Loading...
HomeMy WebLinkAboutResolution - 2014-R0281 - Contract - Compliance Sampling And Analysis Inc.- Asbestos Consulting - 08_28_2014Resolution No. 2014-RO281 August 28, 2014 Item No. 5.16 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 12002 for asbestos consulting services per ITB 14-11951-MA, by and between the City of Lubbock and Compliance Sampling and Analysis, Inc., and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on August 28, 2014 GLE C. RO ERTSON, MAYOR ATTEST: Reb cca Garza, City 'ecret ry APPROVED AS TO CONTENT: Mark YeaAvood, Assistant Clay Manager Attorney vw:ccdocs/RES.Contract-Compliance Sampling August 13, 2014 Resolution No. 2014-R0281 City of Lubbock, TX Asbestos Consulting Services Agreement Contract 12002 This Service Agreement (this "Agreement") is entered into as of the 281h day of August, 2014, ("Effective Date") by and between Compliance Sampling and Analysis (the Contractor ),and the City of Lubbock (the "City"). RECITALS WHEREAS, the City has issued a Request for Proposals 14-11951-MA, Asbestos Consulting Services. WHEREAS, the proposal submitted by the Contractor has been selected as the proposal which best meets the needs of the City for this service; and WHEREAS, Contractor desires to perform as an independent contractor to provide Asbestos Consulting Service as the Secondary Contractor, upon terms and conditions maintained in this Agreement; and NOW THEREFORE, for and in consideration of the mutual promises contained herein, the City and Contractor agree as follows: City and Contractor acknowledge the Agreement consists of the following exhibits which are attached hereto and incorporated herein by reference, listed in their order of priority in the event of inconsistent or contradictory provisions: 1. This Agreement 2. Exhibit A - General Requirements 3. Exhibit B - Fee Schedule 4. Exhibit C - Insurance Requirements 5. Exhibit D - Offerors Proposal Scope of Work Contractor shall provide the services that are specified in Exhibit A. The Contractor shall comply with all the applicable requirements set forth in Exhibit B and C attached hereto. Article 1 Services 1.1 Contractor agrees to perform services for the City that are specified under the General Requirements set forth in Exhibit A. The City agrees to pay the amounts stated in Exhibit B, to Contractor for performing services. 1.2 Contractor shall use its commercially reasonable efforts to render Services under this Agreement in a professional and business -like manner and in accordance with the standards and practices recognized in the industry. goods or services provided under the Agreement, the City will terminate the Agreement, without termination charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this Agreement is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this Agreement, cancellation shall be accepted by the Contractor on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this Agreement beyond the date of termination. Article 2 Miscellaneous. 2.1 This Agreement is made in the State of Texas and shall for all purposes be construed in accordance with the laws of said State, without reference to choice of law provisions. 2.2 This Agreement is performable in, and venue of any action related or pertaining to this Agreement shall lie in, Lubbock, Texas. 2.3 This Agreement and its Exhibits contains the entire agreement between the City and Contractor and supersedes any and all previous agreements, written or oral, between the parties relating to the subject matter hereof. No amendment or modification of the terms of this Agreement shall be binding upon the parties unless reduced to writing and signed by both parties. 2.4 This Agreement may be executed in counterparts, each of which shall be deemed an original. 2.5 In the event any provision of this Agreement is held illegal or invalid, the remaining provisions of this Agreement shall not be affected thereby. 2.6 The waiver of a breach of any provision of this Agreement by any parties or the failure of any parties otherwise to insist upon strict performance of any provision hereof shall not constitute a waiver of any subsequent breach or of any subsequent failure to perform. 2.7 This Agreement shall be binding upon and inure to the benefit of the parties and their respective heirs, representatives and successors and may be assigned by Contractor or the City to any successor only on the written approval of the other party. 2.8 All claims, disputes, and other matters in question between the Parties arising out of or relating to this Agreement or the breach thereof, shall be formally discussed and negotiated between the Parties for resolution. In the event that the Parties are unable to resolve the claims, disputes, or other matters in question within thirty (30) days of written notification from the aggrieved Party to the other Party, the aggrieved Party shall be free to pursue all remedies available at law or in equity. 2.9 At any time during the term of the contract, or thereafter, the City, or a duly authorized audit representative of the City or the State of Texas, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided to the City under this Contract. In the event such an audit by the City reveals any errors or overpayments by the City, Contractor shall refund the City the full amount of such overpayments within thirty (30) days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. 2.10 The City reserves the right to exercise any right or remedy to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, this provision shall control. 2.11 All funds for payment by the City under this contract are subject to the availability of an annual appropriation for this purpose by the City. In the event of nonappropriation of funds by the City Council of the City of Lubbock for the goods or services provided under the contract, the City will terminate the contract, without termination charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this contract is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this contract, cancellation shall be accepted by the Seller on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this contract beyond the date of termination. IN WITNESS WHEREOF, this Agreement is executed as of the Effective Date. CITY OF LUBBOCK, TX: T• Retie •ca Garza, City Secret APPROVED AS TO CONTENT: Mark Ye wood, AlUistant Ct y Manager Chief InforThation Officer PROVED A FO IVii ch Satte te, First Assistant City Attorney Contractor: Contractor' 's-§ignature Printed Name Title CITY OF LUBBOCK, TEXAS RFP 14-11951-MA Asbestos Consulting Services H. GENERAL REQUIREMENTS 1 INTENT Exhibit A a) The City of Lubbock (hereinafter called "City") is seeking proposals from interested firms and individuals, (hereinafter called "Proposer") to provide Asbestos Consulting Services. Asbestos Consulting services shall be provided on an "as needed" basis without a minimum quality of work specified. The work shall include the provision of "turn -key" asbestos Consulting services for the City. The City is interested in securing the most qualified firm/personnel to perform the required services. b) Offerors are invited to submit demonstrated competence and qualifications of their firm for providing these services. c) The information contained within this document is intended to provide interested firms with the requirements and criteria that will be used to make the selection. 2 PROJECT DESCRIPTION A. Testing a) The inspection of the properties for asbestos -contain materials. b) All work shall be performed in strict accordance with Texas Department of State Health Services (TDSHS) rules and requirements for asbestos related Consulting service by personnel approximately licensed by TDSHS . c) Services related to National Emission Standards for Hazardous Air Pollutants (NESHAP) compliance should be considered priority issues. d) The evaluation and selection of appropriate asbestos abatement methods and project layout; e) The review of environmental controls, abatement procedures for personal protection employed during the project; f) Consultation regarding compliance with various regulations and standards; g) The evaluation and selection of appropriate asbestos abatement methods and project layout. h) Within thirty (30) days following completion of field activities, provide a final report (one original and one copy) which includes the purpose(s), summary of results, conclusion, recommendations, summary of dates in table form, field notes, methodologies, sample data sheets, laboratory reports and/or other appropriate data. B. Project Process a) The designing of asbestos abatement projects which is the creating and writing of specifications and development of drawing for the abatement of asbestos for the demolition projects. The City may require the Consultant to prepare the entire bid package which includes the plans, specifications, and contract documents or quotes. Make revisions at the City's request. b) The Consultant will be required to attend all Pre -Bid Conferences to explain the specifications and answer questions. Consultant will be required to bring all the bidders to each location to show contractors what is required. C. Construction a) The Consultant will be responsible to meet with the contractor and have a pre - construction meeting. b) During the project the Consultant will be responsible for monitoring the contractor while work is being done. Must make sure the area is secure and take air samples. c) Consultation regarding compliance with various regulations and standards. d) Recommendations for abatement options. e) Any inspection, management planning, air monitoring, or project management. 0 Project site investigation. D. Records a) Records shall be kept in the office of the Consultant for a period of not less than five (5) years and shall be made available to the CITY for inspection and copying upon reasonable request. E. Ownership of Documents a) All documents, including original drawings, estimates, specifications, field notes and data are property of OWNER. CONSULTANT may retain reproducible copies of drawings and other documents. F.CONTRACT a) This is a one year contract with the option to renew for four additional one year periods. 3 PROJECT PRICE A. Small Projects a) Small Projects with a combined amount of asbestos containing materials equal to or less than one hundred sixty (160) square feet of surface area, two hundred sixty (260) linear feet of pipe length or one (1) cubic yard of material. Subject materials shall be isolated to one specific work area. B. Large Projects b) Large Project with a combined amount of asbestos containing materials equal to or greater than one hundred sixty (160) square feet of surface area, two hundred sixty (260) linear feet of pipe length or one (1) cubic yard of material. C. Analytical Related Fees/Charges a) ASBESTOS AIR SANIPLES — Phase Contract Microscopy (PCM) i. 3-day, in -lab ii. 24-hour, in -lab iii. 2- hour, in -lab b) ASBESTOS AIR SAMPLES — Transmission Electron Microscopy (TEM) i. 24-hour, in -lab c) ASBESTOS BULK MATERIALS SAMPLES — Polarized Light Microscopy (PLM) i. 3-day, in -lab ii. 24-hour, in -lab 3 LABOR RATES Labor rates shall represent complete hourly labor rate including taxes, benefits, overhead, profit, etc. Labor rates shall represent standard rates, NOT overtime (premium) rates. Rate provided shall be applicable to hourly rate regardless of minimum charge. a) State the standard hourly rate and overtime hourly rate for the following: 1) Individual Consultant 2) Inspector 3) Inspector Assistant 4) Air Monitoring Technician (include five (5) 24-hour, in -lab PCM samples per work shift b) State the minimum number of hours and minimum hourly charge per call-out/site visit for the following: 1) Asbestos Consultant 2) Inspector 3) Project Manager 4) Air Monitoring Technician (include five (5) 24-hour, in -lab PCM samples per work shift c) State the hourly rate for Report Development/Preparation as required. 4 EXPERIENCE A. The offeror shall provide the following information. a) Experience evaluating and designing asbestos abatement projects. b) The number of years in business. c) Professional affiliations. d) Recent examples of abatement projects. J CITY OF LUBBOCK, TEXAS RFP 14-11951-NLA, Asbestos Consultant Services PROJECT PRICE SHEET � A. Small Projects S i�''�d�� t,•,l��C� a) Small Projects Mth a combined amount of G Cfi� Ofl pEl�fj asbestos containing materials equal to or less �uVAAff146, than one hundred sixty (160) square feet of surface area, two hundred sixty (260) linear 15�1. �D feet of pipe length or one (1) cubic yard of material. Subject materials shall be isolated to one specific work area. B. Large Projects b) Large Project with a combined amount of asbestos containing materials equal to or will VI-e-:eL % f4vi greater than one hundred sixty (160) square feet of surface area, two hundred sixty (260) linear feet of pipe length or one (1) cubic yard of material. C. Analytical Related Fees/Charges a) ASBESTOS AIR SA_'-v'LPLES — Phase Contract Microscopy (PCNI) a) S ^-11,-�� iv. 3-day, in -lab v, 24-hour, in -lab 4 _-2"_-) vi. 2- hour, in -lab b) ASBESTOS AIR SAMPLES — Transmission Electron Microscopy (TEM) b) S 7�%• ii. 24-hour, in -lab c) ASBESTOS BULK NLkTERIALS SA_'MPLES — Polarized Light iVSicroscopy (PLNI) c)S At 1,n�a�E� iii. 3-day, in -lab iv. 24-hour, in -lab'' v. 4 LABOR RITES Labor rates shall represent complete hourly labor rate including taxes, benefits, overhead, profit, etc. Labor rates shall represent standard rates, NOT overtime (premium) rates. Rate provided shall be applicable to hourly rate regardless of minimum charge. the -standard hourly rate- and overtime I a) Standard / Overtime Hourl Exhibit B Q, PtcissrB d 0o RFP 14.1195 CIA 20 hourly.'rate for;the following; Rates 1) Individual Consultant 1) S "TSoG / ;114 2) Inspector 1) Sfo`1.5v / )41pc 3) Inspector Assistant 4) Air Monitoring Technician (include five (5) 4) S�'� / ��� 4) S ln��b 24-hour, in -lab PC�I samples per work shift b) iNlinimum Hours/Hourly b) Staie the miu muiii nctiriberofhgurs and` Charge minimum hourly ctia ge pgr,q. pu_ sire visit` for the following: 1) Asbestos Consultant 2) Inspector 3) Project Manager 4) Air Monitoring Technician (include five (5) 24-hour, in -lab PCM samples per work shift c) S'tatz.., fiquil ;ate foi Report; DevelQpment!P=epaTatiei _as required; 1) S '15mc l 2) S 6,-lo-D / 3) S C.—Z 5v / 4) 5 4,7t5V / c) Hourly Rate Report 1) S 140 Grz.r';,jC_ Name of company. �t�+ttllror'tCG�,mrrta Fr A t'(�.1tS(5,7-f1C n6a QTIJ6Ur Bie Cae J F lit 051 :MA 21 CITY OF LUBBOCK TEXAS RFP 14-11951-MA ASBESTOS CONSULTING SERVICES PROJECT PRICE SHEET 1 ADJUSTMENTS CSA can and will bill for our services in any manner requested by the City of Lubbock. We have used a process that has served us well and has been acceptable on all past projects. Our preferred method is to provide our clients with a proposal that includes a "not to exceed" amount for the work. Our preferred method allows our clients to establish a budget for the project and know a total cost prior to beginning the project. Once we have set a budget, then we try to complete the project within the set budget or for a lesser amount. Our proposed budget will including project meetings, consultant's time, report preparation and all close out documents. We prefer this method over having a client receive a bill with unexpected additional costs for overtime, reports preparation, mileage charges, additional site visits, office overhead, etc. COMPLIANCE SAMPLING AND ANALYSIS, INC. Phone: 806.786.6061 7610— University Ave. Ste 2A. Lubbock, TX. 79423 email cdelavan@cse.net Exhibit C INSURANCE SECTION A. Prior to the approval of this contract by the City, the Contractor shall furnish a completed Insurance Certificate to the City, which shall be completed by an agent authorized to bind the named underwriter(s) to the coverages, limits, and termination provisions shown thereon, and which shall furnish and contain all required information referenced or indicated thereon. THE CITY SHALL HAVE NO DUTY TO PAY OR PERFORM UNDER THIS CONTRACT UNTIL SUCH CERTIFICATES) HAVE BEEN DELIVERED TO THE CITY. INSURANCE COVERAGE REQUIRED SECTION B. The City reserves the right to review the insurance requirements of this section during the effective period of the contract and to require adjustment of insurance coverages and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decisions, or the claims history of the industry as well as the Contractor. SECTION C. Subject to the Contractor's right to maintain reasonable deductibles in such amounts as are approved by the City, the Contractor shall obtain and maintain in full force and effect for the duration of this contract, and any extension hereof, at Contractor's sole expense, insurance coverage written by companies approved by the State of Texas and acceptable to the City, in the following type(s) and amount(s): TYPE AMOUNT General Liability Commercial General Liability $1,000,000 General Aggregate Products-Comp/Op AGG Personal & Adv. Injury Contracutal Liability Pollution $1,000,000 General Aggregate $1,000,000 Automotive Liability Any Auto Workers Compensation Statutory Amounts Or Employer's Liability The City of Lubbock shall be named as additional insured on Auto/General Liability on a primary and non-contributory basis with a waiver of subrogation in favor of the City on all coverage's. All copies of the Certificates of Insurance shall reference the contract number for which the insurance is being supplied. Copies of endorsements are required. ADDITIONAL POLICY ENDORSEMENTS The City shall be entitled, upon request, and without expense, to receive copies of the policies and all endorsements thereto and may make any reasonable request for deletion, revision, or modification of particular policy terms, conditions, limitations, or exclusions (except where policy provisions are established by law or regulation binding upon either of the parties hereto or the underwriter of any of such policies). Upon such request by the City, the Contractor shall exercise reasonable efforts to accomplish such changes in policy coverages, and shall pay the cost thereof. REQUIRED PROVISIONS The Contractor agrees that with respect to the above required insurance, all insurance contracts and certificate(s) of insurance will contain and state, in writing, on the certificate or its attachment, the following required provisions: a. Name the City of Lubbock and its officers, employees, and elected representatives as additional insured, (as the interest of each insured may appear) as to all applicable coverage; b. Provide for 30 days notice to the City for cancellation, nonrenewal, or material change; c. Provide for notice to the City at the address shown below by registered mail; d. The Contractor agrees to waive subrogation against the City of Lubbock, its officers, employees, and elected representatives for injuries, including death, property damage, or any other loss to the extent same may be covered by the proceeds of insurance; e. Provide that all provisions of this contract concerning liability, duty, and standard of care together with the indemnification provision, shall be underwritten by contractual liability coverage sufficient to include such obligations within applicable policies. f. All copies of the Certificates of Insurance shall reference the contract number for which the insurance is being supplied. NOTICES The Contractor shall notify the City in the event of any change in coverage and shall give such notices not less than 30 days prior the change, which notice must be accompanied by a replacement CERTIFICATE OF INSURANCE. All notices shall be given to the City at the following address: Marta Alvarez, Director of Purchasing & Contract Management City of Lubbock 1625 131h Street, Room 204 Lubbock, Texas 79401 SECTION D. Approval, disapproval, or failure to act by the City regarding any insurance supplied by the Contractor shall not relieve the Contractor of full responsibility or liability for damages and accidents as set forth in the contract documents. Neither shall the bankruptcy, insolvency, or denial of liability by the insurance company exonerate the Contractor from liability. Exhibit D CITY OF LUBBOCK TEXAS RFP 14-11951-MA ASBESTOS CONSULTING SERVICES ii. METHODOLOGY TO BE USED CSA's approach to a project is quite simple. First and foremost we must meet the client's needs. Once we understand their needs it is our responsibility to perform the work in an effective and cost efficient manner. We are fortunate to work with the City of Lubbock as you have trained and knowledgeable asbestos people in your facilities management department. Working with the facilities management department on past projects, we are confident in their ability to provide CSA with the needed information and assistance to complete any and all project. Our approach to all projects is to meet with the facilities management team and the department's representative to get an understanding of the total project and what they wish to accomplish. Once we have a clear understanding of the project we can then make our recommendations. With the support of the City's facility management team we can review any potential problems and correct them prior to or during the project as the need arises. Often time projects require abatement of the asbestos materials during a planned renovation. CSA understands that the abatement is only part of the total project, and often the smallest portion. CSA strives to be a team player and work with the City of Lubbock representative(s), the general contractor, and abatement contractor to coordinate the total project. CSA prides itself on the fact that we can provide a real service. We train our team to believe Ianything is possible with proper coordination and CSA's desire to succeed. 1 iii.SIMILAR PROJECTS AND CURRENT PROJECTS WITH MUNICIPALITIES City of Lubbock Facilities Management GTE Building for Demolition: Prepare cost estimate for abatement and project management for abatement Project Manager: Bo DeLavan Location; Lubbock, Texas Estimated consultants fee: $1,250.00 Contact: TJ Carpenter COL asbestos coordinator 806.775. 2200 Currently in planning stage City of Lubbock Facilities Management Baylor Avenue Apartment Complex. Proposal for asbestos survey and project management for abatement Project Manager: Clark DeLavan Location; Lubbock, Texas Estimated consultants fee: $7,800.00 Contact: TJ Carpenter COL asbestos coordinator 806.775.2200 Currently in planning stage COMPLIANCE SAMPLING AND ANALYSIS, INC. Phone: 806.786,6061 7610 — University Ave. Ste 2A. Lubbock, TX. 79423 email cdelavan(@css.net 3 'IE flf I I CITY OF LUBBOCK TEXAS ASBESTOS CONSULTING SERVICES City of Amarillo Building Safety 4414 E. Amarillo Blvd Apartment Fire Asbestos survey and design and project management for abatement Project Manger: Clark DeLavan Location: Amarillo, Texas Estimated consultants Fees $7,600.00 Contact: Randy Schuster Building Safety 806.378.6258 Survey performed waiting approval for abatement 7.16.2014 CURRENT PROJECTS WITH LOCAL A&E FIRMS RFP 14-11951-MA Seminole Hospital Three Year Project for Addition and Renovations Design of abatement projects and project management Coordinate and scheduling of abatement with A&E firm and general contractor Project Manager: Clark DeLavan Estimated consultant Fees: Undetermined. Remains in planning stage Contact: Cory Branch. Parkhill Smith and Cooper, Architects 806.473,3558 Currently in planning stage with design of abatement 6.23.2014 Snyder Church of Christ HVAC Upgrades and Renovation Asbestos survey, design of abatement project, and project management Coordinate and scheduling of abatement with A&E firm and general contractor Project Manager: Clark DeLavan Estimated consultant fees: Undetermined. Project in planning stage Contact: Cory Branch. Parkhill Smith and Cooper, Architects 806.473.3558 Currently in planning stage with design of abatement 7.24.2014 CURRENT PROJECTS WITH CSA's ASSOCIATES Albertson's Store Planned for Demolition. Belt Line Road Richardson, Texas Design of abatement project and project management for abatement Project manager: Bo DeLavan Estimated consultant fees: $57,450 Contact: Scott Bass of EnviroPhase, Inc. Dallas, Texas 817.266.5143 Design of abatement/project management for 30 day $78,000.00 abatement project. Melrose and Crescent View Apartments for Demolition/Re-development. Lucus Road Dallas, Texas Design of abatement project and project management for abatement Project manager: Clark DeLavan, Tony Bustillos Estimated consultant fees: $49,800.00 Contact: Scott Bass of EnviroPhase, Inc. Dallas, Texas 817.266.5143 Bids accepted and approved. Work to begin Aug. 15, 2014. $590,000.00 abatement project to be completed in 90 working days COMPLIANCE SAMPLING AND ANALYSIS, INC. Phone: 806.786.6061 7610 — University Ave. Ste 2A. Lubbock, TX. 79423 email cdelavan@csp,.net s CITY OF LUBBOCK TEXAS RFP 14-11951-MA ASBESTOS CONSULTING SERVICES r 601 Main St. Project. 16 Story Office Building for Demolition. Dallas, Texas Design of abatement project and project management for abatement Project manager: Clark DeLavan, Tony Bustillos Estimated consultant fees: $97,200.00 Contact: Scott Bass of EnviroPhase, Inc. Dallas, Texas 817.266.5143 Abatement completed and demolition underway. Abatement project completed in 120 days and $943,000.00. CURRENT PROJECTS WITH AREA GENERAL CONTRACTORS LOV-COT Warehouses for Demolition. N. Loop 289 Lubbock, Texas. Gary Greenstreet Construction. Lubbock, Texas Asbestos survey and sampling for demolition Project manager: Bo DeLavan Estimated consultants fee: $260.00 survey Contact: Jimmy Henderson 806,745.9444 ` Asbestos survey for demolition. Carillon House Care Center. 51h floor renovations Lubbock, TX Pharr and Company. General Contractors. Lubbock, Texas Asbestos survey and sampling for renovation Project manager: Bo DeLavan Estimated consultants fee: $1,720.00 : Contact: Don Bundock 806.543.3353 No asbestos discovered. 4701 Andrews Highway St. Project. Building for Renovation. Midland, Texas Pharr and Company. General Contractors. Lubbock, Texas Design of abatement project, project management during abatement Project manager: Clark DeLavan Estimated consultants fee: undetermined project is in the planning stage Contact: Don Bundock 806.543.3353 Project waiting on funding and start date South Plains Community Action Assoc. HVAC Renovation. 411 Austin. Levelland TX. Design of abatement project, project management during abatement Project manager: Bo DeLavan Estimated consultants fee: $7,100.00 Contact: SPCAA Larry Martin 806.549.1663 10 day project beginning 7 24. 2014 7 I COMPLIANCE SAMPLING AND ANALYSIS, INC. Phone: 806.786.6061 7610 — University Ave. Ste 2A. Lubbock, TX. 79423 email cdelavan@csg.net CITY OF LUBBOCK TEXAS ASBESTOS CONSULTING SERVICES RFP 14-11951-MA iv. PROJECTS WE BELIEVE CONTRIBUTED TO THE CITY OF LUBBOCK'S GROWTH 1991 City Bus Transfer Station for City of Lubbock. Asbestos survey for the 500 block of Broadway. Survey of existing commercial buildings for demolition and redevelopment of City Bus transfer Station. Asbestos survey, project design for abatement, and project management for abatement. Consulting provided by Clark DeLavan working with Grimes and Associates. 1992 Widening of Indiana Avenue for City of Lubbock. Asbestos survey of 32 houses to be demolished or moved for redevelopment. Survey, project design for abatement and project management during abatement. Consulting provided by Clark DeLavan working with Grimes and Associates. 1993 LP&L Massingale Station Boiler Abatement. For Lubbock, Power and Lights. Asbestos survey for the repairs to plant boilers and generators. Project design for abatement and project management for abatement. r Consulting provided by Clark DeLavan working with Grimes and Associates. 1994 Air Conditioning City of Lubbock's Municipal Coliseum Asbestos survey. Project design for abatement, and project management for abatement. Consulting provided by Clark DeLavan with working with Grimes and Associates. 1996 Lead Based Paint Abatement of Water Towers City of Lubbock's Water Department Project management and industrial hygiene services for the abatement and repainting of water towers for water department repairs and upgrade to system. Compliance with newly written NESHAP regulations for LBP painted structures. Consulting services provided by Clark DeLavan and Ray Vaughn, PE, ClH and CSP working with King Consultants. 1997 Abatement of Ceiling from the Municipal Auditorium for City of Lubbock. Asbestos survey, Project design for abatement, and project management for abatement. Consulting provided by Clark DeLavan working with King Consultants. 2001 Assist City of Lubbock's Facility Management with the Asbestos Surveys of all City owned buildings. Helped assist the City of Lubbock's environmental compliance department in performing asbestos survey of all City owned building and developing asbestos management plans. Consulting provided by Clark DeLavan working with King Consultants. 2013 Widening of Milwaukee Avenue for the City of Lubbock. Abatement of houses to be demolished for widening the Milwaukee Ave. Asbestos survey. Project design for abatement, and project management for abatement. Consulting service provided by Clark DeLavan and CSA. 2013 LP&L Cook Power Plant Abatement for Plant Turn Around Abatement of deterioration asbestos and asbestos removed to rebuilding plant equipment_ Consulting service provided by Clark DeLavan and CSA. COMPLIANCE SAMPLING AND ANALYSIS, INC. Phone: 806.786.6061 7610 — University Ave. Ste 2A. Lubbock, TX. 79423 email cdelavan@csg.net �1, 1 7 a �I CITY OF LUBBOCK TEXAS ASBESTOS CONSULTING SERVICES RFP 14-11951-MA PROJECTS WE BELIEVE CONTRIBUTED TO LUBBOCK COUNTY'S GROWTH 2000 HVAC Upgrades For Lubbock County Buildings Development and installation of a central plant for the HVAC System Upgrades. Abatement boiler/mechanical rooms to allow the County to develop a central plant tying the courthouse, annex, and jail HVAC into one larger system. Asbestos survey. Project design for abatement, and project management for abatement. Consulting service provided by Clark DeLavan working with King Consultants 2003 - 2008 Five Year Program to abate all asbestos containing materials from Lubbock County Courthouse. Abatement prior to total renovation of all floors. Asbestos survey. Project design for abatement, and project management for abatement. Consulting service provided by Clark DeLavan and CSA 2008 — 2014 Renovations to the Lubbock County Annex Building. Abatement of asbestos materials from each floor of the annex building prior to renovation of each floor. Consulting service provided by Clark DeLavan and CSA The above are all project we feel helped in the Lubbock County's Growth. We take great pride in being selected to assist in this growth. COMPLIANCE SAMPLING AND ANALYSIS, INC. 7610 — University Ave. Ste 2A. Lubbock, TX. 79423 Phone: 806.786.6061 email cdelavan(@css.net II' I I J k10 I fl CITY OF LUBBOCK TEXAS ASBESTOS CONSULTING SERVICES V. ORGANIZATION CHART `DeLa St0D[isral RFP 14-11951-MA Joe -Cash 10&0 f p Sbe&to's , Inspector. Clark DeLavan is responsible for project design, project management, project coordination, approval of contractor's pay requests, and project close out. Bo DeLavan is responsible for coordination of project managers and project coordination with abatement contractors. CSA's project managers are assigned the duties of the day to day operations on a given project. Project managers review project schedules and daily activities with our senior project manager or consultant daily. COMPLIANCE SAMPLING AND ANALYSIS, INC. Phone: 806.786.6061 7610 — University Ave. Ste 2A. Lubbock, TX. 79423 email cdeIavanC@csg.net I I I 9 171 J." CITY OF LUBBOCK TEXAS RFP 14-11951-MA ASBESTOS CONSULTING SERVICES vi. LIST OF PROFESSIONS TO BE USED FOR RFP SERVICES CSA has the trained and licensed professionals on staff — in house to address all of the asbestos consulting services requested in the RFP. Asbestos Consulting Services: Clark DeLavan, Asbestos Consultant. Senior Project Manager: Bo DeLavan Project Managers: Aaron Beardon, Tony Bustillos, Joe Cash. Office Manager/Accounting: Carrie Tungate Asbestos Inspectors: Clark DeLavan, Bo DeLavan, Aaron Beardon, Tony Bustillos. vii. SERVICES AVAILABLE WORKING WITH ASSOCIATES Environmental Site Assessments. Phase I and II. Phase II remediation plans, asbestos abatement, building implosions and demolition. EnviroPhase, Inc. 703 McKinney Ave. Suite 332 Dallas, Texas 75202 Contact Scott Bass, Owner CSA has a ten year working relationship with Envirophase, Inc. CSA provides our asbestos consulting services as a sub contractor to Envirophase, Inc. Ennvirophase and CSA have performed projects ranging from smaller asbestos abatement projects to abatement of large multiple story office buildings Together we have abated several large apartment complexes, abatement of shopping malls and retail centers throughout the Dallas Metroplex and North Texas areas. Abatement projects ranging from $1,000.00 to $3,100,000.00. Our services allow an owner to have one firm under one contract that can provide the environmental site assessment study, remediation of environmental hazards, abatement of asbestos hazards, and final demolition of a building or site. COMPLIANCE SAMPLING AND ANALYSIS, INC. Phone: 806.786,6061 7610 — University Ave. Ste 2A. Lubbock, TX. 79423 email cdelavanCaDcsg.net CITY OF LUBBOCK TEXAS RFP 14-11951-MA ASBESTOS CONSULTING SERVICES viii. PROPOSER'S ASSURANCE OF COMPLIANTS WITH REGULATIONS CSA strives to stay on top of the ever changing rules and regulations. In the ten years we have s been in business neither CSA or any of our clients have been issued a notice of violation or have been investigated by a regulatory agency. We work hard to assure our clients of compliance with federal, state, and local regulations. At CSA we strive to "manage risk" we feel it is our responsibility to protect the owner by insuring compliance with the regulations as well as providing a knowledgeable representation to any regulatory agency, the owner's employees, and the general public. We work in a highly regulated field with well defined regulations and enforcement from the ' various regulatory agencies such as USEPA, OSHA, and TDSHS. At CSA we train our staff in compliance and methods of enforcement to assure compliance. In regards to the Davis -Bacon Federal wage requirements we are aware that the local wage rate used for City of Lubbock's projects and will assist in insuring compliance. ix. HANDLING OF ERRORS AND OMISSION WJ During the ten years CSA has provided our services to the City of Lubbock we have not had an error or omissions problem arise. To the best of our knowledge, we have not had a project come i� in over budget or not completed on time. However, should the problem arise, CSA is prepared to address the issue promptly and in a manner fair and agreeable to all parties involved. We will first inform the City of Lubbock's representative and ask for directions to resolve the issue. CSA is prepared to correct any error created by CSA as negotiated with the City of Lubbock.. Should ever the need arise for arbitration CSA will abide by the arbitration requirements of our contract. x. CONFLICT OF INTERESTS To the best of our knowledge there will never be a conflict of interest between CSA, CSA's employees, or any sub contractor on a project. CSA has no association with a City official City employee, or firm contracted to provide a service to the City. Should in the future a situation occur that could be construed as a conflict of interest CSA will promptly inform the City of Lubbock's representative and seek a solution based on the representative's advice, or decline to participate in the project. COMPLIANCE SAMPLING AND ANALYSIS, INC. Phone: 806.786.6061 7610 — University Ave. Ste 2A. Lubbock, TX. 79423 email cdelavanC@csa.net CITY OF LUBBOCK TEXAS RFP 14-11951-MA ASBESTOS CONSULTING SERVICES xi. ADDITIONAL INFORMATION NOT SPECIFICALLY REQUESTED CSA is very proud of the 10 years of services we have provided the City of Lubbock, we are fully aware of the City of Lubbock's dedication to the growth of Lubbock and opportunities provided to local businesses i� In 2003 after Mr. DeLavan had worked with the two larger asbestos agencies in Lubbock he formed CSA. Mr. Delavan and CSA were "thankful" to be allowed to continue providing asbestos consulting services for the City of Lubbock. Now in 2014 there are a few new asbestos consulting agencies in Lubbock and the City has spread the work almost equally between these agencies. It is evident to all of us at CSA that the City of Lubbock is truly interested in supporting their local businesses. We hope we can repay the City of Lubbock for the opportunities provide to CSA. xii. METHODS CSA USES TO UTILIZE LOCAL RESOURCES At CSA we know that Lubbock is the "Hub of the Plains". We work in all of the surrounding towns and know most people come to Lubbock for entertainment, shopping, and use local businesses to service their needs.. The down side to this growth is that many small businesses cannot compete with the big box stores and the internet shopping. Luckily, you can't go to a big box store and get an asbestos consultant in a box. CSA is a locally owned small business. Our employees are local residents. All the funds from CSA's sales go to a locally owned bank. We strive to buy locally and support the locally owned businesses. CSA elects to utilize the services of our local and area abatement contractors on all abatement projects. Our local contractors are more than capable of providing the services needed. It is very rare that CSA sees the need to contact contractors from outside our local area. We strive to utilize local and area businesses. Included in our response we referenced several r "projects of interest" dating back over 20 years, if not mistaken all but one project have been performed by a local contractor. COMPLIANCE SAMPLING AND ANALYSIS, INC. Phone: 806.786.6061 7610 — University Ave. Ste 2A. Lubbock, TX. 79423 email cdelavan@csg.net C a j �j e n CITY OF LUBBOCK TEXAS ASBESTOS CONSULTING SERVICES REFRENCES AND PROJECT DESCRIPTION RFP 14-11951-MA COMPLIANCE SAMPLING AND ANALYSIS, INC. Phone: 806.786.6061 7610 — University Ave. Ste 2A. Lubbock, TX. 79423 email cdelavan@css.net CITY OF LUBBOCK TEXAS ASBESTOS CONSULTING SERVICES IREFRENCES AND PROJECT DESCRIPTION Lyle Fetterly 806. 775.1003 Lubbock County Facilities Manager 902 Main Street Suite 1220 Lubbock, Texas 79401 Numerous projects over the past 20 years. Asbestos survey, project design, project management during abatement Gary Davis Plant Operations 806.725,0107 Covenant Health Systems 3615-19"' Street Lubbock, Texas 79410 �{ Numerous projects over the past 20 years. Asbestos survey, project design, project management during abatement Bobby Hitt Facilities Management 806.725.6612 Covenant Health Systems, Lakeside 4000 — 241h Street Lubbock, Texas 79410 Numerous projects over the past 20 years. Asbestos survey, project design, project management during abatement Courtney Watt 806.794.1492 r CMS Properties CMS Properties 6306 Iola suite 200 Lubbock, Texas 79424 Numerous projects over the past 20 years. Asbestos survey, project design, project management Joe Bob McCartt 806.342-9555 McCartt and Associates 600 S. Tyler Suite 1510 Amarillo, Texas 79101 Numerous projects over the past 10 years. Asbestos survey, project design, project management during abatement RFP 14-11951-MA Randy Schuster Buildings Department 806.378.6258 City of Amarillo Department of Building Safety 509 SE 5" Ave. Amarillo, Texas 79105-1971 In 2013 CSA was awarded a contract with the City to provide asbestos consulting Services. One year contract with three year option COMPLIANCE SAMPLING AND ANALYSIS, INC. Phone: 806.786.6061 7610 — University Ave. Ste 2A. Lubbock, TX. 79423 email cdelavan@csg.net