HomeMy WebLinkAboutResolution - 2010-R0321 - Amendment To Contract - Parkhill, Smith & Cooper, Inc. For Engineering Services - 07/08/2010Resolution No. 2010-RO321
July 8, 2010
Item No. 5.21
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Amendment No. 1 to that certain
contract by and between the City of Lubbock and Parkhill, Smith & Cooper, Inc., for
engineering services for airfield asphalt repair at Lubbock Preston Smith International
Airport, and related documents. Said Amendment is attached hereto and incorporated in
this resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council on
July 8, 2010
TOM MARTIN, MAYOR
ATTEST:
Rebe ca Garza, City ecret
AS TO CONTENT:
Loomis, Assistant City Manager
APPROVT AS TO FORM:
had Weaver, Assistant City Attorney
vwxcdocs'RES.Amend #1 -Parkhill Smith & Cooper
June 22, 2010
Mr. James W. Loomis, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Administration Office, 2nd Floor
5401 N. Martin Luther King Jr. Blvd., Unit 389
Lubbock,Texas 79403
PARKHILLSM ITH &COOPER
Re: Amendment No.1 to Agreement for Professional Services,
Design Phase Services for LBB Airfield Asphalt Repair
Dear Mr. Loomis:
Resolution No. 2010-RO321
May 24, 2010
As requested, we have prepared Amendment No. 1 for design phase services related to airfield asphalt
repair within three General Aviation areas along the west side of the airport. Refer to the fee sheet and
drawings attached for an itemization of the scope and for the proposed limits of the improvements. While it
is understood that construction of these improvements will occur in multiple phases, the entire design will
occur at one time. The intent is to prepare five (5) construction packages which can be "put on the shelf'
and bid at the appropriate time. The contract amendment modifies the scope of professional services
included in our original agreement dated January 14, 2010. Additional bidding and construction phase
services, including on-site representation, construction testing and surveying/engineering services
associated with the FAA AC 150-5300-18B requirements, will be negotiated prior to the bidding of each
package. It will be our intent to upload each project into the FAA's AGIS website following the construction
of each phase and the fee to accomplish this work will be included as part of the construction phase
services.
Task 1 - Fee for Professional Services (5 construction packages)
(Study and Report, Preliminary Design, Final Design, lump sum). $102,800
Task 2 - Surveying and Testing Services related to design, (reimbursable expense). $24,650
TOTAL
$127,450
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
January 14, 2010. and to provide the additional Task 1 or 2 services under the provisions of the contract,
EXHIBIT B - PAYMENTS TO THE ENGINEER, PARAGRAPH B4.02. Compensation for Design Phase -
Task 1 Services shall not exceed $102,800 and compensation for Design Phase - Task 2 Services shall
not exceed $24,650 without Owner's approval
If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our
office. We will take receipt of this signed letter as our notice to proceed with these services. We look
forward to working with you in completing this project. If you have any questions please call either Mark
Haberer or me.
Amarillo
EI Paso
Lubbock
Midland 4222 85th Street Lubbock,Texas 79423 806,473,2200 Fax 806,473.3500
Mr. James Loomis, A.A.E. Page 2 May 24, 2010
Sincerely,
PARKHILL, SMITH & COOPER, INC.
By �
ohn T. Hamilton, PE
irm Principal
JTH/If
Enclosures
IN TRIPLICATE
'�-\data1\prrjpcts12001t2725 ONCIVIL\FEEsVlsphalt rehab 42&10\oDntract amendment 1 doc
Accepted by:
CITY OF LUBBOCK
By
Tom Martin
Mayor
Attest:
By
R becca Garza
City Secretary
Appr d as to Content:
By •C�
ames W. Loomis, A.A.E.
Director of Aviation
Approved,es Fo
dy
7
Chad Weaver
City Attorney
Resolution No. 2010—RO321
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET
LOCATION CODE:
01
..................
..................
....:...........:.
..................
PROJECT NAME:
LBB Airfield Asphalt Repair
..................
JOB NO.:
■I: It ��.. L_J■
■l App in MEMO
TASK:
1DSN
-:.__.An
..................
DATE:
05/25/10
EEOME'EOOEEMOMMEOO
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
JTH
PROD. MANAGER:
MDH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00% $102,800
TOTAL FEE:
$102, 2
LABOR:
$101,096
LABOR:
$101,096
DIRECTS:
$1,726
OVERHEAD:
SUBTOTAL:
$102,822
REIMB. CONSULTANTS:
REIMB. EXPENSES:
REIMB. FEE:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$1,501
TOTAL FEE:
$102,822
LABOR BUDGETS:
CODE
DESCRIPTION
HOURS
COSTS
01
Firm Principal
16
$2,240
03
Engineer
237
$29,625
03
Engineer
352
$32,032
07
Engineer -in -Training
308
$28,028
14
CADD Operator
79
$5,609
11
Resident Project Representative
22
$2,002
18
Clerical
24
$1,560
Page 1 of 1
FEE ESTIMATING SHEET PROJECT: LBB Airfield Asphalt Repair JOB NO.:
TASK: 7DSN
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP ENG
ENG
EIT CADD OPT
RPR CLERICAL
TASK
01 03
03
07
14
11 18
Tris
$140.00 $125.00
$91.00
$91.00
$71.00
$91.00 $65.00
TOTAL
Preliminary Design Phase
Project scoping meeting with Owner 1
1
1
Prepare preliminary OPC's
16
16
Coordination of geotech investigation
8
16
16
40
Coordination of topographic survey
8
16
6
30
Final Design Phase
Develop final project packages 1
6
16
22
Analyze site drainage 1
6
40
40
86
Model new pavement section (HMAC)
6
16
22
Model new pavement section (concrete)
6
16
22
Develop cover sheet (5)
8
8
Develop sheet index (5)
2
8
16
8
34
Develop suvey control sheet (5)
2
8
16
8
34
Develop erosion control plan/details (5)
8
16
24
15
63
Develop phasing plan/details (5)
20
24
24
68
Develop demolition plan (5)
16
24
24
64
Develop site plan (5)
16
24
40
80
Develop grading plan (5)
40
24
40
24
128
Develop construction detail sheets
8
16
24
24
72
Prepare specifications
24
40
16
24
104
Prepare 60% OPC's
8
16
16
40
60% Design review meeting w/ LBB 1
2
2
4
Prepare 90% OPC's
8
16
16
100% Design review meeting with LBB 1
2
2
4
QC/QA Review
16 40
56
"Design services assumes preparation
of 5 independent bid packages
BUDGET SUBTOTALS: HOURS/ Trips - 5
16 237
352
308
79
22 24
103
SALARY
$2,240 $29,625
$32,032
$28,028
$5,609
$2,002 $1,560
#######
o--- 1 ^f 1
FEE ESTIMATING SHEET PROJECT:
DIRECTS
LBB Airfield Asphalt Repair JOB NO.:
TASK:
1DSN
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECH/ELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANT:
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANT:
618 OTHER CONSULTANTS
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 TRAVEL/LODGING
MOTEL DAYS @
AIR TRAVEL AIR FARE @
PARKING DAYS @
CAR RENTAL DAYS @
MILEAGE 30 MILES @
$0.505
MEN @ /MANDAY =
MEN @ /MAN =
/DAY =
/DAY =
@ 5 TRIPS = $75.75
SUBTOTAL
$76
622 REPRODUCTIONS
BLUELINE PRINTS 20 SHTS @
SEPIA PRINTS SHTS @
PRINTING:
ORIGINAL SET-UP COST 20 ORIGINALS
COST PER SHEET 20 SETS @
BINDING COST 20 SETS @
XEROX 1000 SHTS @
$2.55 @ 20 SETS = $1,020.00
$8.51 @ SETS =
@ $0.15 /ORI. _ $3.00
$0.08 /SHT @ 20 SHEETS= $32.00
$2.00 /SET - $40.00
$0.08 /SHT = $80.00
SUBTOTAL
$1,175
623 MODEL/RENDERINGS/PHOTOS
Shots @
/Shot
624 TELEPHONE 10 Calls @
$2.00 /Call
$20
625 MEALS DAYS @
MEN @
/MANDAY
626 FIELD SUPPLIES
628 POSTAGE 20 Mailings @
$1.50 /Mailing30
629 PUBLICATIONS & SUBSCRIPTION
630 MISC DIRECT EXP
631 FAX 100 Pages @
$2.00
$200
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD 22 HOURS @
/HOUR
636 FIELD EQUIP RENTAL
646 SOFTWARE
TOTALDIR CT E S S
1,501
Page 1 of 1
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET
LOCATION CODE:
01
..................
..................
■i MUMMoo
HHUM UHN:
PROJECT NAME:
LBB Airfield Asphalt Repair
uuou.�uuuu
'. .' IN
•IN;
JOB NO.:
ii ii. i.ii
TASK:
2S&T
...............■..
DATE:
05%22/10
FEE TYPE:
Hourly Rate w/Max
PREPARED BY:
MDH
PRINCIPAL:
JTH
PROJ. MANAGER:
MDH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
$24,650
TOTAL FEE:
$241,473
LABOR:
LABOR:
DIRECTS:
OVERHEAD:
SUBTOTAL:
REIMB. CONSULTANTS:
$21,455
REIMB. EXPENSES:
REIMB. FEE:
$24,673
DIRECT CONSULTANTS:
DIRECT EXPENSES:
TOTAL FEE:
$24,673
LABOR BUDGETS:
CODE
DESCRIPTION
HOURS
COSTS
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 1 of 1
FEE ESTIMATING SHEET
REIMBURSABLES
PROJECT:
LBB Airfield Asphalt Repair JOB NO.:
TASK:
2S&T
REIMBURSABLE CONSULTANT COSTS
SUBTOTAL
511 STRUCTURAL CONSULTANTS
512 MECH/ELEC CONSULTANTS
513 ENV & CIVIL CONSULTANTS
514 LANDSCAPE CONSULTANTS
515 TESTING CONSULTANTS
Pavetex
$14,855
516 SURVEYING CONSULTANTS
Smith Surveying
$6,600
517 INTERIOR DESIGN CONSULTANT:
518 OTHER CONSULTANTS
TOT REIMBURSABLE
CONSULTANTS
21,4
REIMBURSABLE EXPENSES
521 TRAVEL/LODGING
MOTEL
AIR TRAVEL
PARKING
CAR RENTAL
MILEAGE
DAYS @
AIR FARE @
DAYS @
DAYS @
MILES @
$0.505
MEN @
MEN @
/DAY
/DAY
@
/MANDAY
/MAN
TRIPS
=
=
=
=
=
SUBTOTAL
522 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING:
ORIGINAL SET-UP COSI
COST PER SHEET
BINDING COST
XEROX
SHTS @
SHTS @
ORIGINALS
SETS @
SETS @
SHTS @
$2.55 @ 8 SETS =
$8.51 @ SETS =
@ $0.15 /ORI. _
$0.08 /SHT @ 250 SHEETS=
$2.00 /SET =
$0.08 /SHT =
SUBTOTAL
523 MODEL/RENDERINGS/PHOTOS
Shots
/Shat
524 TELEPHONE
Calls @
/Call
525 MEALS
DAYS @
MEN @
/MANDAY
526 FIELD SUPPLIES
528 POSTAGE
Mailings @
/Mailing
529 PUBLICATIONS & SUBSCRIPTIONS
530 MISC REIMBURSABLE EXP
531 FAX
Pages
532 TEMPORARY PERSONNEL
533 DRAFTING SUPPLIES
534 OFFICE SUPPLIES
535 CADD
HOURS @
/HOUR
536 FIELD EQUIP RENTAL
546 SOFTWARE
TOTAL
I S L S
0
Page 1 of 1
t
1
City of Lubbock, Texas
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
LBB Airfield Asphalt Repair
Project Summary
ENGINEER'S OPINION OF PROBABLE COSTS
Lubbock Preston Smith
International Airport
5.252010
Item Descirldtion
Bidding and Construction Phase Services Package 1 Includes RPR and Construction related En r. Services)'
Amount
CONSTRUCTION
$38,500
Bidding and Construction Phase Services Package 3 Includes RPR and Construction related En r. Services
Phase 1 - Executive T -Han ars
Bidding and Construction Phase Services Package 4 Includes RPR and Construction related En r. Services
$312,226.55
Phase 2 - Lubbock Aero
$42,120
L $300,000.00
Phase 3 - Lubbock Aero and SW T -Han ars
Construction Package 2 Surveying and Testing Services
$300,000.00
Phase 4 - SW 1 -Hangars
$11,000
$300,000.00
Phase 5 - SW T -Han ars
Construction Packa e 5 Surve in and TestingServices
$501,954.93
PROFES I A�#S I , S SUBITOTAI
$381,000
PROFESSIONAL SERVICES
Design Phase Services
$102,800
Surveying and Testing for Design
$24,650
Bidding and Construction Phase Services Package 1 Includes RPR and Construction related En r. Services)'
$37,400
Bidding and Construction Phase Services Package 2 Includes RPR and Construction related En r. Services
$38,500
Bidding and Construction Phase Services Package 3 Includes RPR and Construction related En r. Services
$39,700
Bidding and Construction Phase Services Package 4 Includes RPR and Construction related En r. Services
$40,900
Bidding and Construction Phase Services Package 5 Includes RPR and Construction related Engr. Services'
$42,120
Construction Package 1 Surveying and Tes ing Services'
$10,350
Construction Package 2 Surveying and Testing Services
$10,700
Construction Package 3 Surveying and Testing Services
$11,000
Construction Package 4 Surveying and Testing Services'
$11,300
Construction Packa e 5 Surve in and TestingServices
$11,600
PROFES I A�#S I , S SUBITOTAI
$381,000
'PRELIMINARY FEE - TO BE NEGOTIATED PRIOR TO BIDDING OF CORRESPONDING CONSTRUCTION PACKAGE
.Wala Ilprge IsL'0011272501,CIVILFEESI4sphallrehab4-2810.Ramp.Rspa:rvse
City of Lubbock, Texas
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
F LBB Airfield Asphalt Repair - Executive T -Hangars
ENGINEER'S OPINION OF PROBABLE COSTS
At
Lubbock Preston Smith
International Airport
4:29:2010
Item
Description
utan
n
n r ce
Amount
BID ITEMS
1
Item P-140, Contractor Mobilization (13%)
1
LS
$19,273.24
$19,273.24
2
Item P-150 Remove and Dispose of 2' P-401 6' TxDOT Item 345 6' P-155
5,898
SY
$10.00
$58,980.00
3
Item P-152, Gradin and Sub rade Preparation One 6' Lift)5,898
SY
$2.50
$14,745.00
4
Item P-152 Gradin and Topsoil in Unpaved Areas
1,185
SY
$1.20
$1,422.00
5
Item P-156, Temporary Air and Water Pollution, Soil Erosion and Siltation Control
1
LS
$5 000.00
$5,000.00
6
TxDOT Item 247, Crushed Aggregate Base Course 6' Thickness
5,898
SY
$9.00
$53,082.00
7
TxDOT Item 341, Plant Mix Bituminous Pavements
662
TON
$95.00
$62,890.00
8
1 Item P-501, Portland Cement Concrete Pavement, 8' Thickness
0
SY
$85.001
$0.00
9
Item P-501, Portland Cement Concrete Pavement, 6' Thickness
269
SY
$70.00
$18,830.00
10
Item P-602, Bituminous Prime Coat, including herbicidal treatment 0.3 aVs
1,769
Gallon
$4.50
$7,962.30
11
Item P-620, Runway and Taxiway Painting
567
SF
$0.75
$425.25
12
Item T-901, Soil Preparation, Seeding and Fertilizing
0.03
AC
$2,500.00
$75.00
13
Crack Seal
696
LF
$1.50
$1,044.00
14
Surface treatment
8,230
SY
$2.00
$16,460.00
15
Construction Contingency 20 f
1
LS
$52,037.76
$52,037.76
A
$312,2M.
idafa1lpr4intS2001@725011CIV1L ,FEEsWspha1trehab42810-Ramp-Repan 1sr
City of Lubbock, Texas
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
MA' LBB Airfield Asphalt Repair - Southwest T-Hangars
ENGINEER'S OPINION OF PROBABLE COSTS
14
c
Lubbock Preston Smith
International Airport
429:2010
Item
Description
Quantft
Unit Unit
Price
Amount
BID ITEMS
1
Item P-140, Contractor Mobilization 8%
1
LS
$53,262.77
$53,262.77
2
Item P-150 Remove and Dispose of 2' P-401 6' TxDOT Item 345 6' P-155
17,818
SY
$10.00
$178,180.00
3
Item P-152, Grading and Sub rade Preparation One 6' Lift
17,429
SY
$2.50
$43,572.50
4
Item P-152 Grading and Topsoil in Unpaved Areas
2,550
SY
$1.20
$3,060.00
7
Item P-156, Temporary Air and Water Pollution, Soil Erosion and Siltation Control
1
LS
$5,000.00
$5,000.00
8
TxDOT Item 247, Crushed Aggregate Base Course, 6' Thickness
17,429
SY
$9.00
$156,861.00
9
TOOT Item 341, Plant Mix Bituminous Pavements
1,854
TON
$95.00
$176,130.00
10
1 Item P-501, Portland Cement Concrete Pavement, 6' Thickness
619
1 SY
$70.001
$43,330.00
11
Item P-602,Bituminous Prime Coat including herbicidal treatment 0.3 al/s
5,229
Gallon
$4.50
$23,529.15
12
Item P-620, Runway and Taxiway Painting
0
SF
$0.75
$0.00
13
Item T-901, Soil Preparation, Seeding and Fertilizing
1
AC
$2,500.00
$2,500.00
14
Surface treatment
16,811
SY
$2.00
$33,622.00
14
Construction Contingency (20%)
1
LS $143,809.48
$143,809.48
TA
8 .91
,Idala 1lproi"Is12001 @725 01 �CIVIL:FEEslAsphall rehab 4 28 10.Ramp Repa,r xrsx
City of Lubbock, Texas
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
t LBB Airfield Asphalt Repair -Lubbock As
ENGINEER'S OPINION OF PROBABLE COSTS
ALubbock
Preston Smith
International Airport
4129, 2010
Rom Descr 'on
Quantityn
nrt Price
AMou
BID ITEMS
1
Item P-140, Contractor Mobilization (8%)
1
LS
$33,277.66
$33,277.66
2
Item P-150 Remove and Dispose of 2' P-401 6' TxDOT Item 345 6' P-155
8,932
SY
$10.00
$89,320.00
3
Item P-150 Remove and Dispose of 8' P-401 6' TxDOT Item 345 6' P-156
0
SY
$25.00
$0.00
4
Item P-152, Grading and Sub rade Preparation One 6' Lift
8,210
SY
$2.50
$20,525.00
5
Item P-152 Grading and Topsoil in Unpaved Areas
876
SY
$1.20
$1,051.20
8
Item P-156, Temporary Air and Water Pollution, Soil Erosion and Siltation Control
1
LS
$5,000.00
$5,000.00
9
TxDOT Item 247, Crushed Aggregate Base Course, 6' Thickness
8,210
SY
$9.00
$73,890.00
10
ITxDOT Item 341, Plant Mix Bituminous Pavements
733
1 TON
$95.001
$69,635.00
11
Item P-501, Portland Cement Concrete Pavement, 8' Thickness
1,421
SY
$85.00
$120,785.00
12
Item P-501, Portland Cement Concrete Pavement, 6' Thickness
147
SY
$70.00
$10,290.00
13
Item P-602, Bituminous Prime Coat, including herbicidal treatment 0.3 al/s
2,463
Gallon
$4.50
$11,083.50
14
Item P-620, Runway and Taxiway Painting
258
SF
$4.00
$1,032.00
15
Item T-901, Soil Preparation, Seeding and Fertilizing
0.03
AC
$2,500.00
$75.00
14
Surface treatment
6,642
SY
$2.00
$13,284.00
16
Construction Contingency (20%)
1
LS
$89,849.67
$89,849.67
AS
B D SUBTOTAL
$539,098.03
ildala llprojeclsLVO112725 01 •CIVILiFEEsl4sphall rehab 4-28 IOIRamp-Repair xrsx
Resolution No. 2010-RO32
P,XIWaY L
PARKHILL SMITH & COOPEF
r
EXECUTIVE T -HANGARS
Issue: DESC Date: 4/21/2011
Project No: JOB NO Sheet: 1 OF:
PAM
1
LUBBOCK AERO
Issue: DESC Date: 4/21/201
Project No: JOB NO Sheet: 1 OF
)F SURVE
< OF CUF
olPARKHILL SMITH & COOPER
SW T—HANGARS
Issue: DESC Date: 4/21/201C
Drawing File: \\dalol\projects\2001\2725,01\CML\FEES\Asphalt rehab 4-28-10\LBB-Romp-Estimate.dwg (CDorr) Project No: JOB NO Sheet: 3 OF 2