Loading...
HomeMy WebLinkAboutResolution - 2013-R0058 - Contract - Allen Butler Construction Inc.- Milwaukee Ave Paving - 02_14_2013 (2)Resolution no. 2013—R0058 February 14, 2013 Item No. 5.4 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 11078 for paving improvements — Milwaukee Avenue, by and between the City of Lubbock and Allen Butler Construction, Inc. of Ransom Canyon, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on February 14, 2013 RbfERTSON, MAYOR ATTEST: QaA4�1 -e�)Q Rebkpa Garza, City Se etary APPROVED AS TO CONTENT: aJj�o-- � Q Q j Marsha eed, P.E., Chief Operating Officer APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vwxcdocs/RES.Contract-Allen Butler January 10, 2013 Addendum 3 Revised [lid Fonn PAVING IMPROWNIENTS—ALTERNA"TF.RID ITEM N. DESCRIPTION ESTIMATED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED AMOUNT Prepare right-of-way, including clearing, grabbing ��liB�t"I,�`� I and removal of all items that are irtconfict. per 103 S'G1. S station. Remove Existing Tree. including removal of lrmk, d 2 limbs, roots, and tilling and compacting of resulting I Er\ Id 00 c � hole with suitable material, per each. Remove Asphalt Paving and/or Stabilized Ease, 3 including neat removal of existing paving materials 30273 SY JI / _19 `�s 4(� S-0 and proper disposal or disposition. per square yard. 1 Remove Small Signs and/or Small Sign Assemblies, including neat removal of existing small signs and/or 4 assemblies including roundations and proper disposal I I EA p or disposition, per each sign and/or assembly. All J, ' rr� ItK) signs removed are to be given to the City of Lubbock Streets Department to salvage. Remove Fence, including neat removal of existing 5 posts and/or assemblies including foundations and 3122 LF , o 0 nroner disnagal or dis sition r linear foot. O f a 16f 6 Replace Fence, including posts and/or assemblies 3122 LF ..11' 1 1 � Q � $4 and all appurtenances. linear foot. ) Remove Mailbox, including neat removal of existing 7 assemblies including foundations and proper disposal 9 EA 3pu� d 16 Ot+ oU or disposition, per each mailbox. Topsoil (d")(Furnish and Place)• including securing necessary sources and royalties, furnishing topsoil; g excavation at the source, loading, hauling, 1000 SY stockpiling and placing; watering; rolling; and equipment, labor, materials, tools, and incidentals. by O• the square yard complete in place. Embankment (Roadway), including borrow material as required, placement and density control to lines 9 and grades shown on drawings, as well as any 51417 CY � qv incidental work, per cubic yard as shown on this bid a ���'a a tll1 j,s S. form. Excavation (Roadway), to lines and grades shown on 129,876.50 10 drawings, as well as any incidental work, per cubic 39962 CY �� j1 ��a►* yard as shown on this bid form. "t Excavation (Channel), to lines and grades shown on I I drawings, as well as any incidental work, per cubic 6790 CY 3 3 :1 and as shown on this bid form. Excavation (Playa Lake). to lines and grades shown 12 on drawings, as welI as any incidental work. per 40940 CY 3' �� 60 cubic and as shown on this bid form. ) Over Excavation. at the unit bid price, of excavation beyond the limits to lines shown in the plans, as directed by the Engineer. to treat or replace deficient 3 subgrade, including subgrade removal and replacement with a suitable material, or approve) 200 CY Gti,J 3 j �1 o:J 7�d Gu treatment of unsuitable material. all borrow material. compaction, testing, and all labor and equipment neces.ary to complete this wont, in cubic yards, Plowable Fill. at the unit bid price, of flowable backlill actually installed at the direction of the Engineer. Where the Contractor chooses on his own accord to install flowable lilt payment will not he 14 made directly, but will be subsidiary to the pertinent item(s). The unit price bid includes full 100 C Y � � • to }� -)low compensation for all materials, testing, materials, labor and equipment necessary to complete the work per cubic yard. ,\ddendum 3 Revised Bid Form frFM NO DESCRIPTION EsTwATED QUANTITY UNfrOP MEASURE UiVfr PRICE EX'rEVDED AMOUNT Surface Treatment, including surface preparation, furnishing, preparing, hauling and placing Aggregate IS and Asphalt; removing existing pavement markers 72135 SY jc{ and excess aggregate; rolling; cleaning up stockpiles; •jt} d4y and equipment, labor. tools and incidentals• as complete in place, per square vard. Ilot Mix Asphalt Pavement (HMAC)(TY D) (2"), 16 including necessary materials, shaping, density 27943 SY ( ) 3 �• 39 `y') controlled placement, complete and in place, per 3� y) ). sc uare yard. flot htix Asphalt Pavement (IIMAC}(TY 8) (•1"). I7 including necessary materials• shaping, density 30507 SY 9 a- � yy controlled placcment. complete and in place. per I S � �,' �� square yard. 18 fiat Mix Asphalt Pavement (FLEXBASE), including necessary materials, shaping, density controlled 3(IS07 SY 6 placement. complete and in place, per square yard. Concrete Paving (Continuously Reinforced)(9"), vJ'3 19 including necessary materials and placement, 59218 SY 494- com lete aitd in place. persquare yard. Concrete Curb (Mono), including necessary materials, joining, forming, finishing, and placement '� ) 20 of monolithic curb with continuously reinforced 1630 LF —q a 3 concrete pavement, complete and in place, per linear 7• (� y foot as measured along the gutter line. Concrete Curb (Mono)(Sawtooft including necessary materials. joining. forming, finishing• and 21 placement of monolithic curb with continuously 100 LF ci0 a� reinforced concrete pavement, complete and in place, r linear foot as measured along the gutter line. 22 Concrete Sidewalk (5"), including necessary materials for placement of concrete sidewalks. 369 SY /) 3421 i33 5-b•N, complete and in place, per square yard. 23 Concrete Sidewalk Romp (in radius - w/ flared sides), including necessary materials for placement 7 EA eco of ramn complete and in place, per each. Concrete Alley Returns and Driveways IV), 24 including necessary materials for placement of concrete alley returns and driveways, as complete 255 SY t{ f • �) 1 y%)''vJ and in place, persquary yard. Concrete Riprup (61. including necessary materials 25 for placement of concrete riprap, including toe wall 1370 SY 4 `� 10 o�H foundations, curbs, aprons. sloped ramps, etc.. Ta complete and in place, per square yard. 26 Stone Riprnp (Dry)(Protection), including necessary materials for of riprap, complete and in 180 CY cu ti9 oar placement . .iA , 3 f 3o, lace including filter fabric, per cubic ,ud. Culvert Pipe (24" RCP), including necessary 27 materials, furnished and installed, complete and in 406 LF�� _ b� -A a� place including excavation and backfrdling, per linear Sl� t )09• foot. Concrete Safety End Treatment (for 24" RCP), for 28 Parallel culvert, including necessary materials 2 EA 33 �13J(a tl Lja. famished and installed, complete and in place, per a each. Concrete Safety End Treatment (Car 24" RCP). for 29 Crossing culvert, including necessary materials, 3 EA f h jf OS furnished and installed, complete and in place, per dt6• 3) 1711. _ each, Permanent Turf Reinforcement Mat (Tcnsar SC250 L30 or equal) including necessary materials and for Mot, in 20300 5F 3 �ytC:r1�' equipment placement of complete and c lnee-oner ssouire vnrd. Addendum 3 Revised Bid Form HTM Nt) DESCRIPTION ESTINIATED QUANTITY UNIT OF MEASUREUNIT PRICE EXfENDGD AMOUNT Concrete Curb Inlet (10 11). including necessary s A 31 materials, fumished and installed, complete and in I EA lace including excavation and backfilling, per each. Precast Reinforced Concrete Box Culvert (S' x 31, 32 including necessary materials, furnished and l U5 LF a S �' �l h "7U3• installed• complete and in place including excavation �3r and bickfilling, per linear foot. Safety End Treatment (for 5' Span, 3' Fleadwall) (3:1) for Parallel culvert, consisting of reinforced 33 concrete headwall/wingwalls and pipe runners in I EA rjcrJJ accordance with plan details, including necessary SCai materials, fumished and installed, complete and in lace, per each Safety End Treatment (for 5' Span, 3' Fleadwall) (6:1) for Parallel culvert, consisting of reinforced 33 concrete headwalUwingwalls and pipe runners in I EA accordance with plan details, including necessary `y6W 6 Gov materials, fumished and installed, complete and in lace, pg each Adjusting Valve Boxes, including materials, 35 including backtill as required, and for excavation, 6 EA Aorb hti G✓ tools, equipmem labor and incidentals• per each valve adjusted. Adjusting Manholes, including materials, including 36 backfill as required, and for excavation, tools, 2 EA �( a.. Ow• G equipment, labor and incidentals, per each valve adjusted. Illumination Pole Assembly (TY SA)(4OT-8)(.25 KW)S: Payment will be made at the unit price bid 37 per each roadway illumination assembly installed. 57 EA �t 41of) S G Iuu (e 4) �n including rumishing, installing, and testing ) luminaries, per each. Drill Shall (Roadway Illumination Pole)(W Diameter), including full compensation fur excavation; furnishing, placing and removing casing (ifnecessary), furnishing, processing and recovering slurry (if necessary); pumping; fumishing and 38 placing reinforcing steel; fumishing and placing a8d LF All � S� tA vJ concrete. including additional concrete require) to fill an uvcrsize caning or oversize excavation; conducting slump loss tests. backlilling; disposing of cuttings and slurry; and materials, tools, equipment, labor. and incidentals, measured by the linear foot of drilled shalt indicated in the plans. Conduit (PVC)(SCFID 40) (1.5 IN)(TRENCH), including full compensation for fumishing and installing conduit: trenching/excavating and furnishing and placing backtill; replacing pavement ,3 1 t) I C4 c 01 39 structure, sod, riprap. curbs, or ether surface; 12671 LF 1 marking location of conduit; fitmishing and installing fittings, junction boxes and expansion joints; and equipment, labor, tools and incidentals, complete and in place. ver linear foot. Conduit (PVCNSCHD 40) (2 INXTRENCH). including full compensation for furnishing and installing conduit. trenching/excavating and fumishing and placing backtill; replacing pavement J structure, sad, riprap. curbs, or other surface; 3y1 n j 0J 40 marking location of conduit; furnishing and installing 5002 LF fittings, junction boxes, and expansion joints; and equipment, labor• tools and incidentals, complete and in place. per linear foot. Addendum 3 Revised Bud Funn ITF'M NO, DF.SCRIPT[ON ESTIMA"FED QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED AMOUNT Llcc Conductor (No. 8) (BARE), including d l Furnishing, installing, and testing electrical conductors and for equipment, labor, tools, and 1267) LF is 3 �1 Qya 13 1 incidental's, per linear foot. rice Conductor (No. 6) (INSULATED), including 12 fumishing, installing, and testing electrical conductors and for equipment, lobar, tools, and 253d2 LF ) O • -J1 ':0r,/ incidentals. r linear foot. Eiec Service Ty A (210/480) 060INS) SS(E) SP(0): This price is full compensation for furnishing and 33 installing paying all fees, permits and other costs, EA making arrangements with the utility company for all �� 3�' 6oa0, work and materials provided by the utility company, complete in place. per each. Ground Box Ty A. complete in place, including -1 l furnishing and placing gravel bedding, all labor and 31 EA 3 -1 2 5 a 1 bL • S materials, r each. 7 t Ground Box Ty D , complete in place, including 45 furnishing and placing gravel bedding, all labor and 27 EA '� (o a-5 I O �I B 7'.5 materials, r each. • . Ground Box Ty I (Ifs), complete in place, including 46 fumishing and placing gravel bedding, all labor and I EA 3 6�5•0� 31iZ5 �t� materials, pereach. Conduit (Rigid Metal)(21N)(TRENCH), including full compensation for furnishing and installing conduit; trenchingtexcavating, and furnishing and placing backtill; replacing pavement structure, sod, 47 ripmp, curbs, or other surface; marking location of 5 LF conduit; fumishing and installing Iittings, junction boxes, and expansion joints; and equipment, labor, tools and incidentals, complete and in place,,per10 q linear foot. Conduit (PVC)(SCHD 40) (21N)(TRENCH), including full compensation for furnishing and installing conduit; lrenching/excavating, and famishing and placing backffll; replacing pavement -18 structure, sod, ripmp, curbs, or other surface; 77 LF marking location of conduit; furnishing and installing Fittings, junction boxes, and expansion joints; and 3 ,1 YY /- equipment, labor, tools and incidentals, complete and 6 in place, per linear foot. Conduit (PVC)(SCHD 40) (3 IN)(TRENCIIL including full compensation for furnishing and installing conduit. trenchinglexcavating and furnishing and placing backtill; replacing pavement 19 stricture, sod, riprap, curbs, or other surface; marking location of conduit; furnishing and installing 16 LF 193. A a littings, junction boxes, and expansion joints; and equipment. labor, tools and incidentals, complete and in place, per linear foot. Conduit (PVCI(SCHD 40) (d INXTRENCHI, including full compensation for furnishing and installing conduit; trenchingtexcavating and fumishing and placing buckfill; replacing pavement structure, sad, riprap, curbs, or other surface; 50 marking location of conduit; furnishing and installing fittings, junction boxes, and expansion joints; and 58 IS equipment, labor, tools and incidentals, complete and in place, per linear foot. Addendum J Revised Bid Form ITEM NO. DESCRIPTION ESTIXLATED QUAN"Iffy UNIT OF MEASURE UNIT PRICE EXTENDED AAIOUN"f Elec Service Ty D (120/2-10) 060 (NS) SS(E) SP(0): Tltis price is full compensation lift fumishing and 51 installing paying all fees, permits and other costs. I EA n �� q D ` making arrangements with the utility company for all 1=�� • work and materials provided by the utility company, complete in place, per each. Small Sign assemblies, including necessary materials, furnished and installed, complete and in 52 place. The unit price bid shall includes sign, post, 30 FA concrete base, plaque. accessories, excavation filling, backtilling, and all incidentals necessaryto complete the work, per each sign complete in place. Pavement Markings 53 (4")(White)(Broken)('I'hennoplastic), including 22169 LF necessary materials, furnished and installed, (p O complete and in place, per linear foot. t Pavement Markings 54 (4")(White)(SolidXThermoplastic), including necessary materials• furnished and installed, 7580 LF complete and in place, per linear foot. try .L Pavement Markings 55 (12")(White)(Solid)(Therrtoplastic), including necessary materials, furnished and installed, 862 LF 3. L$ "� ' I complete and in lace, r linear foot. "r Pavement Markings (4") (Yellow) (Broken) s6 (Thermoplastic), including necessary materials and 14341 LF incidentals, furnished and installed, complete and in lace, per linear foot. D Zi Pavement Markings (4") (Yellow) (Solid) S7 (Thermoplastic), including necessary materials and 7-2147 LF incidentals, furnished and installed, complete and in / a lY / 13 r13 lace, r linear foot, Pavement Markings 58 (8" )(White)(SolidxThermoplastic). including 3472 LF necessary materials, furnished and installed, complete and in place, per linear foot. Pavement Markings (24") (White) (Solid) 59 (Thermoplastic), including necessary materials and 267 LF incidentals, furnished and installed, complete and in a o 3 �• 67 lace, per linear foot. Pavement Markings (Arrowp Whitc)(Thermoplastic), 60 including necessary materials and incidentals, 27 FA Iumished and installed, complete and in place, per �0 d� each. t'a • D� • r7d Raised Relleci orized Pavement Markers (CL 61 BN'rype I-C'-R). including necessary materials and 954 f A incidentals, fumished and installed, complete and in lace. pereach. (!, Raised Rellectorized Pavement Markers (CL 62 B►frype 11-A-A), including necessary materials and 1055 EA incidentals, furnished and installed, complete and in lace, per each. Traffic Buttons (4")(WIIITE), including necessary 63 materials and incidentals, furnished and installed. 197 LF 7� complete and in lace, r linear foot. ` Temporary Raised RellectorizeJ Pavement Markers (Cl- B)(T)pe 1-C•R►, including necessary materials and incidentals, furnished and installed, complete 64 and in place, per each. Placement is for temporary 30 EA construction markings, including but not limited to ( �7 I I D solid markings, double markings, anti broken • markings. Addendum 3 Revised nod Fonn ITEKt NO. DESCRIPTION FSTIMAfEb QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDEDAMOUNT Temporary Raised Relleclorized Pavement Markers I.CL• B)(Type II -A -A), including necessary materials and incidentals, fumished and installed, complete 65 and in place, per each. Placement is for temporary construction markings, including but not limited to 132 EA 2 / solid markings, double markings, and broken markings. Temporary Traffic Buttons (4")(WHITE), including necessary materials and incidentals, furnished and 66 installed, complete and in place, per each. Placement is for temporary construction markings, including but g EA I a not limited to solid markings, double markings, broken markings and stop bars. Temporary Traffic Buttons (4"NYELLOW), including necessary materials and incidentals, 67 furnished and installed, complete and in place, per each. Placement is for temporary construction 526 EA 3, �p8 /- IQ 35. '�+ `j markings, including but not limited to solid markings, double markings, and broken markings. Barricades and Traffic Control Devices, including 68 furnishing and installation of materials and removal 12 MO QO 3) 500 G1�5 thereof r month. • sW PPP /-remporary Erosion Control, including necessary materials and coordination ror compliance 69 with storm water regulations and ordinances, 1 LS furnished and installed, continuously monitored r► com fete and in place, per lump sum. Irrigation System - (Maintain Existing), includes preserving the integrity and operational capacity of the existing irrigation in the areas adjacent to the Right of Way. Includes repair of the existing system 70 which may be damaged by construction of new 1 LS sidewalk, removal, relocation and/or replacement of the existing PVC mainline piping [hat may be affected by the grading work and/or construction, as 4 5 �D 4 5 shown on the plans,aid as lumpsum. �� Permanent Seed, including necessary materials and 71 equipment for placement of seed and establishment 33800 SY of grass from the seed, vegetative watering and weed 5 cuntrol. complete in lace. per square yard. y Db Mobilization, including costs associated with move - 72 in related equipment and labor, bid fund, 1 I S perrormance and construction bonds, and insurance. r lump sum. Ob PAVING: IJIPROVF.NIENTS—TUTA1, ALTF.RY,CrE BID (ITEJIS I - 72)--- Bidder's Initials Addetalum t Rcviscd [lid Funn WATER IMPROVVNIVATS— RASF BID rrtim NO DESCRIPTION ESTIMATL•D QUANTITY UNIT OF MEASURE UNIT PRICE EXTENDED AMOUNT 73 famish and install heavy polyethylene warning tape 2914 LF �� 54 ,4 1with trace wire, complete in lace, r linear foot. .53 74 Furnish and install OSHA approved trench safety 2914 LF 5 3 5q4. 4 4 . 't i 1 a system for utility lines as required, per linear foot. , Furnish and install 6" C900 DR 18 PVC water line, 75 including all labor, material, and equipment, 559 LF 5 f r 1, �1 3 't complete in lace. per linear foot. Furnish and install 8" C900 DR 18 PVC water line, 76 including all tabor, material, and equipment. 11.45 LF �h 35 3 a L4 6(3 .T S complete in place, per linear foot, ► Furnish and install 10" C900 DR 18 PVC water line, 77 including all labor, material, and equipment. 125 LF 3-7.30 L4 -1 ;L6, 0 U complete in place, per linear foot. r Furnish and install 12" C900 DR 18 PVC water line, 78 including all labor, material, and equipment, 1085 LF I 4a p p complete in lace, r linear foot. 79 Furnish and install 6" gate valve and box. including 7 EA D6Q. o0 35Q all appurtenances. complete in place, per each. . ba 80 Furnish and install 8" gate valve and box, including all appurtenances. complete in place, Per each. 14 EA 1515. b0 t161b5o . 00 81 Fumish and install 10" gate valve and box, including all appurtenances, complete in place, per each. 3 EA 105 tQ fa �J • �i Fumish and install 12" x 6" tapping sleeve and 82 associated appurtenances, complete in place, per 7 EA /A100 each. .00 -a0 • 00 Furnish and install 12" x 8" tapping sleeve and 83 associated appurtenances, complete in place, per 3 EA 11 each. Famish and install 12" x 10" tapping sleeve and ed associated appurtenances, , p nances, complete in place, 3 EA 1890.0D each. 83 Furnish and install tire hydrant. complete in place, r each. 8 EA 3 05. 00 �1 �� • t70 d g6 Furnish and install 11" plug, complete in place, per 13 EA 315.00 each. Q5. to 87 Furnish and install 10" plug, complete in place, per 2 EA (4Z.DG Flo. ba each. Furnish and install 12" plug, complete in place, per 1 EA 4ia q each. -5d !�.5c) 89 Furnish and install 12" x 10" reducer, including all appurtenances, complete in lace, reach. I FA 3W •50 31p�. $� 90 Furnish and install 12" x 8" tee, including all appurtenances. complete in place. per each. I I EA B /` 5 V 1 / • s 0 1V,%'1'F.RIMPROVEMENTS -TOTAL BID (ITEMS 73-90) S D�5• 94 Bidder's Initials Mdendum 3 Revised Rid Form CFWFR I1%lPUOVFMFNTC-•RASE RII) ITEM NO DESCRIPTIONQUANTITY ESTIMATED UNIT OF MEASURE UNlTPR1Cf: EXTENDED AMOUNT 91 Furnish and install heavy polyethylene warning [ape 4383 LF 53 with trace wire, complete in lace, r linear foot. . 92 Furnish and install OSIIA approved trench safety 4383 LF 3,15 13 8 a10 system for utility lints as required, per linear foot. ,'15 93 Tie-in existing sanitary sewer line, complete in place, reach. 2 EA a1�.Qd 14d130.0o 91 Furnish and install standard coated or fiberglass manhole (0-6' depth), complete in lace, r each. 14 EA �I'�50 ob 550.00 Fumish and install extra depth to standard coated or 95 tiberglass manhole, complete in place, per vertical 422 VF 3, 5 u j 55 root. D 5. 00 Fumish and install 6" SDR 21 PVC sanitary sewer 96 line (18-22' depth), complete in place, per linear 240 LF 105•6 ono. oa [but. aQ5 Furnish and install 8" S DR 21 PVC sanitary sewn 97 line (20-30' depth), complete in place, per linear 1252 LF 157.50 foot. Fumish and install 8" SDR 21 PVC sanitary sewer 9R line (3040' depth), complete in place, per linear 535 LF A3rp. �5 foot 19 Furnish and install 8" SDR 21 PVC sanitary sewer plug, complete in place, per each. 27 EA Jb Q87• �(� Furnish and install I8" SDR 21 PVC sanitary sewer IQO line (32-38' depth), complete in place, per linear 205 LF �� foot. o�6�5Q tot Furnish and install 18" SDR 21 PVC sanitary sewer plug, complete in place, pereach. 2 EA Sn 5.00 Furnish and install 21" SDR 21 PVC sanitary sewer 102 line (20-30' depth), complete in place, per linear 2689 LF I 0 foot. .9 . Furnish and install 21" SDR 21 PVC sanitary sewer 103 line (30-40' depth), complete in place, per linear 2686 LF alfo.ZO 5So 981• Sa foot. SEWER IMPROVEMENTS -TOTAL BID (ITEHS 91 —103) S / d49 D 1l Bidder's Initials Addendum 3 Revised Bid Form I.INF FXTFNS101V—BASF liln ITEM V�) DESCRIPTION ESTIMATED ESTIMATED UNIT OF MEASURE UNIT PRICE EXTENDED AMOUNT Connect to existing stonn sewer pipe. including 104 necessary materials, furnished and installed. I EA complete and in place including excavation and 3,675 01) 3,675. D a backfillin , per each Storm Sewer Pipe (24"), including necessary 105 materials, furnished and installed, complete and in place including excavation and backfilling, per linear 3030 LF a �, 5 • oa foot. french Safety System and Tunnel or Bore Access 106 Shaft Excavation Protection, complete, per linear 2650 LF �' 'G J �3 q�• 5� foot Concrete Manhole (Type 1)(60"). including 101 necessary materials, furnished and installed, 5 EA complete and in place including excavation and rye+ �S 3q15 �0 backfillin reach. 17. 24" Elastomerie Check Valve, including necessary 108 materials, fumished and installed, complete and in 2 EA �%`1 ,,tt ` lace includingexcavation and backlillin r each. iXi • Q� 1 , Sluice Gate Structure, including necessary materials, 109 fumished and installed, complete and in place I EA including excavation and backfilling, pereach. lbawo. 5tirstep Inlet Stricture, including necessary 110 materials, fumished and installed. complete and in I EA hh ��nn 000 ob w wcl lace includingexcavation and backlillin each. .60 Articulated Concrete Block Mattress, including III necessary materials, furnished and installed, and I LS incidentals required to perform all operations in connection with the installation per lump sum. Stone Riprap (Protection), including necessary 112 materials for placement of riprap, complete and in 90 CY ry G 50 lace including filter fabric, per cubic vard. Jr % ! • LINE EXTENSION —TOTAL BID(ITEJIS 104-112) S ,�85 q�0 • 100 t- Bidder's Initials Addendum ] Rcvised Rid Funn SUBTOTAL - BASE BID PAVING IMPROVEMENTS (rrEM5 1- 72) S � 1 ;, f c��tb-3. " 5 670,444.50 S -_ _ ` ; ,_by;t____ S I Vuis sl"IrrOTA1.- ALTERNATE BASE BID PAVING IMPROVEMENTS (ITEMS 1- 72) St'BTOTAI.- BASE BID WATER IMPROVEMENTS (rrEMS 73 -90) SUBTOTAL- BASE BID SEWER IMPROVENIENTS (ITEMS 91 - 103) S 8q I? 14 . oq sUBTOTAL - BASE BID LINE EXTENSION (ITEMS 104 - 112) S LlQ 5' vl q b . b TOTAL BASE BID TOTAL BASE BID (ITEMS 1- 112) S 1 j_O. q'1 ij Ir — TOTAL ALTERNATE BID 89.43 "rOTAL ALTERNATE BID (rmfs I - In) s - 8� 1 Ab Bidder's Initials