HomeMy WebLinkAboutResolution - 2017-R0275 - Henthorn Commercial Construction - 08_10_2017Resolution No. 2017-RO275
Item No. 6.19
August 10, 2017
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for
and on behalf of the City of Lubbock, Change Order No. 3 to that certain Contract No. 12385 by
and between the City of Lubbock and Henthorn Commercial Construction, for Lubbock
Memorial Civic Center Renovations Phase Two per Bid # 15-12385-MA, and related documents.
Said Change Order No. 3 is attached hereto and incorporated in this resolution as if fully set forth
herein and shall be included in the minutes of the City Council.
Passed by the City Council on August 10, 2017
DANIEL M. POPE, MAYOR
ATTEST:
Rebekca Garza, City Secretary
APPROVED AS TO C
D(Wft'�) 0/) (
cott Snider, Assistant City Manager
APPROVED AS TO FORM:
Ry n ooke, Assistant City Attorney
RES.Change Order #3 Contract-12385
07,25.17
City of Lubbock
Purchasing and Contract Management
Change Order
Contract No: 12385 Contractor: Henthorn Commercial Construction
Change Order No. 03
BID/RFP No. 15-12385-MA
Contract Title: Lubbock Memorial Civic Center Renovations Phase Two
Project Number: 91195
"Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an
addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the
compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a
combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective.
Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters
the nature of the thing to be constructed or that is not an integral part of the project objective must be let out for public bid.
Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction
not covered by the specifications and drawings of the project (attach additional pages if necessary):
This request will provide for additional electrical work necessary in the theatre dressing rooms, upgrade in hand
dryer submittal, tile installation behind a drinking fountain, procurement and installation of dressing room drop
ceiling, installation of additional valves in the dressing rooms, plumbing preparation for future restroom
installation in the stage management offices, changes in tile selection and finishes, reduction of urinal screens.
2. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material
quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices
are contained in the initial contract, no deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM
ITEM DESCRIPTION AMOUNT
A. ORIGINAL CONTRACT VALUE: 2,322,960.00
B. AMOUNT OF THIS CHANGE ORDER: Co,icdappioval iequitedilov•r szs.nnn $62,354.24
COST CENTER: 91195 . ACCOUNT: 8302
C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 2 70 %
D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 6,667.24
E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 69,021.48
F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): '5'%, increase 3.00 (X)
or decrease
G. NEW CONTRACT AMOUNT (A+E): $ 2,391,981.48
3. It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes
full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise,
in anyway incident to, or arising out of or resulting directly or indirectly: from the work performed or modified by the Contractor
under this Change Order.
Purcr4asing and Contrac,tM4azement Department):
-7.•-2a • Zo�'�
OC TRAC OR Date (2) P OJECT CHITECT G EER Date
p ve s ontent Approved as to orm:
7 i/ZoR
(3) OWNER' PRESENTATIVE Date (4 O Date
chnik, &C4_40i 14 1
JUL 2 g Zp11
(5) CAPITAL PROJECTS MANAGER Date (6) PU -F SING MJONTRACTMANAGFR Date
Ch nge •ders over $25,000 require a Contract Cover Sheet and the following signatur
CITY OF U BOCK 8/10/201 MATTES .
/10/2017
(7) MAYOR Date (R) CITY SEC ETARY t D to
Council Date: August 10, 2017 Aaenda Item =: 6.1 ') Resolution 2017—R0275
PL R-45 (Rev 12'2012)
2011 Avenue C
Lubbock, Texas 79404
H E N T H O R N
Phone: f8061687-3084
COMMERCIAL CONSTRUCTION E-mail: mike(bhenthorncommercial.com
rhett(d.)henthorncommercial.com
bryan(a)henthorncommercial.com
heath(a)henthorncommercial.com
Project: Lubbock Memorial Civic Center 7/19/2017
1501 Mac Davis Ln.
Lubbock Tx 79401
Change Order Proposal
CHANGE ORDER PROPOSAL #3
SCOPE OF WORK
Changes in Scope of Work
1) Brightstar Electric- Changes in scope attached
2) Credit from Collins Tile for tile selection
3) Additional Tile Adds at Water Fountains
4) Theater Dressing Room Ceilings
5) Theater Valves
6) Future bathroom Stubs for Theater
7) Hand Dryers
8) Collins Tile Add for Polished Tile
9) Additional Supervision per Scott Snider
10) Urinal Screen Credit (40)
Days added to contract
Subtotal
OH&P 10%
Grand Total
$16,038.00
-$14,036.00
$560.00
$5,462.00
$1,723.92
$1,385.48
$2,600.00
$19,980.00
$40,000.00
-$11, 393.80
6-L .
$34.64
$%21,3s4 24
1
Change Order #3
DATE
HEN CO
DESCRIPTION
AMOUNT
8-31-15
CO#1-4
Urinal Screens- Credit for 47 screens- City paid Henthorn
($11,393.80)
9-29-15
CO#7
Electric Hand Dryer-
$ 2,600.00
9-9-16
CO#8
Bright Star Electric- rebuild/replace lost/damaged circuits
$16,038.00
9-12-16
CO#9
Collins Tile- Additional wall tile at water fountains
$ 560.00
9-12-16
CO#9
Dressing Room ceilings
$ 5,462.00
9-12-16
CO#9
Add valves to theatre dressing rooms
$ 1,723.92
9-12-16
CO#9
Plumbing Prep in mezzanine
$ 1,385.48
9-03-15
E-mail
Submittal change on tile finish: honed to polished
$19,980.00
1-31-17
LTR
Letter from Collins Tile- Credit for City using less expensive product
($14,036.00)
TOTAL:
$22,319.60
OH & P 10%
$ 34.64
6-20-17
CO#10
Time Extension delay and half days
$40,000.00
TOTAL OWED TO HENTHORN:
$62,354.24
City of Lubbock Digitally signed by Heath Davidson
ON cn— Heath Davidson, o=HQ, ou,
email-heathiahenthorncommercial.co
m,c—US
Signature '� ' Date :2017.07.2010:49:48-0500 Date:
Electrical Changes
September 7, 2016
PROJECT: City of Lubbock Memorial Civic Center Renovations
RE: Theater Dressing Room Area
Numerous homerun circuits were damage during the demolition phase, and many electrical
circuits had to be abandoned in place due to the routing of the circuits originally being
installed in slab on grade construction. The loss of these circuits not only affected the areas
under construction that these circuits were to be reused in but also the areas shown to have
no construction. It will require the installation of approximately 3001f of additional conduit
and approximately 2,100 If of #12 THHN copper wire to reinstall these circuits from a
different location. Additionally, we have found that the existing electrical system installed
has no grounding conductor and is grounded by conduit only, we will have to remove and
reinstall approximately 6,000 If of #12 THHN copper to make this a grounded system that
will be needed for GFCI receptacle functions. The ceilings will need to be removed in the
areas shown to have no work to allow access and will require new light fixtures. (I have 12
included in price. 6 for each room).
Material and labor:
Total: $16,038.00
Marto Trkd
Owner
Hnght Star kkeclric TLEC a27896
5004 Grinne 11
BR (J H T STAR lubbock, Texas 79416
(806)-281-360 Fax:866-439-1S65
ELECTRIC brightstarelectrkLiDsuddenlink.net
Construction Estimate Page 1
File Name: Rework electrical in Theater Dressing Rooms.est
Qty Craft@Hours Unit Material Labor Equipment Total
Rework Electrical in Theater Dressing Rooms due to unknown conditions discovered during demolition
resulting in lost electrical circuits to the area and discovery of the electrical system being ungrounded.
Investigation of lost circuits and solutions to regain power to the areas
1.00 L1 @142.0
-- 0.00
5,552.00
0.00
5,552.00
100' 3/4" EMT conduit,
2 set screw connectors, 9 set
screw couplings and
9 one -hole straps
7 #12THHN, solid
3.00 L1 @36.00
CLF 642.00
1,407.60
0.00
2,049.60
Type THHN 600 volt stranded
copper building wire
#12
6.00 L2@72.00
KLF 559.20
2,850.60
0.00
3,409.80
Demo and provide 12 Type A Light Fixtures
12.00 L1 @18.00
-- 2,382.00
703.80
0.00
3,085.80
Shipping
1.00 --@.0000
-- 450.00
0.00
0.00
450.00
Total Manhours, Material, Labor, and Equipment:
268.0 4,033.20 10,514.00 0.00 14,547.20
Subtotal: 14,547.20
5.00% Overhead: 727.36
5.00% Profit: 763.73
Estimate Total.: 16,038.29
No Text
DATE- 1 7/26/20161 COST PROPOSAL
Contraetor,'Custorer HENTHRON CONSTRUCTION
Jot. Name - CIVIC CENTER —
DeScnpdon of Work.
ADb 2-2' VALVES _' '•dti c•_ •x!-VALVES e VALVt=S
P e.mbrng Scperv,s:cn
if Man hou*:
F,
2.36 E 3,1, - 2398,
PvmrSr'Vva.Cer
9 w7an haUrs
ti
23 6E SiH' = 212 85
S1d Saae`V S,C^
Than t2T.1r5
x
e5 55 $, H: $
SIV Jcuir^evr'a,
;v'an .cu:s
t
2365 ::
Da everj
n rau!
x:
rv" �n ':IH• _ z 43 00
P :.m^.ng S Fznr:s
..... Man nuv%
F
3G ?5 E,
—.
�—
SAr S _p.a,. sr,.
- _r,
r.
3995 $,H: S_
SM. Jcurrryrnan
Ma!, rn;.ts
N
3548 $rHr = S -
TOTAL Msn Hours
Labor Su64ctal S a55 7u
r tr•;A.S.tEOtCARE FUTA
SUTA
_ 'S
He=i!r 3 '.:e!fsre
a G
UA pei,' Or.
_ ,...
UA Tr:n,ng
6
UA Organizing 1--n j
V
%N- .e`s 'crop
3"
Gana., 1 at1t)
I
a GC
TOTAL Labor Bt:*dcn
30a 4C
LABOR SUBTOTAL
S W 'u
MATERIAL
plic,':
R;,; ;'.1 ."cF .
ya,i 9l,
MATERIAL SUHTOTALi
5aC :d
EQUIPI►fENT RENTAL
C:-:'.p', C-
TvRC �
5•:
EQUIPMENT RENTAL SUBTOTAL;
-SC.""
SUB -SUBCONTRACTORS
Insulat)on
Ehctr:eal
Controls
M.osc
SUBCONTRACTORS SUBTOTAL
C: C3
E
Subtotal (D+E)
`23 S?
Bonding
_
t SaI45 Tax
(
H
TOTAL CHANGE AMOUNT
$1 723.92
Scintdu,e lmoact
v`. a _.. _ e --m .
cr.•! ^a dav'; . f).' ., _s-
=_xcSussons
G`��R i !h?l-
a.gnatar2 _ J
3
i
DATE: 1 6/16120161 COST PROPOSAL
ContractorlCustomer Henthorn
Job Name . Civic Center
Cescription of Work:
cae 4 holes anC aCd `,u;u
dram a;,c'Naiec burn Ii arar to mezz. Par city.
Piumbin3 Supe-vision
I Man hour,
X
33 0:, SiH, =
K.00
1 AC Supevisicr
V.a,l no?"n
x
33 00 SiH; =
QCO
HVAC Reg Tire
Man ,lour,,
X
23 3% SAIr =
0.01,
HVAC OT
K'a-I nourS
X
34 'd5 S,Hr =
000
H`!AC Fabrication
!fay ,lours
X
23.30 &H, =
on
Plumbing I ee Time
10 ' I ,r n,).ars
X
24 ?C SrHr =
24805
Weld:rg Labor
Man amours
X
23 30 Vw =
_
000
i Ap cvn, Le R,q Tme
Mar. hour;
X
_
18 32 Situ =
000
P'urrtorng Apprent ce Rey Tama
10 Mlar, hour:
X
1,940 $'Hr =
19400
UetE.ey
1 Evian hours
20 00 s rlir =
S20 00
7pTAL Man Hours
22
_aZo Si b:oia'
$495 00
Labor Eursen
5344 :i.
_ $264 53
LABOR SUBTOTAL
575'
MATERIAL
Descnprsan
pVo pipe and fittings
1e9.00
r000er pipe fittings and valves
205.00
MATERIAL SUBTOTAL]
::3"I!
EQUIPMENT RENTAL
Cescr;plar•
co.a machine
12E IN
EQUIPMENT RENTAL SUBTOTAL
SUS -SUBCONTRACTORS
Desc:ipt:on
tnsatatlon
Electrical
—
Controls
u
Ditching
Misc.
_
SUBCONTRACTORS SUBTOTALi
C.ccl
A.
C. Subtotal IA+BI S',395 46
F Subtotal;D+E. SO OC
TOTAL CHANGE AMOUNT (C+F+G)j ;1,385
�schetfute Impact: vre'Will 'aqua? :i"r2 eXler.s;•]^ =r _ .... :.c•k ;ys tG tr?S3 �.na^ges
.> ace's tassed on s.naight time
tl-m
2011 Avenue C
Lubbock, Texas 79404
H E N T H O RN
Phone. (506►, 6g?-3084
COMMERCIAL CONSTRUCTION E-mail: mike(c7nenthorncommerciai.com
rhett(d7henthorncom mercial .com
bryan(c)henthorncommercial.com
heath(a�-henthorncommercial.com
Project: Lubbock Memorial Civic Center 9/20/2015
1501 Mac Davis Ln
Lubbock Tx 79401
Change Order Proposal
CHANGE ORDER PROPOSAL #7
SCOPE OF WORK
Hand Dryers
1) Estimated Alowance for Basic Hand Dryer (26) L' S' 70 each
American Hand Dryer- GX Series
Steel Satin Finish 120V 12A 1500W
Days added to contract 0
City of Lubbock
(26) C $270 each
Subtotal
Grand Total
Signature Date_
$4,420.00
$7 020.00
$2.600.00
$2,600.00
Lisa Thomason
Subject: FW: RFI-Civic Center Color Schedule- Tile Clarification
From: Tim Collins [mailto:timcollins@collinstile.com]
Sent: Thursday, September 03, 2015 1:28 PM
To: Bryan Walters <bryan@henthorncommercial.com>
Subject: RE: RFI-Civic Center Color Schedule- Tile Clarification
Bryan,
The cost to change to polished finish tile will be $19980.00. Note that there is over 14K sq ft of this material.
Second to this issue, I have learned that the material selection W2 is not available in polished finish from the
manufacturer. I have attached the product spec and noted where 4 x 24 size is shown to not be available polished.
Tim Collins
Collins Tile LLP
Office 806-747-7738
Mobile 806-789-7738
From: Bryan Walters [ma iIto: bryan(JIhenthorncommercia1.com]
Sent: Thursday, September 03, 2015 10:11 AM
To: Tim Collins
Subject: FW: RFI-Civic Center Color Schedule- Tile Clarification
Tim,
Can you tell me how much of an increase we are talking about.
Thanks,
Bryan Walters
Project Manager
0:806.687.3084
F:806.209.0220
C:806.548.2079
bryan@henthorncommercial.com
1
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 0f 1
Complete Nos. 1- 4 and 6 if there are interested parties.
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
OFFICE USE ONLY
CERTIFICATION OF FILING
Certificate Number:
2017-243218
Date Filed:
07/31/2017
Date Acknowledged:
08/08/2017
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
Henthorn Commercial Construction
Lubbock, TX United States
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City Of Lubbock, Memorial Civic Center
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
12385
Building Renovations
4
Name of Interested Party
City, State, Country (place of business)
Nature of interest
(check applicable)
Controlling
I Intermediary
Thomason, Lisa
Lubbock, TX United States
X
X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct.
Signature of authorized agent of contracting business entity
AFFIX NOTARY STAMP / SEAL ABOVE
Sworn to and subscribed before me, by the said this the day of
20 , to certify which, witness my hand and seal of office.
Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1of1
Complete Nos. 1- 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
2017-243218
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
Henthorn Commercial Construction
Lubbock, TX United States
Date Filed:
07131/2017
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City Of Lubbock, Memorial Civic Center
Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
12385
Building Renovations
4
Name of Interested Party
City, State, Country (place of business)
Nature of interest
(check applicable)
Controlling
I Intermediary
Thomason, Lisa
Lubbock, TX United States
X
X.
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct.
KATHY VARNER
My Commission Expires
C11 August 31, 2018 .—c i '•' +. , -�=�
Signature of authorized agent of contracting
vw�
business entity
AFFIX NOTARY STAMP / SEAL ABOVE
Sworn to and subscribed before me, by the said �"t ' ' ' �l this the ✓� day of (�
20�_, to certify which, witness my hand and seal of office.
Sign ure of o cer administering oath Printed name of o er administering oath Title of officer ministering oath
Forms provided by Texas Ethics Commission www. ethics.state. tx. Lis Version V1.0.883