HomeMy WebLinkAboutResolution - 2016-R0024 - Collier Construction Company - 01_14_2016No. 2016-R0024
tem No. 6.17
January 14, 2016
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for
and on behalf of the City of Lubbock, Contract Number 16-12662-JOC for building envelope
repair project at City Hall, 1625 131h Street, by and between the City of Lubbock and Collier
Construction Company, of Lubbock. Texas, and related documents. Said Contract is attached
hereto and incorporated in this resolution as 11' fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this 14tL day of lanu=
GLEN -RI'SON, MAYOR
ATTEST:
04 Q, -'. ��
Rebea Garza, City Secretary
APPROVED AS TO CONTE
L.-
Mark arwo d, Assistant City Manager,
Chief Information Officer
APPROVED AS TO ,ORM:
�• r
1my,L. ms, g` t}.C�fy Attorney
RES.CoIGer Construction Company City I Tall 12 15. 15
12.I5.15
Resolution No. 2016-R0024
Contract No. 12662
Work Order Signature Document
N1PA EQIQC Contract No.: TX04-112012-CCC
FX New Work Order Modify and Existing Work Order
Work Order Number: 034777.00, 034332.00, Work Order Date: 12/17/15
034911.00, 034914.00
Work Order Title: Lubbock Business Center Waterproofing
Owner Name: City of Lubbock Contractor Name: Collier Construction
Contact: Wesley Everett Contact: Scott Collier
Phone: (806) 775-2665 Phone: (806)741-1982
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA
EZIQC Contract No. TX04-112012-CCC
Brief Work Order Description:
City Hall exterior waterproofing and restoration of water damage
Time of Performance Start Date:
Estimated Completion Date:
Work Order Number Location
034777.00, 034332.00, 034911.00, City 11all
034914.00
CITY OF LUBBOCK
GlenYwobertson, Mayor
Attest: , e� —)
Rebecca ara, City Secretary
APPROVED AS CONTENT:
MarkV,ear,wo9h, Chief I formation Office
Assistant -City Manager
Amount of Contract
$828,376.98
Scott Collier
Collier Construction Company
Owner's Representative
-yeucf
Wesley Everett, Director of Facilities
APPROV S TO FORM:
As itv orne 't v��v
Work Order Signature Document
�r
THE GORDSAN GRdUP
NJPA PZIQC Contract No.: TX04-112012-CCC
RXNew Work Order 0 Modify an Existing Work Order
Work Order Number: 034777.00 Work Order Date: 12/02/2015
Work Order Title: City of Lubbock- City Half, Waterproof Exterior
Owner Name. City of Lubbock Contractor Name: Collier Construction Company
Contact: Chad Price Contact: Scott Collier
Phone: (806) 775-2272 Phone: (806) 741-1982
Work to be performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA
EZIQC Contract No TX04-112012-CCC.
arlef Work Order Description:
Waterproof City Hall exterior per architects ptanslspecs
Time of Performance Estimated Start Date:
Estimated Completion Dale:
Liquidated Damages Will apply: X Will not apply:
Work Order Firm Fixed Price. $763,472.12
Owner Purchase Order Number:
Approvals
ner Date
Work Order Signalure Document
a: � 6 �—— Contractor Date
Page 1 of 1
121212015
X�:7�-
IQC'
Detailed Scope of Work TFIE GQRFJIAN GROUP
To: Scott Collier From. Chad Price
Collier Construction Company City of Lubbock
2202 Avenue E 1625 13th Street, Room 204
Lubbock, TX 79404 Lubbock, TX 79457
(806)741-1982 (806)775-2272
Date Printed: December 02, 2015
Work Order Number: 034777.00
Work Order Title: City of Lubbock- City Hall, Waterproof Exterior
Brief Scope: Waterproof City Hall exterior per architects planslspecs
Preliminary Revised ❑X Final
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items
set forth below shall be considered part of this scope of work.
1. Work shall include removal of existing concrete walkways along the west, south, and north sides of the facility. as
described in the project drawings in order to install new concrete sloped walks and curbing along the base of the existing
building. 2. Work shall include the removal of the existing wall finish and metal stud framing from below the existing
window units and existing aluminum reveal along the entire length of the west south and partial north face of the building as
described in the project drawings, in order to install new cold form metal framing, insulation, exterior sheathing,
damproofing and new three -fourth inch (314") PC Plaster. Contractor shall provide a five (5) year labor and materials
warranty and a five (5) year manufacturers material warranty. 3. Work shall include removal of existing sealant at all glass
to metal joints on all exterior elevations as described in the project specifications. Contractor shall install all specified
sealant and required accessories as per the project specifications. Contractor shall provide Owner with a five (5) year labor
and materials warranty and a five (5) year manufacturers material warranty. 4. Work shall include removal of the existing
light poles, and exit signs, along Paris Ave. and 13th Street, all associated conduit and electrical wiring back to the
existing junction box on the south west corner of the building as described in the project drawings. Contractor shall clean
and reinstall light poles and exit signs (where shown), install all new underground electrical conduit and electrical wiring
from the existing junction box out to the light pole locations and make all necessary hook ups to maintain fully functional
light poles with all required accessories as per the project drawings. Contractor shah provide Owner with a rive (5) year
labor and materials warranty on all work. 5. Work shall include the infill of the designated underground vaults and
encapsulating the existing electrical conduit in order to install new concrete walkways as described in the project
drawings. 6. Work shall include extending the tops of the existing manhole and adjacent rectangular vault and providing a
new watertight manhole cover and new watertight hinged vault door up to the new concrete walkway as described in the
project drawings. 7. Work shall include removal of a portion of the existing retaining concrete wall along the existing
loading dock drive location and installing a new concrete retaining wall as described in the project drawings. 8. Work shall
include removing the existing exit only, door on the west side of the building on Paris Ave. and replacing with a new 16 ga.
Hollow Metal Door with all associated hardware, reconnect the existing building security as required, provide new painted
finish on both faces of the door and frame, rework the existing wall finishes inside adjacent to the door back to its original
condition as described in the project drawings. Contractor shall provide Owner with a five (5) year labor and materiels
warranty on all work and a five (5) year manufacturers material warranty.
Subject to the terms and conditions of JOC Contract TX04-112012-CCC,
snipe of WeA Page 1 of 2
IZVZO15
Detailed Scope of Work Continues..
Work Order Number. 034777 00
Work Order Title: City of Lubbock- City Hall. Waterproof Exterw
Contractor Date
ner Date
Scapa of Work Page 2 of 2
1202UIS
Contractor's Price Proposal - Summary
Date: December 02, 2015
Re: IOC Master ContractAt TX0-112012-CCC
Work Order #- 034777 oa
Owner PO #
Tille: City of Lubbock- Crty Hall, Waterproof Exterior
Contraclov Collier Con3uuc6on Company
Proposal Value $753 472 12
Section - 01
$19,965.90
Section - 03
$19,587.54
Section - 04
$2,775.45
Section - 07
$710,014.00
Section - 08
$2,236.86
Section - 22 $430.26
Section - 23
$3,435.67
Section - 31
$315.01
Section -32
$1,620.70
Section - 33
$2,940.73
Proposal Total $763,472.12
Thrsl total represents the mrrecl total far the proposal Any dtso.epancy between line totals
sub -totals and the proposal total is due to rounding
The Percentage of NPP on this Proposal: 92.99%
Cuntraclors Price Proposal - Summary - Page 1 of 1
1L22o15
Contractor's Price Proposal - Detail
Date: December 02, 2015
Re.
IOC Master Contract M
Tx04-112012-CCC
Work Order #:
034777.00
Owner PO #:
T'llle:
Cray of Lubbock. City Hall, Waterproof Fxtenor
Contrador:
Collier ConstrucLon Company
Proposal Value'
$763 472.12
Sett Item Mod.
UOM Dascripllon
UneToW
Labor
Equip. Material (Esckrdes)
Section - 01
1
01 22 20 00 0010
HR Elect iwnTasks in the CTC include appropriate costs to cover labor These
51,391.2E
tasks will be requested spezficely by the owner far miscellaneous work not
covered in the CTC.
Quantty Unit Price Factor
Total
Installation 32.00 x 32,92 x 1.3207
1,391.2E
Electfic1an labor hours to disconnect S rtconnect 7 light poles, tia up loose wire in ubhty vault prior to flow fill
instailation
2
01 22 20 00 0024
HR PlumberTasks in the CTC include appmprate testa to cover lebcr These
$8B9 89
tasks will be requesled speciicalty by the owner for miscellaneous work not
covered in the CTC
Quantdy Und Price Factor
Total
installation 20.00 x 3369 x 1 3207
859 B9
Labor to relocated roof drain
9
01 22 23 00 0233
FAO 1 500 L13 Capacity 60' Wtde Slud•Steer Loader (Bobcat) 4Wth Full -Time
S9 699 14
CIFeralor
Quantity Lind Price Factor
Total
InrLdlatidn 1.00 x 7.33537 x 1.3207 -
9,689.14
4 01 22 23 00 0831
DAY 6 Ton Lill Hydraulic Crane Wtth Full -Time Operator
$1,731,54
Quantdy Unit Price Factor
Total
Installation 200 x 655 54 x 1.3207 -
1,731,54
Light pole removal and reinstallation
5 01 56 25 00 0034
EA 10' VMe, 6' High, Temporary Chain Link Fence Gate, Up To 6 Months
$36a.18
Quantty Und Price Factor
Total
installation 200 x 13939 x 1.3207 -
368.10
6 01 S5 26 00 0143
LF Temporary 6' Hgh Chain Link Fence Panels (Portable), Up To 6 Months
$1,929.11
Quantity unit Price Factor
TOW
Installation 807.00 x lei x 1.3207
1,929.11
7 a1 71 13 00 0003
EA E4uipment Delivery, Pickup. Mobiizatian And Demobilization Using A Tractor
S792.42
Trailer With Up To 5T Bedindudes delivery and pickvp. For equipment such as
bulldozers, molpr scrapers, hydraulic excavators, grada3s, mad graders,
loader•barkhoes, heavy duty construction loaders, tractors, pavers, callers.
bridge finishers, straight mast construction forklifts. Wascoprng broom rough
lenain construction forlddis, telescapinu and articulating boom mani is with >
40- boom lengths, etc
Quantity Unit Price Factor
Total
Installation 2.00 x 300.00 x 1 3207 -
792 a2
8 01 71 23 16 0005
HR 2 Person Survey Crew (Unit Of Measure Is Per Crew Hour Worked)lncludes
51 196 98
surveyor rodman, equipment and Instruments.
Quantity Unit Price Factor
Total
•
Installation 11.00 x 11329 x 13207 -
119698
Contractors Pn= Proposal - Detail Page 1 of 4
1202015
Contractor's Price Proposal - Detail Continues..
Work Order Humber: 034777.00
Work Order title: City of Lubbock- City Hafl, Walerproof Exterior
Section - 01
9 01 74 19 000012 E4 15 CY Dumps!er (2 Ten) -CCn3nnOn Debits-Indudes delivery of dumpster 51 977 35
rental cost. pick-u cost, haul n and die p g. pawl lee. Nomharardcus malenal
Ouanbty Unit Pau Factor Total
Installation 4 CO X 374 30 K 1 3207 1 977 35
071234
Subtotal for Section - 01 519,965.90
Section - 03
10 03 31 13 cc 0039 CY Dimd Chute Place 1200 FBI Concrete Slurry 314 724 35
Quantity Unit Prat Factor Total
Installation 10500 x 106 18 K 1 3207 14 724 35
It 03 31 13 00 0094
HR Trailer Mounted Concrete Pumpincludes hoses
34963 19
Quantly Unit Pace Factor
Total
Installation 40.00 K 93 95 x 1 3207 -
4.963 19
Subtotal for Section - 03
$19,687.54
Section - 04
12 04 05 16 26 o0T6
SF Grout Cavity Vh: s - 6- Spare Ccnrsctc Fill t0 500 CFlSF)
$2 775 45
Ouantty Unit Price Factor
Tour
Instaaahon 45000 X 4 67 K 1 3207
2.715 45
Subtotal for Section - 04
$2,775.45
Section - 07
13 07 00 00 00 0214
AN labor ft m&WW io remove and replace *Wwa4 on titres aides of city heir,
5709,988.75
at the same lures elevations remove up in 5' of plaster Removal of the
Plaster rs up the reglet. Once side work is removed, dig approximately 1 toot
of so at sidwalk perimeter damp proof wall, apply waterproofing a foot
below sidewalk and then thru wall Hashing InsW new standard plaster
Caulk new plaster as weal as sidewalk to plaster at 3 sides of the hu4ding
Wei glaze windows on 3 sides of the buidig Re -caulk window perimeters
on all four sides of the building Replace low retaming wall Ldt utihty covers
that are not being replaced Create curbs at 3 side of budding Replace 2
walk doers as specAed. Caulk curb to sidewalk and sidewalk to sidewalk
4PP
Duant�y Unit Price Fedor
Instr'aiSort
TOW
1.00 s 337.476.1)0 x 12500
4$6,6175
X
17et:+oritk}rt 100 x 234,ISM. DIE? x 1.2500 =
293,125,00
14 07 71 23 00 0055
LF 4- x 5' Redangu!ar Aluminum Downspuut
$45 25
Quantity Unit Price Factor
Total
Installation 6 00 K 5 71 K 1.3207
45 25
Subtotal for Section - 07
$710,014.00
Section - 08
15 08 34 23 00 0042
EA 4' x 4' Double Leaf Steel Drainage Floor. Vauy Or Sidewalk Door
32,266 86
Quanhly Und Pnce Factor
Total
Installa3en 100 K 1 731 55 K 13207 -
2,28686
Subtotal for Section - 08
$2,286.86
Section - 22
Contractor's Price Proposal - Detail
Page 2 of 4
12IM015
Contractor's Price Proposal - Detail Continues..
Work Order Number: 034777,00
Work Order Title: City of Lubbock- City Hall, Waterproof Exterior
Section - 22
16 22 14 26 13 0069 EA 6' OuBeL Bronze Root Drain Downspout Houle $430 26
Quantity Unit Price Factor Total
Installation 1 00 x 325 78 x 1 3207 43026
Subtotal for Section - 22 $430.26
Section - 23
17 23 05 29 00 067a F-A to- Pipe Size 116 Stainless Steel U-Soil $3,435.67
1 Quantity Unit Price Factor Total
{ Installation - 343567
2000 x 13007 x 13207 -
Subtotal for Section - 23 $3,435.67
Section - 31
f 6 31 24 13 00 0010 5Y Finish Grade Roadway Parking Areas. Landscaping And Embankments By $315 01
Machine
Quantity Unit Price Factor Total
Instatabon 567.89 x OA2 x 1 3207 a 31501
Subtotal for Section - 31 $315.01
Section - 32
19 32 04 23 0006414
Fit 3' Pop -Up Heght Spray Sprinkler Head
$400 21
Quantity Unit Pncn
Factor
Total
Installation 2000 x 1439 x
1 3207 =
390 10
Demolition 2000 x 3.79 x
1.3207 =
1o0.11
20 32 93 53 00 0041
EA 15 Ga!1on Container Shrub Plaefing
$1,114.34
Quantity Unit Price
Fadar
Total
Installation 2500 x 3375 x
1 3207 -
1.114 34
21 32 93 53 DO 0041 0279 MOD For n 10 To 25, Deduct -355 80
Quantity Unit Pri" Factor Total
lnsta:aton 2500 x -1.69 x 13207 - -55 00
22 32 93 53 00 0062
EA 6' Diameter Potted Groundcover And Flower Planting
$102 16
Quantity Unit Price
Factor
Total
Installation 85.00 . x 0 91 x
1 3207 -
102.15
23 32 93 53 00 0062 0205
MOD For > 50 To 1DO Deduct
-320 21
Quantity Unit Pnce
Factor
Total
Installation 8500 x -0 10 x
13207 -
-20 21
Subtotal for Section - 32
$1,620.70
Section - 33
24 33 01 30 73 a015
FA 6.117 Rise, Up To 36- Diameter Solid Manhole Risen
S594 26
Quantity Unit Pnce
Factor
Total
InstattaLon 1 DO X 44996 x
1 3207
59426
25 33 11 13 23 0199
LF 24' AWWA C905 DR 51 PR 80 PVC Pipe
$2.105 20
Quantity Unrt Price
Factor
Total
installation 4000 x 39.55 x
1 3207 a
2,105,20
26 33 12 16 00 0066
EA 10-JW x 17-114" Precast Concrete Utility Box
$241.27
Quantity Unit Prue
Factor
Total
Installation 400 x 4567 X
1 3207 -
241.27
Contractors Pnce Proposal - Detail Page 3 of 4
IM2015
Contractor's Price Proposal - Detail Continues.,
Work Order Number: 034777 00
Work Order Title: City of Lubbock- City Hell, Waterproof Exterior
Subtotal for Section - 33 $2,940 73
Proposal Total $763,472.12
This total represents the correct total for the proposal. Any discrepancy heFyeen line totals,
sub-loials and the proposal total is due to rounding
The Percentage of NPP on this Proposal: 9199%
Canuactor's price Proposal - Detait Page 4 of 4
121212015
Subcontractor Listing
Date: December02, 2015
Re: IQC Masler Contract #
Work Order #,
Owner PO #
Title.
Conlracta
Prop05a1 Value
TX04-112012-CCC
034777 DO
C,ty of Lubbock Crry Ha i, Walerprocf Extencr
Collier Construction Company
3763 4 72 A 2
THE Gl3RDIAN GROUP
Nameof Corrtracbr
Duties
Amount
%
No Subcontractors have been
selected fur this MA Order
So 00
C 54
Subcontractor LrsWV
Page 1 of 1
1212r2015
CENTENNIAL MOISTURE CONTROL, INC.
1780 Hurd Drive
Irving, Texas 75038
PH: (214) 350-7689 • FAX: (214) 352-1306
E-MAIL: centenmc I. rn • WEB: gentennielmc.corn
Via Email: scott@colliertx.com
November 19, 2015.
Mr. Scott Collier
Collier Construction Company
2202 Avenue E
Lubbock,Texas 79404
Job Ref: Lubbock City Hail
Dear Scott,
It is our pleasure to present to you our written quotation on the above referenced project.
This work is as we discussed in our job site meeting. Scope of work is as follows:
1) Remove and replace sidewalk on three sides of building.
2) At same elevations, remove up to 5 feet of plaster. Removal
is up to metal reglet. Once side work is removed, dig
approximately 1 foot of soil at sidewalk perimeter Damp-proof
wall, apply waterproofing a foot below sidewalk and then thru
wall flashing. We will then place new standard plaster (not
marble type). Caulk new plaster as well as sidewalk to piaster,
three sides of building
3) Wet glaze windows on all 3 sides of building
4) Re -caulk window perimeters on all four sides of building.
5) Replace low retaining wall.
6) Lift utility covers that are not being replaced.
7) Create curb on three sides of building (excludes handicap ramp),
8) Work door and frame as specified.
9) Caulk side to curb and sidewalk to sidewalk.
Exclusions:
1) Any and all abatements.
2) All permits, etc.
3) Payment and performance bond.
4) Work related to back up wall.
5) Work related to filling utility holes.
6) Water that enters through hollow metal doors and its elements.
7) Water that penetrates above our waterproof membrane, also below.
8) All electrical, plumbing, etc.
9) Utilities and facilities
Page 1 or 2
10) Landscaping.
11) Any and all work related to repairs to work on exteriorfarade
above our work.
Price for this work........................................................................ $567.975.00
Excludes B.25% sales tax.
Scott if you have any questions please do not hesitate to give us a call at 214-350-7689.
Sincerely,
Joseph C. Tamer
President
JCTIcp