Loading...
HomeMy WebLinkAboutResolution - 2014-R0119 - Contract - Collier Construction Company - Animal Shelter Renovations - 03_27_2014Resolution No. 2014-RO119 March 27, 2014 Item No. 5.27 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 11801 for animal shelter renovations, by and between the City of Lubbock and Collier Construction Company, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on March 27, 2014 i ATTEST: - yx�� Rebtca Garza, City S cret APPROVED AS TO CONTENT: Mark Ye ood, Assistant ity Manager Chief Information Officer APPROVED AS TO FORM: ad Weav r, Assistant City Attorney vw:ccdocs,'RES.Contract-Collier Construction March 10, 2014 Resolution No. 2014-R0119 Contract No. 14-11801-JOC Work Order Signature Document NJPA EZIQC Contract No.: TX04-112012-CCC ❑X New Work Order Modify and Existing Work Order Work Order Number: 017877.00 Work Order Date: 2/24/2014 Work Order Title: City of Lubbock Animal Shelter Renovations Owner Name: Citv of Lubbock Contractor Name: Collier Construction Contact: Wesley Everett Contact: Jim McMillan Phone: (806) 775-2665 Phone: (806) 741-1982 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJ PA EZIQC Contract No.: TX04-112012-CCC Brief Work Order Description: Work Order Number Location Amount of Contract 0178770.00 City of Lubbock Animal Shelter $946,109.69 Renovation CITY OF LUBBOCK Glen . bertson, Nfayor Jim McMillan, Project Manager Collier Construction Company Attest: Rebecca9'aria, City Secretary APPROVED AS CONTENT: Mark AqD4od, 10hief Inforikation Office Assistant City Manager Owner's ll resent ve I j— � `'Vesley Everett, Director of Facilities APP V AS FORM: Assistant City Attorney 9 Detailed Scope of Work THETHE GORDIAN GROUP To: Jim McMillan Collier Construction Company 2202 Avenue E Lubbock, TX 79404 806-741-1982 Date Printed: February 24, 2014 Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation Brief Scope: City of Lubbock - Animal Shelter Renovation Preliminary Revised From: George Lisenbe City of Lubbock 1625 13th St Lubbock, TX 79401 (806) 775-3000 ❑X Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Per the Specs and Plans by Stiles & Wallace Associates, dated November 21 st, 2013, and their value engineering/work summary letter dated January 14th, 2014: Perform all of the work to complete the building addition 51'-11 5/8" wide x 95'-4" long. This includes all dirt work, fencing, concrete, masonry, reinforcing steel, structural and miscellaneous steel, rough and finish carpentry, roofing and sheet metal, hollow metal doors, hardware, and glazing, acoustical panel ceilings, painting, coating for floors & pens, fire extinguishers, power washing equipment, 45-stainless kennel enclosures and gates, fire sprinkler system, plumbing, HVAC, and electrical work. 3-�—/4- Contractor Date L Owner bate Scope of Work Page 1 of 1 EZIQC - Southwest 2/24/2014 Contractor's Price Proposal - Summary Date: February 24, 2014 Re: IQC Master Contract #: TX04-112012-CCC Work Order #: 017877.00 Owner PO #: Title: City of Lubbock - Animal Shelter Renovation Contractor: Collier Construction Company Proposal Value: $946,109.69 01 - General Requirements $12,652.06 02 - Site Work $2,632.92 03 - Concrete $67,571.45 04 - Masonry $148,867.48 05 - Metals $121,513.29 06 - Wood, Plastic, and Composites $8,262.73 07 - Thermal & Moisture Protection $64,603.99 08 - Openings $24,049.45 09 - Finishes $21,256.01 10 - Specialties $2,031.11 11 - Equipment $41,444.90 12 - Furnishings $953.05 13 - Special Construction $169,175.00 21 - Fire Suppression $14,136.22 22 - Plumbing $67,955.82 23 - Heating, Ventilating, And Air -Conditioning (HVAC) $77,016.45 26 - Electrical $31,095.34 27 - Communications $2,485.04 28 - Electronic Safety And Security $2,824.38 31 - Earthwork $26,865.17 32 - Exterior Improvements $36,823.14 33 - Utilities $1,894.69 Proposal Total Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 22.24% $946,109.69 Contractor's Price Proposal - Summary Page 1 of 1 EZ/QC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Date: February 24, 2014 Re: IQC Master Contract #: TX04-112012-CCC Work Order #: 017877.00 Owner PO #: Title: City of Lubbock - Animal Shelter Renovation Contractor: Collier Construction Company Proposal Value: $946,109.69 Sect Item Mod. UOM Description Line Total Labor Equip. Material (Excludes) 01 - General Requirements 1 01 22 23 00 0891 WK 6,000 LB Telescopic Boom, Hi -Reach, Rough Terrain Construction Forklift With $8,045.51 Full -Time Operator Quantity Unit Price Factor Total Installation 2.50 x 2,474.21 x 1.3007 8,045.51 2 01 22 23 00 0891 0042 For Equipment Without Operator, Deduct -$1,769.03 Quantity Unit Price Factor Total Installation 100 x-1,360.06 x 1.3007 -1,769.03 3 01 52 19 00 0003 MO Portable Toilets, Chemical $1,638.70 Quantity Unit Price Factor Total Installation 14.00 x 89.99 x 1,3007 - 1,638.70 Two toilets for 7 months 4 01 56 26 00 0010 LF Temporary 6' High Chain Link Fence And Posts, > 6 To 12 Months $738.54 Quantity Unit Price Factor Total Installation 340.00 x 1.67 x 1.3007 - 738.54 Around perimeter of jobsite 5 01 56 26 00 0010 0081 For > 250 To 500 LF, Deduct -$71.86 Quantity Unit Price Factor Total Installation 325.00 x -0.17 x 1,3007 - -71.86 6 01 56 26 00 0065 EA 15' Wide, 6' High, Temporary Chain Link Fence Gate, > 6 To 12 Months $244.78 Quantity Unit Price Factor Total Installation 100 x 188.19 x 1.3007 - 244.78 7 01 74 19 00 0015 EA 40 CY Dumpster (5 Ton) "Construction Debris"Includes delivery of dumpster, $3,825.42 rental cost, pick-up cost, hauling, and disposal fee. Non -hazardous material. Quantity Unit Price Factor Total Installation 5.00 x 588.21 x 1.3007 - 3,825.42 Subtotal for 01 - General Requirements $12,652.06 02 - Site Work 8 02 41 13 13 0028 SY 3" To 6" By Machine, Break-up And Remove Wire Mesh Reinforced $1,777.28 Concrete Paving Quantity Unit Price Factor Total Installation 112.00 x 12.20 x 1.3007 - 1,777.28 Old sidewalk and slab 9 02 41 16 13 0060 CF Demo Concrete Footing For Fence, Gate Or Playground Equipment Post, $764.07 Etc. Includes excavation. Quantity Unit Price Factor Total Installation 107.00 x 5.49 x 1.3007 764.07 10 02 41 19 13 0038 LF Saw Cut Concrete Slab Or Paving Up To 4" Depth $91.57 Quantity Unit Price Factor Total Installation 55.00 x 1.28 x 1,3007 - 91.57 Existing concrete slab Contractor's Price Proposal - Detail Page 1 of 20 EZJQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation Subtotal for 02 - Site Work $2,632.92 03 - Concrete 11 03 11 13 00 0009 LF Up To 6" High Slab Edge and Block -Out Wood Formwork $6,360.74 Quantity Unit Price Factor Total Installation 2,264.00 x 2.16 x 1.3007 - 6,360.74 L.F. Curb forming @ the 45 pens 12 03 11 13 00 0094 EA 6" Diameter Sleeves Or Chases for Concrete Formwork, Plastic or Sheet $233.68 Metal Quantity Unit Price Factor Total Installation 26.00 x 6.91 x 1.3007 - 233.68 Drain lines under footings, S2.2 13 03 15 16 00 0006 LF 1/2" x 1" Polyurethane Expansion Joint, Poured, 2 Parts $390.21 Quantity Unit Price Factor Total Installation 250.00 x 1.20 x 1.3007 - 390.21 Sidewalk expansion joints 14 03 15 16 00 0013 LF 1/2" x 6" Premolded Felt Asphalt Expansion Joint, In Slabs Or Walls $365.13 Quantity Unit Price Factor Total Installation 232.00 x 1.21 x 1.3007 - 365.13 Sidewalk to wall 15 03 15 16 00 0043 SF Asphalt Felt Control Joint, 30 LB Felt Bond Breaker $120.18 Quantity Unit Price Factor Total Installation 220.00 x 0.42 x 1.3007 - 120.18 Building slab at outside wall 16 03 15 16 00 0048 LF 24 Gauge Galvanized Steel Keyed Joint, 4-112" Cold Expansion Or Control $2.834.30 Joint Quantity Unit Price Factor Total Installation 986.00 x 2.21 x 1.3007 - 2,834.30 In slab, 7/S1.1 17 03 21 11 00 0006 TON Grade 60 Reinforcing Steel, Footings And Slabs, #346 $15,040.25 Quantity Unit Price Factor Total Installation 7.20 x 1,606.00 x 1.3007 - 15,040.25 In concrete and masonry walls 18 03 22 11 00 0002 SF 6 x 6 x #10, 21 LB/CSF, Welded Wire Reinforcement In Slabs, (W 1.4 x W 1.4) $702.64 Quantity Unit Price Factor Total Installation 1,460.00 x 0.37 x 1.3007 - 702.64 Sidewalks 19 03 31 13 00 0009 CY Direct Chute, Place 3000 PSI Concrete Continuous Footings $4,618.95 Quantity Unit Price Factor Total Installation 33.00 x 107.61 x 1.3007 - 4,618.95 Exterior footings 20 03 31 13 00 0014 CY Concrete Pump, Place 3000 PSI Concrete Spread FootingsExcludes pumping $8,825.70 equipment. Quantity Unit Price Factor Total Installation 55.00 x 123.37 x 1.3007 - 8,825.70 Interior footings 21 03 31 13 00 0028 CY Up To 6", By Concrete Pump, Place 3000 PSI Concrete Slab On $11,586.64 GradeExcludes pumping equipment Quantity Unit Price Factor Total Installation 80.00 x 111.35 x 1.3007 - 11,586.64 In pen curbs Contractor's Price Proposal - Detail Page 2 of 20 EZIQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 03 - Concrete 22 03 31 13 00 0092 HR 150' Boom Truck For Concrete Placement (100 CY Per Hour Rating) $12,805.55 Quantity Unit Price Factor Total Installation 32.00 x 307.66 x 1,3007 - 12,805.55 For interior slabs & curbs & pouring wall cavities 23 03 35 16 00 0006 SF Concrete Floor Finishes, Steel Trowel $3,687.48 Quantity Unit Price Factor Total Installation 6,300.00 x 0.45 x 1.3007 - 3,687.48 On all flat surfaces Subtotal for 03 - Concrete $67,571.45 04 - Masonry 24 04 05 16 26 0015 SF Grout Cavity Walls - 4" Space Concrete Fill (0.333 CF/SF) $24,626.93 Quantity Unit Price Factor Total Installation 5,520.00 x 3.43 x 1.3007 24,626.93 Exterior and interior masonry walls 25 04 05 19 13 0007 CLF #8 (For 8" Walls), Mill Galvanized, 9 Gauge Side Rods, 9 Gauge Cross Rods, $1,433.90 Ladder -Type, Masonry Wall Reinforcement Quantity Unit Price Factor Total Installation 40.50 x 27.22 x 1.3007 1,433.90 CMU horizontal reinforcement 26 04 05 23 13 0007 LF 1-5/8" Width, T-Style, PVC, Masonry Control Joint $625.64 Quantity Unit Price Factor Total Installation 260.00 x 1.85 x 1.3007 625.64 Exterior walls 27 04 22 23 13 0033 SF 8" x 16" x 4", Normal Weight, Regular, Partition Concrete Block $15.471.83 Quantity Unit Price Factor Total Installation 1,950.00 x 6.10 x 1.3007 15,471.83 At 45 pens 28 04 22 23 13 0035 SF 8" x 16" x 8", Normal Weight, Regular, Partition Concrete Block $74,479.12 Quantity Unit Price Factor Total Installation 7,780.00 x 7.36 x 1.3007 74,479.12 At exterior walls and 45 pens 29 04 22 23 13 0035 0031 For Special Color, Add $15,560.01 Quantity Unit Price Factor Total Installation 6,646.00 x 1.80 x 1.3007 - 15,560.01 At exterior walls 30 04 22 23 13 0061 LF 8" x 16" x 8" Regular Weight, Bond Beam Or Lintel Concrete Block (Block $7,518.46 Only) Quantity Unit Price Factor Total Installation 728.00 x 7.94 x 1.3007 7,518.46 In exterior walls and across pens 31 04 22 23 13 0061 0034 For Grout And Fill With 2 #5 Reber, Add $5,302.56 Quantity Unit Price Factor Total Installation 762.00 x 5.35 x 1.3007 - 5,302.56 32 04 23 13 00 0003 SF 8" x 8" x 4" Thick Plain Glass Block $3.849.03 Quantity Unit Price Factor Total Installation 144.00 x 20.55 x 1.3007 - 3,849.03 Subtotal for 04 - Masonry $148,867.48 Contractor's Price Proposal - Detail Page 3 of 20 EZJQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 05 - Metals 33 05 05 23 00 0005 EA 1/2" Diameter x 6" Length, Plain Steel, J-Type Cast In Place Anchor Bolt $537.55 Quantity Unit Price Factor Total Installation 112.00 x 3,69 x 1.3007 - 537.55 @ Wood nailers, AS 34 05 05 23 00 0142 EA 3/4" Diameter x 5-1/2" Length, Zinc Plated Steel, Wedge Anchor Expansion $8,806.39 Bolt Quantity Unit Price Factor Total Installation 550.00 x 12.31 x 1.3007 - 8,806.39 Structural roof supports, S3.1 35 05 05 23 00 1153 EA 3/8" Diameter x 4-1/2" Length, 304/18-8 Stainless Steel, Hex Head Bolt $1,092.59 Quantity Unit Price Factor Total Installation 210.00 x 4.00 x 1.3007 - 1,092.59 Embeds at trench angle 36 05 12 23 00 0011 TON 0-10 LB/LF Rolled Shape Steel Angles $36,646.62 Quantity Unit Price Factor Total Installation 3.90 x 7,224.24 x 1,3007 - 36,646.62 Misc. structural, S3.1 37 05 12 23 00 0082 TON 2" x 2" Weight Range 4-6 LB/LF Structural Tubing - Square $1,772.33 Quantity Unit Price Factor Total Installation 0.25 x 5,450.38 x 1.3007 - 1,772.33 Misc. structural, S3.1 38 05 12 23 00 0108 SF 1/2" Masonry plates, filler plates, sole plates and anchor strap $925.27 Quantity Unit Price Factor Total Installation 26.00 x 27.36 x 1.3007 925.27 Embed plates, S3.1 39 05 21 19 00 0001 TON H. J Or K Open Web Joist, 0-30' Span, Steel, Horizontal Bridging $1,481.78 Quantity Unit Price Factor Total Installation 0.64 x 1,780.03 x 1.3007 - 1,481.78 Roof, S3.1 40 05 21 19 00 0003 TON LJ Or LH Open Web Joist, < 96' Span, Steel, Bolted Cross Bridging $27.002.48 Quantity Unit Price Factor Total Installation 10.30 x 2,015.53 x 1.3007 27,002.48 41 05 31 00 00 0019 SF 1-1/2" Deep, 20 Gauge Open Ribbed Galvanized Steel Deck $15,023.09 Quantity Unit Price Factor Total Installation 5,500.00 x 2.10 x 1.3007 - 15.023.09 Roof, S3.1 42 05 53 00 00 0006 SF 1" x 3/16" Steel, Welded Grating $7,049.79 Quantity Unit Price Factor Total Installation 400.00 x 13.55 x 1.3007 7,049.79 Trench covers 43 05 53 00 00 0006 0118 For 304 Stainless Steel, AddBearing bars at 1-3/16" O.C. and crossbars at 4" $21,175.40 O.C. Quantity Unit Price Factor Total Installation 400.00 x 40.70 x 1.3007 - 21,175.40 Subtotal for 05 - Metals $121,513.29 06 - Wood, Plastic, and Composites Contractor's Price Proposal - Detail Page 4 of 20 EZIQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 06 - Wood. Plastic. and Composites 44 06 11 16 00 0149 LF 2" x 8" Pressure Treated Wood Blocking To Concrete $2,891.77 Quantity Unit Price Factor Total Installation 573.00 x 3.88 x 1.3007 - 2,891.77 Wall coping, A6 45 06 41 13 00 0017 LF > 24" To 30" Width, 34-1/2" High x 24" Deep Built In Place Base $1,126.38 CabinetPrefinished with solid hardwood face frames, hardwood doorframes and drawer fronts. Hardwood veneer on raised door panels. Excludes top. Quantity Unit Price Factor Total Installation 6.00 x 144.33 x 1.3007 - 1,126.38 Cabinets 46 06 41 13 00 0017 0066 For Premium Grade, Add $440.78 Quantity Unit Price Factor Total Installation 6.00 x 58.48 x 1.3007 - 440.78 47 06 41 13 00 0017 0124 For 4 Drawer Unit, Add $440.78 Quantity Unit Price Factor Total Installation 6.00 x 56.48 x 1.3007 - 440.78 48 06 41 13 00 0072 EA > 36" To 42" Wide, 24" High x 13" Deep Double Door Wall CabinetPrefinished $1,939.19 with solid hardwood face frames, hardwood doorframes. Hardwood veneer on raised door panels. Quantity Unit Price Factor Total Installation 6.00 x 248.48 x 1.3007 - 1,939.19 49 06 41 13 00 0072 0066 For Premium Grade, Add $873.84 Quantity Unit Price Factor Total Installation 6.00 x 111.97 x 1.3007 - 873.84 50 06 41 93 00 0002 EA Hinges, Concealed, Steel, Full Or Half Overlay, Self Closing $276.16 Quantity Unit Price Factor Total Installation 16.00 x 13.27 x 1.3007 - 276.16 51 06 41 93 00 0004 EA Pull Handles, Solid Brass $147.19 Quantity Unit Price Factor Total Installation 12.00 x 9.43 x 1.3007 - 147.19 52 06 41 93 00 0010 EA Door Catch $126.64 Quantity Unit Price Factor Total Installation 8.00 x 12.17 x 1.3007 - 126.64 Subtotal for 06 - Wood, Plastic, and Composites $8,262.73 07 - Thermal & Moisture Protection 53 07 13 53 00 0025 CSF 20 Mil PVC Vapor Barrier $2,752.91 Quantity Unit Price Factor Total Installation 64.00 x 33.07 x 1.3007 2,752.91 Under slab, 1/S1.1 54 07 13 53 00 0025 0017 For Joint Taping, Add $320.49 Quantity Unit Price Factor Total Installation 64.00 x 3.85 x 1.3007 320.49 55 07 13 53 00 0025 0019 For Application To Horizontal Surfaces, Deduct -$119.04 Quantity Unit Price Factor Total Installation 64.00 x -1.43 x 1.3007 - -119.04 Contractor's Price Proposal - Detail Page 5 of 20 EZIQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 07 - Thermal & Moisture Protection 56 07 19 13 00 0002 SF Spray On Vertical Wall Protection Sealing System, Concrete Block Or Brick $8,576.82 Quantity Unit Price Factor Total Installation 7,850.00 x 0.84 x 1.3007 - 8,576.82 Apply two layers on outside of exterior CMU walls 57 07 22 16 00 0003 SF V2" Thick, R1.3, High -Density Fiberboard, Roof Board Insulation $6,080.77 Quantity Unit Price Factor Total Installation 5,500.00 x 0.85 x 1.3007 - 6,080.77 58 07 22 16 00 0003 0132 For Mechanically Fastened To Wood Or Steel, Deduct -$930.00 Quantity Unit Price Factor Total Installation 5,500.00 x -0.13 x 1.3007 - -930.00 59 07 22 16 00 0014 SF 1" Thick, R2.78, Partite, Roof Board Insulation $133.45 Quantity Unit Price Factor Total Installation 90.00 x 1.14 x 1.3007 - 133.45 At AC curbs 60 07 22 16 00 0014 0132 MOD For Mechanically Fastened To Wood Or Steel, Deduct -$15.22 Quantity Unit Price Factor Total Installation 90.00 x -0.13 x 1.3007 - -15.22 61 07 22 16 00 0049 SF 2-1/2" Thick, R16.67, Polyisocyanurate, Roof Board Insulation $11.446.16 Quantity Unit Price Factor Total Installation 5,500.00 x 1.60 x 1.3007 - 11,446.16 62 07 22 16 00 0049 0134 MOD For Mechanically Fastened To Wood Or Steel, Deduct -$500.77 Quantity Unit Price Factor Total Installation 5,500.00 x -0.07 x 1.3007 - -500.77 63 07 22 16 00 0084 SF 1/2" Tapered Polyisocyanurate Board $4,392.41 Quantity Unit Price Factor Total Installation 976,00 x 3,46 x 1.3007 - 4,392.41 Per roof plan 64 07 22 16 00 0084 0025 SF For Setting In Hot Asphalt, Add $457.01 Quantity Unit Price Factor Total Installation 976.00 x 0.36 x 1.3007 - 457,01 65 07 51 13 00 0051 LF 4" x 4" Perlite Cant Strip $663.36 Quantity Unit Price Factor Total Installation 340.00 x 1.50 x 1.3007 - 663,36 At base flashings 66 07 54 23 00 0003 SO 60 Mil, Single Ply TPO Roofing Membrane, Fully Adheredlncludes adhesive. $10,119.12 Quantity Unit Price Factor Total Installation 55.00 x 141.45 x 1.3007 - 10,119.12 67 07 54 23 00 0003 0113 For 15 Year Warranty, Add $199.01 Quantity Unit Price Factor Total Installation 51.00 x 3.00 x 1.3007 199.01 As specified 68 07 54 23 00 0009 EA Up To 3" Pipe Diameter, Prefabricated TPO Pipe Cone/Bootincludes attaching $131.21 the boot to the membrane, caulking around the pipe and installing a draw band. Quantity Unit Price Factor Total Installation 4.00 x 25.22 x 1.3007 13121 At roof vents Contractor's Price Proposal - Detail Page 6 of 20 EZ/QC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 07 - Thermal & Moisture Protection 69 07 54 23 00 0012 LF 30" Wide, TPO Walkway Protection Pad $4,140.23 Quantity Unit Price Factor Total Installation 302.00 x 10.54 x 1.3007 - 4,140.23 Around HVAC units 70 07 54 23 00 0013 SF TPO Membrane Base Flashing $5,950.31 Quantity Unit Price Factor Total Installation 1,530.00 x 2.99 x 1.3007 - 5,950.31 Roof membrane 71 07 62 00 00 0051 SF 24 Gauge, Galvanized Steel Flashing $5,600.97 Quantity Unit Price Factor Total Installation 637.00 x 6.76 x 1.3007 - 5,600.97 Wall coping 72 07 63 00 00 0028 EA 2-3/4" ID x 12" Riser Pipe, 4 LB Lead Pipe Flashing For Roofs, Fits 2" Pipe $81.38 Quantity Unit Price Factor Total Installation 100 x 62.57 x 1.3007 - 81.38 At plumbing vents 73 07 63 00 00 0029 EA 3-3/4" ID x 12" Riser Pipe, 4 LB Lead Pipe Flashing For Roofs, Fits 3" Pipe $373.14 Quantity Unit Price Factor Total Installation 4.00 x 71.72 x 1.3007 - 373.14 At plumbing vents 74 07 72 13 00 0051 EA 62" x 122" Outside Frame Dimensions, 12" Height, 18 Gauge, Insulated $752.42 Galvanized Steel, Prefabricated Roof Curb Quantity Unit Price Factor Total Installation 2.00 x 376.21 x 1.0000 - 752.42 HVAC roof curbs 75 07 72 13 00 0051 0236 For Sloped Roofs Up To 1 In 12 Pitch, Add $68.32 Quantity Unit Price Factor Total Installation 2.00 x 34.16 x 1.0000 - 68.32 76 07 92 00 00 0038 CLF 3/8" x 3/4" Joint, Polysulfide Sealant And Caulking $1,427.54 Quantity Unit Price Factor Total Installation 4.25 x 258.24 x 1.3007 - 1,427.54 77 07 95 13 00 0025 LF Exterior Roof To Wall Expansion Joint, 2" Opening Aluminum Assemblies $2,501.99 Quantity Unit Price Factor Total Installation 67.00 x 28.71 x 1.3007 - 2,501.99 Subtotal for 07 - Thermal & Moisture Protection $64,603.99 08 - Openings 78 08 05 13 00 0004 EA For > 2 To 4 SF, Factory Installed 20 Gauge Metal Frame For Vision Glass In $391.42 Door, Add Quantity Unit Price Factor Total Installation 3.00 x 100.31 x 1.3007 - 391 A2 79 08 05 13 00 0011 EA For > 2 To 4 SF, Site Installed 20 Gauge Metal Frame For Vision Glass In Door, $515.51 Add Quantity Unit Price Factor Total Installation 3.00 x 132.11 x 1.3007 - 515.51 80 08 12 13 13 0090 EA Tx >7'-2" Through 9' x 6-3/4" Deep Metal Door Frame, 16 Gauge $3,114.70 Quantity Unit Price Factor Total Installation 9.00 x 266.07 x 1.3007 - 3,114.70 Reference specs Contractor's Price Proposal - Detail Page 7 of 20 EZIQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 08 -Openings 81 08 12 13 13 0090 0073 Fes, For Welded Frames, Add $526.78 Quantity Unit Price Factor Total Installation 9.00 x 45.00 x 1.3007 526.78 82 08 12 13 13 0090 0082 For 14 Gauge Frame, Add $579.11 Quantity Unit Price Factor Total Installation 9.00 x 49.47 x 1.3007 - 579.11 83 08 13 13 13 0057 Fes, Tx 6-8" x 1-3/4" 18 Gauge Metal Door (Unrated) $423.91 Quantity Unit Price Factor Total Installation 1.00 x 325.91 x 1,3007 423.91 Reference specs 84 08 13 13 13 0138 EA Tx 7' x 1-3/4" 16 Gauge Metal Door (Unrated) $4,630.49 Quantity Unit Price Factor Total Installation 8.00 x 445.00 x 1.3007 4.630.49 85 08 13 13 13 0138 0096 For 14 Gauge, Grade III, Extra Heavy Duty, Add $1,892.09 Quantity Unit Price Factor Total Installation 9.00 x 161.63 x 1.3007 - 1.892.09 86 08 13 13 13 0138 0102 For Galvanized Steel, Add $709.52 Quantity Unit Price Factor Total Installation 9.00 x 60.61 x 1.3007 - 709,52 87 08 71 16 00 0122 E1 Satin Chrome Finish, 500 LB Max Door Weight, Intermediate Mount, 3/4" Offset $1,141.48 Pivot Hinge (Ives 7215 INT) Quantity Unit Price Factor Total Installation 9.00 x 97.51 x 1,3007 1,141.48 Reference specs 88 08 71 16 00 0521 E'', 2-1/2" Base Diameter, Convex Or Concave Rubber Insert, Satin Chrome $55.67 Finish, Wrought Brass Wall Bumper (Ives WS406/407) Quantity Unit Price Factor Total Installation 4.00 x 10.70 x 1.3007 - 55,67 89 08 71 16 00 0572 E1 4" Projection, Rigid Type, Satin Aluminum Finish, Aluminum Wall Stop And $203.95 Manual Door Holder (Ives WS20) Quantity Unit Price Factor Total Installation 4.00 x 39.20 x 1.3007 203.95 90 08 71 16 00 1025 E4 6" x 36", 0.050" Thick, Bright/Satin Chrome Finish, Brass Kick Plate $460.45 Quantity Unit Price Factor Total Installation 5.00 x 70.80 x 1.3007 460.45 91 08 71 16 00 2054 E1 1" Flattened x 1/2" Round Aluminum Door Pulls, 10" Long $196.51 Quantity Unit Price Factor Total Installation 4.00 x 37.77 x 1.3007 196.51 92 08 71 16 00 2073 EA 8" x 16" Aluminum Push Plate Door Hardware $96.41 Quantity Unit Price Factor Total Installation 4.00 x 18.53 x 1.3007 96.41 93 08 71 16 00 2077 E'', 3' Push Bar Exit Device, Rim Type, Fire RatedAnodized finish: aluminum or $2,826.68 dark brown. Von Duprin Series 22. Quantity Unit Price Factor Total Installation 5.00 x 434,64 x 1.3007 2,826.68 94 08 71 16 00 2153 E1 Surface Mounted Heavy Duty Door Closer- LCN 4040/4041 Series $1,777.99 Quantity Unit Price Factor Total Installation 5.00 x 273.39 x 1.3007 1.777.99 Contractors Price Proposal - Detail Page 8 of 20 EZIQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 08 -Openings 95 08 71 16 00 2193 EA Heavy Duty Cylindrical Entrance Lockset F82Satin chrome plated US 26D $1,437.99 (BHMA 626) - BHMA 156.2-1989, Grade 1(Corbin Russwin CL 3600). Quantity Unit Price Factor Total Installation 5.00 x 221.11 x 1.3007 - 1,437.99 96 08 71 16 00 2201 EA Extra Heavy Duty Cylindrical Entrance Lockset F82Satin chrome plated US $979.15 26D (BHMA 626) - BHMA 156.2-1989, Grade 1(Corbin Russwin CL 3300). Quantity Unit Price Factor Total Installation 3.00 x 250.93 x 1.3007 - 979.15 97 08 71 16 00 2206 EA Extra Heavy Duty Cylindrical Full Dummy Trim LocksetSatin chrome plated US $1.191.31 26D (BHMA 626) - BHMA 156.2-1989, Grade 1(Corbin Russwin CL 3300). Quantity Unit Price Factor Total Installation 5.00 x 183.18 x 1.3007 1,191.31 98 08 71 16 00 2235 EA Single Cylinder Deadbolt, Key One Side, Knob One SideCylindrical, ANSI $115.10 Grade 1, interchangeable core, bright brass or satin chromium finish. Quantity Unit Price Factor Total Installation 100 x 88.49 x 1.3007 - 115.10 99 08 71 19 00 0081 LF 7/16" Neoprene Insert, 90 Degree, Aluminum Retainer Door Sweep (Pemko $147.69 315CN) Quantity Unit Price Factor Total Installation 15.00 x 7.57 x 1.3007 - 147.69 100 08 71 19 00 0082 LF 11/16" Neoprene Insert, 90 Degree, Aluminum Retainer Door Sweep (Pemko $40.97 368CN) Quantity Unit Price Factor Total Installation 3.00 x 10.50 x 1.3007 - 40.97 101 08 71 19 00 0143 LF 2-1/2" Aluminum Overhead Rain Drip With Slotted Holes (Pemko 346C) $163.63 Quantity Unit Price Factor Total Installation 20.00 x 6.29 x 1.3007 - 163.63 102 08 71 19 00 0148 LF 1/2" x 1/4", Silicon Compression Bulb, Adhesive Backed Perimeter Gasketing $50.42 Weather -Strip (Pemko S88) Quantity Unit Price Factor Total Installation 17.00 x 2.28 x 1.3007 - 50.42 103 08 71 19 00 0150 LF 5/16" x 1/2", Silicone Single Fin, Adhesive Backed Perimeter Gasketing $248.76 Weather -Strip (Pemko S77) Quantity Unit Price Factor Total Installation 75.00 x 2.55 x 1.3007 - 248.76 104 08 71 21 00 0022 LF 6" Width, 1/2" Height, Aluminum Saddle Threshold (Pemko 172A) $131.76 Quantity Unit Price Factor Total Installation 5.00 x 20.26 x 1.3007 - 131.76 Subtotal for 08 - Openings $24,049.45 09 - Finishes 105 09 24 33 00 0002 CSF 1/2" Cement Parging $4.712.85 Quantity Unit Price Factor Total Installation 9.25 x 391.71 x 1.3007 4,712.85 On exterior masonry walls below grade, two coats, per spec 04200, par 3.13 106 09 91 13 00 0225 LF Paint Metal Door Frame And Trim, 2 Coats Paint, Brush/Roller Work $168.57 Quantity Unit Price Factor Total Installation 162.00 x 0.80 x 1.3007 168.57 Contractor's Price Proposal - Detail Page 9 of 20 EZIQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 09 - Finishes 107 09 91 13 00 0329 LF Paint Conduit, Steel Pipe 1/2" To 1-1/2" Diameter, One Coat Primer $62.04 Quantity Unit Price Factor Total Installation 90.00 x 0.53 x 1.3007 - 62.04 Roof top gas lines 108 09 91 13 00 0329 0251 For Epoxy Paint, Add $7.02 Quantity Unit Price Factor Total Installation 90.00 x 0.06 x 1.3007 7.02 109 09 91 13 00 0339 LF Paint Conduit, Steel Pipe 1/2" To 1-1/2" Diameter, Two Coats $127.60 Quantity Unit Price Factor Total Installation 90.00 x 1.09 x 1.3007 - 127.60 110 09 91 23 00 0040 SF Paint Interior Concrete Block, 1 Coat Filler, Brush Work $2,381.14 Quantity Unit Price Factor Total Installation 4,694.00 x 0.39 x 1.3007 - 2,381.14 111 09 91 23 00 0042 SF Paint Interior Concrete Block, 2 Coats Paint, Brush Work $5,250.72 Quantity Unit Price Factor Total Installation 4,694.00 x 0.86 x 1.3007 - 5,250.72 112 09 91 23 00 0226 SF Paint Interior Concrete Floors And Decks, One Coat Bonding Agent, Sprayed $1,688.31 Quantity Unit Price Factor Total Installation 5,900.00 x 0.22 x 1.3007 - 1,688.31 113 09 91 23 00 0260 EA Paint Interior Door, Both Faces, 1 Coat Paint, Spray $319.11 Quantity Unit Price Factor Total Installation 9.00 x 27.26 x 1.3007 319.11 114 09 91 23 00 0261 EA Paint Interior Door, Both Faces, 2 Coats Paint, Spray $596.79 Quantity Unit Price Factor Total Installation 9.00 x 50.98 x 1.3007 - 596.79 115 09 91 33 00 0024 GAL Acrylic Urethane Sealer $5,941.86 Quantity Unit Price Factor Total Installation 65.00 x 70.28 x 1.3007 - 5,941.86 Two coats on floors and on pen walls Subtotal for 09 - Finishes $21,266.01 10 - Specialties 116 10 44 13 00 0007 EA 12" x 27" x 7-3/4" Inside Dimensions, Recessed Steel Fire Extinguisher $1,169.20 Cabinet Quantity Unit Price Factor Total Installation 5.00 x 179.78 x 1.3007 1,169.20 117 10 44 16 13 0012 EA 104 Dry Chemical, Type ABC Portable Fire Extinguisher $861.91 Quantity Unit Price Factor Total Installation 5.00 x 132.53 x 1.3007 861.91 Subtotal for 10 - Specialties $2,031.11 11 - Equipment 118 11 00 00 00 0000 Install central pressure washing system, with ten remote connectlorm (Spray $41,200.00 Master) Quantity Und Price Factor Total NPP Installefion i.Do x 32,960.00 x 12500 = 41,200.00 Pressure washer with 10 renlo o Contractor's Price Proposal - Detail Page 10 of 20 EZJQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock -Animal Shelter Renovation 11 -Equipment 119 11 68 13 00 0457 LF Tuffrurf Geotextile Fabric, (12 1/2' Wide Roll), Order an Additional 20% for $244.90 Ovedap/Waste, per LF (Landscape Structures® 109694A) Quantity Unit Price Factor Total Installation 33.00 x 4.68 x 1.3007 - 200.88 Demolition 36.00 x 0.94 x 1.3007 44.02 Landscape Subtotal for 11 -Equipment $41,444.90 12 - Furnishings 120 12 36 61 16 0004 SF 1/2" Solid Polyester (Conan) CountertopQuantity based on area of counter, $890.62 backsplash and apron. Includes drilling holes for fixtures and 1-1/2" drop edge with 1/8" radius edges (when apron not used). Quantity Unit Price Factor Total Installation 27.00 x 25.36 x 1.3007 890,62 121 12 36 61 16 0004 0030 LF For Each LF Of Half Round Edge, Add $62.43 Quantity Unit Price Factor Total Installation 6.00 x 8.00 x 1.3007 62.43 Subtotal for 12 - Furnishings $953.05 13 - Special Construction - - 122 13 00 00 00 0000 Buld and install 90 new stainless steel pens, matching the existing pens, M 69,175.00 ex-2 of wit' i nprc-aec sta r oss sLce: ;racks, cables, rollers and hardware to :-v a -;rust and deterioration. Unit Price Factor Yoh NPP Installation 1.00 x 135,340.00 x 1.2500 ` 139,)76_00 Subtotal for 13 - Special Construction $169,175.00 21 - Fire Suppression 123 21 13 13 00 0006 EA Exposed Piping, Wet Automatic Sprinkler System, Ordinary Hazardlncludes $10,722.45 branch pipe and fittings, supports and sprinkler heads. Quantity Unit Price Factor Total Installation 40.00 x 206.09 x 1.3007 - 10,722.45 124 21 13 13 00 0023 EA Recessed Chrome Sprinkler Head Escutcheon, Two Piece $403.74 Quantity Unit Price Factor Total Installation 40.00 x 7.76 x 1.3007 - 403.74 125 21 13 13 00 0027 EA 4" Alarm Valve - Wet System $2,225.97 Quantity Unit Price Factor Total Installation 1.00 x 1,711.36 x 1.3007 - 2,225.97 126 21 22 16 00 0434 EA Horn And 75 Candela Strobe, Alarm Devices, Industrial Fire Control System $784.06 (Ansul 429695) Quantity Unit Price Factor Total Installation 5.00 x 120.56 x 1.3007 - 784.06 Subtotal for 21 - Fire Suppression $14,136.22 22 - Plumbing 127 22 05 76 00 0011 EA 4" Heavy Duty Floor Cleanout, Round Top, Cast Iron With Cast Bronze Screw $7,122.40 Plug And Nickel Bronze Cover Quantity Unit Price Factor Total Installation 14.00 x 391.13 x 1.3007 7,122.40 Contractors Price Proposal - Detail Page 11 of 20 EZJQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 22 - Plumbing 128 22 05 76 00 0046 EA 6" Cleanout Tee With Cast Bronze Screw Plug And Square Nickel Bronze $2,183.69 Cover Quantity Unit Price Factor Total Installation 2.00 x 839.43 x 1.3007 - 2,183.69 129 22 07 19 00 0521 LF 1-1/2" Pipe, (1-5/8" Outside Diameter Pipe), 1/2" Thick Insulation, Flexible $1,884.71 Elastomeric Unicellular Cover Quantity Unit Price Factor Total Installation 460.00 x 3.15 x 1.3007 1,884.71 130 22 11 16 00 0189 LF 2" Hard Drawn Type L Copper Tube/Pipe $907.00 Quantity Unit Price Factor Total Installation 36.00 x 19.37 x 1.3007 - 907.00 131 22 11 16 00 0551 LF 1" Inside Diameter Copper PipelTubing Type L Assemblylncludes all hangers $1,398.90 and couplings, elbow, tee, reducer fittings. All hangers are complete assemblies. Not for use where detail is available. Quantity Unit Price Factor Total Installation 90.00 x 11.95 x 1.3007 - 1,398.90 132 22 11 19 00 0170 EA 8" Thick Wall, Cast Bronze, Non Freeze, Nikaloy Face, Integral Vacuum $324.06 Breaker Wall Hydrant Quantity Unit Price Factor Total Installation 100 x 249.14 x 1.3007 - 324.06 133 22 13 16 00 0137 EA 6" x 4" Bell And Spigot Cast Iron Reducing Double Wye $10,529.47 Quantity Unit Price Factor Total Installation 51.00 x 158.73 x 1.3007 - 10,529.47 134 22 13 16 00 0800 LF 4" Schedule 40 ABS-PVC DVW Pipe Assemblylncludes all fittings, couplings $15,850.17 and hangers. Fittings are assumed every 10'. Not for use where detail is available. Quantity Unit Price Factor Total Installation 978.00 x 12.46 x 1.3007 - 15,850.17 135 22 13 16 00 0801 LF 6" Schedule 40 ABS-PVC DVW Pipe Assemblylncludes all fittings, couplings $4,687.20 and hangers. Fittings are assumed every 10'. Not for use where detail is available. Quantity Unit Price Factor Total Installation 180.00 x 20.02 x 1.3007 - 4,687.20 136 22 13 16 00 0859 EA 4" Schedule 40 ABS-PVC DVW P-Traps $2,963.88 Quantity Unit Price Factor Total Installation 51.00 x 44.68 x 1.3007 - 2,963.88 137 22 13 19 13 0004 EA 6" Round Top Floor Drain With 3" Outlet, Bronze Top $13,289.90 Quantity Unit Price Factor Total Installation 50.00 x 204.35 x 1.3007 - 13.289.90 138 22 13 19 13 0028 EA 6" x 6" Floor Drain With 2" Bottom Outlet, Nikaloy Top $310.56 Quantity Unit Price Factor Total Installation 100 x 238.76 x 1.3007 - 310.56 139 22 14 26 13 0031 EA 9" x 9" Cast Iron Roof Drain With 4" Outlet, Cast Iron Promenade Top $4,481.04 Quantity Unit Price Factor Total Installation 10.00 x 344.51 x 1.3007 - 4,481.04 140 22 14 26 13 0069 EA 6" Outlet, Bronze Roof Drain Downspout Nozzle $847,48 Quantity Unit Price Factor Total Installation 2,00 x 325.78 x 1.3007 - 847.48 Contractors Price Proposal - Detail Page 12 of 20 EZJQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 22 - Plumbing 141 22 42 16 00 0097 EA 24" x 20" Enameled Cast Iron Wall Mount Service Sink With Stainless Steel Rim $804.14 Guard, Trap Standard (American Standard 7695.000) Quantity Unit Price Factor Total Installation 100 x 618.24 x 1.3007 - 804.14 142 22 42 39 00 0057 EA 8" Spout With Vacuum Break And Bottom Fork Brace, Wall Mount Service Sink $371.22 Faucet, Stops In Integral Arm, Wrist Blade Handles, American Standard 8345.119 Quantity Unit Price Factor Total Installation 100 x 285.40 x 1.3007 371.22 Subtotal for 22 - Plumbing $67,955.82 23 - Heating, Ventilating, And Air -Conditioning (HVAC) 143 23 05 23 00 0124 EA 1" Ball Valve, Brass Body, Threaded Or Sweated, 125 LB, Regular Port $36.99 Quantity Unit Price Factor Total Installation 100 x 28.44 x 1.3007 - 36.99 144 23 05 23 00 0125 EA 1-1/4" Ball Valve, Brass Body, Threaded Or Sweated, 125 LB, Regular Port $52.44 Quantity Unit Price Factor Total Installation 100 x 40.32 x 1.3007 52.44 145 23 05 23 00 0127 EA 2" Ball Valve, Brass Body, Threaded Or Sweated, 125 LB, Regular Port $76.86 Quantity Unit Price Factor Total Installation 100 x 59.09 x 1.3007 76.86 146 23 05 23 00 0993 EA 1-1/4" NPT Flow Control Valve, Iron And Bronze, Water Balancing Valve With $181.10 Pressures Up To 300 PSIG Quantity Unit Price Factor Total Installation 100 x 139.23 x 1.3007 - 181.10 147 23 05 29 00 0735 EA 3" Adjustable Pipe Saddle Support, Type 38 $1,136.68 Quantity Unit Price Factor Total Installation 10.00 x 87.39 x 1.3007 - 1,136.68 148 23 05 93 00 0016 EA Balancing HVAC Duct System, Ceiling Height > 12' Supply, Return, Exhaust, $2,158.12 Register And Diffuser Quantity Unit Price Factor Total Installation 34.00 x 48.80 x 1.3007 - 2,158.12 149 23 07 13 00 0019 SF 1", 3 LB/CF FSK Rigid Fiber Glass Board Insulation $2,720.54 Quantity Unit Price Factor Total Installation 664.00 x 3.15 x 1.3007 - 2,720.54 150 23 11 23 00 0114 EA 3/4" Port, 425 MBTU Pressure Regulator With Over Pressure Protection $448.69 Device For Corrugated Stainless Steel Tubing (CSST), Flexible Gas Pipe Quantity Unit Price Factor Total Installation 2.00 x 172.48 x 1.3007 - 448.69 151 23 11 23 00 0120 EA 3/4" Gas Stop, Brass $57.60 Quantity Unit Price Factor Total Installation 2.00 x 22.14 x 1.3007 - 57.59 152 23 21 13 23 0004 LF 3/4" Schedule 40 Threaded Black Steel Pipe With 150 LB Malleable Iron Fitting $514.17 Assemblylncludes all hangers and all fittings (couplings, elbows, tees and reducer fittings). All hangers are complete assemblies. Not for use where detail is available. Quantity Unit Price Factor Total Installation 59.00 x 6.70 x 1.3007 - 514.17 Contractor's Price Proposal - Detail Page 13 of 20 EZJQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 23 - Heating, Ventilating, And Air -Conditioning (HVAC) 153 23 21 13 23 0006 LF 1-1/4" Schedule 40 Threaded Black Steel Pipe With 150 LB Malleable Iron $397.55 Fitting Assemblylncludes all hangers and all fittings (couplings, elbows, tees and reducer fittings). All hangers are complete assemblies. Not for use where detail is available. Quantity Unit Price Factor Total Installation 36.00 x 8.49 x 1,3007 - 397.55 154 23 31 13 13 0003 LB Sheet Metal Ductwork, Low Pressure, Field Fabricated, Galvanized, Field $7.975.89 Assemble And Install Quantity Unit Price Factor Total Installation 1,460.00 x 4.20 x 1.3007 - 7,975.89 155 23 31 13 16 0010 LF 14" Round Galvanized Sheet Metal Duct, Factory Fabricated, Field Installed, $3.300.53 Low Pressure Quantity Unit Price Factor Total Installation 250.00 x 10.15 x 1.3007 - 3.300.53 156 23 31 13 16 0031 EA 8" Round Galvanized Sheet Metal 90 Degree Elbows, Factory Fabricated, $102.59 Field Installed, Low Pressure Quantity Unit Price Factor Total Installation 3.00 x 26.29 x 1.3007 - 102.59 157 23 31 13 16 0034 EA 14" Round Galvanized Sheet Metal 90 Degree Elbows, Factory Fabricated, $689.88 Field Installed, Low Pressure Quantity Unit Price Factor Total Installation 7.00 x 75.77 x 1.3007 - 689.88 158 23 31 13 16 0046 EA 14" Round Galvanized Sheet Metal 45 Degree Elbows, Factory Fabricated, $172.89 Field Installed, Low Pressure Quantity Unit Price Factor Total Installation 2.00 x 66.46 x 1.3007 172.89 159 23 31 13 16 0067 EA 8" Round Connector $154.00 Quantity Unit Price Factor Total Installation 10.00 x 11.84 x 1.3007 - 154.00 160 23 31 13 16 0070 EA 14" Round Connector $2,803.72 Quantity Unit Price Factor Total Installation 95.00 x 22.69 x 1.3007 2,803.72 161 23 31 13 16 0078 LF 8" Round Spiral Duct, Galvanized, 26 Gauge, Slip Joint $93.34 Quantity Unit Price Factor Total Installation 12.00 x 5.98 x 1.3007 - 93.34 162 23 31 13 16 0081 LF 14" Round Spiral Duct, Galvanized, 26 Gauge, Slip Joint $1,963.46 Quantity Unit Price Factor Total Installation 139.00 x 10.86 x 1.3007 1,963.46 163 23 74 13 00 0028 EA 15 Ton Electric Cooling, 300 MBH Gas Heating, Self Contained Package $51,979.41 Rooftop Unit Quantity Unit Price Factor Total Installation 2.00 x 19,981.32 x 1.3007 - 51,979.41 Greenheck in lieu of Aeon brand Subtotal for 23 - Heating, Ventilating, And Air -Conditioning (HVAC) $77,016.45 26 - Electrical 164 26 01 50 52 0335 EA 2 Lamp, 32 Watt TBX Compact Fluorescent, 277 V, 5% Light Level, Electronic $791.97 Dimming Ballast Quantity Unit Price Factor Total Installation 4.00 x 152.22 x 1.3007 791.97 Contractor's Price Proposal - Detail Page 14 of 20 EZ/QC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 26 - Electrical 165 26 05 29 00 0073 EA 3/4", One Hole Steel Conduit Strap $275.10 Quantity Unit Price Factor Total Installation 150.00 x 1,41 x 1.3007 - 275.10 166 28 05 29 00 0083 EA 1/2", One Hole Iron Conduit Strap $398.79 Quantity Unit Price Factor Total Installation 210.00 x 1.46 x 1.3007 - 398.79 167 26 05 29 00 0085 EA 1", One Hole Iron Conduit Strap $172.47 Quantity Unit Price Factor Total Installation 78.00 x 1.70 x 1.3007 172.47 168 26 05 33 13 0283 LF 1/2" EMT Conduit $4,097.21 Quantity Unit Price Factor Total Installation 1,875.00 x 1.68 x 1.3007 - 4,097.21 169 26 05 33 13 0284 LF 3/4" EMT Conduit $3,796.35 Quantity Unit Price Factor Total Installation 1,410.00 x 2.07 x 1,3007 - 3,796.35 170 26 05 33 13 0285 LF 1" EMT Conduit $2,529.99 Quantity Unit Price Factor Total Installation 734.00 x 2.65 x 1.3007 2,529.99 171 26 05 33 13 0317 EA 3/4" EMT Compression Coupling $532.77 Quantity Unit Price Factor Total Installation 160.00 x 2.56 x 1.3007 - 532.77 172 26 05 33 13 0318 EA 1" EMT Compression Coupling $392.29 Quantity Unit Price Factor Total Installation 80.00 x 3.77 x 1.3007 - 392.29 173 26 05 33 13 0327 EA 112" EMT Box Connector With Set Screw $147.66 Quantity Unit Price Factor Total Installation 66.00 x 1.72 x 1.3007 147.66 174 26 05 33 13 0349 EA 1/2" EMT Box Compression Connector $294.61 Quantity Unit Price Factor Total Installation 75.00 x 3.02 x 1.3007 - 294.61 175 26 05 33 13 0350 EA 3/4" EMT Box Compression Connector $953.67 Quantity Unit Price Factor Total Installation 195.00 x 3.76 x 1.3007 - 953.67 176 26 05 33 13 0351 EA 1" EMT Box Compression Connector $276.27 Quantity Unit Price Factor Total Installation 40.00 x 5.31 x 1.3007 276.27 177 26 05 33 13 0383 EA 112" EMT To Flexible Conduit Compression Adapter $1.381.47 Quantity Unit Price Factor Total Installation 190.00 x 5.59 x 1.3007 1,381.47 178 26 05 33 13 0470 EA 3/4" IMC Type C Two Hub Conduit Body With Cover $140 94 Quantity Unit Price Factor Total Installation 4.00 x 27.09 x 1.3007 140.94 179 26 05 33 16 0010 EA 3"-1/2" x 3-3/4" Steel Masonry Box With Cover, 1 Gang, Flush Mount $1,842.83 Quantity Unit Price Factor Total Installation 140.00 x 10,12 x 1.3007 - 1,842.83 Contractors Price Proposal - Detail Page 15 of 20 EZ/QC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 26 - Electrical 180 26 05 33 16 0201 EA 2 Gang 4-1/2" x 1-5/8" Box, Concealed With Cover, 3/4" Knock Out, Solid $1,002.45 Outlet Box Quantity Unit Price Factor Total Installation 35.00 x 22.02 x 1.3007 - 1,002.45 181 26 09 23 00 0125 EA Passive Infrared, Wall Switch Mounted Occupancy Sensor (Watt Stopper $105.02 WI-200) Quantity Unit Price Factor Total Installation 100 x 80.74 x 1.3007 - 105.02 182 26 24 16 00 0370 EA 1 Pole GFI, 120/240 Volt, 15-20 A, "Arc Fault" Circuit Breaker, 10,000 Amp $997.61 Interrupting Capacity Quantity Unit Price Factor Total Installation 18.00 x 42.61 x 1.3007 - 997.61 183 26 27 26 00 0133 EA 20 A, 120/277 V SPST Switch $13.71 Quantity Unit Price Factor Total Installation 1.00 x 10.54 x 1.3007 13.71 1B4 26 27 26 00 0134 EA 20 A. 120/277 V 3-Way Switch $67,79 Quantity Unit Price Factor Total Installation 4.00 x 13.03 x 1.3007 67.79 185 26 27 26 00 0135 EA 20 A. 120/277 V 4-Way Switch $148.33 Quantity Unit Price Factor Total Installation 4.00 x 28.51 x 1.3007 148.33 186 26 27 26 00 0138 EA 15A 120/277 V, Single Pole, Momentary Contact Switch, Toggle, Three $48.93 Position, Center Off Quantity Unit Price Factor Total Installation 100 x 37.62 x 1.3007 - 48.93 187 26 28 16 00 0127 EA 100 A, Fused Disconnect Switch, NEMA 1, General Duty, With Fuses, 240 V, $426.07 3 Phase Quantity Unit Price Factor Total Installation 1.00 x 327.57 x 1.3007 - 426.07 188 26 51 13 00 0124 EA 3 T8 Lamps, 2' x 4% Parabolic, Lay-In/Troffer, Recessed Fluorescent Fixture $8,639.56 Quantity Unit Price Factor Total Installation 44.00 x 150.96 x 1.3007 - 8.639.56 189 26 53 00 00 0010 EA Single Face, Thermoplastic Housing, LED Exit Sign/Emergency Light Combo $1,621.48 With Battery Back-Upincludes two circular side mounted krypton emergency lights. Quantity Unit Price Factor Total Installation 6.00 x 207.77 x 1.3007 - 1,621.48 Subtotal for 26 - Electrical $31,095.34 27 - Communications 190 27 14 13 16 0009 MLF 6 Pair #12 AWG, Solid, Low Voltage, Placed In Conduit, Alarm And $2,485.04 Communications Cable Quantity Unit Price Factor Total Installation 0.42 x 4,548.91 x 1.3007 - 2,485.04 Subtotal for 27 - Communications $2,485.04 28 - Electronic Safety And Security 191 28 31 23 00 0084 EA Superduct, Signature Duct Smoke Detector (EST3 SIGA-SD) $569.63 Quantity Unit Price Factor Total Installation 2.00 x 218.97 x 1.3007 - 569.63 Contractors Price Proposal - Detail Page 16 of 20 EZJQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 28 - Electronic Safety And Security 192 28 31 23 00 0518 EA Addressable Single Action Manual Pull Station (Simplex 4099-9001) $908.67 Quantity Unit Price Factor Total Installation 5.00 x 139.72 x 1.3007 - 908.67 193 28 31 23 00 0543 EA Wall Mounted Hom Strobe, Multi -Candela, Red (Wheelock HS4-24MCW-FR) $1,196.47 Quantity Unit Price Factor Total Installation 7.00 x 131.41 x 1.3007 - 1,196.47 194 28 31 23 00 0551 EA Wall Mounted Strobe, Multi -Candela, Red (Simplex 4906-9101) $149.61 Quantity Unit Price Factor Total Installation 100 x 115.02 x 1.3007 - 149.61 Subtotal for 28 - Electronic Safety And Security $2,824.38 31 - Earthwork 195 31 05 13 00 0004 CY Native Clean Fill Soil/Dirt - Common $6,400.22 Quantity Unit Price Factor Total Installation 278.00 x 17.70 x 1.3007 6,400.22 Compacted pad slab 196 31 05 16 00 0002 CY #3 Stone Aggregate Fill (1" To 2" Clean) $1,643.24 Quantity Unit Price Factor Total Installation 55.00 x 22.97 x 1.3007 - 1,643.24 At gravel drive add 2" 197 31 05 16 00 0026 CY Aggregate Placementincludes Spreading, Grading, Compaction Rolling $1,392.85 Quantity Unit Price Factor Total Installation 59.00 x 18.15 x 1.3007 - 1,392.85 At drive 198 31 23 16 13 0003 CY Over 12" Wide, Excavation for Trenching by Machine in Soil $980.52 Quantity Unit Price Factor Total Installation 216.00 x 3.49 x 1.3007 980.52 At exterior footings and plumbing trenches 199 31 23 16 13 0003 0056 For > 50 To 250, Add $106.37 Quantity Unit Price Factor Total Installation 94.00 x 0.87 x 1.3007 - 106.37 200 31 23 16 13 0008 CY Excavation For Trenching By Hand In Loose Rocklncludes stockpiling excess $4,224.67 materials and trimming sides and bottom of trench. Quantity Unit Price Factor Total Installation 58.00 x 56.00 x 1.3007 - 4,224.67 At pen walls and drain trenches 201 31 23 16 13 0010 CY Backfilling or Placing Subbase for Trenches with Imported or Stockpiled $250.75 Materials by Machine Quantity Unit Price Factor Total Installation 119.00 x 1.62 x 1.3007 - 250.75 At plumbing trenches 202 31 23 16 13 0010 0060 For > 20 To 50, Add $40.04 Quantity Unit Price Factor Total Installation 38.00 x 0.81 x 1.3007 - 40.04 203 31 23 16 13 0011 CY Backfilling or Placing Subbase for Trenches with Imported or Stockpiled $212.35 Materials by Hand Quantity Unit Price Factor Total Installation 18.00 x 9.07 x 1.3007 - 212.35 Contractors Price Proposal - Detail Page 17 of 20 EZJQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 31 - Earthwork 204 31 23 16 13 0018 CY Load Excess Material by Machine for Removal from Excavation for Trenching $164.47 Quantity Unit Price Factor Total Installation 45.00 x 2.81 x 1.3007 - 164.47 205 31 23 16 13 0018 0071 For > 50 To 250, Add $0.00 Quantity Unit Price Factor Total Installation 0.00 x 0.70 x 1.3007 - 0.00 206 31 23 16 13 0050 LF Backfill 8" Wide, 24" Deep Trench, With Compaction $478.66 Quantity Unit Price Factor Total Installation 1,150.00 x 0.32 x 1.3007 - 478.66 207 31 23 16 33 0014 CY Relocating On Site Excavated Material From Bulk Excavation Over 1000' $2,753.19 Quantity Unit Price Factor Total Installation 305.00 x 6.94 x 1.3007 - 2,753.19 20B 31 23 16 33 0020 CY Loading Excess Material For Removal From Bulk Excavation $1,202.04 Quantity Unit Price Factor Total Installation 305.00 x 3.03 x 1.3007 - 1,202.04 209 31 23 16 36 0006 CY Excavation For Building Foundations And Other Structures By Hydraulic $325.33 Excavator, Backhoe, Loader in Soil Quantity Unit Price Factor Total Installation 74.00 x 3.38 x 1.3007 - 325.33 210 31 23 16 36 0018 CY Backfilling Around Building Foundations And Other Structures By Hydraulic $184.02 Excavator, Backhoe, Loader Quantity Unit Price Factor Total Installation 54.00 x 2.62 x 1.3007 - 184.02 211 31 23 16 36 0019 CY Backfilling Around Building Foundations And Other Structures By Hand $364.07 Quantity Unit Price Factor Total Installation 18.00 x 15.55 x 1.3007 - 364,07 212 31 23 16 36 0022 CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures $2,235.44 by Hand Quantity Unit Price Factor Total Installation 168.00 x 10.23 x 1.3007 - 2,235.44 213 31 23 16 36 0025 SY Finish Grading For Building Foundations And Other Structures by Machine $457.85 Quantity Unit Price Factor Total Installation 440.00 x 0.80 x 1.3007 457.85 214 31 23 16 36 0026 SY Finish Grading For Building Foundations And Other Structures by Hand $392.81 Quantity Unit Price Factor Total Installation 100.00 x 3.02 x 1.3007 - 392.81 215 31 23 16 36 0028 CY Load Excess Material For Removal From Excavation For Building Foundations $1,972.90 and Other Structures by Machine Quantity Unit Price Factor Total Installation 480.00 x 3.16 x 1.3007 - 1,972.90 216 31 23 16 36 0031 CY Spread Excess Or Imported Material On Site By Machine $38.63 Quantity Unit Price Factor Total Installation 22.00 x 1.35 x 1.3007 - 38.63 217 31 23 16 43 0103 BCY Roadway Excavation Scraper- Soil $113.58 Quantity Unit Price Factor Total Installation 59.00 x 1.48 x 1.3007 - 113.58 Contractor's Price Proposal - Detail Page 18 of 20 EZIQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 31 - Earthwork 218 31 24 13 00 0018 SY Finish Grade Roadway, Parking Areas, Landscaping And Embankments By $685.60 Machine Quantity Unit Price Factor Total Installation 1,255.00 x 0,42 x 1.3007 = 685.60 219 31 25 14 16 0015 SY P300 Permanent Polypropylene Turf Reinforcement Mat100% synthetic, UV $245.57 stabilized, two layer netting. Quantity Unit Price Factor Total Installation 32.00 x 5.90 x 1.3007 = 245.57 Subtotal for 31 - Earthwork $26,865.17 32 - Exterior Improvements 220 32 13 13 00 0014 SF 5" Thick Slab On Grade, 3000 PSI Assembly $24,106.52 Quantity Unit Price Factor Total Installation 5,050.00 x 3,67 x 1.3007 = 24,106.52 221 32 16 13 13 0008 LF 6" X 24" Cast In Place Concrete Curb $503.88 Quantity Unit Price Factor Total Installation 37.00 x 10.47 x 1.3007 = 503.88 Underfence 222 32 16 23 00 0002 SF 4" Cast In Place Concrete Sidewalk With Wire Mesh $6,925.90 Quantity Unit Price Factor Total Installation 1,475.00 x 3.61 x 1.3007 = 6,925.90 223 32 31 13 00 0007 VLF 6" Diameter Hole, Auger By Machine Fence Post Hole In Soil $142.58 Quantity Unit Price Factor Total Installation 18.00 x 6.09 x 1.3007 = 142.58 224 32 31 13 00 0008 VLF 8" Diameter Hole, Auger By Machine Fence Post Hole In Soil $104.42 Quantity Unit Price Factor Total Installation 12.00 x 6.69 x 1.3007 - 104.42 225 32 31 13 00 0024 VLF Concrete Fill, 6" Diameter Hole $142.56 Quantity Unit Price Factor Total Installation 20.00 x 5.48 x 1.3007 = 142.56 226 32 31 13 00 0025 VLF Concrete Fill, 8" Diameter Hole $114.41 Quantity Unit Price Factor Total Installation 12.00 x 7.33 x 1.3007 = 114.41 227 32 31 13 00 0083 LF 2-1/2" Outside Diameter Galvanized Steel Post, 7' To 10' In Length $252.86 Quantity Unit Price Factor Total Installation 30.00 x 6.48 x 1.3007 = 252.86 226 32 31 13 00 0090 LF 3" Outside Diameter Galvanized Steel Post, 7' To 10' In Length $448.00 Quantity Unit Price Factor Total Installation 50.00 x 8.96 x 1.0000 = 448.00 229 32 31 13 00 0275 EA 4' Wide x 6' High Single Gate Galvanized Steel Without Barbed Wire $249.03 Quantity Unit Price Factor Total Installation 100 x 182.53 x 1.3007 - 237.42 Demolition 1.00 x 8.93 x 1.3007 = 11.62 230 32 31 13 00 0275 0214 For Gate With Double Barb Wire Arm, Add $32.40 Quantity Unit Price Factor Total Installation 100 x 24.91 x 1.3007 = 32.40 Contractor's Price Proposal - Detail Page 19 of 20 EZIQC - Southwest 2/24/2014 Contractor's Price Proposal - Detail Continues.. Work Order Number: 017877.00 Work Order Title: City of Lubbock - Animal Shelter Renovation 32 - Exterior Improvements 231 32 31 13 00 0640 EA Barbed Wire Extension Arms 3 Strands (Single Arm) $74.00 Quantity Unit Price Factor Total Installation 7.00 x 4.90 x 1.3007 = 44.61 Demolition 9.00 x 2.51 x 1.3007 = 29.38 232 32 31 13 00 0727 LF Removal And Reinstallation Of Chain Link Fence 6' To 12' Height $1,418.28 Quantity Unit Price Factor Total Installation 116.00 x 9.40 x 1.3007 = 1,418.28 233 32 31 26 00 0025 LF Barbed Wire, Galvanized Per Strand $46.83 Quantity Unit Price Factor Total Installation 120.00 x 0.30 x 1.3007 = 46.83 234 32 91 13 36 0001 MSF Rake Topsoil With Machine $227.83 Quantity Unit Price Factor Total Installation 5.70 x 30.73 x 1.3007 = 227.83 Around building 235 32 91 19 13 0003 CY Remove Topsoil, 6" Deep Stockpile On Site $524.44 Quantity Unit Price Factor Total Installation 160.00 x 2.52 x 1.3007 = 524.44 For building pad 236 32 91 19 13 0012 SY Furnish And Place Imported Screened Topsoil, 2" Deep $1,509.20 Quantity Unit Price Factor Total Installation 566.00 x 2.05 x 1.3007 1,509.20 Around building Subtotal for 32 - Exterior Improvements $36,823.14 33 - Utilities 237 33 31 00 00 0023 LF 6" Schedule 40 ABS-PVC Sewer And Drain Pipe $1,118.54 Quantity Unit Price Factor Total Installation 135.00 x 6.37 x 1.3007 = 1,118.54 238 33 31 00 00 0044 EA 6" 118 Bend, ABS-PVC Sewer And Drain $196.30 Quantity Unit Price Factor Total Installation 4.00 x 37.73 x 1.3007 = 196.30 239 33 31 00 00 0052 EA 6" Long Sweep 1/4 Bend, ABS-PVC Sewer And Drain $83.35 Quantity Unit Price Factor Total Installation 2.00 x 32.04 x 1.3007 - 83.35 240 33 31 00 00 0086 EA 6" Wye, ABS-PVC Sewer And Drain $137.87 Quantity Unit Price Factor Total Installation 2.00 x 53.00 x 1.3007 = 137.87 241 33 31 00 00 0121 EA 6" Clean Out Tees With Plug, ABS-PVC Sewer And Drain $358.63 Quantity Unit Price Factor Total Installation 2.00 x 137.86 x 1.3007 = 358.63 Subtotal for 33 - Utilities $1,894.69 Proposal Total $946,109.69 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 22.24% Contractor's Price Proposal - Detail Page 20 of 20 EZIQC - Southwest 2/24/2014 Subcontractor Listing Date: February 24, 2014 Re: IQC Master Contract #: Work Order #: Owner PO #: Title: Contractor: Proposal Value: TX04-112012-CCC 017877.00 City of Lubbock - Animal Shelter Renovation Collier Construction Company $946,109.69 IIJIQC GROUP Name of Contractor Duties AmouPt % No Subcontractors have been selected for this Work Order $0.00 0.00 Subcontractor Listing Page 1 of 1 EZJQC - Southwest 2/24/2014 CNA FORM SUMMARY: The nolicv auoted includes the following forms. endorsements and exclusions. which rnav not be deleted. FORM ED. DATE FORM NAME CNACOVERPG 04/13 Proprietary Coverage Page Form CNA62641XX 09M2 First Party Glossary of Defined Terms CNA62642XX 09/12 Common Terms and Conditions CNA62846XX 09/12 Bridge Endorsement CNA62647XX 09112 First Party Terms and Conditions CNA62814TX 09/12 Cancellation / Non -Renewal - Texas CNA62815TX 09112 Amendatory Endorsement - Texas CNA62855TX 09/12 Important Notice - For Texas Policyholders GNA62866TX 09/12 To Obtain information Or Make A Complaint CNA68757XX 09/12 Policy Holder Notice - Countrywide CNA62648XX 09112 Business Property Coverage Part CNA62691XX 09/12 Cap on Losses from Certified Acts of Terrorism End CNA62854TX 09/12 For Our Texas Commercial Lines Policyholders CNA77042XX 11113 Notification of Pending Law Change to Terr Risk CNA62823XX 09/12 Policy Holder Notice - Countrywide CNA62731XX 09112 Named Covered Peril Percentage Deductible Endor The following forms and endorsements are available for an additionalpremium: FORM ED. DATE FORM NAME Additional Premium GENERAL LIABILITY Quote # 5084166949 Company Vallej Forge insurance Company Effective 03126/14 Expiration 03/26/15 LIMITS: General Liability Coverages Each Occurrence: $1,000,000 Pero & Advertising Injury: $1,000,000 General Aggregate: $2,000,000 Fire Damage: $100,000 Products/Comp OPS Aggregate: $2,000,000 Medical Expense: $5,000 Other Coverages Occurrence/Claim/Person Aggregate Pollution $1,000,000 $2,000,000 13 of 24 ATIONAL JOINT POWERS ALLIANCES Book 1 — Project Informalm, Instructions to Bidders and Execution documents ,4JPA National Joint Powers Alliance INDEFINITE QUANTITY CONSTRUCTION AGREEMENT IFBNUMSER: TX04-112012-CCC GEOGRAPHIC ZONE Panhandle -Lubbock This Agreement dated 11/20/12 by and between the National Joint Powers Alliance, hereinafter referred to es NJPA and Collier Construction Company st the fallowing address 2202 Avenue 6, Lubbock, TX 79404 hereinafter referred to as the CONTACTOR; WRNESSETH: NJPA and CONTRACTOR for the consideration hereafter agree as follows: ARTICLE 1. CONTRACT DOCUMENTS A. Contrail Documents: This Agreement; the IFS Oocranents; (Book 1 - Project Information, Instructions to Bidders and Execution Documents; Book 2 - IOCC Standard Terns and Conditions and Genera! Conditions; Book 3 - Construction Task Catalog (CTC). Book 4 - Technial Specifications) and Addenda thereto, the Bid Deposit, all payment and pedornance bonds (if any), material and workmanship bonds (if any); wage rate decisions and ceadled payroll records (if arty): Notics of Award; ill modifications issued thereto, including Supplemental Worst OmWWChange Orders and written Interpretations and all Purchase Orders and accompanytng documents (Requests for Proposals, Detailed Scopes of Work, Wodt Order Proposes Packages, eta) Issued hereunder. B. The terns and conditions of a Purchase Order issued by an NJPA Member In connedon with any Work Order, including supplemental technical specifications referenced therein, shall govern. C. The Contractor shag, within two (2) business days of receipt of a Purchase Order from an NJPA Member, provide notfication to NJPA or their designated repneuntative of each Purchase Omer by forwarding a copy of the Purchase Order vie email to PO_flEZIOC cam or via facsimile to (864) 233-9100. 0. The Contractor shall, within two (2) business days of sending an Irrvoice to an NJPA Member, provide notification to NJPA or their designated represemtaWe of each Invoice by forwarding a copy of the Invoice via email to 1nwice0)EZI0C,com or via fwsirrule to (664) 233-9100. 43 Section Four - Exhibit$ October 2012 NATIONAL JOINT POWERS ALLIANCE9 Book 1 — Project Information, Instructions to Bidders and Execution Documents ARTICLE 2. SCOPE OF WORK A. The Contractor shall provide the services required to develop each Work Order In accordance with the procedures for developing Work Orders set forth in the IOCC Standard Terms and Conditions and the Contract Documents. B. Each Work Order developed in accordance with this Agreement will be issued In connection with a Purchase Order by an individual NJPA Member. The Purchase Order will reference the Work Order and require the Contmdor to perform the Detailed Scope of Work within the Work Order Completion Time for the Work Order Price. C. It Is anticipated that the Contractor will perform Work primarily In the Geographic Area set forth above. However, the parties may agree that the Contractor can perform Work in a different Geographic Area at Its current Adjustment Factors. ARTICLE 3. THE AGREEMENT PRICE A. This Agreement Is an Indefinite -quantity contract for construction/rocfing work and services. The Estimated Annual Value of this Agreement Is S 2,000.000. This Is only an estimate and may increase or decrease at the discroWn of the State. B. The Contractor shall perform any or all Tasks in the Construction Task Cataloo for the unit price appearing therein multiplied by the following Adjustment Factors: a. The Contractor shall perform any or all Tasks in the Construction Task CatalogV for the unit price appearing therein multiplied by the following Adjustment Factors. a. Normal Working Hours Prevailing Wage: Work performed from 7:OOam until 4.00pm Monday to Friday, except holidays. Contractor shall perform Tasks during Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Fodor of: 1. 2696 (Speak to by (6) decimal places) b. Other Than Normal Working Hours Prevailing Wage: Work performed from 4.00pm to 7:OOam Monday to Friday, and any time Saturday, Sunday and Holidays. Contractor shall perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor oh. 1 3723 (Specify to bra (4) decimal µaces) 2. C. Normal Working Hours Non Prevailing Wage: Work performed from 7 OOam until 4.QOpm Monday to Friday, except holidays. Contractor shall perform Tasks during Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1, 2534 (Sp" to bur (4) deca+rat places) 44 Section Three — Bid Forms October 2012 ATIONAL JOINT POWERS ALLIANCE6 Book I — Project Information, Instructions to B'dders and Execution Documents Other Than Normal Working Hours Non Prevailing Wage: Work performed from 4:00pm to 7.00am Monday to Friday, and any time Saturday, Sunday and Holidays. Contractor shall perform Tasks during Other Than Normal Working Hours for the Unit Price set forth In the CTC multiplied by the Adjustment Factor of: 1, 3450 (Sp" to four (4) decimal plaeea) Non Pre -priced Adjustment Factor, To be applied to Work deemed not to be included in the CTC but within the general scope of the work: 1, 2500 (Sp" to four (4) dedmai places) ARTICLE 4. TERM OF THE AGREEMENT A. The base term shall be one year with a one year option. The total term of the Contract shall not exceed two years, The Contractor may withdrew from the Agreement on each anniversary of the award, provided that the Contractor gives 60 Days written notice of its Intent to withdraw. NJPA may, for any reason, terminate this Agreement at any time. B. All Purchase Orders issued during a tern of this Agreement shall be valid and in effed notwithstanding that the Detailed Scope of Work may be performed, payments may be made, and the guarantee period may continue, after such term has expired. All terms and conditions of the Agreement apply to each Purchase Order. ARTICLE 5. SOFTWARE LICENSING NJPA selected The Gordian Group's (Consultant) software, data and services (IQCC System) for their IQCC program. The system Includes Consultant's proprietary PROGENP, eGordlano and/or ezlQCe IQCC applications (IOCC Applications) and construction cost data (Construction Task Catalog, which shall be used by the Contractor to prepare and submit Price Proposals, subcontractor lists, and other requirements specified by NJPA and NJPA Members. The Contractor shalt be required to agree to Consultant's IQCC System License to obtain access to Consultant's IQCC Applications. The Contractor's use, in whole or in part, of Consultant's IQCC Applications and Construction Task Catalogs and other proprietary materials provided by Consultant for any purpose other than to execute work under this Contract for NJPA and NJPA Members is strictly prohbded unless otherwise stated in writing by Consultant The Contractor hereby agrees to abide by the temps of the following IOCC System License: ARTICLE 6. IQCC SYSTEM LICENSE Consultant hereby grants to the Contractor, and the Contractor hereby accepts from Consultant for the term of this Contract or Consultant's contract with NJPA, whichever is shorter, a non-exclusive right, privilege, and license to Consultant's proprietary IOCC System and related proprietary materials (collectively referred to as 'Proprietary Infornationj to be used for the sole purpose of executing Contractors responsibilities to NJPA and NJPA Members under this Contract. The Contractor hereby agrees that Proprietary Inrormation shall include, but Is rot 45 Section Four - Exhibits October 2012 INSURANCE REQUIREMENTS 25.1 The Contractor shall procure and maintain, at its own cost and expense, until final acceptance of all the Worts covered by this Agreement, the following kinds of insurance: 25.1.1 Workers' Compensation Insurance. A policy complying with the requirements of the laws of the State in which the Project is located. 25.1.2 General Liability and Property Damage Insurance. A standard general comprehensive liability insurance policy or a commercial general liability insurance policy issued to and covering the liability of the Contractor for all Work and operations under this Agreement, including, but not limited to, contractual and completed operations coverage. The coverage under such policy shall not be less than the following limits: Bodily Injury and Property Damage Liability, $ 1,000,000 Each Occurrence, 2,000,000 Aggregate. 25.1.3 Automobile Liability and Property Damage Insurance. A policy covering the use in connection with the Work covered by the Contract Documents of all owned, nonowned and hired vehicles bearing, or, under the circumstances under which they are being used, required by the Motor Vehicle Laws of the State in which the Project is located. The coverage under such policy shall not be less than the following ;�--� lIily Injury and Property Damage Liability, $ 1,000,000 Each Occurrence. 295 All Risk Builders Risk Insurance. Where specifically required In the Detailed Scope of Work, the ontractor shall provide, before the Work Order is issued, Builders' Risk Insurance in an amount at least equal- the Work Order Price in a form and by a carrier acceptable to the NJPA Member. - .5 ottution Liability Insurance. If a Project Involves asbestos abatement encapsulation or other vities involving hazadous materials, the Contractor, Subcontactor or other party responsible for such Work shall procure and maintain a liability Insurance policy issued to and covering the liability, of the Contractor, Subcontactor or other party engaged in the removal, or handling of hazardous materials, for bodily injury, illness, sickness or property damage caused by exposure In an amount not less than $1,000,000 per occurrence and $2,000,000 aggregate. 25.2 The Contractor shall provide certificates of Insurance. Such certificates shall be on a form prescribed by NJPA, shall list the various coverages and shall contain, in addition to any provisions hereinbefore required, a provision that the policy shall not be changed or cancelled and that it will be automatically renewed upon expiration and continued in force until final acceptance by NJPA, or NJPA Member, of all the work covered by the Agreement, unless NJPA is given fifteen (15) days' written notice to the contrary. Upon request, the Contractor shall furnish NJPA or any NJPA Member with a certified copy of each policy. 25.3 All insurance required to be procured and maintained as aforesaid must be procured from insurance companies approved by NJPA. 25.4 I1 at any time any of the above -required insurance policies should be cancelled, terminated or modified so that insurance is not in effect as above required, then, if NJPA shall so direct, the Contractor shall suspend performance of the work. If the said work is so suspended, no extension of time shall be due on account thereof. If said work is not suspended, then NJPA may, at its option, obtain insurance affording coverage equal to that above required, the cost of such insurance to be payable by the Contractor. 25.5 Should the awarded Contractor retain a Subcontractor to perform any of the services mentioned herein, it is the Contractor's responsibility to insure that the Subcontractor(s) maintains the same types of insurance coverage in accordance with the requirements and amounts indicated herein. 25.6 NJPA, its officers, and employees must be included as a named insured. Any NJPA Member, its officials, officers, and employees must be included as a named insured when so requested by the NJPA Member.