HomeMy WebLinkAboutResolution - 2003-R0312 - Engineering Services Agreement For Drainage - Parkhill, Smith & Cooper - 08_06_2003Resolution No. 2003-RO312 August 6, 2003 Item No, 30 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Amendment No. 2 and any associated documents to the Engineering Services Agreement by and between the City of Lubbock and Parkhill, Smith & Cooper, Inc., for professional services with regard to the South Lubbock Drainage Improvement Project, including the redesign of the eastern end of the project due to right-of-way problems, separating the plans and specifications for the portion of the project west of Slide Road so that it may be included in the 98th Street paving project from Slide Road to Frankford Avenue, evaluation of possible modifications at Hoel Park, and extension of time to accommodate the extra work; a copy of which Amendment No. 2 is attached hereto and which shall be spread upon the minutes of this Council and as spread upon the minutes of this Council shall constitute and be a part hereof as if fully copied herein in detail. Passed by the City Council this 6th day of ATTEST: Rebecca Garza, City Secretary APPROVW AS TO Hertel, 45E, City Engineer APPROVED AS TO FO G.-Vandiver, Attorney of Counsel DDres/EngAmendMes July 25, 2003 Resolution No. 2003—RO312 August 6, 2003 Item No. 30 AMENDMENT NO.2 TO AGREEMENT CITY OF LUBBOCK, TEXAS AND PARKHILL, SMITH & COOPER, INC. FOR ENGINEERING SERVICES ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN: "South Lubbock Drainage Improvements Project". THIS IS AN AMENDMENT TO THE AGREEMENT dated April 12, 2001 and entered into by and between CITY OF LUBBOCK, TEXAS hereinafter called "Owner" and PARKHILL, SMITH & COOPER, INC., hereinafter called the "Engineer", of 4222 85`" Street, Lubbock, Texas a corporation which is duly chartered under the laws of the State of Texas. The purpose of this amendment is to establish the Basic Services, Supplemental Services and Compensation for professional services associated with the design of the "South Lubbock Drainage Improvements Project". Basic Services, Supplemental Services and Compensation for drainage engineering and design are described in Attachment A and Attachment B. Executed in two counterparts (each of which is an original) on behalf of Engineer by its Vice President shown below, and on behalf of Owner by its Mayor (thereunto duly authorized) this 6 day of August , 2003. OWNER ENGINEER CITY OF LUBBOCK PARKHILL, SMIT COOP , C. By By , � 9 r, � � !—/� arc WLB6uga EcTwin E. ` avis, P. . Mayor ZVice President ATTEST: By C:Q� 40 eb ca Garza City Secretary APPROVED AS T ONTENT: APPROVED AS TO7M, y ; f 4 1 mzfnQF� arry D. He , P.E. Vandiver City Engineer Attorney Resolution No. 2003—RO312 ATTACHMENT A TO AMENDMENT NO.2 TO AGREEMENT CITY OF LUBBOCK, TEXAS AND PARKHILL, SMITH & COOPER, INC. FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: South Lubbock Drainage Improvements Project A DESCRIPTION OF SCOPE OF SERVICES The scope of services for this Amendment No. 2 is as follows. Work will not proceed until Owner has authorized Engineer in writing to proceed. 1. DESIGN AND BIDDING PHASE ADDITIONAL SERVICES A. BASIC SERVICES Basic engineering services include: 1. Design services as defined by the tasks and man-hours in Exhibit A-1, which include additional hydrologic and hydraulic models at Hoel Park Lake, preparation of plans and specifications for inclusion in the 98th Street widening project, and revisions affected by re-route of the storm sewer outfall east of U.S. Highway 87. 2. Surveying services as defined in the tasks and man-hours in Exhibit A-1. 3. Deliver to the Owner one (1) reproducible plus (10) non -reproducible copies of drawings and technical specifications developed for the construction projects. 4. Deliver to the Owner one (1) complete hard copy and automated copy of any supporting data and calculations developed during the design of the project. 5. Disks containing the electronic files associated with the design of the project, including the supporting data, plans, specifications and opinions of probable construction costs. B. SUPPLEMENTAL SERVICES — TYPE A 1. Supplemental Services — Type A a. Initial coordination with the Corps of Engineers (COE) or the Environmental Protection Agency (EPA) concerning their requirements for the project. Tasks and man-hours are defined in Exhibit A-2. Furnish cut and fill quantities within jurisdictional areas of the playa lakes located at Hoel Park, Jan Jennings Park, Earl Crow Park, and Chas Guy Park, plus the storm outlet location at the canyon. C. SCHEDULE Schedule for services is enclosed as Exhibit B. D. ADDITIONAL SERVICES 1. At the request of the OWNER, the ENGINEER will provide Additional Services as included herein or upon agreement between OWNER and the ENGINEER defining the extent of such Additional Services and the amount and manner in which ENGINEER will be compensated for such Additional Services. 2. Any work requested by the OWNER that is not included in one of the items listed in any other place will be classified as Additional Services. 3. Additional services may be authorized by a notice -to -proceed in writing from the City Engineer and addressed to the Engineer. Resolution No. 2003—RO312 ATTACHMENT B TO AMENDMENT NO.2 TO AGREEMENT CITY OF LUBBOCK, TEXAS AND PARKHILL, SMITH & COOPER, INC. FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: South Lubbock Drainage Improvements Project COMPENSATION Design and Bidding Phase Services For these services covered by this Agreement, the Owner agrees to pay the Engineer as follows: A. GENERAL The Engineer will be paid on an hourly rate basis shown in Table B-1 and subcontract personnel services will be billed at cost. Engineer and subcontractor reimbursable expenses will be billed at cost plus 15 percent surcharge. Reimbursable expenses are shown in Table B-1. 2. The Engineer agrees to use its best efforts to perform services as defined herein within the billing limits stated below. 3. It is understood and agreed that the maximum billings of each of the items listed below are based on the start of Services being authorized not later than July 1, 2003. If start of Basic Engineering Services is not authorized by date given, it is understood and agreed that the upper billing limit will be adjusted accordingly by a supplement to this Agreement. 4. Monthly payments shall be made to the Engineer by the Owner based on Engineer's statement. The statement shall be itemized to indicate the amount of work performed and the associated reimbursable expenses and subcontract costs. 5. The uncontested amount of each statement shall be due and payable upon receipt by the Owner. Carrying charges of 1-1/2 percent per month from the billing date shall be due for accounts that are not paid within 60 days after the billing date. 6. The Engineer shall keep records on the basis of generally accepted accounting practices of costs and expenses and which records shall be available for inspection by Owner during normal business hours. B. BASIC ENGINEERING SERVICES I. The maximum billed for Basic Engineering Services including personnel services and reimbursable expenses for the Engineer and Subcontractors is shown as follows: Basic Basic Personnel Reimbursable Services Expenses Parkhill, Smith & Cooper, Inc. $ 95,012.00 $ 6,151.00 Hugo Reed and Associates, Inc. $ 34,598.00 $ 1,390.00 Surveying and Aerial Photography $125,260.00 TOTAL BASIC ENGINEERING SERVICES NOT TO EXCEED $262,411.00 -1- B. SUPPLEMENTAL SERVICES — TYPE A The maximum billed for Supplemental Services Type A including personnel services and reimbursable expenses for the Engineer and subcontractor is shown as follows: Supplemental Supplemental Personnel Reimbursable Services Expenses Parkhill, Smith & Cooper, Inc. $ 17,452.00 $ 1,248.00 Hugo Reed and Associates, Inc. $ 16,224.00 $ 1,015.00 TOTAL SUPPLEMENTAL TYPE A SERVICES NOT TO EXCEED $ 35,939.00 C. ADDITIONAL SERVICES Additional services must be authorized in writing by the Owner. 1. The maximum billed for Additional Services will be determined by mutual consent before the Additional Services are authorized by the Owner. 2. The Engineer shall start the performance of the authorized Additional Services within ten (10) days of receipt of notice to proceed and will complete the Additional Services within the time period determined by mutual consent before the Additional Services are authorized by the Owner. -2- TABLE B-1 PERSONNEL SERVICE RATES AMENDMENT NO.2 TO AGREEMENT CITY OF LUBBOCK, TEXAS AND PARKHILL, SMITH & COOPER, INC. FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: South Lubbock Drainage Improvements Project COMPENSATION RATES Hourly fees listed herein will apply for the term of this contract. A. Personnel Services Parkhill, Smith & Cooper, Inc. Category of Personnel Rates ($/HR) Principal -in -Charge $ 130.00 Project Manager or Senior Professional Engineer $ 108.00 Professional Engineer $ 81.00 Professional Architect $ 81.00 Engineer -in -Training $ 75.00 Technician or Designer $ 65.00 Drafter/CADD Operator $ 58.00 Clerical $ 28.00 Hugo Reed and Associates Category of Personnel Rates ($/HR) Principal -in -Charge or Officer $ 110.00 Senior Engineer $ 92.00 Professional Engineer $ 82.00 Professional Land Surveyor $ 80.00 Engineer -in -Training $ 70.00 Technician/Designer $ 59.00 Drafter/CADD Operator $ 55.00 Clerical $ 37.00 -1- B. Reimbursable Expenses The following expenses are reimbursable: 1. Travel, subsistence and incidental costs. 2. Use of motor vehicles on a monthly basis for assigned vehicles and on a current mileage basis or rental cost basis for vehicles used for short periods. 3. Telegraph costs, long distance telephone costs and project ` onsite" telephone costs. 4. Reproduction of reports, drawings and specifications 5. Postage and shipping charges for project -related materials. 6. Computer time charges, including program use charges. 7. Rental charges for use of equipment. 8. Cost of acquiring any other materials or services specifically for and applicable to only this project. -2- Resolution No. 2003-R0312 EXHIBIT A-1 TO AMENDMENT NO.2 BASIC SERVICES TASKING, MAN-HOURS, REIMBURSABLES AND SUBCONTRACTORS CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN SOUTH LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESKiN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS AMENDMENT NO.2 Rle: SLDIP-MIEND2-PG1.XLS EXI ISIT A-1 28-May-03 10:60 PM Firm Task Prin. Prq. Sr. Prof. Prof. ER Technician Drafter Clerical Total Total or M. y Engr. Ergr. Arch. or or CADD Hours Extension pacer Designer Operator $ PSC $130.00 $108.00 $108.00 $81.00 $81.00 $75.00 $65.00 $58.00 526.00 HR cccccccccccc Rates »»»»»» $110.00 $0.00 moo $moo $0.00 $70.00 $59.00 $55.00 $37.00 PSC 4 12 6 8 1 31 $2,830 HR 1. Man* ease nerWpmperty acquisition need 1 12 8 21 $1.774 Review with C ( eH eadern re-route PSC 2. Reserved 0 $0 HR 0 $o PSC 3. Reserved 0 $0 HR 0 $0 PSC 4. Reserved 0 $0 HR 0 $0 PSC 1. Coordinate aerial phologrephy needs east of 1S87 0 $o HR (done - covered under original tWtlpel) o $0 PSC 2. Coordinate with surveyors for ground Surveying 2 2 4 1 1 10 $886 HR and aerials srrveylrg (krtlalxeastem re -role) 4 4 1 1 10 $740 PSC 3. Revise geotedntical invest1geaons (revised eastern 2 4 8 16 16 2 48 $3,524 HR route) 1 1 $37 PSC 4. Reserved 0 $0 HR 0 $0 PSC Confirm storm sewer rate wlh Cigr staff, prepare 2 8 16 1 27 $1,772 15. HR exhibits as neoaeeary for coordination with Stall 2 4 1 7 $501 PSC 8. Coordination and onshe presence for project 1 2 2 16 21 $1.762 HR surveying, OA/CC of aerials 2 2 $184 (revised eastern route) PSC 7. Reserved 0 $0 HR 0 $0 Page 1 of 6 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN SOUTH LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS AMENDMENT NO.2 rw: aunr-wwcruu-rui.ua cnruvrw w-r -y-w Firm Task Prin, Pm). i Sr. Prof. Prof. Err Tedvdcien Drafter Clerical Tom Total or Mgr. Engr. Ergr. Arch. or or CARD hours Extension Offlcer Designer 1 Operator a PSC $130.00 $108.00 $108.00 $81.00 $81.00 $75.00 $65.00 $58.00 $28.00 MR «««««« Rates »»»»»» $110.00 $0.00 $92.00 $82.00 $0.00 $70.00 $59.00 $55.00 $37.00 Reserved 01 a0I PSC 1. Refine model dictated try new eastern outlet route 2 8 10 $864 MR 1 2 1 8 1 1 10 $840 PSC 2. Review model results with City Staff, revise summaries 2 12 4 is $1,488 MR of drain down tines (revised mute hydraulics effects) 12 4 16 $1264 PSC Reline model to consider sawooth curb replacement and 1 4 6 10 1 22 51,826 MR 13. nuisance water orb NOK review results with Owner 3 8 12 1 24 $1,533 PSC 4. Reserved 0 $0 MR 0 $0 PSC 5. Reserved 0 $0 MR 0 $0 PSC Recalculate coordinates for Slide tunnel tle 1 1 2 2 6 a455 MR 11. (needed for 98th Street widenog plans) 0 $O PSC 2. Reserved 0 $0 MR 0 $0 PSC 3. Reserved 0 $0 MR 0 $0 PSC 1. ,lust east of Slide Road o branch 10 Lake 13Z extend brands 1 6 32 72 84 195 $13,642 hlti o rvd-of-way Ine (estimate 7 Nroets) 0 $0 (For 9ft Sb')W PSC 2. Remove ms segment tram be od*W apreememt (with (8) (26) (24) (16) (36) (110) (a7.898) MR all warce for breakout Into separate contract and koor- 0 $0 e into 98th Street Plops PSC 3. Prepare eastern routs revised plan pr001aS 4 12 36 72 30 220 4 378 $24.954 MR (Est 20 &reef Hre-dip plan views, ON)C new DTM. DTM 0 $0 meW. property Ines. R.O.W. redo) PSC 4. Reserved S0 W Page 2 of 6 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN SOUTH LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIVATE OF MAN410URS AND TASKS AMENDMENT NO.2 Rln• CI rv0.ALA9WY3JDr'1 YI C EYNIRIT A-1 29-Mav,113 110.50 PM Firm Task Prin. Prof. Sr. Prof. Prof. Efi Technician Drafter Clerical Total Total or Mgr. Engr. Engr. Arch. or or CADD Hours Extension Oft" Desillner Operator a PSC $130.00 $108.00 $108.06 $81.00 $81.00 $75.00 $65.06 $58.00 $26.00 HR «<«<««« Rates »»»»»» $110.00 $0.00 $92.00 $82.00 $0.00 $70.00 $59.00 $55.06 $37.00 PSC 1. TMM Nng, Exavabw and SWO 2 2 2 0 8 1 1s $1,020 HR Typical details (not mislom bK use prior project with 2 2 2 0 4 1 11 $745 with revlelons for 98m Street project )(2 stwis eat) 88th Street ) PSC 2. Manholes 2 2 •2 16 1 23 $1,484 HR Two sets of details, large ale. pipe and smell ale. pipe 2 2 4 1 9 $581 special details associated Weach (3 sheets est.) (prior project sheets with revisions)(8881 Street widen PSC Reserved 0 $0 HR 13. 0 a0 PSC 4. Tunnel" 1 2 3 4 0 14 24 $1,701 HR Typicat tunneling details (1 anest eet.)(g8th St widen) 2 0 0 0 2 4 $294 PSC S. Pavement Cut and Repair 1 1 2 2 2 6 1 1s $1,142 HR Typical details for approx 1 street "a (98th St. widen 0 $0 PSC 6. Reserved 0 $0 HR 0 $0 PSC 7. Reserved 0 $0 HR 0 $0 PSC 8. Reserved 0 $0 HR 0 $0 PSC 9. Reserved 0 $0 HR 0 $0 PSC 10. Reserved 0 $0 HR 0 $0 Pegs 3 016 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN SOUTH LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET I BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS AMENDMENT NO.2 FM- si ap-AUFWrXPr1 WA EXHIBIT A-1 29-Maw03 10M PM Rrn Task Prin. Prof. Sr. Prof. Prof. ER T Drafter Clerical Total Total or Mgr. Engr. Engr. Arch, or or CARD Hours Extension Officer Designer Operator $ PSC $130.00 $108.00 $108.00 $81.00 $81.00 $76.00 $65.00 $68.00 $28.00 HR cnccccccccc Rants >»a>aaa»» $110.00 $0.00 $92.00 W-00 $0.00 $70.00 $59.00 $55.00 $37.00 PSC 1. Prepare outline of specifications sections 1 4 2 2 1 10 $902 HR (9811n Street Widening incorporation) 1 2 2 1 6 $433 (Coordinate with HRA on detention basin &abn requirements) PSC 2. Special provisions for construction -related fforms regarding 2 10 4 3 19 $1,748 HR the storm drains incorporated Into 98tn Street widening 4 4 8 $696 PSC 3. Prepare Individual Specification Sections 8 8 16 4 36 $2,824 HR 2 12 4 16 $1,172 PSC 4. OAIOC of plans and spscftati0ns 1 2 1 4 $374 HR (final OAQC 9W Street widen) Incoryoratlm) 2 2 $184 PSC 5. P6rh= quantity tatm offs, develop Opinion of 2 4 16 4 4 2 32 $2.288 HR Probable Construction Cast (98th SWO ) 2 4 6 $512 PSC 6. Coordinate with City staff on format of bid form 2 4 4 4 2 16 $1,372 HR and arry alternate bids (98M Street ) 4 4 4 1 2 $976 PSC 7. Reserved 0 $0 HR 0 $0 PSC 8. Reserved 0 $0 HR 0 $0 PSC 1. Coordinate with City staff on easement and dyed 8 12 8 8 24 2 62 $5,032 HR of way needs (revised eastern route) 12 8 24 2 46 $3,154 PSC 2. Prepare easement and dyed of way parcel drawings 1 24 2 27 $2.778 HR end melee anti bourlds desalplbfe for private 24 2 26 $2.282 Properly rw of wayeasement aoquwdm (Clty at t RIM exfatinp property metes and bounds) PSC 4. Prepare permit applications and supporting 1 4 4 8 17 $1,464 HR erddblts (rxDOT Spur 331) 0 $0 PSC 5. Reserved 0 $0 HR 0 $0 PSC 5. Reserved 0 SO HR 0 1% PSC Reserved 0 $0 16, HR 0 $0 Page 4 of 6 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN SOUTH LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF UM44OURS AND TASKS AMENDMENT NO.2 Fie: SLDIRAMEN02-1`13I.XLS EXHI81i A-7 29 Aay-03 1030 PM Firm Task Prin. Proj. Sr. Prof. Prof. ER Technician Drafter Clerical Total Total or Mgr. Erb. Engr. Arch. or or CADD Hass Extension Omcer Designer Operator $ PSC $130.00 $108.00 $108.00 $81.00 $81.00 $75.00 $65.00 $58.00 $28.00 HR <KK<K«« Rates »>»»»>» $110.00 $0.00 $92.00 $82.00 $0.00 $70.00 $59.00 $55.00 $37.00 PSC 1. Cowlin ate with Eherges, SPS, LP&L, AT&T. Bel 4 12 24 32 48 120 $819" HR Teleptarte, City Water Um" Cox Cable 12 8 24 48 92 $6,080 (Revised eastern mule) PSC 2. Coordination meatinge wtM utilifes 8 24 24 42 12 110 $7.380 HR Miles to mark up anon rebin set of drawings with 8 24 24 4 60 $4,532 dnek utilities ktcated thereon for treader to co nswumon *WNW s, prepare tlrewings for utilities use (revised eastern route) PSC wermy wf•ly adKnatr wit n --" to the proyact 4 8 8 8 2 30 $2,200 HR 13. (UtlWy &tlJ *Mwd designs not part of Oft scope) 4 8 8 B 2 30 $2.098 (revised eastern routa) PSC 4. Notify Cky staff and review utility &*sW erde 1 4 2 7 $618 HR re RINFoOrK135" 4 2 6 $442 PSC 5. Reserved 0 $0 HR 0 $0 PSC 1. Reserved 0 $0 HR 0 $0 PSC 2. Reserved 0 $0 HR 0 $0 PSC 3. Reserved 0 $0 HR 0 $0 PSC 4, Reserved 0 $0 HR 0 $0 PSC S. Reserved 0 $0 HR 0 $0 PSC 1. Organise and aonsol late final dedp data 2 4 6 8 1 21 $1,482 HR (oft Sheet widening paclape) 2 4 6 8 1 21 $1,409 PSC 2. Reproduce dupYceta sets of hie design data and 2 2 1 5 $340 delver to CRY HR (88tin Street widerun ) 2 1 3 $177 PSC 13. OWrdze electronic files and dhectaias, write to 2 4 /0 16 16 3 51 $3,714 HR CD, deliver CD's of electronic files 4 8 6 8 2 28 $1,958 (Six PS&E ) Pegg 5 016 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN SOUTH LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIIMATE OF MAN-HOURS AND TASKS - AMENDMENT NO. 2 . v 1 1 1< (MW- •. • • ® 1 11 ,�1 11 . 111 :✓ 11 111 ■® [ 11 11 r 11.. 1 11 1 Page 6 of 6 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN SOUTH LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF REIMBURSABLE EXPENSES, WORKSHEET 2 BASIC DESIGN SERVICES, REIMBURSABLE EXPENSES AMENDMENT NO.2 File: SLDIP-AMEND2-PG2.XLS EXHIBIT A-1 05:50 PM 28-May-03 Reimbursable Expenses Total PSC Mileage - revised eastern route (additional) 500 Miles ® $0.33 per mile $163 HR 500 Miles ® $0.33 per mile $163 PSC Bluelins prints - est. 20 utility companies, 20 streets each 400 Sheets a $2.55 per sheet $1,020 HR utility re -coordination 0 Sheets ® $2.55 per sheet $0 PSC 8.5 x 11 and 11x 17 Reproductions, misc. 150 Sheets ® $0.10 per sheet $15 HR 150 Sheets a $0.10 per sheet $15 PSC Toll telephone 0 Project ® $1,500.00 per project $0 HR 0 Project ® $750.00 per project $0 PSC Fax 25 Pages ® $1.00 per page $25 HR 25 Pages ® $1.00 per page $25 PSC Postage, shipping and delivery, misc. 10 Mailings ® $15.00 per mailing $150 HR 10 Mailings ® $15.00 per mailing $150 PSC CADD charges 497 Hours ® $8.00 per hour $3,976 HR 107 Hours a $8.00 per hour $856 Im S OkftM for Woe kid 2 — Bak Design Servlees PSC $5,349 HR $1 �m wt Contract muftWw for reimbursables a 1.15 Total $7,541 will Page 1 of 1 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN SOUTH LUBBOCK DRAINAGE IMPROVEMENTS ESTIMATE OF SUBCONSULTANT EXPENSES, WORKSHEET 3 BASIC DESIGN SERVICES, SUBCONSULTANi EXPENSES AMENDMENT NO.2 CVU!Crr A_1 11.1n AU Da-Mav-M Subconnsultaru Expenses Total Subtotal •• No charges •• Aerial Photoaraohv (subcorrsultent) Black and white overlapping 9x9 contact prints at 1' = 330 feel 0 Project O $ 12,500.00 per project (Orig. agreement) so Anelyfical aerotriengulaaon, DTM collection, and digital orgrophoto 6 Was O $ 2,800.00 per mile $16,800 production for a wkhh of no less than 500 feet (250 feet each side of centerflne) along the proposed storm sewer route, ESL 6 miles of route depending on photo and project orientation Analytical aerotriangulemon, DTM collection, and digital oMophoto 0 Lakes O $ 1,500.00 per lake (Ong. agreement) $0 production for a wkhh of no lass Van 800 feel surrounding playa lakes $16,800 Photo ID points for control One -foot contour Interval DTM frequency, 25-foot grid 0.5-foot pbtal resolution for electronic maps Digitized Imagery rectified on a phel by pbel basis using DTM data TIF Poe deliverable DTM data In MloroStation format No herd copy plots of either DTM data or digital orthophoto Standard photogrammetrlc accuracy for 1 inch = 50 feet scale and 1-foot contour interval 90% of all well-defined ptanimetric detall will be plotted to within 1/408rknch at map scale and no such feature will be in am by more then 1/201h-Inch. 90% of all solid line contours will be accurate to within one-hef the contour interval and no such contour will be In eror by more Nan one full Interval. 90% of all spot elevations will be accurate to within 1/4th the comour Interval and no such elevation will be In error by more than one-ha8 the Interval Suirveving (subconsuhantNeastem re-route) Hortzontal control, vertical control, photo ID points (eastern re-route) 180 Hours ® $ 100.00 per Hour $16,000 Existing uttitiy locations (EASTERN RE-ROUTE) 180 Hours O $ 100.00 per Hour $18,000 Cross sections (west of of US 87) (Excludes cross Seen" to Iloes 84A 0.0 Miles O $ 5,500.00 per Mile (prig. agreement) $0 and 132 Ties and row limits at railroad crossings (1 crossirgs with 1 tracks) 0 Each O $ 3,000.00 per Each (orig. agreement) $0 Ties and row Omits at US 84. US 87 and Sale Flood crossings 1 Each O $ 5,000.00 per Each (Spur 331) $5,000 CenterOne profiles (excludes Lekres 84A and 132 profiles) 0 Hours O $ 100.00 per Flour (odg• agreement) $0 Bethymetric surveys (survey of Ingress -egress of pipellme routes and Inlets & headwalls 0 Lakes u $ 16,000.00 per Lake (orig. agreement) $0 locations In Immediate take vkAntry, elves with known permanent water) (Lakes 28, 84. 86. 89. 90. 91 and 92) (Contingent on aerlal photo water level being at historical'normaP water surface elevations) (Other lakes In system normally dry) Topography around lakes (See Supplementary Services) $0 Easements (7 eastern re-route estimated) 7 Easements O $ 5,000.00 per Easement $35,0D0 Page i of 2 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN SOUTH LUBBOCK DRAINAGE IMPROVEMENTS ESTIMATE OF SUBCONSULTANT EXPENSES, WORKSHEET 3 BASIC DESIGN SERVICES, SUBCONSULTANT EXPENSES AMENDMENT NO.2 rne. ci rve_eucune_orv_a v, a CI[IARIT AL-1 11•In W 9QAA—tea Submwib" Emwisas Total SubtoW !d faubeonsullantl (eastern re-routsl Test Moles 0 Holes O S 305.00 per Hole (prig. agreement) $0 monitoring Weis 0 wells O $ 600.00 per Well (orig. agreement) $0 Office (CADD) 0 Hours O $ 55.00 per How $0 Section Corners 48 Hours O $ 100.00 per Project (orig. agreement) $4,800 RPLS (eastern re-roule) 100 Hours o $ 80.00 per Hour $8.000 GPS EW*ff m Ctwges (eastem re -rase) 70 Days O 8 250.00 per Day $17,500 AOeage (eastern to -route) 3,e00 Miles O $ 0.60 per Mile $2,160 Cross sections and detailed Woo at outlet cluumal 0 Hours O $100.00 per How (odg. agreemenrt) $0 Defeaed tap0 at t1S87 wrdarpass (wrder6rldpe feebaes do not show on aerials) 0 Hours O $100.00 per Hour (069. agreement) $0 $108,460 City to obfaln axess permission ordo private row imming, rnordor Wee sites (suDrprsutant) 0 Project O $500.00 per project (orig. agreement) $0 $0 No dredge Subewala for Wwk MIt 3-- Balk Design Ssrvlew $125260 AMENDMENT MD. 1 Subtotal from Workshlest 1 $129,610 Subtotal from WoA6best 2 $7,541 Total Estimated ProNssional Bask Design Swvkss Fee "M Mhl 1) $262,411 Page 2 of 2 Resolution No. 2003-R0312 EXHIBIT A-2 SUPPLEMENTAL SERVICES TYPE A TASKING, MAN-HOURS, REIMBURSABLES, AND SUBCONTRACTORS AMENDMENT NO.2 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN SOUTH LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF SUPPLEMENTAL SERVICES, WORKSHEET A-2 SUPPLEMENTAL SERVICES — TYPE A Amendment No. 2 File: SYSG-ENV-Amand2_XLS EXHIBITA-2 29-Mav-03 10:40A.M. Prin. Proi. Sr. Prof. Prof. EIT Technician Drafter Clerical Total Total Firm Combined Labor, Reimbursables and Sultants or Mgr. Engr. Engr. Ards or or CADD Hours Extension Officer Desi ner Operator $ PSC Limited local coordination, limited mist correspondence, 6 48 48 32 32 48 12 226 $17,452 HR miscellaneous telecons, up to one airline trips to Fort Worth 6 48 48 32 32 48 12 226 $16,224 to meet with Corps of Engineers, Assemble permit application and inlet/outlet grading details and quantities to go with permit application, prepare for Owner's signature. Services for Hoel Park, Chas Guy Park, Earl Crow Park, Jan Jennings Park, and the Canyon outlet for the system. Others, if needed, will be performed as additional services. (Note: Does riot include biological data acquisition to support a permit application. Work under this budget to be performed on an as -needed basis to the extent of the budget limits. Work directed by the City that exceeds this budget or is related to regulatory issues that fall outside this scope will be performed under Additional Services). (Does include jurisdictional cut/fill quantifies from grading PSC plans developed under the Basic Services design phase for 0 $0 HR the five locations listed above). 0 $0 PSC Reserved 0 $0 HR 0 $0 PSC Reserved 0 $0 HR 0 $0 PSC 6 48 0 48 0 0 32 32 48 12 226 $17,452 HR Totals Personnel 6 0 48 48 0 0 32 32 48 12 226 $16,224 Begin reimbursable expenses PSC Airline travel 1 tickets ® $250.00 each $250 HR 1 tickets ® $250.00 each $250 PSC Mileage 80 miles ® $0.33 per mile $26 HR 80 miles 0 $0.33 per mile $26 PSC Toll telephone 1 project ® $25.00 per project $25 HR 1 project 0 $25.00 per project $25 PSC Fax 80 pages 0 $1.00 per page $80 HR 50 pages ® $1.00 per page $50 Page 1 of 2 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN SOUTH LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF SUPPLEMENTAL SERVICES, WORKSHEET A-2 SUPPLEMENTAL SERVICES — TYPE A Anmwxhriad No. 2 rue: A1Al*Cnv-Mlaq'[.JILA" r-ArUDI1 !FC zwmuy-W lw~l L Prim Proj. Sr. Prof. Prof. EIT Tedrudan Drafter clerical, Total Total Firm Combined Labor, Reirnbrrsables aid Subconsultarb or Mgr. Engr. Engr. Arch I or or CADD Hours Erdension Officer i Designer Operator $ PSC Postage, shipping and delivery 6 mailings ® $15.00 per mailing $90 HR 6 mailings ® $15.00 per mailing $90 PSG CARD dtarges 48 taus O $8.00 per hour $384 HR 48 hours 6 $8.00 per hor $384 PSC Reproductions 500 sheets ® $0.10 per page $50 HR 200 sheets 6 $0.10 per page $20 PSC Blusline prints 45 sheets 6 $2.55 per sheet $115 HR 15 aft o $2.55 per sheet $38 PSC Car rental 1 days 8 $65.00 per day $65 HR $0 PSC Subtotal reimbursable expenses $1,085 HR $883 15% of reimbursable epenses to aocoud for 1.15 avAplier ( ( $295 Total rekt rsable expenses $2.263 $01 for worbhest A-2 ( I $35,939 I lammed Servioee — Type A Page 2 of 2 Resolution No. 2003-R0312 EXHIBIT B SCHEDULE FOR AMENDMENT NO.2 1W141,611 SOUTH LUBBOCK DRAINAGE HAPROVEMENTS AMENDMENT NO.2 SCHEDULE 1. BASIC SERVICES A. Primary Plan and Specification Package (Attachment A, Item I.A. La in the original engineering services agreement) except for the reach from Slide Road westward to the branch leading to Lake 132 — December 2003. B. 98th Street widening associated trunk storm sewer plan and specification package from Slide Road westward to the branch leading to Lake 132 — dependent on 98th Street widening schedule and geotechnical options. 2. SECONDARY DESIGN PACKAGES — PLANS AND SPECIFICATIONS A. Original engineering services agreement, Attachment A, Item I.A. Lb, designated branch storm sewers — July 2004. B. Original engineering services agreement, Attachment A, Item I.A.I.c, designated branch storm sewers — July 2004. C. Original engineering services agreement, Attachment A, Item I.A. Ld, designated branch storm sewers — July 2004. D. Original engineering services agreement, Attachment A, Item I.A.Le, designated branch storm sewers — July 2004. E. Original engineering services agreement, Attachment A, Item I.A.l.f, designated branch storm sewers — already delivered. 3. SUPPLEMENTARY SERVICES — TYPE A A. Section 404 Dredge and Fill Permit application for five locations — August 2003. END SCHEDULE