HomeMy WebLinkAboutResolution - 2010-R0217 - Professional Service Contract Bid Phase For Fiber Optic Cable Loop - 05/13/2010Resolution No. 2010-RO217
May 13, 2010
Item No. 5.23
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, Amendment No 12C to the
Agreement for Professional Services Contract for design and bid phase services for
completing a fiber optic cable loop and related infrastructure for Runway 08'26, by and
between the City of Lubbock and Parkhill Smith & Cooper, and related documents. Said
Amendment is attached hereto and incorporated in this resolution as if fully set forth
herein and shall be included in the minutes of the City Council.
Passed by the City Council on May 13, 2010
TOM MARTIN, MAYOR
ATTEST:
Rebec a Garza, City Secretary
APPROVED AS TO CONTENT:
Jan
es Loomis, Assistant City Manager
ansi)ortation
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vwxcdocs'RES.Amend 12C -Parkhill Smith & Cooper
April 23, 2010
Mr. James W. Loomis, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Administration Office, 2nd Floor
5401 N. Martin Luther King Jr. Blvd., Unit 389
Lubbock,Texas 79403
PAR KH I LLS M ITH &COO P E R
Resolution No. 2010-RO217
March 22, 2010
Re: Amendment No. 12C to Agreement for Professional Services,
Design Phase Services for Runway 08/26 & Taxiway Improvements
Scope changes including:
1. Switching from Order 405 survey to AC 150/5300-16A, 17B and 18B (FAA regulation
change)
2. Additional effort associated with subdividing project into 4 bid packages.
3. Addition of fiber optic cable loop.
Dear Mr. Loomis:
As you are aware, the FAA has mandated that all projects adhere to the requirements of AC 150/5300/16A,
17B and 18B. During the preparation of Amendments 12 and 12A, PSC scoped the project to include
FAA Order 405 survey requirements (Refer to excerpt from Amendment 12 attached). With the scope
changes resulting from the new FAA survey requirements, it will be necessary to perform additional aerial
and field surveying work. In order to accomplish this work and keep the project on schedule, we have
prepared Amendment 12C for your consideration. Also included in this amendment is a fee adjustment
related to project phasing. With the original single project being divided into four bid packages, additional
effort is required on the part of our subconsultants. Finally, Amendment 12C also includes design and bid
phase services for completing a fiber optic cable loop and related infrastructure, connecting from Gate
26/27 to the ARFF facility. These additional services were requested by LBB on March 16, 2010. The
contract amendment modifies the scope of professional services included in our original agreement dated
January 13, 2005 and in Amendment No. 12 dated April 23, 2008 and Amendment No. 12A dated July 21,
2008. Since the plan for these projects is to have the designed improvements ready to bid, additional
Tasks 2 and 3 construction phase services and construction surveying/testing will be negotiated prior to the
start of Package 2-4 construction, at a later date.
Task 1 - Fee for Professional Services (Study and Report, Preliminary Design,
Final Design, lump sum). $174,400
Task 2 - Construction Phase Services (Bidding/Negotiation, Engineers Services
Paragraph A1.05 of contract, which includes RPR and construction
related Engineering Services, lump sum). No Change
Task 3 - Surveying and Testing Services, (reimbursable expense). No change
TOTAL
$174,400
Amarillo
EI Paso
Lubbock
Midland 4222 85th Street Lubbock5exas 79423 806.473.2200 Fax 806 473.3500
Mr. James Loomis, A.A.E. Page 2 March 22, 2009
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
January 13, 2005, and to provide the additional Task 2 services on a lump sum basis under the provisions
of the contract, EXHIBIT B - PAYMENTS TO THE ENGINEER, PARAGRAPH 84.01. Compensation for
Design Phase - Task 1 Services shall not exceed $3,402,015 (Amendments 12, 12A and 12C combined)
without Owner's approval. Tasks 2 and 3 included in Amendment 12B will remain unchanged at $346,225
and $128,750 respectively.
If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our
office. We will take receipt of this signed letter as our notice to proceed with these services. We look
forward to working with you in completing this project. If you have any questions please call either Mark
Haberer or me.
Sincerely,
PARKHILL, SMITH & COOPER, INC.
By PIE
John T. Hamilton, PE
Firm Principal
JTH/If
Enclosures
IN TRIPLICATE
Accepted by:
CITY OF LUBBOCK
By
Tom Martin
Mayor
Attest:
By10 L1,
R ecca Garza
City Secretary
to Content:
By c -��,�6
J es W. Loomis, A.A.E.
irector of Aviation
Approved as t9 Form;
By
Chad Weaver
City Attorney
%\data11projects12008\2706 081CIV L\00- FEE NEGOTIATIONWdme AgreemenAcontract amendment= doc
Resolution No. 2010—RO217
FEE ESTIMATING SHEET PROJECT:
LBB 8/26 Extension JOB NO.: 01-2706-08 TASK:
1DSN
DIRECTS
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
The Translec Group
$65,775
612 MECH/ELEC CONSULTANTS
Crossno & Associates
$182,925
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
Rodriguez En ineerin Laboratories
$84,724
616 SURVEYING CONSULTANTS
mi ury ng
$70,000
616 SURVEYING CONSULTANTS
Geodelix, Inc. (to meet FAA 405 accuracystd4
$28,320
618 OTHER CONSULTANTS
B marl unkel rg & Co.
11,200
2,944
DIRECT EXPENSES
621 TRAVELILODGING
MOTEL DAYS Q
MEN @ /MANDAY =
AIR TRAVEL 2 AIR FARE @
2 MEN @ $250.00 /MAN =
$1,000.00
PARKING DAYS @
/DAY =
CAR RENTAL DAYS@
/DAY =
MILEAGE 36 MILES @
$0.505 @ 625 TRIPS =
$11,362.50
SUBTOTAL
$12,363
622 REPRODUCTIONS
BLUELINE PRINTS 220
SHTS @ @ 40 SETS =
$22,440.00
SEPIA PRINTS
nn
SHTS rQ �V Q SETS =
PRINTING:
+�
ORIGINAL SET-UP COST 400
ORIGINALP $0.15 /ORI. _
$60.00
COST PER SHEET 40
SETS ,J.08 /SHT @ 225 SHEETS=
$720.00
BINDING COST 40
SE' $2.00 /SET =
$0.08 /SHT =
$80.00
$3.20
XEROX 40
�Ql�
SUBTOTAL
$23,303
623 MODEL/RENDERINGS/PHOTOS
Shots Q /Shot
$200
624 TELEPHONE 1250 Calls'
'6.00 /
$6,250
625 MEALS DAYSMIEN /MANDAY
626 FIELD SUPPLIES Q
626 POSTAGE 400 r' Qj� `
$5.00 /Mailing
$2,000
629 PUBLICATIONS & SUBSCRIr +G
630 MISC DIRECT EXP
631 FAX 500 r s @
$1.00
$500
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD 11156 HOURS @
$8.00 /HOUR
$89,248
636 FIELD EQUIP RENTAL
646 SOFTWARE
TOTAL DIRECT EXPENSES133,864
Page 1 of 1
Resolution No. 2010-RO217
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LBB 8/26 Extension
JOB NO.:
01-2706-08
TASK:
2SUB
DATE:
03/17/10
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
JTH
PROJ. MANAGER:
MDH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$14,421
LABOR:
$174,400
OVERHEAD:
REIMB. CONSULTANTS:
REIMB. EXPENSES:
DIRECT CONSULTANTS:
$151,670
DIRECT EXPENSES:
LABOR BUDGETS:
CODE
DESCRIPTION HOURS COSTS
01
Firm Principal
#N/A
#N:A
03
Engineer
09
Engineering Technician
07
Engineer -in -Training
14
CADD Operator
18
Clerical
Page 1 of 1
Resolution No. 2010-RO217
FEE ESTIMATING SHEET
[DIRECTS
PROJECT:
LBB 8/26 Extension
JOB NO.: 01-2706.08 TASK:
2SUB
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
The Transtec Group
$14,580
612 MECH/ELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
Smith Surveying
$44,000
616 SURVEYING CONSULTANTS
Geodetix, Inc. (16A, 17B and 186 standards)
$82,090
618 OTHER CONSULTANTS
Ncom (FOC Sub)
$11,000
TOTAL DIRECT CONSULTANTS
$151,670
DIRECT EXPENSES
621 TRAVEULODGING
MOTEL
AIR TRAVEL
PARKING
CAR RENTAL
MILEAGE
DAYS @
AIR FARE @
DAYS @
DAYS @
MILES ®
MEN @
2 MEN @
/DAY
/DAY
$0.505 @
/MANDAY =
$250.00 /MAN
=
=
TRIPS =
SUBTOTAL
622 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING:
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX
SHTS @ $2.55 ® 40 SETS =
SHTS @ $8.51 @ SETS =
ORIGINALS ® $0.15 /ORI. _
SETS ® $0.08 /SHT ® 225 SHEETS=
SETS ® $2.00 /SET =
SHTS @ $0.08 /SHT =
SUBTOTAL
623 MODEURENDERINGS/PHOTOS
Shots ®
/Shot
624 TELEPHONE
Calls ®
$5.00 /Call
625 MEALS
DAYS ®
MEN @
/MANDAY
626 FIELD SUPPLIES
628 POSTAGE
Mailings @
$5.00 /Mailing
629 PUBLICATIONS & SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX
Pages ®
$1.00
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD
HOURS @
$8.00 /HOUR
636 FIELD EQUIP RENTAL
646 SOFTWARE
11
TOTAL DIRECT EXPENSES
Page 2 of 2
l
X X
XIX o
EXISTING WITH
MULTI IN DUCT
A
0
O
4
a
N
L
TO EXIST! G I
BEROPTIC LO
T JUNCTION
U
Ln
Resolution No. 2010-RO217
EXISTING 18" CONCRETE
PIPE (MAY BE USED FOR
CASING)
R
R
�'1
-4-22.5' BENDS IN 18"
CASING UNDER TAXIWAY J
O
. O 4JUNCTION �.
Bu�
i
X l
i
i
0.1 500, 1"00(
I
FNOTE-
DESIGN
WILL NEED TO I,, CLUDE ADDITION OF
HAND HOLES ALONG EXISTING 4" CONDUIT
2. FEE SHkL INCLUDE 12 STRAND FIBER
3. FEE SHA4� INCLUDE LNEMARKER POST ,AND
CONDUTf MARKERS
4. TOTAL LEkGTH OF FIBER TO BE INSTAL4 IS
APPROXIMATELY 8,500 LI+R FEET
5. FEE SHALL INCLUDExPEDITED DESIGN
ISCHEDULEiWH 95% SY ITTAL DUE MA"" '12,a2OIIC
6. FEE FOR CONSTRUCT! PERIOD SERVICE WIL,I, B
Not -
NEGOTIATED IAT A LATER DATE. '