HomeMy WebLinkAboutResolution - 2010-R0020 - Talon/LPE For Testing And Balancing City Hall HVAC System - 01/14/2010Resolution No. 2010-R0020
January 14, 2010
Item No. 5.32
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, Job Order Contract No. 10-
007-F-007-NJPA for full water and air balance for the HVAC system per National Joint
Powers Alliance (NJPA), Indefinite Quantity Construction Contract, by and between the
City of Lubbock and Talon/LPE of Amarillo, Texas, and related documents. Said Job
Order Contract is attached hereto and incorporated in this resolution as if fully set forth
herein and shall be included in the minutes of the City Council.
Passed by the City Council this 14th day of January , 2010.
TOM NARTIN, MAYOR
ATTEST:
Rebec Garza, City Secretary
APPROVED AS TO CONTENT:
Yearvkbd, Assistant City Manager
Information Officer
APPROVED A ' TO FORM:
(�Chad Weaver, Assistant City Attorney
vwxcdocs'RES.Contract-Talon LPE
November 19, 2009
City of Lubbock Job Order
phis .lob Order is -overned by all terns and conditions of the Contract referenced below which is hereby
incorporated by reference.
Omier: Weslev Fverett. Director of Fac)lltles Management for - Facilities
N.11"A Contract No.: TX04-1161908-TAL. National Joint 1'oNvers Alliance (N.JPA), Indefinite Quantity
Construction Contract.
Contract .lob Order: 10-007-F-007-N.1PA
Contractor: Talon/LPr.
Date of'Contract: September 25. 2008
.lob Order Date: NoN ember 19, 2009
Project :architect filr this .lob Order: I 1st name. p11o11C IlUmber and rirrl name of Architect contracted for this
project. N[A
S11111mar) and Description of Statement of Work attached hereto: Full Water and Air Balance of the HVAC
System
Talon Job Order Number: 009322.00 hereto attached.
Value of'prC-priceCl \\ork: $ 011.00
Valuc ofnon-pre:-priced \vork: S 38,153.711
Pa\ meat and PerfOrnlance 13oncls: S 978.30 Insurance Regllirements per Exhibit A, attached.
Total I - fixed 1'I -ICC stipulated SUM for this .lob Order (".lob Order S1.1111"): $ 39,132.00
Notice to Proceed Date for this .lob Order: To be issued after Citv Council approval
Ixpected Completion Date for this .lob Order: To be determined after City Council approval
Liquidated Dama`les (Ii diffcrent than as set lorth in agreement): $25 per day
CON I'RACI OR:
alon'1 I'1
13N:
PRINTED NAME: 131ZIDGF-R HOWARD
TITLE: PROJECT MANAGER
COMPLEITE ADDRESS:
C0111pam I alo11/LPL
Aciclresti 9'21 N. 13i\ ins Strect
Cit). State. Zip Amarillo. TX 79107
n-rrl�ti I
Corporate Secretary
CITY 01--'LUBBOCK. TEXAS OWNER):
13):
MAYOR
ATTEST:
City Som-etary
APPROVED AS TO CONTENT:
bL
O\vnei s Representative
Dire - .
APP �D TU FORM:
City Attorney
O'+ I'urchasedItihIic Work. C+ititwo y,\hsh Order C'otit rack 811312009
Detailed Scope of Work
To: Select a Contractor Project Manager in People From: Select a TGG Project Manager in People
Date Printed: October 09, 2009
Work Order Number:
Work Order Title:
Brief Scope:
009322.00
Lubbock -TAB City hall
TAB City Hall
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the
items set forth below shall be considered part of this scope of work.
Detailed Scope:
This proposal is for a Full TAB at City Hall to be performed by N.D. White Engineering Services.
Detailed Scope of Work Page 1 of 1
EZIQC - Southwest 10/9/2009
Page 1 of 4 of Proposal - CSI
Contractor's Price Proposal Summary - CSI
Print Date: October 09, 2009
Contract Number:
Work Order Number:
Work Order Title:
Contractor:
Proposal Value:
Proposal Name:
TX04-061908-TAL
009322.00
Lubbock -TAB City hall
Talon/LPE
$39,132.00
Lubbock -TAB City halt
•IQG
Subtotal for Section -15: $39,132.00
Proposal Total
This proposal total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding of the line totals and sub -totals.
The Percentage of NPP on this Proposal: 100.0000%
$39,132.00