM BURSABLES
BLE CONSULTANT COSTS
SUBTOTAL
ctural Consultant
-
h/ElecConsultant
ron/CivilConsultant
itectural Consultant
E12
ing Consultant
eying Consultant
er Consultant
TOTAL REIM BURSABLE CONSULTANTS
REIM BURSABLE EXPENSES
521 Travel
Motel
Days (g?
Men Q /Manday
=
Air Travel
Air Fare Q
Men Q /Man
=
Parking
Days Q
/Day
=
Car Rental
Days Q
/Day
=
M ileage 50
Miles Q
$0.500
Q 280 Trips
=
$7,000.00
SUBTOTAL
$7,000
522 Reproductions
Blackline Prints
34"x22"
Shts Q
$0.70 Q
Sets =
36" x 24"
Shts Q
$0.78 Q
Sets =
42" x 30
Shts Q
$1.15 Q
Sets =
Other
sf Q
$0.15 Q
Sets =
Printing:
8-1/2" x 1T' B&W
1000
Originals Q
$0.08 /Sht Q 1
Sets =
$80.00
8-1/2" x 1T' Color
Originals Q
$0.50 /Sht Q
Sets =
1T' x 17" B&W
Originals Q
$0.18 /Sht Q
Sets =
11" x 17" Color
Originals Q
$1.00 /Sht Q
Sets =
Binding Cost
Sets Q
$2.50 /Set
=
Laminating
Shts Q
$2.00 /Sht
=
Scan to file
Burn to CD/DVD
2
CD/DVD Q
$13.50 /each
=
$27.00
Scan Specs
500
Originals Q
$0.15 /Sht
=
$75.00
Scan Drawings
50
Originals Q
$1.50 /Sht
=
$75.00
SUBTOTAL
$257
523 Models/Renderings/Photos
Shots Q $0.50 /Shot
524 Telephone
Calls Q
/Call
$1,400
525 M eals
Days Q
Men Q $10.00 /M anday
526 Field Supplies
528 Postage
MailingsQ
$25.00 /Mailing
529 Publications
530 M isc Reimbursable Exp
531 Fax
Pages Q
$1.00
532 Temporary Personnel
533 Drafting Supplies
534 Office Supplies
535 CADD
Hours Q
/Hour
536 Field Equip Rental
537 Interior Design Items
539 NM Gross Racal pt Tax
547 Computer Supplies
TOTAL REIM BURSABLE EXPENSES$8,657
Markup onReimbursables $ 433
Labor from Previous Page $ 280,000
Total Fee G-1 RPR $ 289,100
Page 31 of 39
FEE ESTIMATING SHEET
PROJECT:
Lub LAHTwL
JOB NO.:
01-2772-10
TASK:
c-zc
SALARY
CATEGORY OF PERSONNEL
RATE
PER HOUR
FP
ENG
ENG
ARCHINT EIT
CADD OPT
CLERICAL
TASK
01
03
03
06 07
14
18
Trips
$175.00
$135.00
$115.00
$90.00
$75.00
$75.00
TOTAL
Segment G-2 CPS
Project Setup
8
8
4
20
Preconstruction Conference
1
4
8
12
4
28
Monthly progress meetings (18)
18
36
72
24
72
36
240
Bi -weekly team meetings (28)
28
84
12
84
36
244
Monthly billing
18
9
27
Site visits during construction
159
15
72
24
72
183
Submittal review and processing
16
120
80
160
120
496
Review/ respond to RFI's
24
160
24
160
80
448
Review and Process pay estimates
18
36
16
70
Develop punch list items
2
24
16
32
72
Final walk-thni
1
16
16
16
48
Project Closeout
8
24
40
16
88
Record Drawings
12
32
120
164
BUDGET SUBTOTALS: HOURS/
Trips- 181
157
618
196
716
120
321
2128
SALARY
[$27,475
$83,430
$22,540
$64,440
$9,000
$24,075
$230,960
Page 32 of 39
FEE ESTIM ATING SHEET PROJECT:
LubLAHTWL
JOB NO.: 01-2772-10
TASK:
G -2C
REIM BURSABLES
ABLE CONSULTANT COSTS
SUBTOTAL
tructural Consultant
ech/ElecConsultant
nvironlCivil Consultant
P
rchitectural Consultant
esting Consultant (Verification Testing Budget)
$15,000
urveying Consultant
518 Other Consultant
TOTAL REIM BURSABLE CONSULTANTS
$15,000
REIM BURSABLE EXPENSES
521 Travel
Motel Days @
Men Q /M and ay
=
Air Travel Air Fare@
Men @ /Man
=
Parking Days Q
/Day
=
Car Rental Days Q
/Day
=
M ileage 40 M iles @
$0.500
@ r 181 Trips
=
$3,620.00
SUBTOTAL
$3,620
522 Reproductions
Blackline Prints
34" x 22"
SMs @
$0.70 @
Sets =
36" x 24"
Shia @
$0.78 @
Sets =
42" x 30
SMs Q
$1.15 @
Sets =
Other
sf @
$0.15 Q
Sets =
Printing:
8-1/2" x 1T B&W 1500
Originals @
$0.08 /Sht Q 1
Sets =
$120.00
8-1/2" x 11" Color
Originals @
$0.50 /Sht Q
Sets =
11" x 17" B&W
Originals @
$0.18 /Sht Q
Sets =
11" x 17" Color
Originals Q
$1.00 /Sht @
Sets =
Binding Cost
Sets @
$2.50 /Set
=
Laminating
SMs@
$2.00 /Sht
=
Scan to file
Burn to CD/DVD 2
CD/DVD @
$13.50 /each
=
$27.00
Scan Specs 500
Originals
$0.15 /Sht
=
$75.00
Scan Drawings 100
Originals @
$1.50 /Sht
=
$150.00
SUBTOTAL
$372
523 Models/Renderings/Photos
1000 Shots@ $0.50 /Shot
$500
524 Telephone 500 Calls Q
$2.00 /Call
$1,000
525 Meals 36 Days@
8
Men @ $10.00 /Manday
$2,880
526 Field Supplies
528 Postage 10 Mailings@
$25.00 /Mailing
$250
529 Publications
530 M isc Reimbursable Exp
531 Fax 1000 Pages @
$1.00
$1,000
532 Temporary Personnel
533 Drafting Supplies
534 Office Supplies
535 CADD 120 Hours Q
/Hour
536 Field Equip Rental
537 Interior Design Items
539 NM Gross Receipt Tax
547 Computer Supplies
TOTAL REIM BURSABLE EXPENSES
$9,622
Markup on Reimbursables $ 1,231
Labor from Previous Page $ 230,960
Total Fee G-2CPS $ 256,800
Page 33 of 39
FEE ESTIMATING SHEET PROJECT: Lub LAHTwL JOB NO.: 01-2772-10 TASK: c -2R
SALARY CATEGORY OF PERSONNEL
RATE PER HOUR
FP ENG ENG RPR EIT CADD OPT CLERICAL
TASK
01 03 03 11 07 14 18
Trips
$175.00 $135.00 $115.00 $100.00 $90.00 $75.00 $75.00
TOTAL
Segment G-2 RPR
Full-time observation (50hr/wk, 72 wks) 360
3600
3,600
BUDGET SUBTOTALS: HOURS/ Trips - 3603600
3600
SALARY
$360,000 1
$360,000
Page 34 of 39
FEE ESTIMATING SHEET
PROJECT:
Lub LAHTWL JOB NO.: 01-2772-10
TASK: G -2R
REIM BURSABLES
SABLE CONSULTANT COSTS
SUBTOTAL
Structural Consultant
Mech/ElecConsultant
EnviroNCivil Consultant
Architectural Consultant
B
Testing Consultant
Surveying Consultant
OtherConsultant
TOTAL REIMBURSABLIE CONSULTANTS
REIM BURSABLE EXPENSES
521 Travel
Motel
Days @
Men Q /Manday
=
Air Travel
Air Fare Q
M an Q /Man
=
Parking
Days @
/Day,
=
Car Rental
Days Q
/Day
=
M ileage 80
M lies @
$0.500
Q 360 Trips
=
$14,400.00
SUBTOTAL
$14,400
522 Reproductions
Blackline Prints
34" x 22"
Shts @
$0.70 @
Sets =
36"x24"
Shts @
$0.78 @
Sets =
42" x 30
Shts @
$1.15 @
Sets =
Other
sf Q
$0.15 @
Sets =
Printing:
8-V2" x 1T' B&W
1000
Originals Q
$0.08 /Sht @ 1
Sets =
$80.00
8-V2" x 11' Color
Originals @
$0.50 /Sht Q
Sets =
1T' x 17" B&W
Originals @
$0.18 /Sht Q
Sets =
1T' x 17" Color
Originals @
$1.00 /Sht @
Sets =
Binding Cost
Sets @
$2.50 /Set
=
Laminating
Shts Q
$2.00 /Sht
=
Scan to file
Burn to CD/DVD
2
CD/DVDQ
$13.50 /each
=
$27.00
Scan Specs
500
Originals Q
$0.15 /Sht
=
$75.00
Scan Drawings
50
Originals Q
$1.50 /Sht
=
$75.00
SUBTOTAL
$257
523 Models/Renderings/Photos
Shots (5? $0.50 /Shot
524 Telephone
Calls Q
/Call
$1,800
525 M eals
Days Q
Men @ $10.00 /M anday
526 Field Supplies
528 Postage
M ailings @
$25.00 /M ailing
529 Publications
530 M isc Reimbursable Exp
531 Fax
Pages Q
$1.00
532 Temporary Personnel
533 Drafting Supplies
534 Office Supplies
535 CADD
Flours @
/Hour
536 Field Equip Rental
537 Interior Design Items
539 NM Gross Receipt Tax
547 Computer Supplies
TOTAL REIMBURSABLEEXPENSE$16,457
Markup onReimbursables $ 823
Labor from Previous Page $ 360,000
Total Fee G-2 RPR $ 377,300
Page 35 of 39
EXHIBIT C Resolution No. 2010—RO341
DUTIES, RESPONSIBILITIES, AND LIMITATIONS
OF AUTHORITY
OF RESIDENT PROJECT REPRESENTATIVE
A. ENGINEER shall furnish a full-time Resident Project Representative ("RPR"), assistants, and other
field staff (based on the hours and weeks provided below) to assist ENGINEER in observing
progress and quality of the Work. The RPR, assistants, and other field staff under this Exhibit C
may provide full time representation or may provide representation to a lesser degree, as needed
and in accordance with the work in progress at the time. The ENGINEER shall provide the
following construction phase staff RPRs for the construction of the two phases of the treated
water pipeline construction:
Segment G-1 50 hours per week for 56 weeks
Segment G-2 50 hours per week for 72 weeks
OWNER agrees to pay, in addition to the labor effort, expenses for the field personnel as
established in the ENGINEER's fee for providing the construction phase services.
B. Through such additional observations of Contractor's work in progress and field checks of materials
and equipment by the RPR and assistants, ENGINEER shall endeavor to provide further protection for
OWNER against defects and deficiencies in the Work. However, ENGINEER shall not, during such visits
or as a result of such observations of Contractor's work in progress, supervise, direct, or have control over
the Contractor's Work nor shall ENGINEER have authority over or responsibility for the means, methods,
techniques, sequences, or procedures selected by Contractor, for safety precautions and programs incident
to the Contractor's work in progress, for any failure of Contractor to comply with Laws and Regulations
applicable to Contractor's performing and furnishing the Work, or responsibility of construction for
Contractor's failure to furnish and perform the Work in accordance with the Contract Documents.
C. The duties and responsibilities of the RPR are limited to those of ENGINEER in the Agreement
with the OWNER and in the Contract Documents, and are further limited and described as follows:
1. General: RPR is ENGINEER's agent at the Site, will act as directed by and under the
supervision of ENGINEER, and will confer with ENGINEER regarding RPR's actions. RPR's dealings
in matters pertaining to the Contractor's work in progress shall in general be with ENGINEER and
Contractor, keeping OWNER advised as necessary. RPR's dealings with subcontractors shall only be
through or with the full knowledge and approval of Contractor. RPR shall generally communicate with
OWNER with the knowledge of and under the direction of ENGINEER. RPR shall generally
communicate with OWNER with the knowledge of and under the direction of ENGINEER.
2. Schedules: Review the progress schedule, schedule of Shop Drawing and Sample submittals,
and schedule of values prepared by Contractor and consult with ENGINEER concerning acceptability.
3. Conferences and Meetings: Attend meetings with Contractor, such as preconstruction
conferences, progress meetings, job conferences and other project -related meetings, and prepare and
circulate copies of minutes thereof.
4. Liaison:
a. Serve as ENGINEER's liaison with Contractor, working principally through Contractor's
superintendent and assist in understanding the intent of the Contract Documents.
Page 36 of 39
b. Assist ENGINEER in serving as OWNER's liaison with Contractor when Contractor's
operations affect OWNER's on -Site operations.
c. Assist in obtaining from OWNER additional details or information, when required for
proper execution of the Work.
5. Interpretation of Contract Documents: Report to ENGINEER when clarifications and
interpretations of the Contract Documents are needed and transmit to Contractor clarifications and
interpretations as issued by ENGINEER.
6. Shop Drawings and Samples.
a. Record date of receipt of Samples and approved Shop Drawings.
b. Receive Samples which are furnished at the Site by Contractor, and notify ENGINEER of
availability of Samples for examination.
c. Advise ENGINEER and Contractor of the commencement of any portion of the Work
requiring a Shop Drawing or Sample submittal for which RPR believes that the submittal has not
been approved by ENGINEER.
7. Modifications: Consider and evaluate Contractor's suggestions for modifications in Drawings
or Specifications and report with RPR's recommendations to ENGINEER. Transmit to Contractor in
writing decisions as issued by ENGINEER.
8. Review of Work and Rejection of Defective Work:
a. Conduct on -Site observations of Contractor's work in progress to assist ENGINEER in
determining if the Work is in general proceeding in accordance with the Contract Documents.
b. Report to ENGINEER whenever RPR believes that any part of Contractor's work in
progress will not produce a completed Project that conforms generally to the Contract Documents
or will prejudice the integrity of the design concept of the completed Project as a functioning whole
as indicated in the Contract Documents, or has been damaged, or does not meet the requirements of
any inspection, test or approval required to be made; and advise ENGINEER of that part of work in
progress that RPR believes should be corrected or rejected or should be uncovered for observation,
or requires special testing, inspection or approval.
9. Inspections, Tests, and System Startups:
a. Consult with ENGINEER in advance of scheduled major inspections, tests, and systems
startups of important phases of the Work.
b. Verify that tests, equipment, and systems start-ups and operating and maintenance training
are conducted in the presence of appropriate OWNER's personnel, and that Contractor maintains
adequate records thereof.
c. Observe, record, and report to ENGINEER appropriate details relative to the test
procedures and systems startups.
d. Accompany visiting inspectors representing public or other agencies having jurisdiction
over the Project, record the results of these inspections, and report to ENGINEER.
Page 37 of 39
10. Records:
a. Maintain at the Site orderly files for correspondence, reports of job conferences,
reproductions of original Contract Documents including all Change Orders, Field Orders, Work
Change Directives, Addenda, additional Drawings issued subsequent to the execution of the
Contract, ENGINEER's clarifications and interpretations of the Contract Documents, progress
reports, Shop Drawing and Sample submittals received from and delivered to Contractor, and other
Project related documents.
b. Prepare a daily report or keep a diary or log book, recording Contractor's hours on the Site,
weather conditions, data relative to questions of Change Orders. Field Orders, Work Change
Directives, or changed conditions, Site visitors, daily activities, decisions, observations in general,
and specific observations in more detail as in the case of observing test procedures: and send copies
to ENGINEER.
c. Record names, addresses and telephone numbers of all Contractors, subcontractors, and
major suppliers of materials and equipment.
d. Maintain records for use in preparing Project documentation.
e. Upon completion of the Work, furnish original set of all RPR Project documentation to
ENGINEER.
11. Reports:
a. Furnish to ENGINEER periodic reports as required of progress of the Work and of
Contractor's compliance with the progress schedule and schedule of Shop Drawing and Sample
submittals.
b. Draft and recommend to ENGINEER proposed Change Orders, Work Change Directives,
and Field Orders. Obtain backup material from Contractor.
c. Furnish to ENGINEER and OWNER copies of all inspection, test, and system startup
reports.
d. Report immediately to ENGINEER the occurrence of any Site accidents, any Hazardous
environmental Conditions, emergencies, or acts of God endangering the Work, and property
damaged by fire or other causes.
12. Payment Requests: Review Applications for Payment with Contractor for compliance with the
established procedure for their submission and forward with recommendations to ENGINEER, noting
particularly the relationship of the payment requested to the schedule of values, Work completed, and
materials and equipment delivered at the Site but not incorporated in the Work.
13. Certificates, Operation and Maintenance Manuals: During the course of the Work, verify that
materials and equipment certificates, operation and maintenance manuals and other data required by the
Specifications to be assembled and furnished by Contractor are applicable to the items actually installed
and in accordance with the Contract Documents, and have these documents delivered to ENGINEER for
review and forwarding to OWNER prior to payment for that part of the Work.
14. Completion:
a. Before ENGINEER issues a Certificate of Substantial Completion, submit to Contractor a
list of observed items requiring completion or correction.
b. Observe whether Contractor has arranged for inspections required by Laws and
Regulations, including but not limited to those to be performed by public agencies having
jurisdiction over the Work.
Page 38 of 39
c. Participate in a final inspection in the company of ENGINEER, OWNER, and Contractor
and prepare a final list of items to be completed or corrected.
d. Observe whether all items on final list have been completed or corrected and make
recommendations to ENGINEER concerning acceptance and issuance of the Notice of
Acceptability of the Work.
D. Resident Project Representative shall not:
1. Authorize any deviation from the Contract Documents or substitution of materials or equipment
(including "or -equal" items).
2. Exceed limitations of ENGINEER's authority as set forth in the Agreement or the Contract
Documents.
3. Undertake any of the responsibilities of Contractor, subcontractors, suppliers, or Contractor's
superintendent.
4. Advise on, issue directions relative to or assume control over any aspect of the means, methods,
techniques, sequences or procedures of Contractor's work unless such advice or directions are
specifically required by the Contract Documents.
5. Advise on, issue directions regarding, or assume control over safety precautions and programs
in connection with the activities or operations of OWNER or Contractor.
6. Participate in specialized field or laboratory tests or inspections conducted off-site by others
except as specifically authorized by ENGINEER.
7. Accept Shop Drawing or Sample submittals from anyone other than Contractor.
8. Authorize OWNER to occupy the Project in whole or in part.
Page 39 of 39