Loading...
HomeMy WebLinkAboutResolution - 2010-R0067 - Contract 10-015-P-015-NJPA Talon/LPE Restroom Installation At Fiesta Plaza - 02/09/2010Resolution No. 2010-R0067 February 9, 2010 Item No. 5.11 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, job order Contract No. 10- 015-P-015-NJPA for Fiesta Plaza precast restroom installation per National Joint Powers Alliance (NJPA), Indefinite Quality Construction Contract, by and between the City of Lubbock and Talon/LPE of Amarillo, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 9th ATTEST: cc?_�R J Rebe Garza, City Secretary APPROVED AS TO CONTEN : Scott Snider, Assistant City Manager Community Development APPROVED AS TO FORM: "'z Chad Weaver, Assistant City Attorney vwxcdocs: RES.Contract-Talon LPE January 21, 2010 day of February , 2010. TOM MARTIN, MAYOR Resolution No. 2010—R0067 City of Lubbock Job Order This Job Order is governed b) all terms and conditions of the Contract referenced below which is hereby incorporated b) reference. O\tiner: Wesley F\erett. Director of Facilities Management for— Parks & Recreation N.1PA Contract No.: TX04-061908-TAL. National Joint Powers Alliance (NJPA), Indefinite Quantity Construction Contract. Contract Job Order No.: 10-015-P-015-NJPA Contractor: Talon/LPF- Date of Contract: September 25. 2008 Job Order Date: January 15, 2010 ProlCct Architect for this Job Ordcr: List name, phone number and firm name of Architect contracted for this project. N/A Sltnlnlary and Description of Statement of' Worl< attached hereto: Fiesta Plaza Precast Restroom Installation Talon Job Order Number: 009516.00 hereto attached. Value ol'pre-priced xxork: S 46,513.46 Value of non -pre -priced .work: S 323.28 Insurance Requirements per Exhibit A. attached. I oral I; iNed Price stipulated suns fir this .lob Order (".lob Order Sunl"): S 46,836.74 'tiotice to Proceed Date Ior this .lob Order: To be issued after Citv Council approval 1=xpected Completion Date for this Job Order: To be determined after City Council approval liquidated Damages (if clif'lerent than as set forth in Agreement): $25 per day CONTRACTOR: 'talon/1_131- 13) : PRIN 11=D NAME: BRIDGER I 10\k/ARD TITLE: PROJECT MANAGER COMPLETE ADDRESS: CITY OF LUBBOCK, TEXAS (OWNER): By: MAYOR ATTEST: City Secretary APPROVED AS TO CONTENT: Company Talon/LPI- Aciclress 921 N. Bivins Street Owne CitN. State. lip Amarillo. TX 79107 AT"FES"I : Corporate Secretary Cit TO FORM: crt purcj,;u¢Il,uj)jic \\ Oik, comr,,cmig i„i, cider Conliac1% Wesley Everett, Director of Facilities 1 262010 Resolution No. 2010—R0067 (f,IQC Detailed Scope of Work 11� 10 To: Select a Contractor Project Manager in People From: Select a TGG Project Manager in People Date Printed: January 15, 2010 Work Order Number: 009516.00 Work Order Title: Lubbock - Fiesta Plaza Precast RR Installation Brief Scope: Fiesta Plaza Precast Restroom Installation The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Detailed Scope: SOW: 1. Plumbing to include 925' runof PEX water system connecting to modular restroom. 2. Install approximately 30' of 4" pvc sewer line. 3. Hook up plumbing as needed for bathrooms per plans. 4. Install (1) 100 amp, single phase, 240 volt circuit from the existing panel box east of the gazebo to the new restroom building (up to 210'). 5. Proposal is based on a 100 amp service b/c a 2 pole beaker is the largest bresker the existing panel will hold as a branch breaker. If a larger circuit is needed, additional charges will apply. 6. Proposal is based on building being prewired and plumbed by others prior to installation. 7. This proposal is based on approximately 5 loads of import sand for backfill and 5 loads of native dirt to infill the composting reservoir. An 18" X 18" concrete footing will be installed around the perimter of the building. 8. The existing building will be demolished and hauled offsite to a disposal facility. Detailed Scope of Work Page 1 of 1 EZ/QC - Southwest 1/15/2010 Resolution No. 2010-R0067 Page 1 of 7 of Proposal - CSI -.i, —1 to% r ' 1 Contractor's Price Proposal Summary - CSI Print Date: January 15, zu1u Contract Number: TX04-061908-TAL Work Order Number: 009516.00 Work Order Title: Lubbock - Fiesta Plaza Precast RR Installation Contractor: Talon/LPE Proposal Value: $ 46,836.74 Proposal Name: Lubbock - Fiesta Plaza Precast RR Installation Subtotal for Section -01: $18,037.79 Subtotal for Section -02: $6,907.64 Subtotal for Section -03: $2,739.06 Subtotal for Section -05: $32.79 Subtotal for Section -15: $14,531.13 Subtotal for Section -16: $4,588.33 Proposal Total $46,836.74 This proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding of the line totals and sub -totals. The Percentage of NPP on this Proposal: 0.6902% Price Proposal Summary - CSI Paqe 1 of 7 EZIQC - Southwest 1/15/2010 Page 2 of 7 of Proposal - CSI JQCjC:(' Contractor's Price Proposal Detail - CSI Print Date: January 15, 2010 Contract Number: TX04-061908-TAL Work Order Numbe 009516.00 Work Order Title: Lubbock - Fiesta Plaza Precast RR Installation Contractor: Talon/LPE Proposal Value: $ 46,836.74 Proposal Name: Lubbock - Fiesta Plaza Precast RR Installation Record Section - Item ModiufierUOM Description Line Total Section -01 1 01352-0023 HR Plumber,Note: Line items in the CTC include appropriate costs to cover labor. $11,258.41 These items will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 240.00 x $36.28 x 1.2930 = $11,258.41 2 01352-0029 HR Sprinkler Installer,Note: Line items in the CTC include appropriate costs to cover $1,176.11 labor. These items will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 20.00 x $45.48 x 1.2930 = $1,176.11 3 01590-0213 WK 60" Wide, 1/3 CY Bobcat, With Full -Time Operator $3,539.59 Quantity Unit Price Factor Total Installation 2.00 x $1,368.75 x 1.2930 = $3,539.59 4 01590-0297 WK 1/2 To 5/8 CY, 65 HP, Loader -Backhoe, With Full -Time Operator $2,063.68 Quantity Unit Price Factor Total Installation 1.00 x $1,596.04 x 1.2930 = $2,063.68 Subtotal for Section -01: $18,037.79 Section -02 5 02201-0002 EA Bobcat Delivery/Mob/DemobNote: Use for bobcat or similar sized equipment. $130.44 Includes delivery fee, delivery, set-up and return. Quantity Unit Price Factor Total Installation 1.00 x $100.88 x 1.2930 = $130.44 6 02201-0003 EA Backhoe, Dozer Or Roller Up To 250 HP Delivery/Mob/DemobNote: Use for $433.35 backhoe, dozer, roller, loader, excavator or similar sized equipment Includes delivery fee, delivery, set-up and return. Quantity Unit Price Factor Total Installation 1.00 x $335.15 x 1.2930 = $433.35 7 02213-0003 CY Sand, Washed $2,592.14 Quantity Unit Price Factor Total Installation 75.00 x $26.73 x 1.2930 = $2,592.14 8 02215-0003 CY Over 12" Wide, Excavation for Trenching by Machine in Soil $0.00 Quantity Unit Price Factor Total Installation 0.00 x $2.87 x 1.2930 = $0.00 9 02215-0010 CY Backfilling or Placing Subbase for Trenches with Imported or Stockpiled Materials $115.40 by Machine Quantity Unit Price Factor Total Installation 75.00 x $1.19 x 1.2930 = $115.40 Price Proposal Detail - CSI Paqe 2 of 7 EZ/QC - Southwest 1/15/2010 Page 3 of 7 of Proposal - CSIIQCJI! 'CA( Record Section - Item ModiufierUOM Description Line Total Section -02 10 02224-0051 LF Directional Boring For 3" (76 mm) Diameter Pipe, Horizontal, Underground $1,501.82 Quantity Unit Price Factor Total Installation 50.00 x $23.23 x 1.2930 = $1,501.82 11 02224-0068 LF 3" (76 mm) Steel Pipe Pull In Place By Boring Machine, Includes Pipe Welding $476.47 Quantity Unit Price Factor Total Installation 50.00 x $7.37 x 1.2930 = $476.47 12 02951-0003 EA Initial Set Up For Video Camera Inspection, Up To 12" Diameter Pipe Or Culvert $346.92 Quantity Unit Price Factor Total Installation 1.00 x $268.31 x 1.2930 = $346.92 13 02951-0010 LF 4" To 6" Diameter Pipe Inspection, Planning/Analysis PhaseNote: CCN inspection $527.54 of pipe interior. Quantity Unit Price Factor Total Installation 600.00 x $0.68 x 1.2930 = $527.54 14 02951-0019 LF 4" To 6" Diameter Pipe Inspection, Pre -Rehabilitation PhaseNote: CCN inspection $783.56 of pipe interior. Quantity Unit Price Factor Total Installation 600.00 x $1.01 x 1.2930 = $783.56 Subtotal for Section -02: $6,907.64 Section -03 15 03210-0006 TON Grade 60 Reinforcing Steel, Footings And Slabs, #346 $745.00 Quantity Unit Price Factor Total Installation 0.40 x $1,440.45 x 1.2930 = $745.00 16 03311-0009 CY Pour Continuous Footings, Direct Chute, 3000 PSI Concrete $1,994.06 Quantity Unit Price Factor Total Installation 20.00 x $77.11 x 1.2930 = $1,994.06 Subtotal for Section -03: $2,739.06 Section -05 17 05506-0002 LF Unistrut Channel 1-5/8" Wide x 1-5/8" High, 12 Gauge $32.79 Quantity Unit Price Factor Total Installation 4.00 x $6.34 x 1.2930 = $32.79 Subtotal for Section -05: $32.79 Section -15 18 15063-0391 LF 1/2" Inside Diameter (12 mm) Copper Pipe/Tubing Type L, Prices Include All $230.41 Hangers And Couplings, Elbow, Tee, Reducer Fittings. All Hangers Are Complete Assemblies Quantity Unit Price Factor _ Total Installation 20.00 x $8.91 x 1.2930 = $230.41 19 15063-0392 LF 3/4" Inside Diameter (20 mm) Copper Pipe/Tubing Type L, Prices Include All $277.22 Hangers And Couplings, Elbow, Tee, Reducer Fittings. All Hangers Are Complete Assemblies Quantity Unit Price Factor f Total Installation 20,00 x $10.72 x 1.2930 = $277.22 Price Proposal Detail - CSI Pape 3 of 7 EZ/QC - Southwest 1/15/2010 Page 4 of 7 of Proposal - CSI 1QC' CIA(:1 Record Section - Item ModiufierUOM Description Line Total Section -15 20 15063-0395 LF 1-1/2" Inside Diameter (40 mm) Copper Pipe/Tubing Type L, Prices Include All $415.05 Hangers And Couplings, Elbow, Tee, Reducer Fittings. All Hangers Are Complete Assemblies Quantity Unit Price t Factor Total Installation 20.00 x $16.05 x 1.2930 = $415.05 21 15063-0396 LF 2" Inside Diameter (50 mm) Copper Pipe/Tubing Type L, Prices Include All $561.42 Hangers And Couplings, Elbow, Tee, Reducer Fittings. All Hangers Are Complete Assemblies Quantity Unit Price Factor Total Installation 20.00 x $21.71 x 1.2930 = $561.42 22 15064-0340 LF 2" Pipe Schedule 40 PVC Socket Weld $84.30 Quantity Unit Price Factor Total Installation 20.00 x $3.26 x 1.2930 = $84.30 23 15064-0343 LF 4" Pipe Schedule 40 PVC Socket Weld $196.79 Quantity Unit Price Factor Total Installation 20.00 x $7.61 x 1.2930 = $196.79 24 15064-0366 EA 2" 45 Degree Elbow, PVC Schedule 40 Socket Weld $534.16 Quantity Unit Price Factor Total Installation 20.00 x $19.43 x 1.2930 = $502.46 Demolition 2.00 x $12.26 x 1.2930 = $31.70 25 15064-0368 EA 3" 45 Degree Elbow, PVC Schedule 40 Socket Weld $155.63 Quantity Unit Price Factor Total Installation 3.00 x $40.12 x 1.2930 = $155.63 26 15064-0379 EA 2" Tee, PVC Schedule 40 Socket Weld $217.30 Quantity Unit Price Factor Total Installation 6.00 x $28.01 x 1.2930 = $217.30 27 15064-0449 EA 2" Coupling, PVC Schedule 40 Socket Weld $727.70 Quantity Unit Price Factor Total Installation 30.00 x $18.76 x 1.2930 = $727.70 28 15064-0451 EA 3" Coupling, PVC Schedule 40 Socket Weld $3,364.26 Quantity Unit Price Factor Total Installation 70.00 x $37.17 x 1.2930 = $3,364.26 29 15064-0452 EA 4" Coupling, PVC Schedule 40 Socket Weld $115.13 Quantity Unit Price Factor Total Installation 2.00 x $44.52 x 1.2930 = $115.13 30 15064-1042 LF 1" Cross -Linked Polyethylene Tubing $7,271.83 Quantity Unit Price Factor Total Installation 1,850.00 x $3.04 x 1.2930 = $7,271.83 Cross Link Tubing will be 2", 2" line item not available 31 15104-0022 EA 2" Ball Valve, PVC, Socket Weld, 150# $120.61 Quantity Unit Price Factor Total Installation 2.00 x $46.64 x 1.2930 = $120.61 32 15104-0024 EA 3" Ball Valve, PVC, Socket Weld, 150# $259.32 Quantity Unit Price Factor Total Installation 2.00 x $100.28 x 1.2930 = $259.32 Subtotal for Section -15: $14,531.13 Price Proposal Detail - CSI Paqe 4 of 7 EZ/QC - Southwest 1/15/2010 Page 5 of 7 of Proposal - CSI Record Section - Item ModiufierUOM Description ( IQ 'A C (C Line Total 33 16027 Time Clock Allowance $323.25 Quantity Unit Price Factor Total NPP Task Installation 1.00 x $250.00 x 1.2930 a $323.25 34 16120-0114 MLF #6 AWG Cable - Type THHN-THWN, Underground Feeder And Branch Circuit $368.50 Quantity Unit Price Factor Total Installation 0.22 x $1,295.43 x 1.2930 = $368.50 35 16120-0117 MLF #1 AWG Cable - Type THHN-THWN, Underground Feeder And Branch Circuit $2,977.90 Quantity Unit Price Factor Total Installation 0.66 x $3,489.53 x 1.2930 = $2,977.90 36 16131-0868 LF 1-1/4" EMT Conduit, Mounted Exposed On Flat Wall $21.98 Quantity Unit Price Factor Total Installation 5.00 x $3.40 x 1.2930 = $21.98 37 16131-0934 EA 1-1/4" EMT Box Connector, Compression $24.59 Quantity Unit Price Factor Total Installation 2.00 x $9.51 x 1.2930 = $24.59 38 16131-1121 EA 1-1/4" IMC Coupling, Mounted Exposed On Flat Wall $27.28 Quantity Unit Price Factor Total Installation 2.00 x $10.55 x 1.2930 = $27.28 39 16131-1137 LF 1-1/4" PVC Schedule 40 Conduit With Coupling, Direct Burial, Glued Coupling $621.80 Quantity Unit Price Factor Total Installation 210,00 x $2.29 x 1.2930 = $621.80 40 16131-1150 EA 1-1/4" PVC Schedule 40 Elbow 90 Degree Direct Burial, Glued Coupling $30.70 Quantity Unit Price Factor Total Installation 2.00 x $11.87 x 1.2930 = $30.70 41 16131-1163 EA 1-1/4" PVC Schedule 40 Adapter, Direct Burial, Glued Coupling $17.79 Quantity Unit Price Factor Total Installation 2.00 x $6.88 x 1.2930 = $17.79 42 16131-1541 LF 1-1/4" Liquid Tight Flex Conduit $16.71 Quantity Unit Price Factor Total T Installation 4.00 x $3.23 x 1.2930 = $16.71 43 16131-1594 EA 1-1/4" Flexible Straight Connectors, Plain $19.50 Quantity Unit Price Factor Total Installation 2.00 x $7.54 x 1.2930 = $19.50 44 16190-0332 EA PVC Coated One Hole MI Conduit Strap, 1-1/4" $20.71 Quantity Unit Price Factor Total Installation 2.00 x $8.01 x 1.2930 = $20.71 45 16923-0060 EA 60 A / 2 Pole - 100 A / 2 Pole Bolt -On Branch Circuit Breaker $117.62 Quantity Unit Price Factor Total Installation 1.00 x $90.97 x 1.2930 = $117.62 Subtotal for Section -16: $4,588.33 Proposal Total $46,836.74 This proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding of the line totals and sub -totals. Price Proposal Detail - CSI Paqe 5 of 7 EZ/QC - Southwest 1/15/2010 Page 6 of 7 of Proposal - CSI IQCr The Percent of NPP on this Proposal: 0.69016% Price Proposal Detail - CSI Paqe 6 of 7 EZ/QC - Southwest 1/15/2010 Page 7 of 7 of Proposal - CSI Subcontractor Listing Date Printed: 1/15/2010 Work Order Number: 009516.00 Work Order Title: Lubbock - Fiesta Plaza Precast RR Installation Amount: $ 46,836.74 IQC. CIA( Name of Contractor Duties Amount No Subcontractors have been $0.00 0.00 selected for this Work Order Signature Title Firm or Corporate Name Talon/LPE Address 921 N Bivins Street, , Amarillo TX 79107 Telephone Number Date of Signing 15 -January -2010 Subcontractor Listing Pape 7 of 7 EZ/QC - Southwest 1/15/2010 Res. No. 2010—R0067 ACORD- CERTIFICATE OF LIABILITY INSURANCE MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. NISR LTR 12123109(MM/DDIYYW PRODUCER POLICY NUMBER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Willis of Texas, Inc. LIMITS ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 1800 Washington, Suite 400 9 GENERAL LIABILITY HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P O Box 1149 12/31/10 EACH OCCURRENCE $1,000,000 Amarillo, TX 79105-1149 INSURERS AFFORDING COVERAGE NAIC # INSURED INSURER A: Ironshore Specialty Ins. 25445 Talon/LPE, Ltd. INSURER B: Ironshore Specialty Ins. 124 921 N. Bivins Street INSURER c: Texas Mutual Insurance Company 22945 Amarillo, TX 79107 MED EXP (Any one person) S25,000 INSURERD: America First Insurance 12696 INSURER E: CAVFRAnFC THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. NISR LTR NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DTE MMIDD POLICY EXPIRATION DATE M LIMITS A GENERAL LIABILITY 000065300 12/31/09 12/31/10 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTED $300,000 X COMMERCIAL GENERAL LIABILITY CLAIMS MADE 51OCCUR MED EXP (Any one person) S25,000 PERSONAL & ADV INJURY $1,000,000 X PD Ded:10,000 GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/012 AGG $2,000,000 POLICY PRCT LOC D AUTOMOBILE LIABILITY BA8369955 12/31/09 12/31/10 COMBINED SINGLE LIMIT 51,000,000 X ANY AUTO (Eeaccident) BODILY INJURY $ ALL OWNED AUTOS SCHEDULED AUTOS (Per person) BODILY INJURY $ X HIRED AUTOS X NON -OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC $ ANY AUTO AUTO ONLY: AGG S B EXCESSIUMBRELLA LIABILITY 000065500 12/31/09 12/31/10 EACH OCCURRENCE S9 000 000 X OCCUR F1 CLAIMS MADE AGGREGATE $9,000,000 S $ DEDUCTIBLE $ X RETENTION $10000 C WORKERS COMPENSATION AND TSF0001155583 12/31/09 12/31/10 X TORY WC LIMITATT OTH- C EMPLOYERS' LIABILITY I -.L EACH ACCIDENT $1,000,000 ANY PROPRIETORIPARTNERJEXECUTIVE E.L. DISEASE - EA EMPLOYEE $1,000,000 OFFICERIMEMBEREXCLUDED? If yes, describe under SPECIAL PROVISIONS below E.L. DISEASE - POLICY LIMIT $1,000,000 A OTHER 000065300 12/31/09 12/31/10 $1,000,000 Occurrence Professional Llab $1,000,000 Aggregate Pollution Liab Claims Made DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT 15PEGIAL PROVISIONS It is hereby understood and agreed that the certificate holder is an additional Insured on the general liability and the general liability is primary. A waiver of subrogation applies on the general liability, automobile and workers compensation coverage. The general liability does (See Attached Descriptions) TE City of Lubbock 162513th Street Lubbock, TX 79414 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL IQ_ DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVE IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. DESCRIPTIONS (Continued from Page 1) not exclude XCU Coverage. aMc,2r, i mniinm 'A of a 11M799ao