HomeMy WebLinkAboutResolution - 2017-R0288 - Change Order With Utility Contractors Of America - 08_24_2017Resolution No. 2017-RO288
Item No. 6.12
August 24, 2017
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for
and on behalf of the City of Lubbock, Change Order No. 1 to that certain Contract No. 12670 by
and between the City of Lubbock and Utility Contractors of America, Inc. for the pump station
16 and ground storage tank, and related documents. Said Change Order No. 1 is attached hereto
and incorporated in this resolution as if fully set forth herein and shall be included in the minutes
of the City Council.
Passed by the City Council on
ATTEST:
Reb ta Garza, City Secreta
AS TO CONTENT:
August 24, 2017
DANIEL M. POPE, MAYOR
Wq'od Fran)flin, P.E., Director of Public Works
APPROVED AS TO FORM:
Ke li Leisure, Assistant City Attorney
RES.ChgOrd# 1.Contract 12670-UtilityContractorsofAmerica
07.25.17
City of Lubbock
Purchasing and Contract Management
Change Order
Contract No: 12670 Contractor: Utility Contractors of America
Change Order No. t Contract Title: Pump Station 16 and ground Storage Tank
BID/RFP No.16-1267a-TF Project Number: 92255
1. "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an
addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the
compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a
combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective.
Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters
the nature of the thine to be constructed or that is not an integral part of the project objective must be let out for public bid.
Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction
not covered by the specifications and drawings of the project (attach additional pages ifnecessary):
Delete the 42-inch valve near pump station 7. Delete the HVAC safety switch. Revise sizing of electrical transformers. Delete one
electric manhole. Modify the piping in flow control valve vault in 29th Drive to remove the PVC pipe and replace with steel pipe. Modify
the 24-inch piping at the tie-in at pump station 7. Replace the existing 30-inch valve in slide road with a new 30-inch butterfly valve and
perform the associated street repairs. Modifications to building exterior coating system by deleting the form liner, colored concrete and
sand blasting and replacing with textured colored coating. Add 60 days to the contract for additional work described above.
2. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material
quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices
are contained in the initial contract, no deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM DESCRIPTION
A. ORIGINAL CONTRACT VALUE:
B. AMOUNT OF THIS CHANGE ORDER: Council approval required if over $25, 000
COST CENTER: 6211 ACCOUNT: 92255.9241.30000
C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
D. AMOUNT OF PREVIOUS CHANGE ORDERS:
E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D):
F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25Y. increase
or decrease
AMOUNT
$ 17,075,000.00
$ 114,011.30
0.65
$ 0.00
$ 114,011.39
0.65
G. NEW CONTRACT AMOUNT (A+E): $17,789,011.39
3. It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes
full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise,
in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor
under this Change Order.
This Change Order is not valid without the followine signatures (please sign in order and return 3 oripinais with Contract Cover Sheet to
L'urchasing and C Wract Management Department):
(1)�RACTOR Date (2) PROJECT ARCHITECT/ENGINEER Date
Approved as to ontent:
�l
OWNE R ESENTATIVE Date
n�g�c I tl
(5) CAPI AL PROJECTS MANAGER Date
(6) PU
CONTRACT MANAGER Date
--17
1 0 2011
Change Orders over $25,000 require a Contract Cover Sheet and the follow g signes:
CITY F LUBBO K ATI' S 1
8/24/2017 A>e8/24/2017
(7) MAYOR Date (8) CITY ECRETARY Date
Council Date: August 24, 2017 Agenda Item 11: v� ! Resolution ft
PLJR-45 (Rev 12/2012)
City of Lubbock
Purchasing and Contract Management
Change Order
PUR-45 (Rev 12/2012)
FREESE
ENOWNICHOLS
CHANGE ORDER (4.43)
JJECT: Pump Station 16 and Ground Storage Tank
✓NER: City of Lubbock OWNER PROJ # 92255
NTRACTOR: Utility Contractors of America CONTRACTOR #
GINEER: Freese and Nichols, Inc. ENG. PROD. # LUB16233
CHANGE ORDER NO. 1 CHANGE ORDER DATE: 7/20/2017
Make following additions/deletions or modifications to work described in the Contract Documents:
1
2
3
4
5
6
Description of Change
PCM 001- 42-inch valve removal and electrical modifications
PCM 002 - Flow Vault Modifications
PCM 003 -Tie-in Piping modifications
PCM 004 - Hydrostop, 30-inch valve replacement, and associated asphalt
pavement repairs
PCM 005 - Modifications to building exterior coatings
Cost
-$66,620.50
$8,598.09
$19,807.80
$166,900.00
-$14,674.00
TOTAL COST OF THIS CHANGE ORDER:
$114,011.39
The compensation agreed to upon in this change order is full, complete and final payment for all costs the Contractor may incur as a result of or related
to this change whether said costs are known, unknown, foreseen or unforeseen at this time, including without limitation, any cost far delay, extended
overhead, ripple or Impact cost, or any other affect on changed or unchanged work as a result of this Change Order.
Contract Cost and/or Time Impacts:
Original Contract Amount
$17,675,000.00
Previously Approved Change Order Amount
$0.00
Adjusted Contract Amount
$17,675,000.00
Proposed Change Order Amount (this change order)
$114,011.39
Revised Contract Amount
$17,789,011.39
Previous substantial Completion Contract Time
460
Previous Final Completion Contract Time
510
Previous Substantial Completion Date
2-Aug-17
Previous Final Completion Date
21-Sep-17
Net Change in Contract Time
60
Revised Contract Time
570
Revised Substantial Completion Date
1-Oct-17
Revised Final Completion Date
20-Nov-17
Recommended by:
FREESE AND NICHOLS, INC.
By �L)!; Add jh tA- , 7/20/2017
lQic o as Lester Date
roved by:
UCA
By �-Z �zt
ae
roved by:
City of Lubbock
By
Date
rM
Freese and Nichols
SUBMITTAL TRANSMITTAL
(4.
Pump Station #16 & Storage Tank
PROJECT: Contract 12670/RFP 1 6-12670-TF PROJECT NUMBER:
OWNER: City of Lubbock 92255
CONTRACTOR: Utility Contractors of America, Inc. (UCA)
ARCHITECT/ENGINEER: Freese & Nichols, Inc.
REFERENCE DATA:
Contractor's Submittal No. 090.3 Specification Section: Various
Plan Sheet No.: C-18, C-49, E-4, E-6, E-8, E-19, and E-19 Description: PCM 01-removal of
proposed 42" YP6-BFV1
CONTRACTOR'S CERTIFICATION: / hereby certify that this submittal has been reviewed by the Contractor
and is in strict conformance with the Contract Documents as modified by Addenda, Change Orders and Field
Orders. CERTIFIED BY: Jonathan Ziegner, P.E. DATE: 11/09/2016
TYPE
#
DESCRIPTION
#SENT
#RET'D
STATUS
CMR
Contractor's Modification Request
❑ Approved
❑ Approved As Noted
❑ Not Approved
❑ Revise & Resubmit
❑ Filed As Received
❑ Final Distribution
❑ Change Order Issued
❑ Field Order Issued
❑ Recommended For Approval
❑ Returned W/O Review
❑ Add'I Information Required
❑ Cancelled
See Review Comments
❑ Pending Change Order
CTR
Certified Test Report
EIR
Equipment Installation Report
O&M
Operation & Maintenance Manual
NBC
Notification By Contractor
PCM
Proposed Contract Modification
1
1
PR
Payment Request
PP
Project Photographs
RD
Record Data
RFI
Request For Information
SAM
Sample
SCH
Schedule Of Progress
SD
Shop Drawing
FOR ARCHITECT / ENGINEER'S USE ONLY
DATE RECEIVED BY DATE RETURNED BY
COMMENTS:
DISTRIBUTION
REVIEW
NO.
SENT TO.
NO.
SENT TO.
DEPT.
BY
DATE SENT
DATE RET=D
P:\Job 16-990 - Pump Station 16 & Storage Tank\Submittals\SUBMITTAL TRANSMITTAL.doc
PCM 001 - Removal of 4T' YP6-BVF7
Labor I Be" Rat d IT W. Coat I Qugale
CorTimat a I �oYttanr I OwrTenalXaun I COSTEO I EQUIPMENT COST
Total $ (6,262.00)
MATERIALS
VENDOR
DlueAption
QUANTITY
UnN
UnXCost
1.otl
NOTES
Reynolds
DBdunt HVAC Safety Switch
2
LUMP SUM
-1,494.00
-2,988.00
R Ift
Change EqulpmeM to 50katc
1
LUMP SUM
-25.011.00
-25.011.00
Reywids
Adder to upatra to TSKVA banefermel
1
LUMP SUM
663.00
663.00
Adder
ReynoMs
Adder to upsim MCB to 225 amp
1
LUMP SUM
50.00
50.00
Adder
aught Canuate
Electrical Manhole
2
LUMP SUM
-5690
-11380
crate
C.—te Bloddng
1
LUMP SUM
-75
-75
Total
-38,741.00
VENDOR
Deaerlptlon
QUANTITY
UNIT COST
Total
NOTES
Ferguson
42 FLG SFV WGeer 82' Nut
1
S (8,TT5.00)
S
(8,T75.00)
Ferguson
42 STL FRE O O-L Coupling
1
S (2,000.00)
$
(2,000.00)
Ferguson
42CS SO PLT FLG
2
$ (1,05000)
$
(2,100.00)
Ferguson
Wax Tape
7
S (8500)
S
(85,00)
Ferguson
VaWe Box
1
S (149.50)
$
(149.50)
Ferguson
BoB Set
3
S (800.00)
S
(2,400.00)
SUMMARY
Summary
Total$
NOTES
This Pnpowd PCM will not haw any coosbuci-lens rotated chmges
Dead Cost of Adder
S 713.00
Dkect Cost of Labor
S (6,282 00)
Dwcl Cost of Equipment
S (6,801 00)
Dkec1 Cost of Material (UCA)
E (15,509.50)
DiRcl Cost of Sub—fta-,
S (38.74700)
Total Time and Matd la Cost
S (6020.50)
4055 International Plaza, Suite 200 • Fort Worth, Texas 76109 • 817-735-7300 • fax 817-735-7491
PROJECT: Pump Station 16 and Storage Tank PROJECT NO.: LUB1623
OWNER: City of Lubbock
CONTRACTOR: Utility Contractors of America, Inc.
ENGINEER: Freese and Nichols, Inc.
DESCRIPTION: Flow Control Vault Modifications PCM NO.: 002
NOTIFICATION TO CONTRACTOR:
The Owner proposes to make the additions, modifications or deletions to the Work described in the
Contract Documents as shown in Attachment "A". We request that you take the following action
within 10 calendar days:
rl Notify us that you concur that this change does not require a change in Contract time or
amount. A Field Order will be issued.
rl Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials,
equipment and all other costs related to this change. Impacts on Contract Time shall be
shown in a revised schedule, included with the submitted proposal.
rl Proceed with the change. Payment will be made at the unit price bid.
rl Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in
accordance with the Contract Documents.
BY:NCL
CONTRACTOR'S RESPONSE:
We respond to your request as follows:
DATE:1
rl We propose that this is a no cost or time change. Issue Field Order.
rl We submit the attached Price/Credit Proposal with detailed cost breakdown and revised
schedule for performing the described change.
rl We are proceeding with the change at the unit price bid.
rl We are proceeding with the change under the time and materials provisions of the
Contract.
BY: DATE:
ACTION TAKEN:
171 Proposed Contract Modification rejected. See comments.
rl Field Order will be issued.
rl Change Order will be issued.
BY:
DATE:
ATTACHMENT A
The Owner proposes to make the following additions, modifications or deletions to the work
described in the Contract Documents. Authorization to proceed with these changes must be
approved by Field Order or Change Order in accordance with the Contract Documents, prior to
commencing the work involved.
Submit a price to replace the existing 2" piping in the flow vault feeding the flow control valves.
1. Replace the existing 2-inch schedule 80 PVC pipe with 2-inch threaded, coated steel pipe.
2. Install one 2-inch RPZ valve and two 2-inch check valves.
3. Install a new 110-volt sump pump (Minimum 100gpm) with float to be connected to the
outlet adjacent to sump hole.
4. Install a new 2-inch Schedule 80 PVC sump discharge pipe across 29' drive ending it on the
Pump Station 16 site adjacent to the existing SCADA installation.
5. Install Three 6-inch SDR 35 PVC pipes from the existing SCADA site to the flow vaults. One to
each vault (Flow Meter Vault and Flow Control Vault) to be utilized as a return air tube and
One interconnecting the 2 vaults to be utilized as a vent, install a wind turbine on each pipe
above the ground on the SCADA site.
NOTE - The road repair associated with this is in the existing contract for Pumps Station 16.
NCL DATE: 12 9 16
2" By-pass in existing vault
Total
Lobar I Be. Rate ITTotal ,Cats) Total ONE„fin• I RT:. I Total Owr TinislHoun I IXCOSTED I EQUIPMENT COST Hours
Total f 3,870.00
MATERUU.S
VENDOR
Dacripgon
QUANTITY
Unit
Unit Coal
Total
NOTES
O'lool
Backlbw Weir gap and 2' presaue pipe (Steel)
1
LUMP SUM
2.029.30
2.029.30
01o01
Becklrow w/air gap and 2'pm-p,po(PVC)
....
Allamala
011001
Sump prmp and discharge piping
1
LUMP SUM
1.020.86
1,020.86
O'10o1
Vent Pipe and cap
1
LUMP SUM
566.44
556.44
W"c
ToW
3,606.60
Pipe
Total
........
Pipe
VENDOR
Description
QUANTITY
UNIT COST
Total
NOTES
Total
S
SUMMARY
Summary
Total.
NOTES
Tlas is based on 30 hours lotaf time
Dimct Cat of Latlor
f
3,870.00
Direct Coelaf Matenel(UCA)
f
3,606.60
Tat.ITirno and Materiels Cal
f
7,478.60
Toblr1115%
f
5,598.09
Sales Quote
ERSKINE & AVE. Q
(806) 762-1822
FAX (806) 762-1452
(800) 333-1197
Bill To: Jonathan
Utility Contractors of America, Inc
5805 CR 7700
Lubbock Texas 79424
Date
Quantity
M Customer Number
PLASTIC PIPE, INC.
210030
Distributors of Quality Products
Sales Quote No.
P.O. Box 1917
161701
Lubbock, TX 79408
Ship To:
backflow and sump pump
salesperson Order Date
5 11 /29/2016
U/M Description / Stock Number
1.00 I EA
1.00 I EA
60.00 FT
7.00 EA
2.00 EA
1.00 EA
3.00 EA
10.00 FT
2.00 EA
1.00 EA
1.00 EA
10.00
20.00
4.00
40.00
1.00
3.00
EA
FT
EA
FT
EA
EA
Purchase Order No.
Special Instructions
Code Unit Price Amount
backflow with air gap and 2" pressure piping and drain
pipe
SKU[55-860-2"] 2" LF-RPZ Backflow FEBCO
0011
$775.00
$775.00
Air gap
0001
$45.00
$45.00
SKU[40-2" BLACK 80] 2" Black SMLS Sch.80 Pipe
0011
$7.64
$458.40
21'
SKU[68-B808-020] 2" 90* Elbow Threaded 3M FS
0011
$26.05
$182.35
SKU[68-B839-247] 2" x 1/2" Red. Bushing FS 3M
0011
$11.07
$22.14
SKU[68-B805-020] 2" Tee Threaded 3M CS Blk
0011
$45.22
$45.22
SKU[68-B898-020] 2" Union Threaded Blk F/S
0011
$47.40
$142.20
SKU[40-1/2" BLACK 80] 1/2 Black SMLS Sch.80
0011
$1.22
$12.20
SKU[68-B898-005] 1/2" Union Threaded Blk F/S
0011
$11.55
$23.10
SKU[31-897-020] 2" Union Slip Sch.80
0011
$23.76
$23.76
SKU[31-836-020] 2" Male Adapter Sch.80
0011
$12.27
$12.27
SKU[94-703-020] 2" Strut Clamp
0011
$4.77
$47.70
SKU[94-703-158] 1-5/8" Strut
0011
$6.60
$132.00
SKU [94-703-005] 1/2" Strut Clamp
0011
$2.37
$9.48
SKU[40-2" SCH.80] 2" Sch.80 PVC P.E. (20')
0011
$1.82
$72.80
SKU[31-836-020] 2" Male Adapter Sch.80
0011
$12.27
$12.27
SKU[31-806-020] 2" 90* Slip Elbow Sch.80
0011
$4.47
$13.41
sump pump and discharge piping
1.00 EA FL51A-3 115v pump
1.00 EA SKU[31-836-015] 1-1/2" Male Adapter Sch.80
80.00 FT SKU[40-1 1/2" SCH.80] 1-1/2" Sch.80 PVC P.E.
(20')
42.00 FT SKU[40-4" SDR-35] 4" SDR-35 Gasketed Pipe
�' vent pipe and cap
$2,029.30
0001
$875.00
$875.00
0011
$8.52
$8.52
0011
$1.26
$100.80
0011
$0.87
$36.54
$1,020.86
Sales Quote
ERSKINE & AVE. Q
(806) 762-1822
FAX (806) 762-1452
(800) 333-1197
Bill To: Jonathan
Utility Contractors of America, Inc
5805 CR 7700
Lubbock Texas 79424
dttco Customer Number
PLASTIC PIPE, INC. 210030
Distributors of Quality Products Sales Quote No.
P.O. Box 1917 161701
Lubbock, TX 79408
Ship To:
backflow and sump pump
Date
Salesperson Order Date
Purchase Order No.
Special Instructions
5 1 11 /29/2016
Quantity
U/M
Description / Stock Number
Code
Unit Price
Amount
60.00
FT
SKU[40-4" SCH.80]
4" Sch.80 PVC P.E. (20')
0011
$5.16
$309.60
3.00
EA
SKU[31-806-040]
4" 90* Slip Elbow Sch.80
0011
$17.88
$53.64
1.00
EA
SKU[61-71 1 -QUART] 711 Quart Gray Cement
0011
$36.10
$36.10
1.00
EA
SKU[61-P-70-QUART] P-70 Clear Quart Primer
0011
$32.10
$32.10
1.00
EA
4" vent cap
0001
$125.00
$125.00
$556.44
alternate pvc pipe with backflow
1.00
EA
SKU[55-860-2"]
2" LF-RPZ Backflow FEBCO
0011
$775.00
$775.00
1.00
EA
Air gap
0001
$45.00
$45.00
100.00
FT
SKU[40-2" SCH.80]
2" Sch.80 PVC P.E. (20')
0011
$3.75
$375.00
7.00
EA
SKU[31-808-020]
2" 90* TxT Elbow Sch.80
0011
$7.44
$52.08
2.00
EA
SKU[31-839-247]
2" x 1/2" TxT RB Sch.80
0011
$7.71
$15.42
1.00
EA
SKU[31-805-020]
2" Threaded Tee Sch.80
0011
$13.86
$13.86
3.00
EA
SKU[31-898-020]
2" Threaded Union Sch.80
0011
$42.15
$126.45
10.00
FT
SKU[40-1/2" SCH.80]
1/2" Sch.80 PVC P.E. (20')
0011
$0.52
$5.20
2.00
EA
SKU[31-898-005]
1/2" Threaded Union Sch.80
0011
$6.00
$12.00
1.00
EA
SKU[31-897-020]
2" Union Slip Sch.80
0011
$23.76
$23.76
3.00
EA
SKU[33-887-240]
2" x 24" PVC Sch80 Nipples
0011
$19.80
$59.40
2.00
EA
SKU[33-887-180]
2" x 18" PVC Sch80 Nipples
0011
$17.70
$35.40
3.00
EA
SKU[33-887-120]
2" x 12" PVC Sch80 Nipples
0011
$5.97
$17.91
2.00
EA
SKU[31-836-020]
2" Male Adapter Sch.80
0011
$12.27
$24.54
3.00
EA
SKU[31-806-020]
2" 90* Slip Elbow Sch.80
0011
$4.47
$13.41
10.00
EA
SKU[94-703-020]
2" Strut Clamp
0011
$4.77
$47.70
20.00
FT
SKU[94-703-158]
1-5/8" Strut
0011
$6.60
$132.00
4.00
EA
SKU [94-703-005]
1/2" Strut Clamp
0011
$2.37
$9.48
I
$1,783.61
All pipe sales are final.
Al accounts due and payable al
Order subject to approval of our
our office in Lubbock, Luhhoc County, Texas. Loss or damage in transit at purchasers risk
home office. Shlpments subl'ecl to delays, due to strikes, accidents, transportation companies
Sales Quote Subtotal
$5,390.21
and other conditions beyond our control. Prices subject to change without notice. Al warranties expressed or implied are subject
to manufacturers polices and credits.
OTool Plastic Pipe Inc. [OTooq is a pipe, valve and fitting distributor. We buy from manufacturers to supply products to our
customers. O'Tool does not manufacture or engmeer anyy products and does not advise our customers of any product's capacity
8.2CJQ% TeX
or uses. Al warranty comes from the manufacturers. OTool does not warrant its products or accept legal responsibility for the use
or misusea o, any product It sell a.
Freight Charges
Payment/Terms:
THANK YOU
2% 10 Net 10 Due by
12/12/2016
Sales Quote Total
$5,390.21
w.
r
NEW.
112 hp
314 hp
Submersible
Effluent Pumps
314"Solids Handling
1-112" or 2" Discharge
0eatures:
• Semi -open impellers permit passage
i of solids without clogging
• Heavy cast iron construction
• Stainless steel fasteners
• 416 stainless steel rotor shaft
• Permanently lubricated upper and
lower ball bearings
• Oil -filled hermetically sealed motors with
thermal overload protection
_ • Unitized carbon and ceramic shaft seal
ear�Ula�ranty' • Dual -sized discharge flange: 1-1/2: or 2"
• Quick -disconnect power cord in 10' standard
length (25' and 35' optional lengths available
on some models)
� 14 UUM I t UU "em
4055 International Plaza, Suite 200 • Fort Worth, Texas 76109 • 817-735-7300 • fax 817-735-7491
PROJECT: Pump Station 16 and Storage Tank PROJECT NO.: LUB1623
OWNER: City of Lubbock
CONTRACTOR: Utility Contractors of America, Inc.
ENGINEER: Freese and Nichols, Inc.
DESCRIPTION: Valve Installation PCM NO.: 003
NOTIFICATION TO CONTRACTOR:
The Owner proposes to make the additions, modifications or deletions to the Work described in the
Contract Documents as shown in Attachment "A". We request that you take the following action
within 10 calendar days:
Notify us that you concur that this change does not require a change in Contract time or
amount. A Field Order will be issued.
rl Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials,
equipment and all other costs related to this change. Impacts on Contract Time shall be
shown in a revised schedule, included with the submitted proposal.
rl Proceed with the change. Payment will be made at the unit price bid.
rl Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in
accordance with the Contract Documents.
BY: N
CONTRACTOR'S RESPONSE:
We respond to your request as follows:
DATE:
rl We propose that this is a no cost or time change. Issue Field Order.
rl We submit the attached Price/Credit Proposal with detailed cost breakdown and revised
schedule for performing the described change,
rl We are proceeding with the change at the unit price bid.
rl We are proceeding with the change under the time and materials provisions of the
Contract.
BY:
ACTION TAKEN:
rl Proposed Contract Modification rejected. See comments.
rl Field Order will be issued.
rl Change Order will be issued.
BY:
DA
DATE:
ATTACHMENT A
The Owner proposes to make the following additions, modifications or deletions to the work
described in the Contract Documents. Authorization to proceed with these changes must be
approved by Field Order or Change Order in accordance with the Contract Documents, prior to
commencing the work involved.
Perform the following modifications:
1. Remove the existing 20" gate valve and replace with a 24" Butterfly Valve with flanged
adapter spool pieces at PS 16 — YP7 Station 0+00.
2. Plug line at 18" outlet station 0+00, plug 24" line just east of 18" outlet feeding the Grace
Clinic Line.
Drawing attached.
Nick Lester
DATE: 06/0712017
No Text
PCM 003 - 24" BFV and Spool Pieces for New Tle-in at Pump Station 7, Plugging and Demo of existing water line at Pump Station 7
labor I Base te ITYn�Co<tal 01C • I To nr I01er TenalHoun I IXCOST I EQUIPMENT COST
Tole) $ 5,451.00
MATERIALS
VENDOR
OueApUon
QUANTITY
Unit
Unit Cost
Total
NOTES
Gravel
Gravel for d.mo of Ewing vault
10 Cubic Yards
Cubic Yard
$21.00
$210.00
Total
S210.00
VENDOR
Description
QUANTITY
'UNIT COST
Total
NOTES
Tate -
SUMMITRY
Srmmary
Totals
NOTES
This Pmposed PCM win have an additional Umof 49 days added
This PCM is fm the mef associated wifh pluggingodemo of oosting wafe/fines, velvet, and naue. associated with PS 7
No costa have been added fornew 24'RFV,Spoof Precea, and labor for the fle4n at PS
Direct Cost of Labor
S 8,481.80
Dirac Coat of Equipment
S 11,116.00
Direct Cost of Material (UCA)
$ 210.00
Total Ten. and Material. Coat
S 19.007.1110
4055 International Plaza, Suite 200 • Fort Worth, Texas 76109 • 817-735-7300 • fax 817-735-7491
PROJECT: Pump Station 16 and Storage Tank PROJECT NO.: LUB16233
OWNER: City of Lubbock
CONTRACTOR: Utility Contractors of America, Inc.
ENGINEER: Freese and Nichols, Inc.
DESCRIPTION: Valve Replacement PCM NO.: 004
NOTIFICATION TO CONTRACTOR:
The Owner proposes to make the additions, modifications or deletions to the Work described in the
Contract Documents as shown in Attachment "A". We request that you take the following action
within 10 calendar days:
r"I Notify us that you concur that this change does not require a change in Contract time or
amount. A Field Order will be issued.
rl Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials,
equipment and all other costs related to this change. Impacts on Contract Time shall be
shown in a revised schedule, included with the submitted proposal.
rl Proceed with the change. Payment will be made at the unit price bid.
rl Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in
accordance with the Contract Documents.
BY: NICK LESTER DATE: 05/31/2017
CONTRACTOR'S RESPONSE:
We respond to your request as follows:
r"I We propose that this is a no cost or time change. Issue Field Order.
rl We submit the attached Price/Credit Proposal with detailed cost breakdown and revised
schedule for performing the described change.
rl We are proceeding with the change at the unit price bid.
r"I We are proceeding with the change under the time and materials provisions of the
Contract.
BY:
ACTION TAKEN:
r"I Proposed Contract Modification rejected. See comments.
r"I Field Order will be issued.
r"I Change Order will be issued.
BY:
DATE:
DATI',
4055 International Plaza, Suite 200 • Fort Worth, Texas 76109 • 817-735-7300 • fax 817-735-7491
PROJECT: Pump Station 16 and Storage Tank PROJECT NO.: LUB16233
OWNER: City of Lubbock
CONTRACTOR: Utility Contractors of America, Inc.
ENGINEER: Freese and Nichols, Inc.
DESCRIPTION: Valve Replacement PCM NO.: 005
NOTIFICATION TO CONTRACTOR:
The Owner proposes to make the additions, modifications or deletions to the Work described in the
Contract Documents as shown in Attachment "A". We request that you take the following action
within 10 calendar days:
rl Notify us that you concur that this change does not require a change in Contract time or
amount. A Field Order will be issued.
rl Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials,
equipment and all other costs related to this change. Impacts on Contract Time shall be
shown in a revised schedule, included with the submitted proposal.
rl Proceed with the change. Payment will be made at the unit price bid.
rl Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in
accordance with the Contract Documents.
BY: NICK LESTER DATE: 05131/2017
CONTRACTOR'S RESPONSE:
We respond to your request as follows:
rl We propose that this is a no cost or time change. Issue Field Order.
rl We submit the attached Price/Credit Proposal with detailed cost breakdown and revised
schedule for performing the described change.
rl We are proceeding with the change at the unit price bid.
rl We are proceeding with the change under the time and materials provisions of the
Contract.
BY: DATE:
ACTION TAKEN:
rl Proposed Contract Modification rejected. See comments.
rl Field Order will be issued.
rl Change Order will be issued.
BY:
DATE:
ATTACHMENT A
The Owner proposes to make the following additions, modifications or deletions to the work
described in the Contract Documents. Authorization to proceed with these changes must be
approved by Field Order or Change Order in accordance with the Contract Documents, prior to
commencing the work involved.
Submit a price/credit as follows.
1. Delete the form liner.
2. Delete the colored concrete.
3. Delete the sand blasting.
4. Install textured coating as chosen from the mock up panel.
BY: Nick Lester DATE:05/31/2017
rM
Freese and Nichols
SUBMITTAL TRANSMITTAL
(4
Pump Station #16 & Storagge Tank
PROJECT: Contract 12670/RFP16-12670-TF PROJECT NUMBER:
OWNER: City of Lubbock 92255
CONTRACTOR: Utility Contractors of America, Inc. (UCA)
ARCHITECT/ENGINEER: Freese & Nichols, Inc.
REFERENCE DATA:
Contractor's Submittal No. 0134 Specification Section: Various
Plan Sheet No.:_ Description: Textured Painted Tilt Walls
CONTRACTOR'S CERTIFICATION: I hereby certify that this submittal has been reviewed by the Contractor
and is in strict conformance with the Contract Documents as modified by Addenda, Change Orders and Field
Orders. CERTIFIED BY: Jonathan Ziegner, P.E. DATE: 06/23/2017
TYPE
#
DESCRIPTION
#SENT
#RET'D
STATUS
CMR
Contractor's Modification Request
❑ Approved
❑ Approved As Noted
❑ Not Approved
❑ Revise & Resubmit
❑ Filed As Received
❑ Final Distribution
❑ Change Order Issued
❑ Field Order Issued
❑ Recommended For Approval
❑ Returned W/O Review
❑ Add'I Information Required
❑ Cancelled
F1 See Review Comments
❑ Pending Change Order
CTR
Certified Test Report
EIR
Equipment Installation Report
O&M
Operation & Maintenance Manual
NBC
Notification By Contractor
PCM
Proposed Contract Modification
1
1
PR
Payment Request
PP
Project Photographs
RD
Record Data
RFI
Request For Information
SAM
Sample
SCH
Schedule Of Progress
SD
Shop Drawing
FOR ARCHITECT / ENGINEER'S USE ONLY
DATE RECEIVED BY DATE RETURNED BY
COMMENTS:
DISTRIBUTION
REVIEW
NO.
SENT TO.
NO.
SENT TO.
DEPT,
BY
DATE SENT
DATE RET=D
P:\Job 16-990 - Pump Station 16 & Storage Tank\Submittals\SUBMITTAL TRANSMITTAL.doc
PCM 005 - Tilt Wall Textured Painting
Total
Labof I E.-Rat. ITI qut r I Cmr Th a I RN �nulsr I O.af Tim•INeun I �COS7E0 I EQUIPMENT COST
Total S
MATERIALS D.serlptlon QUANTITY Unit Unit Coat Total NOTES
VENDOR
Total 0.00
SUB
Dasertptlon
QUANTITY
UNrICOST
Total
NOTES
.inert
Calorad Canaete
32D
$ 50.00
$ (16,000.DD)
ainert
Sandbiasbing Panels
3600
$ 1.38
$ (5,004.00)
einert
Fonn Lfrr
7250
$ 3.00
$ (21.75000)
einert
..tore C..WV
10600
$ 2.60
$ 28,080.00
Total
04,674,00)
SUMMARY
Summ.ry
T.W.
NOTES
That Pmpcsed PC6M r iS not have any conshudiontime relate. changes
Direct Cost of Adder
Direct Coal of Labor
S
Dmct Cost of Equipment
S -
D'uect Cost of Material (UCA)
Direct Coat of Subcontractor
$ (14,674.00)
Total Ti.. ..,I M.ted 1. Cost
$ (14,674.00)
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 of 1
Complete Nos. 1- 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2017-248278
Utility Contractors of America, Inc.
Lubbock, TX United States
Date Filed:
08/10/2017
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Lubbock
Date Acknowledged:
08/14/2017
3 Provide the identification number used by the governmental entity or state agency to track or identify
description of the services, goods, or other property to be provided under the contract.
the contract, and provide a
12670
Pump Station 16 - Change Order 1
4
Name of Interested Party
City, State, Country (place of business)
Nature of interest
(check applicable)
Controlling I
Intermediary
Ziegner, Jonathan
Lubbock, TX United States
X
Lane, Ty
Lubbock, TX United States
X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct.
Signature of authorized agent of contracting business entity
AFFIX NOTARY STAMP / SEAL ABOVE
Sworn to and subscribed before me, by the said this the
day of
20 , to certify which, witness my hand and seal of office.
Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
lotl
Complete Nos. 1- 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2017-248278
Utility Contractors of America, Inc.
Lubbock, TX United States
Date Filed:
08/1012017
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Lubbock
Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify
the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
12670
Pump Station 16 - Change Order 1
Nature of interest
4 Name of Interested Parry
City, State, Country (place of business)
(check applicable)
Controlling I
Intermediary
Ziegner, Jonathan
Lubbock, TX United States
X
Lane, Ty
Lubbock, TX United States
X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear, or affjrr�u der penalty of perjury, that the above disclosure is true and correct.
°•�Y.U,,, TAMMYVANBUREN
Notary Public, State of Texas % J
ID# 12506869.2
hA
Myy Commission Expires i 1
September 27, 2020
'5(iJgnat&e of authorized agen f contracting business entity
AFFIX NOTARY STAMP I SEAL ABOVE
Sworn to and su . ore -me— Ty Lane this the
1 nth day of August
20 17 to cc wh h, witness my hand and seal of office.
_ Tamm VanBuren
Signature of o administering o Printed name of officer administering oath Title of officer administering oath