HomeMy WebLinkAboutResolution - 2014-R0119 - Contract - Collier Construction Company - Animal Shelter Renovations - 03_27_2014Resolution No. 2014-RO119
March 27, 2014
Item No. 5.27
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for
and on behalf of the City of Lubbock, Contract No. 11801 for animal shelter renovations, by and
between the City of Lubbock and Collier Construction Company, and related documents. Said
Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall
be included in the minutes of the City Council.
Passed by the City Council on March 27, 2014
i
ATTEST:
- yx��
Rebtca Garza, City S cret
APPROVED AS TO CONTENT:
Mark Ye ood, Assistant ity Manager
Chief Information Officer
APPROVED AS TO FORM:
ad Weav r, Assistant City Attorney
vw:ccdocs,'RES.Contract-Collier Construction
March 10, 2014
Resolution No. 2014-R0119
Contract No. 14-11801-JOC
Work Order Signature Document
NJPA EZIQC Contract No.: TX04-112012-CCC
❑X New Work Order Modify and Existing Work Order
Work Order Number: 017877.00 Work Order Date: 2/24/2014
Work Order Title: City of Lubbock Animal Shelter Renovations
Owner Name: Citv of Lubbock Contractor Name: Collier Construction
Contact: Wesley Everett Contact: Jim McMillan
Phone: (806) 775-2665 Phone: (806) 741-1982
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of
NJ PA EZIQC Contract No.: TX04-112012-CCC
Brief Work Order Description:
Work Order Number
Location
Amount of Contract
0178770.00 City of Lubbock Animal Shelter $946,109.69
Renovation
CITY OF LUBBOCK
Glen . bertson, Nfayor Jim McMillan, Project Manager
Collier Construction Company
Attest:
Rebecca9'aria, City Secretary
APPROVED AS CONTENT:
Mark AqD4od, 10hief Inforikation Office
Assistant City Manager
Owner's ll resent ve I j—
�
`'Vesley Everett, Director of Facilities
APP V AS FORM:
Assistant City Attorney
9
Detailed Scope of Work THETHE GORDIAN GROUP
To: Jim McMillan
Collier Construction Company
2202 Avenue E
Lubbock, TX 79404
806-741-1982
Date Printed: February 24, 2014
Work Order Number: 017877.00
Work Order Title: City of Lubbock - Animal Shelter Renovation
Brief Scope: City of Lubbock - Animal Shelter Renovation
Preliminary Revised
From: George Lisenbe
City of Lubbock
1625 13th St
Lubbock, TX 79401
(806) 775-3000
❑X Final
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items
set forth below shall be considered part of this scope of work.
Per the Specs and Plans by Stiles & Wallace Associates, dated November 21 st, 2013, and their value engineering/work
summary letter dated January 14th, 2014: Perform all of the work to complete the building addition 51'-11 5/8" wide x 95'-4"
long. This includes all dirt work, fencing, concrete, masonry, reinforcing steel, structural and miscellaneous steel, rough
and finish carpentry, roofing and sheet metal, hollow metal doors, hardware, and glazing, acoustical panel ceilings,
painting, coating for floors & pens, fire extinguishers, power washing equipment, 45-stainless kennel enclosures and
gates, fire sprinkler system, plumbing, HVAC, and electrical work.
3-�—/4-
Contractor Date
L
Owner bate
Scope of Work Page 1 of 1
EZIQC - Southwest 2/24/2014
Contractor's Price Proposal - Summary
Date: February 24, 2014
Re: IQC Master Contract #: TX04-112012-CCC
Work Order #: 017877.00
Owner PO #:
Title: City of Lubbock - Animal Shelter Renovation
Contractor: Collier Construction Company
Proposal Value: $946,109.69
01 - General Requirements
$12,652.06
02 - Site Work
$2,632.92
03 - Concrete
$67,571.45
04 - Masonry
$148,867.48
05 - Metals
$121,513.29
06 - Wood, Plastic, and Composites
$8,262.73
07 - Thermal & Moisture Protection
$64,603.99
08 - Openings
$24,049.45
09 - Finishes
$21,256.01
10 - Specialties
$2,031.11
11 - Equipment
$41,444.90
12 - Furnishings
$953.05
13 - Special Construction
$169,175.00
21 - Fire Suppression
$14,136.22
22 - Plumbing
$67,955.82
23 - Heating, Ventilating, And Air -Conditioning (HVAC)
$77,016.45
26 - Electrical
$31,095.34
27 - Communications
$2,485.04
28 - Electronic Safety And Security
$2,824.38
31 - Earthwork
$26,865.17
32 - Exterior Improvements
$36,823.14
33 - Utilities
$1,894.69
Proposal Total
Thisl total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding.
The Percentage of NPP on this Proposal: 22.24%
$946,109.69
Contractor's Price Proposal - Summary Page 1 of 1
EZ/QC - Southwest 2/24/2014
Contractor's Price Proposal - Detail
Date: February 24, 2014
Re: IQC Master Contract #:
TX04-112012-CCC
Work Order #:
017877.00
Owner PO #:
Title:
City of Lubbock - Animal Shelter Renovation
Contractor:
Collier Construction Company
Proposal Value:
$946,109.69
Sect Item Mod.
UOM Description
Line Total
Labor Equip. Material (Excludes)
01 - General Requirements
1 01 22 23 00 0891
WK 6,000 LB Telescopic Boom, Hi -Reach, Rough Terrain Construction Forklift With
$8,045.51
Full -Time Operator
Quantity Unit Price
Factor
Total
Installation 2.50 x 2,474.21 x
1.3007
8,045.51
2 01 22 23 00 0891 0042
For Equipment Without Operator, Deduct
-$1,769.03
Quantity Unit Price
Factor
Total
Installation 100 x-1,360.06 x
1.3007
-1,769.03
3 01 52 19 00 0003 MO Portable Toilets, Chemical $1,638.70
Quantity Unit Price Factor Total
Installation 14.00 x 89.99 x 1,3007 - 1,638.70
Two toilets for 7 months
4 01 56 26
00 0010
LF Temporary 6' High Chain Link Fence And Posts, > 6 To 12 Months
$738.54
Quantity Unit Price Factor
Total
Installation 340.00 x 1.67 x 1.3007 -
738.54
Around perimeter of jobsite
5 01 56 26
00 0010 0081
For > 250 To 500 LF, Deduct
-$71.86
Quantity Unit Price Factor
Total
Installation 325.00 x -0.17 x 1,3007 -
-71.86
6 01 56 26
00 0065
EA 15' Wide, 6' High, Temporary Chain Link Fence Gate, > 6 To 12 Months
$244.78
Quantity Unit Price Factor
Total
Installation 100 x 188.19 x 1.3007 -
244.78
7 01 74 19
00 0015
EA 40 CY Dumpster (5 Ton) "Construction Debris"Includes delivery of dumpster,
$3,825.42
rental cost, pick-up cost, hauling, and disposal fee. Non -hazardous material.
Quantity Unit Price Factor
Total
Installation 5.00 x 588.21 x 1.3007 -
3,825.42
Subtotal for 01 - General Requirements
$12,652.06
02 - Site Work
8 02 41 13
13 0028
SY 3" To 6" By Machine, Break-up And Remove Wire Mesh Reinforced
$1,777.28
Concrete Paving
Quantity Unit Price Factor
Total
Installation 112.00 x 12.20 x 1.3007 -
1,777.28
Old sidewalk and slab
9 02 41 16 13 0060 CF Demo Concrete Footing For Fence, Gate Or Playground Equipment Post,
$764.07
Etc. Includes excavation.
Quantity Unit Price
Factor
Total
Installation 107.00 x 5.49 x
1.3007
764.07
10 02 41 19 13 0038 LF Saw Cut Concrete Slab Or Paving Up To 4" Depth
$91.57
Quantity Unit Price
Factor
Total
Installation 55.00 x 1.28 x
1,3007 -
91.57
Existing concrete slab
Contractor's Price Proposal - Detail
Page 1 of 20
EZJQC - Southwest
2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number:
017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
Subtotal for 02 - Site Work
$2,632.92
03 - Concrete
11 03 11 13 00 0009
LF Up To 6" High Slab Edge and Block -Out Wood Formwork
$6,360.74
Quantity Unit Price
Factor
Total
Installation 2,264.00 x 2.16 x
1.3007 -
6,360.74
L.F. Curb forming @ the 45 pens
12 03 11 13 00 0094
EA 6" Diameter Sleeves Or Chases for Concrete Formwork, Plastic or Sheet
$233.68
Metal
Quantity Unit Price
Factor
Total
Installation 26.00 x 6.91 x
1.3007 -
233.68
Drain lines under footings, S2.2
13 03 15 16 00 0006
LF 1/2" x 1" Polyurethane Expansion Joint, Poured, 2 Parts
$390.21
Quantity Unit Price
Factor
Total
Installation 250.00 x 1.20 x
1.3007 -
390.21
Sidewalk expansion joints
14 03 15 16 00 0013
LF 1/2" x 6" Premolded Felt Asphalt Expansion Joint, In Slabs Or Walls
$365.13
Quantity Unit Price
Factor
Total
Installation 232.00 x 1.21 x
1.3007 -
365.13
Sidewalk to wall
15 03 15 16 00 0043
SF Asphalt Felt Control Joint, 30 LB Felt Bond Breaker
$120.18
Quantity Unit Price
Factor
Total
Installation 220.00 x 0.42 x
1.3007 -
120.18
Building slab at outside wall
16 03 15 16 00 0048
LF 24 Gauge Galvanized Steel Keyed Joint, 4-112" Cold Expansion Or Control
$2.834.30
Joint
Quantity Unit Price
Factor
Total
Installation 986.00 x 2.21 x
1.3007 -
2,834.30
In slab, 7/S1.1
17 03 21 11 00 0006
TON Grade 60 Reinforcing Steel, Footings And Slabs, #346
$15,040.25
Quantity Unit Price
Factor
Total
Installation 7.20 x 1,606.00 x
1.3007 -
15,040.25
In concrete and masonry walls
18 03 22 11 00 0002
SF 6 x 6 x #10, 21 LB/CSF, Welded Wire Reinforcement In Slabs, (W 1.4 x W 1.4)
$702.64
Quantity Unit Price
Factor
Total
Installation 1,460.00 x 0.37 x
1.3007 -
702.64
Sidewalks
19 03 31 13 00 0009
CY Direct Chute, Place 3000 PSI Concrete Continuous Footings
$4,618.95
Quantity Unit Price
Factor
Total
Installation 33.00 x 107.61 x
1.3007 -
4,618.95
Exterior footings
20 03 31 13 00 0014
CY Concrete Pump, Place 3000 PSI Concrete Spread FootingsExcludes pumping
$8,825.70
equipment.
Quantity Unit Price
Factor
Total
Installation 55.00 x 123.37 x
1.3007 -
8,825.70
Interior footings
21 03 31 13 00 0028
CY Up To 6", By Concrete Pump, Place 3000 PSI Concrete Slab On
$11,586.64
GradeExcludes pumping equipment
Quantity Unit Price
Factor
Total
Installation 80.00 x 111.35 x
1.3007 -
11,586.64
In pen curbs
Contractor's Price Proposal - Detail
Page 2 of 20
EZIQC - Southwest
2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
03 - Concrete
22 03 31 13
00 0092
HR 150' Boom Truck For Concrete Placement (100 CY Per Hour Rating)
$12,805.55
Quantity Unit Price
Factor
Total
Installation 32.00 x 307.66 x
1,3007 -
12,805.55
For interior slabs & curbs & pouring wall cavities
23 03 35 16
00 0006
SF Concrete Floor Finishes, Steel Trowel
$3,687.48
Quantity Unit Price
Factor
Total
Installation 6,300.00 x 0.45 x
1.3007 -
3,687.48
On all flat surfaces
Subtotal for 03 - Concrete
$67,571.45
04 - Masonry
24 04 05 16
26 0015
SF Grout Cavity Walls - 4" Space Concrete Fill (0.333 CF/SF)
$24,626.93
Quantity Unit Price
Factor
Total
Installation 5,520.00 x 3.43 x
1.3007
24,626.93
Exterior and interior masonry walls
25 04 05 19
13 0007
CLF #8 (For 8" Walls), Mill Galvanized, 9 Gauge Side Rods, 9 Gauge Cross Rods,
$1,433.90
Ladder -Type, Masonry Wall Reinforcement
Quantity Unit Price
Factor
Total
Installation 40.50 x 27.22 x
1.3007
1,433.90
CMU horizontal reinforcement
26 04 05 23
13 0007
LF 1-5/8" Width, T-Style, PVC, Masonry Control Joint
$625.64
Quantity Unit Price
Factor
Total
Installation 260.00 x 1.85 x
1.3007
625.64
Exterior walls
27 04 22 23
13 0033
SF 8" x 16" x 4", Normal Weight, Regular, Partition Concrete Block
$15.471.83
Quantity Unit Price
Factor
Total
Installation 1,950.00 x 6.10 x
1.3007
15,471.83
At 45 pens
28 04 22 23
13 0035
SF 8" x 16" x 8", Normal Weight, Regular, Partition Concrete Block
$74,479.12
Quantity Unit Price
Factor
Total
Installation 7,780.00 x 7.36 x
1.3007
74,479.12
At exterior walls and 45 pens
29 04 22 23
13 0035
0031 For Special Color, Add
$15,560.01
Quantity Unit Price
Factor
Total
Installation 6,646.00 x 1.80 x
1.3007 -
15,560.01
At exterior walls
30 04 22 23
13 0061
LF 8" x 16" x 8" Regular Weight, Bond Beam Or Lintel Concrete Block (Block
$7,518.46
Only)
Quantity Unit Price
Factor
Total
Installation 728.00 x 7.94 x
1.3007
7,518.46
In exterior walls and across pens
31 04 22 23 13 0061 0034
For Grout And Fill With 2 #5 Reber, Add
$5,302.56
Quantity Unit Price
Factor
Total
Installation 762.00 x 5.35 x
1.3007 -
5,302.56
32 04 23 13 00 0003
SF 8" x 8" x 4" Thick Plain Glass Block
$3.849.03
Quantity Unit Price
Factor
Total
Installation 144.00 x 20.55 x
1.3007 -
3,849.03
Subtotal for 04 - Masonry
$148,867.48
Contractor's Price Proposal - Detail Page 3 of 20
EZJQC - Southwest 2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number:
017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
05 - Metals
33 05 05 23 00 0005
EA 1/2" Diameter x 6" Length, Plain Steel, J-Type Cast In Place Anchor Bolt
$537.55
Quantity Unit Price
Factor
Total
Installation 112.00 x 3,69 x
1.3007 -
537.55
@ Wood nailers, AS
34 05 05 23 00 0142
EA 3/4" Diameter x 5-1/2" Length, Zinc Plated Steel, Wedge Anchor Expansion
$8,806.39
Bolt
Quantity Unit Price
Factor
Total
Installation 550.00 x 12.31 x
1.3007 -
8,806.39
Structural roof supports, S3.1
35 05 05 23 00 1153
EA 3/8" Diameter x 4-1/2" Length, 304/18-8 Stainless Steel, Hex Head Bolt
$1,092.59
Quantity Unit Price
Factor
Total
Installation 210.00 x 4.00 x
1.3007 -
1,092.59
Embeds at trench angle
36 05 12 23 00 0011
TON 0-10 LB/LF Rolled Shape Steel Angles
$36,646.62
Quantity Unit Price
Factor
Total
Installation 3.90 x 7,224.24 x
1,3007 -
36,646.62
Misc. structural, S3.1
37 05 12 23 00 0082
TON 2" x 2" Weight Range 4-6 LB/LF Structural Tubing - Square
$1,772.33
Quantity Unit Price
Factor
Total
Installation 0.25 x 5,450.38 x
1.3007 -
1,772.33
Misc. structural, S3.1
38 05 12 23 00 0108
SF 1/2" Masonry plates, filler plates, sole plates and anchor strap
$925.27
Quantity Unit Price
Factor
Total
Installation 26.00 x 27.36 x
1.3007
925.27
Embed plates, S3.1
39 05 21 19 00 0001
TON H. J Or K Open Web Joist, 0-30' Span, Steel, Horizontal Bridging
$1,481.78
Quantity Unit Price
Factor
Total
Installation 0.64 x 1,780.03 x
1.3007 -
1,481.78
Roof, S3.1
40 05 21 19 00 0003
TON LJ Or LH Open Web Joist, < 96' Span, Steel, Bolted Cross Bridging
$27.002.48
Quantity Unit Price
Factor
Total
Installation 10.30 x 2,015.53 x
1.3007
27,002.48
41 05 31 00 00 0019
SF 1-1/2" Deep, 20 Gauge Open Ribbed Galvanized Steel Deck
$15,023.09
Quantity Unit Price
Factor
Total
Installation 5,500.00 x 2.10 x
1.3007 -
15.023.09
Roof, S3.1
42 05 53 00 00 0006
SF 1" x 3/16" Steel, Welded Grating
$7,049.79
Quantity Unit Price
Factor
Total
Installation 400.00 x 13.55 x
1.3007
7,049.79
Trench covers
43 05 53 00 00 0006
0118 For 304 Stainless Steel, AddBearing bars at 1-3/16" O.C. and crossbars at 4"
$21,175.40
O.C.
Quantity Unit Price
Factor
Total
Installation 400.00 x 40.70 x
1.3007 -
21,175.40
Subtotal for 05 - Metals
$121,513.29
06 - Wood, Plastic, and Composites
Contractor's Price Proposal - Detail
Page 4 of 20
EZIQC - Southwest
2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title: City of Lubbock - Animal Shelter Renovation
06 - Wood. Plastic. and Composites
44
06 11
16
00 0149
LF 2" x 8" Pressure Treated Wood Blocking To Concrete
$2,891.77
Quantity Unit Price
Factor
Total
Installation 573.00 x 3.88 x
1.3007 -
2,891.77
Wall coping, A6
45
06 41
13
00 0017
LF > 24" To 30" Width, 34-1/2" High x 24" Deep Built In Place Base
$1,126.38
CabinetPrefinished with solid hardwood face frames, hardwood doorframes
and drawer fronts. Hardwood veneer on raised door panels. Excludes
top.
Quantity Unit Price
Factor
Total
Installation 6.00 x 144.33 x
1.3007 -
1,126.38
Cabinets
46
06 41
13
00 0017 0066
For Premium Grade, Add
$440.78
Quantity Unit Price
Factor
Total
Installation 6.00 x 58.48 x
1.3007 -
440.78
47
06 41
13
00 0017 0124
For 4 Drawer Unit, Add
$440.78
Quantity Unit Price
Factor
Total
Installation 6.00 x 56.48 x
1.3007 -
440.78
48
06 41
13
00 0072
EA > 36" To 42" Wide, 24" High x 13" Deep Double Door Wall CabinetPrefinished
$1,939.19
with solid hardwood face frames, hardwood doorframes. Hardwood veneer
on raised door panels.
Quantity Unit Price
Factor
Total
Installation 6.00 x 248.48 x
1.3007 -
1,939.19
49
06 41
13
00 0072 0066
For Premium Grade, Add
$873.84
Quantity Unit Price
Factor
Total
Installation 6.00 x 111.97 x
1.3007 -
873.84
50
06 41
93
00 0002
EA Hinges, Concealed, Steel, Full Or Half Overlay, Self Closing
$276.16
Quantity Unit Price
Factor
Total
Installation 16.00 x 13.27 x
1.3007 -
276.16
51
06 41
93
00 0004
EA Pull Handles, Solid Brass
$147.19
Quantity Unit Price
Factor
Total
Installation 12.00 x 9.43 x
1.3007 -
147.19
52
06 41
93
00 0010
EA Door Catch
$126.64
Quantity Unit Price
Factor
Total
Installation 8.00 x 12.17 x
1.3007 -
126.64
Subtotal for 06 - Wood, Plastic, and Composites
$8,262.73
07 - Thermal & Moisture Protection
53
07 13
53
00 0025
CSF 20 Mil PVC Vapor Barrier
$2,752.91
Quantity Unit Price
Factor
Total
Installation 64.00 x 33.07 x
1.3007
2,752.91
Under slab, 1/S1.1
54
07 13
53
00 0025 0017
For Joint Taping, Add
$320.49
Quantity Unit Price
Factor
Total
Installation 64.00 x 3.85 x
1.3007
320.49
55
07 13
53
00 0025 0019
For Application To Horizontal Surfaces, Deduct
-$119.04
Quantity Unit Price
Factor
Total
Installation 64.00 x -1.43 x
1.3007 -
-119.04
Contractor's Price Proposal - Detail Page 5 of 20
EZIQC - Southwest 2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number:
017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
07 - Thermal & Moisture Protection
56 07 19 13 00 0002
SF Spray On Vertical Wall Protection Sealing System, Concrete Block Or Brick
$8,576.82
Quantity Unit Price
Factor
Total
Installation 7,850.00 x 0.84 x
1.3007 -
8,576.82
Apply two layers on outside of exterior CMU walls
57 07 22 16 00 0003
SF V2" Thick, R1.3, High -Density Fiberboard, Roof Board Insulation
$6,080.77
Quantity Unit Price
Factor
Total
Installation 5,500.00 x 0.85 x
1.3007 -
6,080.77
58 07 22 16 00 0003
0132 For Mechanically Fastened To Wood Or Steel, Deduct
-$930.00
Quantity Unit Price
Factor
Total
Installation 5,500.00 x -0.13 x
1.3007 -
-930.00
59 07 22 16 00 0014
SF 1" Thick, R2.78, Partite, Roof Board Insulation
$133.45
Quantity Unit Price
Factor
Total
Installation 90.00 x 1.14 x
1.3007 -
133.45
At AC curbs
60 07 22 16 00 0014
0132 MOD For Mechanically Fastened To Wood Or Steel, Deduct
-$15.22
Quantity Unit Price
Factor
Total
Installation 90.00 x -0.13 x
1.3007 -
-15.22
61 07 22 16 00 0049
SF 2-1/2" Thick, R16.67, Polyisocyanurate, Roof Board Insulation
$11.446.16
Quantity Unit Price
Factor
Total
Installation 5,500.00 x 1.60 x
1.3007 -
11,446.16
62 07 22 16 00 0049
0134 MOD For Mechanically Fastened To Wood Or Steel, Deduct
-$500.77
Quantity Unit Price
Factor
Total
Installation 5,500.00 x -0.07 x
1.3007 -
-500.77
63 07 22 16 00 0084
SF 1/2" Tapered Polyisocyanurate Board
$4,392.41
Quantity Unit Price
Factor
Total
Installation 976,00 x 3,46 x
1.3007 -
4,392.41
Per roof plan
64 07 22 16 00 0084
0025 SF For Setting In Hot Asphalt, Add
$457.01
Quantity Unit Price
Factor
Total
Installation 976.00 x 0.36 x
1.3007 -
457,01
65 07 51 13 00 0051
LF 4" x 4" Perlite Cant Strip
$663.36
Quantity Unit Price
Factor
Total
Installation 340.00 x 1.50 x
1.3007 -
663,36
At base flashings
66 07 54 23 00 0003
SO 60 Mil, Single Ply TPO Roofing Membrane, Fully Adheredlncludes adhesive.
$10,119.12
Quantity Unit Price
Factor
Total
Installation 55.00 x 141.45 x
1.3007 -
10,119.12
67 07 54 23 00 0003
0113 For 15 Year Warranty, Add
$199.01
Quantity Unit Price
Factor
Total
Installation 51.00 x 3.00 x
1.3007
199.01
As specified
68 07 54 23 00 0009
EA Up To 3" Pipe Diameter, Prefabricated TPO Pipe Cone/Bootincludes attaching
$131.21
the boot to the membrane, caulking around the pipe and installing a draw
band.
Quantity Unit Price
Factor
Total
Installation 4.00 x 25.22 x
1.3007
13121
At roof vents
Contractor's Price Proposal - Detail
Page 6 of 20
EZ/QC - Southwest
2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title: City of Lubbock - Animal Shelter Renovation
07 - Thermal & Moisture Protection
69
07 54
23
00 0012
LF 30" Wide, TPO Walkway Protection Pad
$4,140.23
Quantity Unit Price
Factor
Total
Installation 302.00 x 10.54 x
1.3007 -
4,140.23
Around HVAC units
70
07 54 23
00 0013
SF TPO Membrane Base Flashing
$5,950.31
Quantity Unit Price
Factor
Total
Installation 1,530.00 x 2.99 x
1.3007 -
5,950.31
Roof membrane
71
07 62
00
00 0051
SF 24 Gauge, Galvanized Steel Flashing
$5,600.97
Quantity Unit Price
Factor
Total
Installation 637.00 x 6.76 x
1.3007 -
5,600.97
Wall coping
72
07 63
00
00 0028
EA 2-3/4" ID x 12" Riser Pipe, 4 LB Lead Pipe Flashing For Roofs, Fits 2" Pipe
$81.38
Quantity Unit Price
Factor
Total
Installation 100 x 62.57 x
1.3007 -
81.38
At plumbing vents
73
07 63
00
00 0029
EA 3-3/4" ID x 12" Riser Pipe, 4 LB Lead Pipe Flashing For Roofs, Fits 3" Pipe
$373.14
Quantity Unit Price
Factor
Total
Installation 4.00 x 71.72 x
1.3007 -
373.14
At plumbing vents
74 07 72 13 00 0051
EA 62" x 122" Outside Frame Dimensions, 12" Height, 18 Gauge, Insulated
$752.42
Galvanized Steel, Prefabricated Roof Curb
Quantity Unit Price Factor
Total
Installation 2.00 x 376.21 x 1.0000 -
752.42
HVAC roof curbs
75 07 72 13 00 0051 0236
For Sloped Roofs Up To 1 In 12 Pitch, Add
$68.32
Quantity Unit Price Factor
Total
Installation 2.00 x 34.16 x 1.0000 -
68.32
76 07 92 00 00 0038
CLF 3/8" x 3/4" Joint, Polysulfide Sealant And Caulking
$1,427.54
Quantity Unit Price Factor
Total
Installation 4.25 x 258.24 x 1.3007 -
1,427.54
77 07 95 13 00 0025
LF Exterior Roof To Wall Expansion Joint, 2" Opening Aluminum Assemblies
$2,501.99
Quantity Unit Price Factor
Total
Installation 67.00 x 28.71 x 1.3007 -
2,501.99
Subtotal for 07 - Thermal & Moisture Protection
$64,603.99
08 - Openings
78 08 05 13 00 0004
EA For > 2 To 4 SF, Factory Installed 20 Gauge Metal Frame For Vision Glass In
$391.42
Door, Add
Quantity Unit Price Factor
Total
Installation 3.00 x 100.31 x 1.3007 -
391 A2
79 08 05 13 00 0011
EA For > 2 To 4 SF, Site Installed 20 Gauge Metal Frame For Vision Glass In Door,
$515.51
Add
Quantity Unit Price Factor
Total
Installation 3.00 x 132.11 x 1.3007 -
515.51
80 08 12 13 13 0090
EA Tx >7'-2" Through 9' x 6-3/4" Deep Metal Door Frame, 16 Gauge
$3,114.70
Quantity Unit Price Factor
Total
Installation 9.00 x 266.07 x 1.3007 -
3,114.70
Reference specs
Contractor's Price Proposal - Detail
Page 7 of 20
EZIQC - Southwest
2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
08 -Openings
81 08 12 13
13 0090
0073 Fes, For Welded Frames, Add
$526.78
Quantity Unit Price
Factor
Total
Installation 9.00 x 45.00 x
1.3007
526.78
82 08 12 13
13 0090
0082 For 14 Gauge Frame, Add
$579.11
Quantity Unit Price
Factor
Total
Installation 9.00 x 49.47 x
1.3007 -
579.11
83 08 13 13
13 0057
Fes, Tx 6-8" x 1-3/4" 18 Gauge Metal Door (Unrated)
$423.91
Quantity Unit Price
Factor
Total
Installation 1.00 x 325.91 x
1,3007
423.91
Reference specs
84 08 13 13
13 0138
EA Tx 7' x 1-3/4" 16 Gauge Metal Door (Unrated)
$4,630.49
Quantity Unit Price
Factor
Total
Installation 8.00 x 445.00 x
1.3007
4.630.49
85
08 13 13 13 0138 0096
For 14 Gauge, Grade III, Extra Heavy Duty, Add
$1,892.09
Quantity Unit Price Factor
Total
Installation 9.00 x 161.63 x 1.3007 -
1.892.09
86
08 13 13 13 0138 0102
For Galvanized Steel, Add
$709.52
Quantity Unit Price Factor
Total
Installation 9.00 x 60.61 x 1.3007 -
709,52
87
08 71 16 00 0122
E1 Satin Chrome Finish, 500 LB Max Door Weight, Intermediate Mount, 3/4" Offset
$1,141.48
Pivot Hinge (Ives 7215 INT)
Quantity Unit Price Factor
Total
Installation 9.00 x 97.51 x 1,3007
1,141.48
Reference specs
88
08 71 16 00 0521
E'', 2-1/2" Base Diameter, Convex Or Concave Rubber Insert, Satin Chrome
$55.67
Finish, Wrought Brass Wall Bumper (Ives WS406/407)
Quantity Unit Price Factor
Total
Installation 4.00 x 10.70 x 1.3007 -
55,67
89
08 71 16 00 0572
E1 4" Projection, Rigid Type, Satin Aluminum Finish, Aluminum Wall Stop And
$203.95
Manual Door Holder (Ives WS20)
Quantity Unit Price Factor
Total
Installation 4.00 x 39.20 x 1.3007
203.95
90
08 71 16 00 1025
E4 6" x 36", 0.050" Thick, Bright/Satin Chrome Finish, Brass Kick Plate
$460.45
Quantity Unit Price Factor
Total
Installation 5.00 x 70.80 x 1.3007
460.45
91
08 71 16 00 2054
E1 1" Flattened x 1/2" Round Aluminum Door Pulls, 10" Long
$196.51
Quantity Unit Price Factor
Total
Installation 4.00 x 37.77 x 1.3007
196.51
92
08 71 16 00 2073
EA 8" x 16" Aluminum Push Plate Door Hardware
$96.41
Quantity Unit Price Factor
Total
Installation 4.00 x 18.53 x 1.3007
96.41
93
08 71 16 00 2077
E'', 3' Push Bar Exit Device, Rim Type, Fire RatedAnodized finish: aluminum or
$2,826.68
dark brown. Von Duprin Series 22.
Quantity Unit Price Factor
Total
Installation 5.00 x 434,64 x 1.3007
2,826.68
94
08 71 16 00 2153
E1 Surface Mounted Heavy Duty Door Closer- LCN 4040/4041 Series
$1,777.99
Quantity Unit Price Factor
Total
Installation 5.00 x 273.39 x 1.3007
1.777.99
Contractors Price Proposal - Detail Page 8 of 20
EZIQC - Southwest 2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
08 -Openings
95 08 71 16 00 2193
EA Heavy Duty Cylindrical Entrance Lockset F82Satin chrome plated US 26D
$1,437.99
(BHMA 626) - BHMA 156.2-1989, Grade 1(Corbin Russwin CL 3600).
Quantity Unit Price Factor
Total
Installation 5.00 x 221.11 x 1.3007 -
1,437.99
96 08 71 16 00 2201
EA Extra Heavy Duty Cylindrical Entrance Lockset F82Satin chrome plated US
$979.15
26D (BHMA 626) - BHMA 156.2-1989, Grade 1(Corbin Russwin CL 3300).
Quantity Unit Price Factor
Total
Installation 3.00 x 250.93 x 1.3007 -
979.15
97 08 71 16 00 2206
EA Extra Heavy Duty Cylindrical Full Dummy Trim LocksetSatin chrome plated US
$1.191.31
26D (BHMA 626) - BHMA 156.2-1989, Grade 1(Corbin Russwin CL 3300).
Quantity Unit Price Factor
Total
Installation 5.00 x 183.18 x 1.3007
1,191.31
98 08 71 16 00 2235
EA Single Cylinder Deadbolt, Key One Side, Knob One SideCylindrical, ANSI
$115.10
Grade 1, interchangeable core, bright brass or satin chromium finish.
Quantity Unit Price Factor
Total
Installation 100 x 88.49 x 1.3007 -
115.10
99
08 71 19 00 0081
LF 7/16" Neoprene Insert, 90 Degree, Aluminum Retainer Door Sweep (Pemko
$147.69
315CN)
Quantity Unit Price Factor
Total
Installation 15.00 x 7.57 x 1.3007 -
147.69
100
08 71 19 00 0082
LF 11/16" Neoprene Insert, 90 Degree, Aluminum Retainer Door Sweep (Pemko
$40.97
368CN)
Quantity Unit Price Factor
Total
Installation 3.00 x 10.50 x 1.3007 -
40.97
101
08 71 19 00 0143
LF 2-1/2" Aluminum Overhead Rain Drip With Slotted Holes (Pemko 346C)
$163.63
Quantity Unit Price Factor
Total
Installation 20.00 x 6.29 x 1.3007 -
163.63
102
08 71 19 00 0148
LF 1/2" x 1/4", Silicon Compression Bulb, Adhesive Backed Perimeter Gasketing
$50.42
Weather -Strip (Pemko S88)
Quantity Unit Price Factor
Total
Installation 17.00 x 2.28 x 1.3007 -
50.42
103 08 71 19 00 0150
LF 5/16" x 1/2", Silicone Single Fin, Adhesive Backed Perimeter Gasketing
$248.76
Weather -Strip (Pemko S77)
Quantity Unit Price Factor
Total
Installation 75.00 x 2.55 x 1.3007 -
248.76
104 08 71 21 00 0022
LF 6" Width, 1/2" Height, Aluminum Saddle Threshold (Pemko 172A)
$131.76
Quantity Unit Price Factor
Total
Installation 5.00 x 20.26 x 1.3007 -
131.76
Subtotal for 08 - Openings
$24,049.45
09 - Finishes
105 09 24 33 00 0002
CSF 1/2" Cement Parging
$4.712.85
Quantity Unit Price Factor
Total
Installation 9.25 x 391.71 x 1.3007
4,712.85
On exterior masonry walls below grade, two coats, per spec 04200, par 3.13
106 09 91 13 00 0225 LF Paint Metal Door Frame And Trim, 2 Coats Paint, Brush/Roller Work $168.57
Quantity Unit Price Factor Total
Installation 162.00 x 0.80 x 1.3007 168.57
Contractor's Price Proposal - Detail Page 9 of 20
EZIQC - Southwest 2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
09 - Finishes
107
09 91
13
00 0329
LF Paint Conduit, Steel Pipe 1/2" To 1-1/2" Diameter, One Coat Primer
$62.04
Quantity Unit Price
Factor
Total
Installation 90.00 x 0.53 x
1.3007 -
62.04
Roof top gas lines
108
09 91
13
00 0329
0251 For Epoxy Paint, Add
$7.02
Quantity Unit Price
Factor
Total
Installation 90.00 x 0.06 x
1.3007
7.02
109
09 91
13
00 0339
LF Paint Conduit, Steel Pipe 1/2" To 1-1/2" Diameter, Two Coats
$127.60
Quantity Unit Price
Factor
Total
Installation 90.00 x 1.09 x
1.3007 -
127.60
110
09 91
23
00 0040
SF Paint Interior Concrete Block, 1 Coat Filler, Brush Work
$2,381.14
Quantity Unit Price
Factor
Total
Installation 4,694.00 x 0.39 x
1.3007 -
2,381.14
111
09 91
23
00 0042
SF Paint Interior Concrete Block, 2 Coats Paint, Brush Work
$5,250.72
Quantity Unit Price
Factor
Total
Installation 4,694.00 x 0.86 x
1.3007 -
5,250.72
112
09 91
23
00 0226
SF Paint Interior Concrete Floors And Decks, One Coat Bonding Agent, Sprayed
$1,688.31
Quantity Unit Price
Factor
Total
Installation 5,900.00 x 0.22 x
1.3007 -
1,688.31
113 09 91 23
00 0260
EA Paint Interior Door, Both Faces, 1 Coat Paint, Spray
$319.11
Quantity Unit Price
Factor
Total
Installation 9.00 x 27.26 x
1.3007
319.11
114 09 91 23
00 0261
EA Paint Interior Door, Both Faces, 2 Coats Paint, Spray
$596.79
Quantity Unit Price
Factor
Total
Installation 9.00 x 50.98 x
1.3007 -
596.79
115 09 91 33
00 0024
GAL Acrylic Urethane Sealer
$5,941.86
Quantity Unit Price
Factor
Total
Installation 65.00 x 70.28 x
1.3007 -
5,941.86
Two coats on floors and on pen walls
Subtotal for 09 - Finishes
$21,266.01
10 - Specialties
116 10 44 13
00 0007
EA 12" x 27" x 7-3/4" Inside Dimensions, Recessed Steel Fire Extinguisher
$1,169.20
Cabinet
Quantity Unit Price Factor Total
Installation 5.00 x 179.78 x 1.3007 1,169.20
117 10 44 16 13 0012 EA 104 Dry Chemical, Type ABC Portable Fire Extinguisher $861.91
Quantity Unit Price Factor Total
Installation 5.00 x 132.53 x 1.3007 861.91
Subtotal for 10 - Specialties $2,031.11
11 - Equipment
118 11 00 00 00 0000 Install central pressure washing system, with ten remote connectlorm (Spray $41,200.00
Master)
Quantity Und Price Factor Total
NPP Installefion i.Do x 32,960.00 x 12500 = 41,200.00
Pressure washer with 10 renlo o
Contractor's Price Proposal - Detail Page 10 of 20
EZJQC - Southwest 2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title: City of Lubbock -Animal Shelter Renovation
11 -Equipment
119 11 68 13 00 0457
LF Tuffrurf Geotextile Fabric, (12 1/2' Wide Roll), Order an Additional 20% for
$244.90
Ovedap/Waste, per LF (Landscape Structures® 109694A)
Quantity Unit Price Factor
Total
Installation 33.00 x 4.68 x 1.3007 -
200.88
Demolition 36.00 x 0.94 x 1.3007
44.02
Landscape
Subtotal for 11 -Equipment
$41,444.90
12 - Furnishings
120 12 36 61 16 0004
SF 1/2" Solid Polyester (Conan) CountertopQuantity based on area of counter,
$890.62
backsplash and apron. Includes drilling holes for fixtures and 1-1/2" drop
edge with 1/8" radius edges (when apron not used).
Quantity Unit Price Factor
Total
Installation 27.00 x 25.36 x 1.3007
890,62
121 12 36 61 16 0004 0030
LF For Each LF Of Half Round Edge, Add
$62.43
Quantity Unit Price Factor
Total
Installation 6.00 x 8.00 x 1.3007
62.43
Subtotal for 12 - Furnishings
$953.05
13 - Special Construction
-
-
122 13 00 00 00 0000
Buld and install 90 new stainless steel pens, matching the existing pens,
M 69,175.00
ex-2 of wit' i nprc-aec sta r oss sLce: ;racks, cables, rollers and hardware to
:-v a -;rust and deterioration.
Unit Price Factor
Yoh
NPP
Installation 1.00 x 135,340.00 x 1.2500 `
139,)76_00
Subtotal for 13 - Special Construction
$169,175.00
21 - Fire Suppression
123 21 13 13 00 0006
EA Exposed Piping, Wet Automatic Sprinkler System, Ordinary Hazardlncludes
$10,722.45
branch pipe and fittings, supports and sprinkler heads.
Quantity Unit Price Factor
Total
Installation 40.00 x 206.09 x 1.3007 -
10,722.45
124 21 13 13 00 0023
EA Recessed Chrome Sprinkler Head Escutcheon, Two Piece
$403.74
Quantity Unit Price Factor
Total
Installation 40.00 x 7.76 x 1.3007 -
403.74
125 21 13 13 00 0027
EA 4" Alarm Valve - Wet System
$2,225.97
Quantity Unit Price Factor
Total
Installation 1.00 x 1,711.36 x 1.3007 -
2,225.97
126 21 22 16 00 0434
EA Horn And 75 Candela Strobe, Alarm Devices, Industrial Fire Control System
$784.06
(Ansul 429695)
Quantity Unit Price Factor
Total
Installation 5.00 x 120.56 x 1.3007 -
784.06
Subtotal for 21 - Fire Suppression
$14,136.22
22 - Plumbing
127 22 05 76 00 0011
EA 4" Heavy Duty Floor Cleanout, Round Top, Cast Iron With Cast Bronze Screw
$7,122.40
Plug And Nickel Bronze Cover
Quantity Unit Price Factor
Total
Installation 14.00 x 391.13 x 1.3007
7,122.40
Contractors Price Proposal - Detail
Page 11 of 20
EZJQC - Southwest
2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title: City of Lubbock - Animal Shelter Renovation
22 - Plumbing
128 22 05 76 00 0046 EA 6" Cleanout Tee With Cast Bronze Screw Plug And Square Nickel Bronze $2,183.69
Cover
Quantity Unit Price Factor Total
Installation 2.00 x 839.43 x 1.3007 - 2,183.69
129 22 07 19 00 0521
LF 1-1/2" Pipe, (1-5/8" Outside Diameter Pipe), 1/2" Thick Insulation, Flexible
$1,884.71
Elastomeric Unicellular Cover
Quantity Unit Price Factor
Total
Installation 460.00 x 3.15 x 1.3007
1,884.71
130 22 11 16 00 0189
LF 2" Hard Drawn Type L Copper Tube/Pipe
$907.00
Quantity Unit Price Factor
Total
Installation 36.00 x 19.37 x 1.3007 -
907.00
131 22 11 16 00 0551
LF 1" Inside Diameter Copper PipelTubing Type L Assemblylncludes all hangers
$1,398.90
and couplings, elbow, tee, reducer fittings. All hangers are complete
assemblies. Not for use where detail is available.
Quantity Unit Price Factor
Total
Installation 90.00 x 11.95 x 1.3007 -
1,398.90
132 22 11 19 00 0170
EA 8" Thick Wall, Cast Bronze, Non Freeze, Nikaloy Face, Integral Vacuum
$324.06
Breaker Wall Hydrant
Quantity Unit Price Factor
Total
Installation 100 x 249.14 x 1.3007 -
324.06
133 22 13 16 00 0137
EA 6" x 4" Bell And Spigot Cast Iron Reducing Double Wye
$10,529.47
Quantity Unit Price Factor
Total
Installation 51.00 x 158.73 x 1.3007 -
10,529.47
134 22 13 16 00 0800
LF 4" Schedule 40 ABS-PVC DVW Pipe Assemblylncludes all fittings, couplings
$15,850.17
and hangers. Fittings are assumed every 10'. Not for use where detail is
available.
Quantity Unit Price Factor
Total
Installation 978.00 x 12.46 x 1.3007 -
15,850.17
135 22 13 16 00 0801
LF 6" Schedule 40 ABS-PVC DVW Pipe Assemblylncludes all fittings, couplings
$4,687.20
and hangers. Fittings are assumed every 10'. Not for use where detail is
available.
Quantity Unit Price Factor
Total
Installation 180.00 x 20.02 x 1.3007 -
4,687.20
136 22 13 16 00 0859
EA 4" Schedule 40 ABS-PVC DVW P-Traps
$2,963.88
Quantity Unit Price Factor
Total
Installation 51.00 x 44.68 x 1.3007 -
2,963.88
137 22 13 19 13 0004
EA 6" Round Top Floor Drain With 3" Outlet, Bronze Top
$13,289.90
Quantity Unit Price Factor
Total
Installation 50.00 x 204.35 x 1.3007 -
13.289.90
138 22 13 19 13 0028
EA 6" x 6" Floor Drain With 2" Bottom Outlet, Nikaloy Top
$310.56
Quantity Unit Price Factor
Total
Installation 100 x 238.76 x 1.3007 -
310.56
139 22 14 26 13 0031
EA 9" x 9" Cast Iron Roof Drain With 4" Outlet, Cast Iron Promenade Top
$4,481.04
Quantity Unit Price Factor
Total
Installation 10.00 x 344.51 x 1.3007 -
4,481.04
140 22 14 26 13 0069
EA 6" Outlet, Bronze Roof Drain Downspout Nozzle
$847,48
Quantity Unit Price Factor
Total
Installation 2,00 x 325.78 x 1.3007 -
847.48
Contractors Price Proposal - Detail
Page 12 of 20
EZJQC - Southwest
2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
22 - Plumbing
141
22 42
16 00 0097
EA 24" x 20" Enameled Cast Iron Wall Mount Service Sink With Stainless Steel Rim
$804.14
Guard, Trap Standard (American Standard 7695.000)
Quantity Unit Price Factor
Total
Installation 100 x 618.24 x 1.3007 -
804.14
142
22 42
39 00 0057
EA 8" Spout With Vacuum Break And Bottom Fork Brace, Wall Mount Service Sink
$371.22
Faucet, Stops In Integral Arm, Wrist Blade Handles, American Standard
8345.119
Quantity Unit Price Factor
Total
Installation 100 x 285.40 x 1.3007
371.22
Subtotal for 22 - Plumbing
$67,955.82
23 - Heating,
Ventilating,
And Air -Conditioning (HVAC)
143
23 05
23 00 0124
EA 1" Ball Valve, Brass Body, Threaded Or Sweated, 125 LB, Regular Port
$36.99
Quantity Unit Price Factor
Total
Installation 100 x 28.44 x 1.3007 -
36.99
144
23 05
23 00 0125
EA 1-1/4" Ball Valve, Brass Body, Threaded Or Sweated, 125 LB, Regular Port
$52.44
Quantity Unit Price Factor
Total
Installation 100 x 40.32 x 1.3007
52.44
145
23 05
23 00 0127
EA 2" Ball Valve, Brass Body, Threaded Or Sweated, 125 LB, Regular Port
$76.86
Quantity Unit Price Factor
Total
Installation 100 x 59.09 x 1.3007
76.86
146
23 05
23 00 0993
EA 1-1/4" NPT Flow Control Valve, Iron And Bronze, Water Balancing Valve With
$181.10
Pressures Up To 300 PSIG
Quantity Unit Price Factor
Total
Installation 100 x 139.23 x 1.3007 -
181.10
147
23 05
29 00 0735
EA 3" Adjustable Pipe Saddle Support, Type 38
$1,136.68
Quantity Unit Price Factor
Total
Installation 10.00 x 87.39 x 1.3007 -
1,136.68
148
23 05
93 00 0016
EA Balancing HVAC Duct System, Ceiling Height > 12' Supply, Return, Exhaust,
$2,158.12
Register And Diffuser
Quantity Unit Price Factor
Total
Installation 34.00 x 48.80 x 1.3007 -
2,158.12
149
23 07
13 00 0019
SF 1", 3 LB/CF FSK Rigid Fiber Glass Board Insulation
$2,720.54
Quantity Unit Price Factor
Total
Installation 664.00 x 3.15 x 1.3007 -
2,720.54
150
23 11
23 00 0114
EA 3/4" Port, 425 MBTU Pressure Regulator With Over Pressure Protection
$448.69
Device For Corrugated Stainless Steel Tubing (CSST), Flexible Gas Pipe
Quantity Unit Price Factor
Total
Installation 2.00 x 172.48 x 1.3007 -
448.69
151
23 11
23 00 0120
EA 3/4" Gas Stop, Brass
$57.60
Quantity Unit Price Factor
Total
Installation 2.00 x 22.14 x 1.3007 -
57.59
152
23 21
13 23 0004
LF 3/4" Schedule 40 Threaded Black Steel Pipe With 150 LB Malleable Iron Fitting
$514.17
Assemblylncludes all hangers and all fittings (couplings, elbows, tees and
reducer fittings). All hangers are complete assemblies. Not for use where
detail is available.
Quantity Unit Price Factor
Total
Installation 59.00 x 6.70 x 1.3007 -
514.17
Contractor's Price Proposal - Detail Page 13 of 20
EZJQC - Southwest 2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number:
017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
23 - Heating, Ventilating,
And Air -Conditioning (HVAC)
153 23 21 13 23 0006
LF 1-1/4" Schedule 40 Threaded Black Steel Pipe With 150 LB Malleable Iron
$397.55
Fitting Assemblylncludes all hangers and all fittings (couplings, elbows, tees
and reducer fittings). All hangers are complete assemblies. Not for use where
detail is available.
Quantity Unit Price Factor
Total
Installation 36.00 x 8.49 x 1,3007 -
397.55
154 23 31 13 13 0003
LB Sheet Metal Ductwork, Low Pressure, Field Fabricated, Galvanized, Field
$7.975.89
Assemble And Install
Quantity Unit Price Factor
Total
Installation 1,460.00 x 4.20 x 1.3007 -
7,975.89
155 23 31 13 16 0010
LF 14" Round Galvanized Sheet Metal Duct, Factory Fabricated, Field Installed,
$3.300.53
Low Pressure
Quantity Unit Price Factor
Total
Installation 250.00 x 10.15 x 1.3007 -
3.300.53
156 23 31 13 16 0031
EA 8" Round Galvanized Sheet Metal 90 Degree Elbows, Factory Fabricated,
$102.59
Field Installed, Low Pressure
Quantity Unit Price Factor
Total
Installation 3.00 x 26.29 x 1.3007 -
102.59
157 23 31 13 16 0034
EA 14" Round Galvanized Sheet Metal 90 Degree Elbows, Factory Fabricated,
$689.88
Field Installed, Low Pressure
Quantity Unit Price Factor
Total
Installation 7.00 x 75.77 x 1.3007 -
689.88
158 23 31 13 16 0046
EA 14" Round Galvanized Sheet Metal 45 Degree Elbows, Factory Fabricated,
$172.89
Field Installed, Low Pressure
Quantity Unit Price Factor
Total
Installation 2.00 x 66.46 x 1.3007
172.89
159 23 31 13 16 0067
EA 8" Round Connector
$154.00
Quantity Unit Price Factor
Total
Installation 10.00 x 11.84 x 1.3007 -
154.00
160 23 31 13 16 0070
EA 14" Round Connector
$2,803.72
Quantity Unit Price Factor
Total
Installation 95.00 x 22.69 x 1.3007
2,803.72
161 23 31 13 16 0078
LF 8" Round Spiral Duct, Galvanized, 26 Gauge, Slip Joint
$93.34
Quantity Unit Price Factor
Total
Installation 12.00 x 5.98 x 1.3007 -
93.34
162 23 31 13 16 0081
LF 14" Round Spiral Duct, Galvanized, 26 Gauge, Slip Joint
$1,963.46
Quantity Unit Price Factor
Total
Installation 139.00 x 10.86 x 1.3007
1,963.46
163 23 74 13 00 0028
EA 15 Ton Electric Cooling, 300 MBH Gas Heating, Self Contained Package
$51,979.41
Rooftop Unit
Quantity Unit Price Factor
Total
Installation 2.00 x 19,981.32 x 1.3007 -
51,979.41
Greenheck in lieu of Aeon brand
Subtotal for 23 - Heating, Ventilating, And Air -Conditioning (HVAC)
$77,016.45
26 - Electrical
164 26 01 50 52 0335
EA 2 Lamp, 32 Watt TBX Compact Fluorescent, 277 V, 5% Light Level, Electronic
$791.97
Dimming Ballast
Quantity Unit Price Factor
Total
Installation 4.00 x 152.22 x 1.3007
791.97
Contractor's Price Proposal - Detail
Page 14 of 20
EZ/QC - Southwest
2/24/2014
Contractor's Price Proposal - Detail Continues..
Work
Order Number:
017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
26 - Electrical
165
26 05 29
00 0073
EA 3/4", One Hole Steel Conduit Strap
$275.10
Quantity
Unit Price
Factor
Total
Installation 150.00 x
1,41
x 1.3007 -
275.10
166
28 05 29
00 0083
EA 1/2", One Hole Iron Conduit Strap
$398.79
Quantity
Unit Price
Factor
Total
Installation 210.00 x
1.46
x 1.3007 -
398.79
167
26 05 29
00 0085
EA 1", One Hole Iron Conduit Strap
$172.47
Quantity
Unit Price
Factor
Total
Installation 78.00 x
1.70
x 1.3007
172.47
168
26 05 33
13 0283
LF 1/2" EMT Conduit
$4,097.21
Quantity
Unit Price
Factor
Total
Installation 1,875.00 x
1.68
x 1.3007 -
4,097.21
169
26 05 33
13 0284
LF 3/4" EMT Conduit
$3,796.35
Quantity
Unit Price
Factor
Total
Installation 1,410.00 x
2.07
x 1,3007 -
3,796.35
170
26 05 33
13 0285
LF 1" EMT Conduit
$2,529.99
Quantity
Unit Price
Factor
Total
Installation 734.00 x
2.65
x 1.3007
2,529.99
171
26 05 33
13 0317
EA 3/4" EMT Compression Coupling
$532.77
Quantity
Unit Price
Factor
Total
Installation 160.00 x
2.56
x 1.3007 -
532.77
172
26 05 33
13 0318
EA 1" EMT Compression Coupling
$392.29
Quantity
Unit Price
Factor
Total
Installation 80.00 x
3.77
x 1.3007 -
392.29
173
26 05 33
13 0327
EA 112" EMT Box Connector With Set Screw
$147.66
Quantity
Unit Price
Factor
Total
Installation 66.00 x
1.72
x 1.3007
147.66
174
26 05 33
13 0349
EA 1/2" EMT Box Compression Connector
$294.61
Quantity
Unit Price
Factor
Total
Installation 75.00 x
3.02
x 1.3007 -
294.61
175
26 05 33
13 0350
EA 3/4" EMT Box Compression Connector
$953.67
Quantity
Unit Price
Factor
Total
Installation 195.00 x
3.76
x 1.3007 -
953.67
176
26 05 33
13 0351
EA 1" EMT Box Compression Connector
$276.27
Quantity
Unit Price
Factor
Total
Installation 40.00 x
5.31
x 1.3007
276.27
177
26 05 33
13 0383
EA 112" EMT To Flexible Conduit Compression Adapter
$1.381.47
Quantity
Unit Price
Factor
Total
Installation 190.00 x
5.59
x 1.3007
1,381.47
178
26 05 33
13 0470
EA 3/4" IMC Type C Two Hub Conduit Body With Cover
$140 94
Quantity
Unit Price
Factor
Total
Installation 4.00 x
27.09
x 1.3007
140.94
179
26 05 33
16 0010
EA 3"-1/2" x 3-3/4" Steel Masonry Box With Cover, 1 Gang, Flush Mount
$1,842.83
Quantity
Unit Price
Factor
Total
Installation 140.00 x
10,12
x 1.3007 -
1,842.83
Contractors Price Proposal - Detail
Page 15 of 20
EZ/QC - Southwest
2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
26 - Electrical
180
26 05 33 16 0201
EA 2 Gang 4-1/2" x 1-5/8" Box, Concealed With Cover, 3/4" Knock Out, Solid
$1,002.45
Outlet Box
Quantity Unit Price Factor
Total
Installation 35.00 x 22.02 x 1.3007 -
1,002.45
181
26 09 23 00 0125
EA Passive Infrared, Wall Switch Mounted Occupancy Sensor (Watt Stopper
$105.02
WI-200)
Quantity Unit Price Factor
Total
Installation 100 x 80.74 x 1.3007 -
105.02
182
26 24 16 00 0370
EA 1 Pole GFI, 120/240 Volt, 15-20 A, "Arc Fault" Circuit Breaker, 10,000 Amp
$997.61
Interrupting Capacity
Quantity Unit Price Factor
Total
Installation 18.00 x 42.61 x 1.3007 -
997.61
183
26 27 26 00 0133
EA 20 A, 120/277 V SPST Switch
$13.71
Quantity Unit Price Factor
Total
Installation 1.00 x 10.54 x 1.3007
13.71
1B4
26 27 26 00 0134
EA 20 A. 120/277 V 3-Way Switch
$67,79
Quantity Unit Price Factor
Total
Installation 4.00 x 13.03 x 1.3007
67.79
185
26 27 26 00 0135
EA 20 A. 120/277 V 4-Way Switch
$148.33
Quantity Unit Price Factor
Total
Installation 4.00 x 28.51 x 1.3007
148.33
186
26 27 26 00 0138
EA 15A 120/277 V, Single Pole, Momentary Contact Switch, Toggle, Three
$48.93
Position, Center Off
Quantity Unit Price Factor
Total
Installation 100 x 37.62 x 1.3007 -
48.93
187
26 28 16 00 0127
EA 100 A, Fused Disconnect Switch, NEMA 1, General Duty, With Fuses, 240 V,
$426.07
3 Phase
Quantity Unit Price Factor
Total
Installation 1.00 x 327.57 x 1.3007 -
426.07
188
26 51 13 00 0124
EA 3 T8 Lamps, 2' x 4% Parabolic, Lay-In/Troffer, Recessed Fluorescent Fixture
$8,639.56
Quantity Unit Price Factor
Total
Installation 44.00 x 150.96 x 1.3007 -
8.639.56
189
26 53 00 00 0010
EA Single Face, Thermoplastic Housing, LED Exit Sign/Emergency Light Combo
$1,621.48
With Battery Back-Upincludes two circular side mounted krypton emergency
lights.
Quantity Unit Price Factor
Total
Installation 6.00 x 207.77 x 1.3007 -
1,621.48
Subtotal for 26 - Electrical
$31,095.34
27 - Communications
190 27 14 13 16 0009
MLF 6 Pair #12 AWG, Solid, Low Voltage, Placed In Conduit, Alarm And
$2,485.04
Communications Cable
Quantity Unit Price
Factor
Total
Installation 0.42 x 4,548.91 x
1.3007 -
2,485.04
Subtotal for 27 - Communications
$2,485.04
28 - Electronic Safety And Security
191 28 31 23 00 0084
EA Superduct, Signature Duct Smoke Detector (EST3 SIGA-SD)
$569.63
Quantity Unit Price
Factor
Total
Installation 2.00 x 218.97 x
1.3007 -
569.63
Contractors Price Proposal - Detail
Page 16 of 20
EZJQC - Southwest
2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title: City of Lubbock - Animal Shelter Renovation
28 - Electronic Safety And Security
192 28 31 23 00 0518 EA Addressable Single Action Manual Pull Station (Simplex 4099-9001) $908.67
Quantity Unit Price Factor Total
Installation 5.00 x 139.72 x 1.3007 - 908.67
193
28 31
23
00 0543
EA Wall Mounted Hom Strobe, Multi -Candela, Red (Wheelock HS4-24MCW-FR)
$1,196.47
Quantity Unit Price
Factor
Total
Installation 7.00 x 131.41 x
1.3007 -
1,196.47
194
28 31
23
00 0551
EA Wall Mounted Strobe, Multi -Candela, Red (Simplex 4906-9101)
$149.61
Quantity Unit Price
Factor
Total
Installation 100 x 115.02 x
1.3007 -
149.61
Subtotal for 28 - Electronic Safety And Security
$2,824.38
31 - Earthwork
195
31 05
13
00 0004
CY Native Clean Fill Soil/Dirt - Common
$6,400.22
Quantity Unit Price
Factor
Total
Installation 278.00 x 17.70 x
1.3007
6,400.22
Compacted pad slab
196
31 05
16
00 0002
CY #3 Stone Aggregate Fill (1" To 2" Clean)
$1,643.24
Quantity Unit Price
Factor
Total
Installation 55.00 x 22.97 x
1.3007 -
1,643.24
At gravel drive add 2"
197
31 05
16
00 0026
CY Aggregate Placementincludes Spreading, Grading, Compaction
Rolling
$1,392.85
Quantity Unit Price
Factor
Total
Installation 59.00 x 18.15 x
1.3007 -
1,392.85
At drive
198
31 23
16
13 0003
CY Over 12" Wide, Excavation for Trenching by Machine in Soil
$980.52
Quantity Unit Price
Factor
Total
Installation 216.00 x 3.49 x
1.3007
980.52
At exterior footings and plumbing trenches
199
31 23
16
13 0003 0056
For > 50 To 250, Add
$106.37
Quantity Unit Price
Factor
Total
Installation 94.00 x 0.87 x
1.3007 -
106.37
200
31 23
16
13 0008
CY Excavation For Trenching By Hand In Loose Rocklncludes stockpiling excess
$4,224.67
materials and trimming sides and bottom of trench.
Quantity Unit Price
Factor
Total
Installation 58.00 x 56.00 x
1.3007 -
4,224.67
At pen walls and drain trenches
201
31 23
16
13 0010
CY Backfilling or Placing Subbase for Trenches with Imported or Stockpiled
$250.75
Materials by Machine
Quantity Unit Price
Factor
Total
Installation 119.00 x 1.62 x
1.3007 -
250.75
At plumbing trenches
202
31 23
16
13 0010 0060
For > 20 To 50, Add
$40.04
Quantity Unit Price
Factor
Total
Installation 38.00 x 0.81 x
1.3007 -
40.04
203
31 23
16
13 0011
CY Backfilling or Placing Subbase for Trenches with Imported or Stockpiled
$212.35
Materials by Hand
Quantity Unit Price
Factor
Total
Installation 18.00 x 9.07 x
1.3007 -
212.35
Contractors Price Proposal - Detail Page 17 of 20
EZJQC - Southwest 2/24/2014
Contractor's Price Proposal - Detail Continues..
Work
Order Number:
017877.00
Work Order Title:
City of Lubbock - Animal Shelter Renovation
31 - Earthwork
204
31 23 16
13 0018
CY Load Excess Material by Machine for Removal from Excavation for Trenching
$164.47
Quantity Unit Price Factor
Total
Installation 45.00 x 2.81 x 1.3007 -
164.47
205
31 23 16
13 0018
0071 For > 50 To 250, Add
$0.00
Quantity Unit Price Factor
Total
Installation 0.00 x 0.70 x 1.3007 -
0.00
206
31 23 16
13 0050
LF Backfill 8" Wide, 24" Deep Trench, With Compaction
$478.66
Quantity Unit Price Factor
Total
Installation 1,150.00 x 0.32 x 1.3007 -
478.66
207
31 23 16
33 0014
CY Relocating On Site Excavated Material From Bulk Excavation Over 1000'
$2,753.19
Quantity Unit Price Factor
Total
Installation 305.00 x 6.94 x 1.3007 -
2,753.19
20B
31 23 16
33 0020
CY Loading Excess Material For Removal From Bulk Excavation
$1,202.04
Quantity Unit Price Factor
Total
Installation 305.00 x 3.03 x 1.3007 -
1,202.04
209
31 23 16
36 0006
CY Excavation For Building Foundations And Other Structures By Hydraulic
$325.33
Excavator, Backhoe, Loader in Soil
Quantity Unit Price Factor
Total
Installation 74.00 x 3.38 x 1.3007 -
325.33
210
31 23 16
36 0018
CY Backfilling Around Building Foundations And Other Structures By Hydraulic
$184.02
Excavator, Backhoe, Loader
Quantity Unit Price Factor
Total
Installation 54.00 x 2.62 x 1.3007 -
184.02
211
31 23 16
36 0019
CY Backfilling Around Building Foundations And Other Structures By Hand
$364.07
Quantity Unit Price Factor
Total
Installation 18.00 x 15.55 x 1.3007 -
364,07
212
31 23 16
36 0022
CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures
$2,235.44
by Hand
Quantity Unit Price Factor
Total
Installation 168.00 x 10.23 x 1.3007 -
2,235.44
213
31 23 16
36 0025
SY Finish Grading For Building Foundations And Other Structures by Machine
$457.85
Quantity Unit Price Factor
Total
Installation 440.00 x 0.80 x 1.3007
457.85
214
31 23 16
36 0026
SY Finish Grading For Building Foundations And Other Structures by Hand
$392.81
Quantity Unit Price Factor
Total
Installation 100.00 x 3.02 x 1.3007 -
392.81
215
31 23 16
36 0028
CY Load Excess Material For Removal From Excavation For Building Foundations
$1,972.90
and Other Structures by Machine
Quantity Unit Price Factor
Total
Installation 480.00 x 3.16 x 1.3007 -
1,972.90
216
31 23 16
36 0031
CY Spread Excess Or Imported Material On Site By Machine
$38.63
Quantity Unit Price Factor
Total
Installation 22.00 x 1.35 x 1.3007 -
38.63
217
31 23 16
43 0103
BCY Roadway Excavation Scraper- Soil
$113.58
Quantity Unit Price Factor
Total
Installation 59.00 x 1.48 x 1.3007 -
113.58
Contractor's Price Proposal - Detail
Page 18 of 20
EZIQC - Southwest
2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title: City of Lubbock - Animal Shelter Renovation
31 - Earthwork
218 31 24 13 00 0018
SY Finish Grade Roadway, Parking Areas, Landscaping And Embankments By
$685.60
Machine
Quantity Unit Price Factor
Total
Installation 1,255.00 x 0,42 x 1.3007 =
685.60
219 31 25 14 16 0015
SY P300 Permanent Polypropylene Turf Reinforcement Mat100% synthetic, UV
$245.57
stabilized, two layer netting.
Quantity Unit Price Factor
Total
Installation 32.00 x 5.90 x 1.3007 =
245.57
Subtotal for 31 - Earthwork
$26,865.17
32 - Exterior Improvements
220 32 13 13 00 0014
SF 5" Thick Slab On Grade, 3000 PSI Assembly
$24,106.52
Quantity Unit Price Factor
Total
Installation 5,050.00 x 3,67 x 1.3007 =
24,106.52
221
32 16
13
13 0008
LF 6" X 24" Cast In Place Concrete Curb
$503.88
Quantity Unit Price
Factor
Total
Installation 37.00 x 10.47 x
1.3007 =
503.88
Underfence
222
32 16
23
00 0002
SF 4" Cast In Place Concrete Sidewalk With Wire Mesh
$6,925.90
Quantity Unit Price
Factor
Total
Installation 1,475.00 x 3.61 x
1.3007 =
6,925.90
223
32 31
13
00 0007
VLF 6" Diameter Hole, Auger By Machine Fence Post Hole In Soil
$142.58
Quantity Unit Price
Factor
Total
Installation 18.00 x 6.09 x
1.3007 =
142.58
224
32 31
13
00 0008
VLF 8" Diameter Hole, Auger By Machine Fence Post Hole In Soil
$104.42
Quantity Unit Price
Factor
Total
Installation 12.00 x 6.69 x
1.3007 -
104.42
225
32 31
13
00 0024
VLF Concrete Fill, 6" Diameter Hole
$142.56
Quantity Unit Price
Factor
Total
Installation 20.00 x 5.48 x
1.3007 =
142.56
226
32 31
13
00 0025
VLF Concrete Fill, 8" Diameter Hole
$114.41
Quantity Unit Price
Factor
Total
Installation 12.00 x 7.33 x
1.3007 =
114.41
227
32 31
13
00 0083
LF 2-1/2" Outside Diameter Galvanized Steel Post, 7' To 10' In Length
$252.86
Quantity Unit Price
Factor
Total
Installation 30.00 x 6.48 x
1.3007 =
252.86
226
32 31
13
00 0090
LF 3" Outside Diameter Galvanized Steel Post, 7' To 10' In Length
$448.00
Quantity Unit Price
Factor
Total
Installation 50.00 x 8.96 x
1.0000 =
448.00
229
32 31
13
00 0275
EA 4' Wide x 6' High Single Gate Galvanized Steel Without Barbed Wire
$249.03
Quantity Unit Price
Factor
Total
Installation 100 x 182.53 x
1.3007 -
237.42
Demolition 1.00 x 8.93 x
1.3007 =
11.62
230
32 31
13
00 0275 0214
For Gate With Double Barb Wire Arm, Add
$32.40
Quantity Unit Price
Factor
Total
Installation 100 x 24.91 x
1.3007 =
32.40
Contractor's Price Proposal - Detail Page 19 of 20
EZIQC - Southwest 2/24/2014
Contractor's Price Proposal - Detail Continues..
Work Order Number: 017877.00
Work Order Title: City of Lubbock - Animal Shelter Renovation
32 - Exterior Improvements
231
32 31
13
00 0640
EA Barbed Wire Extension Arms 3 Strands (Single Arm)
$74.00
Quantity Unit Price
Factor
Total
Installation 7.00 x 4.90 x
1.3007 =
44.61
Demolition 9.00 x 2.51 x
1.3007 =
29.38
232
32 31
13
00 0727
LF Removal And Reinstallation Of Chain Link Fence 6' To 12' Height
$1,418.28
Quantity Unit Price
Factor
Total
Installation 116.00 x 9.40 x
1.3007 =
1,418.28
233
32 31
26
00 0025
LF Barbed Wire, Galvanized Per Strand
$46.83
Quantity Unit Price
Factor
Total
Installation 120.00 x 0.30 x
1.3007 =
46.83
234
32 91
13
36 0001
MSF Rake Topsoil With Machine
$227.83
Quantity Unit Price
Factor
Total
Installation 5.70 x 30.73 x
1.3007 =
227.83
Around building
235
32 91
19
13 0003
CY Remove Topsoil, 6" Deep Stockpile On Site
$524.44
Quantity Unit Price
Factor
Total
Installation 160.00 x 2.52 x
1.3007 =
524.44
For building pad
236
32 91
19
13 0012
SY Furnish And Place Imported Screened Topsoil, 2" Deep
$1,509.20
Quantity Unit Price
Factor
Total
Installation 566.00 x 2.05 x
1.3007
1,509.20
Around building
Subtotal for 32 - Exterior Improvements
$36,823.14
33 - Utilities
237
33 31
00
00 0023
LF 6" Schedule 40 ABS-PVC Sewer And Drain Pipe
$1,118.54
Quantity Unit Price
Factor
Total
Installation 135.00 x 6.37 x
1.3007 =
1,118.54
238
33 31
00
00 0044
EA 6" 118 Bend, ABS-PVC Sewer And Drain
$196.30
Quantity Unit Price
Factor
Total
Installation 4.00 x 37.73 x
1.3007 =
196.30
239 33 31 00 00 0052
EA 6" Long Sweep 1/4 Bend, ABS-PVC Sewer And Drain
$83.35
Quantity Unit Price
Factor
Total
Installation 2.00 x 32.04 x
1.3007 -
83.35
240 33 31 00 00 0086
EA 6" Wye, ABS-PVC Sewer And Drain
$137.87
Quantity Unit Price
Factor
Total
Installation 2.00 x 53.00 x
1.3007 =
137.87
241 33 31 00 00 0121
EA 6" Clean Out Tees With Plug, ABS-PVC Sewer And Drain
$358.63
Quantity Unit Price
Factor
Total
Installation 2.00 x 137.86 x
1.3007 =
358.63
Subtotal for 33 - Utilities
$1,894.69
Proposal Total $946,109.69
This total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding.
The Percentage of NPP on this Proposal: 22.24%
Contractor's Price Proposal - Detail Page 20 of 20
EZIQC - Southwest 2/24/2014
Subcontractor Listing
Date: February 24, 2014
Re: IQC Master Contract #:
Work Order #:
Owner PO #:
Title:
Contractor:
Proposal Value:
TX04-112012-CCC
017877.00
City of Lubbock - Animal Shelter Renovation
Collier Construction Company
$946,109.69
IIJIQC
GROUP
Name of Contractor
Duties
AmouPt
%
No Subcontractors have been
selected for this Work Order
$0.00
0.00
Subcontractor Listing Page 1 of 1
EZJQC - Southwest 2/24/2014
CNA
FORM SUMMARY:
The nolicv auoted includes the following forms. endorsements and exclusions. which rnav not be deleted.
FORM
ED. DATE
FORM NAME
CNACOVERPG
04/13
Proprietary Coverage Page Form
CNA62641XX
09M2
First Party Glossary of Defined Terms
CNA62642XX
09/12
Common Terms and Conditions
CNA62846XX
09/12
Bridge Endorsement
CNA62647XX
09112
First Party Terms and Conditions
CNA62814TX
09/12
Cancellation / Non -Renewal - Texas
CNA62815TX
09112
Amendatory Endorsement - Texas
CNA62855TX
09/12
Important Notice - For Texas Policyholders
GNA62866TX
09/12
To Obtain information Or Make A Complaint
CNA68757XX
09/12
Policy Holder Notice - Countrywide
CNA62648XX
09112
Business Property Coverage Part
CNA62691XX
09/12
Cap on Losses from Certified Acts of Terrorism End
CNA62854TX
09/12
For Our Texas Commercial Lines Policyholders
CNA77042XX
11113
Notification of Pending Law Change to Terr Risk
CNA62823XX
09/12
Policy Holder Notice - Countrywide
CNA62731XX
09112
Named Covered Peril Percentage Deductible Endor
The following forms and endorsements are available for an additionalpremium:
FORM ED. DATE FORM NAME Additional Premium
GENERAL LIABILITY
Quote # 5084166949 Company Vallej Forge insurance Company
Effective 03126/14 Expiration 03/26/15
LIMITS:
General Liability Coverages
Each Occurrence:
$1,000,000
Pero & Advertising Injury:
$1,000,000
General Aggregate:
$2,000,000
Fire Damage:
$100,000
Products/Comp OPS
Aggregate:
$2,000,000
Medical Expense:
$5,000
Other Coverages
Occurrence/Claim/Person
Aggregate
Pollution
$1,000,000
$2,000,000
13 of 24
ATIONAL JOINT POWERS ALLIANCES
Book 1 — Project Informalm, Instructions to Bidders and Execution documents
,4JPA
National Joint Powers Alliance
INDEFINITE QUANTITY CONSTRUCTION AGREEMENT
IFBNUMSER: TX04-112012-CCC
GEOGRAPHIC ZONE Panhandle -Lubbock
This Agreement dated 11/20/12 by and between the National Joint Powers Alliance,
hereinafter referred to es NJPA and Collier Construction Company
st the fallowing address 2202 Avenue 6, Lubbock, TX 79404
hereinafter referred to as the CONTACTOR;
WRNESSETH: NJPA and CONTRACTOR for the consideration hereafter agree as follows:
ARTICLE 1. CONTRACT DOCUMENTS
A. Contrail Documents: This Agreement; the IFS Oocranents; (Book 1 - Project Information,
Instructions to Bidders and Execution Documents; Book 2 - IOCC Standard Terns and
Conditions and Genera! Conditions; Book 3 - Construction Task Catalog (CTC). Book 4 -
Technial Specifications) and Addenda thereto, the Bid Deposit, all payment and pedornance
bonds (if any), material and workmanship bonds (if any); wage rate decisions and ceadled payroll
records (if arty): Notics of Award; ill modifications issued thereto, including Supplemental Worst
OmWWChange Orders and written Interpretations and all Purchase Orders and accompanytng
documents (Requests for Proposals, Detailed Scopes of Work, Wodt Order Proposes Packages,
eta) Issued hereunder.
B. The terns and conditions of a Purchase Order issued by an NJPA Member In connedon with
any Work Order, including supplemental technical specifications referenced therein, shall govern.
C. The Contractor shag, within two (2) business days of receipt of a Purchase Order from an NJPA
Member, provide notfication to NJPA or their designated repneuntative of each Purchase Omer
by forwarding a copy of the Purchase Order vie email to PO_flEZIOC cam or via facsimile to
(864) 233-9100.
0. The Contractor shall, within two (2) business days of sending an Irrvoice to an NJPA Member,
provide notification to NJPA or their designated represemtaWe of each Invoice by forwarding a
copy of the Invoice via email to 1nwice0)EZI0C,com or via fwsirrule to (664) 233-9100.
43 Section Four - Exhibit$ October 2012
NATIONAL JOINT POWERS ALLIANCE9
Book 1 — Project Information, Instructions to Bidders and Execution Documents
ARTICLE 2. SCOPE OF WORK
A. The Contractor shall provide the services required to develop each Work Order In accordance
with the procedures for developing Work Orders set forth in the IOCC Standard Terms and
Conditions and the Contract Documents.
B. Each Work Order developed in accordance with this Agreement will be issued In connection with
a Purchase Order by an individual NJPA Member. The Purchase Order will reference the Work
Order and require the Contmdor to perform the Detailed Scope of Work within the Work Order
Completion Time for the Work Order Price.
C. It Is anticipated that the Contractor will perform Work primarily In the Geographic Area set forth
above. However, the parties may agree that the Contractor can perform Work in a different
Geographic Area at Its current Adjustment Factors.
ARTICLE 3. THE AGREEMENT PRICE
A. This Agreement Is an Indefinite -quantity contract for construction/rocfing work and services. The
Estimated Annual Value of this Agreement Is S 2,000.000. This Is only an estimate and may
increase or decrease at the discroWn of the State.
B. The Contractor shall perform any or all Tasks in the Construction Task Cataloo for the unit price
appearing therein multiplied by the following Adjustment Factors:
a. The Contractor shall perform any or all Tasks in the Construction Task CatalogV for the unit price
appearing therein multiplied by the following Adjustment Factors.
a. Normal Working Hours Prevailing Wage: Work performed from 7:OOam until 4.00pm
Monday to Friday, except holidays. Contractor shall perform Tasks during Normal Working
Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Fodor of:
1. 2696
(Speak to by (6) decimal places)
b. Other Than Normal Working Hours Prevailing Wage: Work performed from 4.00pm to
7:OOam Monday to Friday, and any time Saturday, Sunday and Holidays. Contractor shall
perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the
CTC multiplied by the Adjustment Factor oh.
1 3723
(Specify to bra (4) decimal µaces)
2.
C. Normal Working Hours Non Prevailing Wage: Work performed from 7 OOam until 4.QOpm
Monday to Friday, except holidays. Contractor shall perform Tasks during Normal Working
Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of:
1, 2534
(Sp" to bur (4) deca+rat places)
44 Section Three — Bid Forms October 2012
ATIONAL JOINT POWERS ALLIANCE6
Book I — Project Information, Instructions to B'dders and Execution Documents
Other Than Normal Working Hours Non Prevailing Wage: Work performed from 4:00pm to
7.00am Monday to Friday, and any time Saturday, Sunday and Holidays. Contractor shall
perform Tasks during Other Than Normal Working Hours for the Unit Price set forth In the
CTC multiplied by the Adjustment Factor of:
1, 3450
(Sp" to four (4) decimal plaeea)
Non Pre -priced Adjustment Factor, To be applied to Work deemed not to be included in the
CTC but within the general scope of the work:
1, 2500
(Sp" to four (4) dedmai places)
ARTICLE 4. TERM OF THE AGREEMENT
A. The base term shall be one year with a one year option. The total term of the Contract shall not
exceed two years, The Contractor may withdrew from the Agreement on each anniversary of the
award, provided that the Contractor gives 60 Days written notice of its Intent to withdraw. NJPA
may, for any reason, terminate this Agreement at any time.
B. All Purchase Orders issued during a tern of this Agreement shall be valid and in effed
notwithstanding that the Detailed Scope of Work may be performed, payments may be made, and
the guarantee period may continue, after such term has expired. All terms and conditions of the
Agreement apply to each Purchase Order.
ARTICLE 5. SOFTWARE LICENSING
NJPA selected The Gordian Group's (Consultant) software, data and services (IQCC System)
for their IQCC program. The system Includes Consultant's proprietary PROGENP, eGordlano
and/or ezlQCe IQCC applications (IOCC Applications) and construction cost data (Construction
Task Catalog, which shall be used by the Contractor to prepare and submit Price Proposals,
subcontractor lists, and other requirements specified by NJPA and NJPA Members. The
Contractor shalt be required to agree to Consultant's IQCC System License to obtain access to
Consultant's IQCC Applications. The Contractor's use, in whole or in part, of Consultant's IQCC
Applications and Construction Task Catalogs and other proprietary materials provided by
Consultant for any purpose other than to execute work under this Contract for NJPA and NJPA
Members is strictly prohbded unless otherwise stated in writing by Consultant The Contractor
hereby agrees to abide by the temps of the following IOCC System License:
ARTICLE 6. IQCC SYSTEM LICENSE
Consultant hereby grants to the Contractor, and the Contractor hereby accepts from Consultant
for the term of this Contract or Consultant's contract with NJPA, whichever is shorter, a
non-exclusive right, privilege, and license to Consultant's proprietary IOCC System and related
proprietary materials (collectively referred to as 'Proprietary Infornationj to be used for the sole
purpose of executing Contractors responsibilities to NJPA and NJPA Members under this
Contract. The Contractor hereby agrees that Proprietary Inrormation shall include, but Is rot
45 Section Four - Exhibits October 2012
INSURANCE REQUIREMENTS
25.1 The Contractor shall procure and maintain, at its own cost and expense, until final acceptance of all
the Worts covered by this Agreement, the following kinds of insurance:
25.1.1 Workers' Compensation Insurance. A policy complying with the requirements of the laws of the
State in which the Project is located.
25.1.2 General Liability and Property Damage Insurance. A standard general comprehensive liability
insurance policy or a commercial general liability insurance policy issued to and covering the liability of
the Contractor for all Work and operations under this Agreement, including, but not limited to, contractual
and completed operations coverage. The coverage under such policy shall not be less than the following
limits: Bodily Injury and Property Damage Liability, $ 1,000,000 Each Occurrence, 2,000,000 Aggregate.
25.1.3 Automobile Liability and Property Damage Insurance. A policy covering the use in connection with
the Work covered by the Contract Documents of all owned, nonowned and hired vehicles bearing, or,
under the circumstances under which they are being used, required by the Motor Vehicle Laws of the
State in which the Project is located. The coverage under such policy shall not be less than the following
;�--� lIily Injury and Property Damage Liability, $ 1,000,000 Each Occurrence.
295 All Risk Builders Risk Insurance. Where specifically required In the Detailed Scope of Work, the
ontractor shall provide, before the Work Order is issued, Builders' Risk Insurance in an amount at least
equal- the Work Order Price in a form and by a carrier acceptable to the NJPA Member.
- .5 ottution Liability Insurance. If a Project Involves asbestos abatement encapsulation or other
vities involving hazadous materials, the Contractor, Subcontactor or other party responsible for such
Work shall procure and maintain a liability Insurance policy issued to and covering the liability, of the
Contractor, Subcontactor or other party engaged in the removal, or handling of hazardous materials, for
bodily injury, illness, sickness or property damage caused by exposure In an amount not less than
$1,000,000 per occurrence and $2,000,000 aggregate.
25.2 The Contractor shall provide certificates of Insurance. Such certificates shall be on a form prescribed
by NJPA, shall list the various coverages and shall contain, in addition to any provisions hereinbefore
required, a provision that the policy shall not be changed or cancelled and that it will be automatically
renewed upon expiration and continued in force until final acceptance by NJPA, or NJPA Member, of all
the work covered by the Agreement, unless NJPA is given fifteen (15) days' written notice to the contrary.
Upon request, the Contractor shall furnish NJPA or any NJPA Member with a certified copy of each
policy.
25.3 All insurance required to be procured and maintained as aforesaid must be procured from insurance
companies approved by NJPA.
25.4 I1 at any time any of the above -required insurance policies should be cancelled, terminated or
modified so that insurance is not in effect as above required, then, if NJPA shall so direct, the Contractor
shall suspend performance of the work. If the said work is so suspended, no extension of time shall be
due on account thereof. If said work is not suspended, then NJPA may, at its option, obtain insurance
affording coverage equal to that above required, the cost of such insurance to be payable by the
Contractor.
25.5 Should the awarded Contractor retain a Subcontractor to perform any of the services mentioned
herein, it is the Contractor's responsibility to insure that the Subcontractor(s) maintains the same types of
insurance coverage in accordance with the requirements and amounts indicated herein.
25.6 NJPA, its officers, and employees must be included as a named insured. Any NJPA Member, its
officials, officers, and employees must be included as a named insured when so requested by the NJPA
Member.