HomeMy WebLinkAboutResolution - 2010-R0139 - Professional Services Agreement: Parkhill, Smith & Cooper, Inc For Lake Henry - 03/25/2010Resolution No. 2010-RO139
March 25, 2010
Item No. 5.15
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, an Amendment to that
certain Professional Services Agreement, dated on or about September 25, 2008, between
the City of Lubbock and Parkhill, Smith & Cooper, Inc. to provide certain professional
evaluation, engineering, and design services in connection with the Lake Alan Henry
Pipeline Project, and related documents. Said Amendment is attached hereto and
incorporated in this Resolution as if fully set forth herein and shall be included in the
minutes of the Council.
Passed by the City Council this 25th day of
ATTEST:
ecre
APPROVED AS TO CONTENT:
Marsha Reed, P.E., Chief Operating Officer
AS TO FORM:
stant City Attorney
ofessional Srvs Agrmnt-Parkhill,Smith&Cooper Amendment res
15 10
March 2010.
TOM MARTIN, MAYOR
Resolution No. 2010-RO139
Contract: 8712
FIRST AMENDMENT
TO
PROFESSIONAL SERVICES AGREEMENT
This First Amendment to Professional Services Agreement (the "Amendment") is entered into this
25th day of March , 2010, by and between the City of Lubbock (the "City" or "Owner"), a
Texas home rule municipal corporation, and Parkhill, Smith & Cooper, Inc. (the "Engineer"), a Texas
corporation.
WITNESSETH
WHEREAS, City and Engineer entered into that certain Professional Services Agreement (the
"Original Agreement"), dated on or about September 25, 2008, Resolution No. 2008-R0368, Contract
No. 8712, providing for certain activities regarding the design of the treated water supply line related
to water delivered from Lake Alan Henry;
WHEREAS, it would be advantageous to accelerate the completion of design of that portion of
the treated water line extending from Memphis Avenue to Pump Station 14, exclusive of tie-in
connections and appurtenances at PS 14; and
WHEREAS, Engineer is amenable to performing such design;
WHEREAS, the City and Engineer now desire to amend the Original Agreement to provided
for such expanded services.
NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of
which is hereby acknowledged, the City and Engineer hereby agree to amend the Original Agreement
as follows:
1. Exhibit "A" of the Original Agreement shall be supplemented with Exhibit "A-1 ", "Scope of
Services", attached hereto and made a part of the Original Agreement for all intents and
purposes.
2. Exhibit "B", "Payments to Engineer", is hereby supplemented with Exhibit "B-1",
"Payments to Engineer", attached hereto and made a part of the Original Agreement for all
intents and purposes.
3. Except as otherwise amended hereby, the terms and provisions of the Original Agreement
shall remain valid and subsisting as originally provided.
Page I of 7
Parkhill, Smith & Cooper, Inc.
By: 04 Z�101117�
N e: John S. Kelley, .E.
Title: Firm Principa . roject Manager
CITY OF LUBBOCK
TOM MARTIN, MAYOR
ATTEST:
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
�4
Marsha Reed, P.E., Chief Operating Officer
Spear, 0., Difector of Water Utilities
,...�0731-1
�.
�, it - •
Page 2 of 7
EXHIBIT A-1
SCOPE OF SERVICES
General:
Resolution No. 2010—R0139
The design and bid phases of the segment of the treated water line from Memphis Avenue to Pump Stationl4,
exclusive of the tie-in and appurtenances at Pump Station 14, shall be accelerated from the original schedule in
accordance with the following schedule:
• Completion of Level 3 Design June 1, 2010
• Advertisement for Proposals June 15, 2010
• Receipt of Proposals July 15, 2010
Page 3 of 7
Resolution No. 2010—RO139
EXHIBIT B-1
PAYMENTS TO THE ENGINEER
PAYMENTS TO THE ENGINEER
2.
OWNER shall pay ENGINEER for services set forth in Exhibit A — Scope of Services, Basic
Services as follows:
a. For the acceleration of design and bid phases of the segment of treated water line from
Memphis Avenue to Pump Station 14, exclusive of the tie-in and appurtenances at Pump Station
14 -- a Lump Sum amount of $75,000 based on the following distribution of compensation:
Level 3 Design $50,000 June 1, 2010
Receive and Evaluate Bids $25,000 July 15, 2010
b. The Lump Sum includes compensation for ENGINEER's services and services of
ENGINEER's Consultants. Appropriate amounts have been incorporated in the Lump Sum to
account for labor, overhead, profit, and direct expenses. The basis for the fee, including tasks
and man-hours, is shown in the attached Fee Estimating Sheet.
c. The portion of the Lump Sum amount billed monthly for ENGINEER's services will be based
upon ENGINEER's reasonable estimate of work accomplished for the specified deliverable.
Authorized Additional Services
a. OWNER shall pay ENGINEER for any authorized Additional Services associated with this
Amendment as follows:
1) For labor on an hourly rate basis per the attached schedules, as applicable for personnel
actually performing the work.
2) Engineer Consultants will be billed on the basis of cost times a factor of 1.05.
3) For reimbursable expenses, on the basis of cost times a factor of 1.05.
Page 4 of 7
Client: City of Lubbock
Project: Lake Alan Henry Treated Water Line
Agreement Date:
Classification Hourly Rate
PROFESSIONAL LEVEL VII
Engineer VII
Architect VII
Landscape Architect VII
Interior Designer VII
PROFESSIONAL LEVEL VI
Engineer VI
Architect VI
Landscape Architect VI
Interior Designer VI
PROFESSIONAL LEVEL V
Engineer V
Architect V
Landscape Architect V
Interior Designer V
165.00
141.00
126.00
PROFESSIONAL LEVEL IV 108.00
Engineer IV
Architect IV, Intern (Architect) IV
Landscape Architect IV
Interior Designer IV
Technologist IV
Resident Project Representative IV
PROFESSIONAL LEVEL III 92.00
Engineer 1/11, III
Architect III, Intern (Architect) III
Landscape Architect III
Intern (Landscape Architect) III
Interior Designer III
Technologist III
Resident Project Representative III
Expenses
Parkhill, Smith & Cooper, Inc.
Hourly Rate Schedule
January 1, 2010
Classification Hourly Rate
PROFESSIONAL LEVEL II 82.00
Intern (Architect) II
Interior Designer 11, Intern (Interiors) II
Technologist II
Resident Project Representative II
Landscape Architect II
PROFESSIONAL LEVEL I
Intern (Architect) I
Intern (Interiors) I
Technologist I
Resident Project Representative I
SUPPORT STAFF III
Engineering Technician III
CADD III
Administrative Secretary III
Project Assistant 1/11
SUPPORT STAFF II
Accounting Clerk
CADD
Clerical
Engineering Technician II
Administrative Secretary II
SUPPORT STAFF I
Architectural Student
Engineering Student
Interiors Student
Landscape Architecture Student
Accounting Clerk Trainee
CADD Trainee
Clerical Trainee
74.00
71.00
Moll]
37.00
Reimbursement for expenses, as listed below, incurred in connection with the Additional Services, will be at cost plus five percent for items such as:
1. Maps, photographs, postage, toll telephone, reproductions, printing, equipment rental, and special supplies related to the services.
2. Rented vehicles, local public transportation and taxis, travel, and subsistence.
3. Special or job specific fees, insurance, permits, and licenses applicable to the work services.
4. Outside computer processing, computation, and proprietary programs purchased for the services.
Rate for professional staff for legal proceedings or as expert witnesses will be a rate one and one-half times the Hourly Rates specified above.
Excise and gross receipts taxes, if any, will be added as an expense.
Page 5 of 7
FEE ESTIMATING SHEET PROJECT: LAHTwLSegments
JOB NO.:
TASK
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP ARCH
ENG ARCHINT
EIT
CADDOPT CLERICAL
TASK
01 02
03 06
07
14
18
Trips
$165.00
$126.00
$92.00
$71.00
$65.00
TOTAL
Drawings
Revise General Sheets (10)
8
24
8
40
Segment Plan/ Profile Sheets
4
8
16
28
Segment Pavement Repair Sheets
2
4
8
14
Segment Pump Station Piping Sheets
4
8
8
20
Modify Misc Detail Sheets (12)
4
8
16
28
Renumber Sheets (2 packages)
40
120
24
184
Additional Plotting
4
14
18
Revise Traffic Control Plan Sheets
4
40
44
Specifications
Modify/Assemble additional set
2
8
16
16
42
City Front -End Documenets
Modify / Assemble additional set
4
8
8
4
24
Advertisement Period
Answer Questions
8
40
24
72
Prepare Addenda
4
24
24
40
4
96
PreProposal Conference
2
4
4
2
12
Bid Opening
2
2
4
Evaluation Process
Review proposals
8
8
16
Evaluation meeting with City
4
4
8
Prepare recommendation letter
2
4
1
7
Contract Documents
Assemble Contract Documents
4
12
24
4
44
Additional TCEQ Submittal
2
4
8
2
16
BUDGET SUBTOTALS: HOURS/ Trips -
42
188
334
120
33
717
SALARY
$6,930
$23,688
$30.728
$8,520
$2,145
$72,011
Page 6 of 7
FEE ESTIM ATIN G SHEET PROJECT: LAHTWLSegments JOB NO.: TASK
DIRFCTS
M
LTANT COSTS SUBTOTAL
CTURAL CONSULTANTS
WELEC CONSULTANTS
CIVILCONSULTANTS
SCAPE CONSULTANTS
NG CONSULTANTS
EYINGCONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS
Page 7 of 7
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 TRAVEULODGING
MOTEL
DAYS@
MEN @
IMANDAY =
AIR TRAVEL
AIRFARE@
MEN @
IMAN —
PARKING
DAYS@
]DAY
=
CAR RENTAL
DAYS @
+DAY
—
r
M ILEAGE
20 M ILES @
$0505
@ 5
TRIPS =
$50.50
SUBTOTAL
$51
622 REPRODUCTIONS
B LU ELIN E PR INTS
40
SHTS@
$2.55 @
20 SETS =
$2,040,00
SEPIA PRINTS
SHTS @
$8 51 @
SETS =
pr
PRINTING
ORIGINAL SET-UP COST
ORIGINALS
@ $0.15
LORI, _
COST PER SHEET
20
SETS @
$0.08 ISHT @
400 SHEETS=
P' $640.00
BINDING COST
20
SETS@
$2.00 ISET
=
r $40,00
XEROX
1000
SHTS@
$0.08 ISHT
=
$80.00
SUBTOTAL
$2,800
623 MODEURENDERINGSIPHOTOS
Shots@
(Shot
624 TELEPHONE
50 Calls@
$2.00
Kali
$100
625 MEALS
DAYS
MEN @
IMANDAY
626 FIELD SUPPLIES
628 POSTAGE
2 Mailings@
$5000 !Mailing
$100
629 PUB LICATIONS &SUBSCRIPTIONS
630 M ISC DIRECT EXP
631 FAX
Pages @
632 TEM PORARY PERSONNEL
633 DRAFTING SUPPLIES
_
634 OFFICE SUPPLIES
635 CADD r
120 HOURS
/HOUR
636 FIELD EQUIP RENTAL
646 SOFTWARE
TOTAL DIRECT EXPENSES
$3,051
LABOR SUBTOTAL
$72,011
TOTAL
$75,062
LUMP SUM FEE BASIS
$75,000
Page 7 of 7