Loading...
HomeMy WebLinkAboutResolution - 2007-R0234 - Amendment To Contract- Lee Lewis Construction Inc- Construction Manager Services - 06_14_2007Resolution No. 2007-RO234 .June 14, 2007 Item No. 5.14 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the City Council of the City of Lubbock hereby authorizes and directs the Mayor of the City of Lubbock to execute an Amendment to the Contract by and between the City of Lubbock and Lee Lewis Construction, Inc., of Lubbock, Texas, for construction manager services for Phase I, Youth Sports Facility (ITB #07-700- BM), which Amendment and any associated documents, are attached hereto and made a part of this Resolution for all intents and purposes. Passed by the City Council this 14tN day of ATTEST: Reb •ca Garza, City Secrets APPROVED Scott Snider, Assistant City Manager/Community Services APPROVED AS FORM: Don Vandiver, Attorney of Counsel Wres/LeeL ewisWonAmendRes June 11, 2007 June , 2007. DAVID A. K41LLER, MAYOR Resolution No. 2007—RO234 *MWW AIADocument A121 CMc 2003 Amendment No.1 AMENDMENT NO. I TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pursuant to Section 2.2 of the Agreement, dated January 12, 2007 between City Of Lubbock (Owner) and Lee Lewis Construction, Inc., (the Construction Manager), for Construction Manager at Risk Services, Phase I Youth Sports Facility (the Project), the ADDITIONS AND DELETIONS: Owner and Construction Manager establish a Construction Cost Limitation, Guaranteed The author of this document has Maximum Price and Contract Time for the Work as set forth below. added Information needed for Its completion. The author may also ARTICLE I GUARANTEED MAXIMUM PRICE have revised the text of the original The Guaranteed Maximum Price for the Work is Eleven Million Seven Hundred AIA standard form.. An Additions and Thousand and Zero Cents ($11,700,000). The Construction Manager's Construction Cost Deletions Report that notes added Limitation for the Work, including the estimated Cost of the Work as defined in Article 6 information as well as revisions to and the Construction Manager's Fee as defined in Article 5, is Ten Million Five Hundred the standard form text Is available Forty -One Thousand Six Hundred and Eighty Six Dollars and Zero Cents ($10,541,686 from the author and should be ). This Price is for the performance of the Work in accordance with the Contract reviewed. A vertical line in the left Documents listed and attached to this Amendment and marked Exhibits A through F, as margin of this document indicates follows. where the author has added necessary information and where Exhibit A Drawings, Specifications, addenda and General, the author has added to or deleted Supplementary and other Conditions of the Contract on which the Guaranteed from the original AIA text_ Maximum Price is based, pages 1 through 7 Package A dated 6n107 and pages This document has Important legal 1 through 4 , Package B dated 617/07. consequences. Consultation with an attorney is encouraged with respect Exhibit B Allowance items, pages 1 through 1 , dated 6n/07 to its completion or modification. Exhibit C Assumptions and Clarifications made in preparing the (Paragraph deleted) Construction Cost Limitaion, pages 1 through 4 , dated 617107 Init. AIA Document A121 TrCMc - 2003 Amendment NO. I. Copyright 01991, MIS and 2003 by The Amsrlcen Instftsne of ArChitetAs and The Associated General Contractors of America. All rights reserved !F*;trlt,, Tnl; slocunre rt J6r019ctRJ by tl.8, %op t L:+w and International Irmati". 6lnauthonzrd repruaucnan Qisnibut.on of doctunem any r(lrian ❑f iL m ra-s cfv- and criminal peowlies, and will be prosecuted to the maximum extent po:s-Abfe iied,r 1 1, This document was produced by AIA software at 14:03:42 on 06/08/2007 under Order No.1000267310_l which expires on t I1112W7, and Is not for resale. User Notes: (87990542) ARTICLE II CONTRACT TIME The date of Substantial Completion established by this Amendment is: CONSTRUCTION MANAGER: Lee Lewis Construction, Inc. By:IPM/t44L, PRTNTED N Elizabeth R gren TITLE: Vice President COMPLETE ADDRESS: Company Lee Lewis Construction, Inc. Address 7810 Orlando Ave. City, State, Zip Lubbock, Texas 79423 ATTEST: CITY OF LUBBOCK, X (OWNER): Bp� MAYOR ATTEST: U11w y ecretary APPROVED AS TO CONTENT: Owner's CYI AA ,,� CS, AEPgROYED AS TO F Co to Secretary hVI �Z C A A A4 Cit torney 1111t AIA Document A121 T"CMc — 2003 Amendment No. 1. Copyright 01991, 1998 and 2003 by The American institute of Architects and inne Associated General Contractors of America. All rights reserved. WARNING: This document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 09:19:15 on 06/08/2007 under Order No.1000267310_1 which expires on 1111/2007, and is not for resale. User Notes: (428697698) AMENDMENT NO.1 TO AGREEMENT EXHIBIT A Between Owner and Construction Manager Resolution No. 2007-R0234 City of Lubbock Youth Sports Complex Package A Lubbock, Texas Exhibit A — Listing of Specifications Listing of Drawings Listing of Addenda Exhibit A Listing of Specifications City of Lubbock YOUTH SPORTS GOMPLEX- PHA$E 1 00 S E!FCI TI0NS 1ABLE DE Cary NIS - PAMAC29-AA SECTION NAME NO. OF PAGl=5 00100 1011CI; TO PROPOSERS �F Golm INFORMATION TO PROPOSER, 4 003'0 PRQPOW, f z4RM 4 04200 kl T i,l IMAPOMM"i Mt AaKWENT 32 01010 SUMMARY OF WORK 3 01020 ALLOWAN 1 01030 ALTERNATE$ 2 01045 OMWO S PATCHING 2 000 SUBMITTALS 3 01400 QUALITY CONTROL, SERVICES � 01631 PRODUCT WBSTI'I JTIONS 3 ENEROY CALCULAM t)l=LQN §11EWDERK 02110 . - SITE CLEARING 3 02200 EARTHWORK (BUILDMPADS ONLY) 3 C()Nf';R5 E 6 02282 QU SION - TERMITE CONTROL 3 02830 CHAINLINK FENCING AND GATES 5 03300 CONCRETE WORD (BUILOING CONCRETE ONLY) 14 04200 Dill LION 4 UNIT MASONRY 9 04230 REINFORCED UNIT MASONRY 6 04721 CAST STONE 6 05400 COLD -FORMED METAL FRAMING 6 05501 METAL. FABRICATIONS 6 Exhibit A 2 Listing of Specifications 060511-2 City of L.0bQvk- YQUTH SPORTS COMPLE=X PHASE 1 061,00 ROUGH CARPEMY " 4 -06402 INTERIOR ARCRTE�G""t4ML WOODWORK, 6 N 7 TLIERMAL 07211 v & 10M IRE PRDIECTEON BuLDI,NG NsuIVATIQN 4 0760b FLASHING SAND SHal Mt-TAL 3: 077b0 ROOFING SPECIALTIES & ACCESSORIES 4 0901 JOINT SEALERS 6 r)IVIAlauLa D008"n 1i IKI I]V1lS 081:00 - STEEL 5 0933D OVERHEAD COILING DOORS 'r 08410 ALUMINUM ENTRANCE& & STOREFRONTS 8 08710 FINISH HARDWARE -9 08 o GLASS & GLAZING 5 489 0 INSULATED TRANSLUCENT SKYLIGHT 3 09301 TIDE 5 09511 ACOUSTICAL Cr: NGS 4 09650 RESILIENT FLOORING 3 09900 PAINTING 7 10160 TOILET PARTMQNS 3 1Oa00 METAL L CK'ERS 3 10522 FIRE ENTWGUISHERS 2 10900 TOILET AND BATH ACCESSORIES 3 109660 MISCELLANEOtlS SPECIALTIES [ IVI 1t7N 41-(NC)T "SEW DIVISION 12,- NOT 2 13010 LSEl 17f\f1SiC N 1'�- SPECIAL QQNS_TRI4C;TIC3N SQFTBALL.FIELD CONSTRUCTION 2 13121 SHAPE SHELTERS 2 13122 METAL BUILDiNG SY-`STF=IBIS 8 13124 ALUMINUM BLEACHERS . 3 Exhibit A Listing of Specifications 0ty of Lubbock YOUTH SPORT'S COMPLr=X- PHASE l 0,605-2 DI}c/#`SIC1I>J iNOT USE€]l SEETAHLE�OF CONTENTS AT DIVISION 15 QM=W 15 - El EMICA SEE.TASLE OF CONTENTS AT DIVISION I$ END OF TABLE OF C6,NTENTS Exhibit A 4 Listing of Drawings: Index to Drawings - 1/30/2007 SITE WORK SP1.1 Overall Site Plan SP1.2 Enlarged Site Plan at Area "A" and Area "C" and Site Details SP1.3 Enlarged Site Plan at Area "G" and Area "J" and Site Details SP2.1 Enlarged Plan - Fastpitch Softball Area "D" SP2.2 Enlarged Plan -- Fastpitch Softball Area "F" SP2.3 Enlarged Plan - Fastpitch Softball Area "H" SP3.1 Enlarged Plan - Baseball Area "B" SP4.1 Enlarged Fastpitch Softball Field Enlarged Little League Baseball Field SP5.1 Enlarged Junior League Baseball Field in Area "B" ARCHITECTURAL A1.1 Concession Building Floor Plan, Elevations and Building Section A1.2 Concession Building Roof Plan, Reflected Ceiling Plan, Sections and Details A2.1 Press Box Floor Plan, Elevations and Building Sections A2.2 Press Box Roof Plan, Reflected Ceiling Plan, and Details A3.1 Batting Cage Floor Plan, Elevations and Building Section A3.2 Batting Cage Roof Plan, Reflected Ceiling Plan, Sections and Details A4.1 Maintenance Building Floor Plan and Elevations A4.2 Maintenance Building Roof Plan, Reflected Ceiling Plan, Sections and Details A5.1 League Maintenance Building Floor Plan, Roof Plan, Building Section and Elevations A5.2 League Maintenance Building Reflected Ceiling Plan, Sections and Details A7.1 Door and Window Schedule and Details A8.1 Interior Millwork and Toilet Elevations, Millwork Sections and Accessible Fixture Schedule A9.1 Chain Link Fence and Dugout Details STRUCTURAL SNO.1 Structural Notes S 1.1 Concession Building Foundation Plan and Details S 1.2 Concession Building Framing Plan and Details S2.1 Press Box Foundation Plan and Details S2.2 Press Box Framing Plan and Details S3.1 Batting Cage Foundation Plan and Details S3.2 Batting Cage Framing Plan and Details S4.1 Maintenance Building Foundation Plan and Details S4.2 Maintenance Building Framing Plan and Details Exhibit A S5.1 League Maintenance Building Foundation Plan and Details S5.2 League Maintenance Building Framing Plan and Details MECHANICAL M 1.1 Floor Plans — Mechanicial M2.1 Details & Schedules — Mechanical PLUMBING P 1.1 Floor Plans — Concession and Batting Cage — Plumbing P I.2 Floor Plans — Maintenance and League Maintenance — Plumbing P2.1 Plumbing Details and Schedules ELECTRICAL E1 A Site — Electrical E L I Site — Area A — Lighting E1.2 Site — Area B — Lighting E l .3 Site — Area C - Lighting EI A Site — Area D - Lighting E1.5 Site — Area F - Lighting E1.6 Site — Area G - Lighting E1.7 Site — Area H - Lighting E1.8 Site — Area J - Lighting E2.1 Floor Plans - Lighting E2.2 Floor Plans — Lighting E3.1 Floor Plans — Power E3.2 Floor Plans — Power E4.1 Riser Diagrams & Details E4.2 Details E4.3 Panel Schedules E4.4 Panel Schedules E4.5 Panel Schedules Exhibit A 6 Listing of Addenda Addendum No, 1 Addendum No. 2 Addendum No. 3 Addendum No. 4 Addendum No. 5 Dated February 16, 2007 Dated February 28, 2007 Dated March 2, 2007 Dated March 5, 2007 Dated March 6, 2007 General Conditions Part of Owner/ CM Agreement Dated 1/30/2007 Supplementary General Conditions Reference Project Manual Dated 1/30/2007 Exhibit A 7 AMENDMENT NO.1 TO AGREEMENT EXHIBIT A Between Owner and Construction Manager Resolution No. 2007-R0234 City of Lubbock Youth Sports Complex Package B Lubbock, Texas Exhibit A — Listing of Specifications Listing of Drawings Listing of Addenda Exhibit A Listing of Specifications TARLE OF CON'IzFM DIVISION. 0 ; RADUA G-REQUiREMENTS AND CONTRACT INFORMATION Nat Used DIVISION 1 - =NE+ RA L REQUIREMF rS 61300 01,356 SeWt6��rnmittWaFaste.P..oanu .o] m.,T�Gntion eua-suw.«G,sr --._..M...,.....-...........,,..,...ow......»..w.............._ ._.. 2 01555 Barricades, Sipsand imffiq X1 01700 Contract Closeaut ,.<.._ .,,.... .a «..u►k�,... ,� .,.,'.a.. ._,H,... s,� �,y-....,....-... a DMSION 2 . SITE WORK M U2, ........... .,.d...«........ � 02094 tFz=,es,a7.�gOnate�sril � RIngs, aUr�vers.... �.....�,,..,y,a..<....�.. a, ...,..: r.,..,,........�....�.�,�..�,.,k.,•.,�,. 4215.I i4fbcaX iavy...,.lY+./,Al'[aiiiiif7.sal�.+Nksc..�.frf+lit +.s..lc.d v•s µ�..rMsre.reµ.H�••r.. (...».... ..v.w._......3 a2300 Excavadon, �.o� I3� jt�1 r 1ttt tit _ 0022�3117n tE�i &-va7d�..i��1���71Y �:.•.w�:3�i,ii��.r.t•r..as++pe9..v...+,r.,...asva.+«,..w.........w........................ y�1 ► 2320 1JMAy Bu .� W '1lEIl�ITYMtPal.�r�..s.q wl pfie;r...v...�....w..r....e......�.ww...........«..........a.......++.�'+i+.�Yi4 02-533 07540 02665 Water' Woft P'igW& W-Yes, and Ks=Uancous Vs...,•,...............-.c................... ..�....,.... 02700 Site 027M Aggregate Base sae .........._...,.., .....,...........,.«.. ��.:�...�w.<.:��t...��.»..�....k..�.:.�k �..,a.# 02730 fiiewtrt7LIle-•rts+. ataaE..siK.,iwcsefxecirawWK�r f Herr+r..,..r..u•asp,e..............r................. 02732 Glass -Fiber Reinfareed Polyester -.)' .w .,... _ .......,... ...........w.......... 02741 -mix AVhslt 11 02751 Rein€orced. Concmtc for Site � ...,.+•.svf.s3 N7a1!!.•ZkfPfY4iJYQP5�.�...1Jt�!OZJ�VhS�!• ASLRHM4ll�w..:..«. 14 02764 Fqymnmt.94iat ............-4 DIVISIONS 3 � 10 Not Used DIVISION 11— EQUIPMENT 11311 Submersible Wastewater Liftcat��„�., ..,..,.,F�.,,.,,,.....,.........................�.,........„...... , :' DIVISIONS 12 —16 Not Used Exhibit A 2 Listing of Drawings: G1.0 Cover Sheet G2.0 Location Map, Vicinity Map & Sheet Index G3.0 Site Survey G4.0 Project Layout C2.0 Construction Plan - Complex 1 C2.0 Construction Plan - Complex 2 C3.0 Construction Plan - Complex 3 C4.0 Construction Plan - Complex 4 C5.0 Construction Plan - Parking 1 C6.0 Construction Plan - Parking 2 C7.0 Construction Plan - Parking 3 C8.0 Construction Plan - Parking 4 C9.0 Overall Grading Plan 1 C10.0 Spot Elevation Plan - Complex 1 C 11.0 Spot Elevation Plan - Complex 2 C 12.0 Spot Elevation Plan - Complex 3 C 13.0 Spot Elevation Plan - Complex 4 C14.0 Spot Elevation Plan - Parking 1 C15.0 Spot Elevation Plan - Parking 2 C 16.0 Spot Elevation Plan - Parking 3 C 17.0 Spot Elevation Plan - Parking 4 C 18.0 Force Main Plan / Lift Station Plan C19.0 Overall Utility Plan C20.0 Sanitary Sewer Plan & Profile - Line 1 C21.0 Sanitary Sewer Plan & Profile - Line 2 C22.0 Water Main Plan (Line W-1, Line W-3) C23.0 Utility Plan - Complex 1 C24.0 Utility Plan - Complex 2 C25.0 Utility Plan - Complex 3 C26.0 Utility Plan - Complex 4 C27.0 Milwaukee Plan and Profile -I C28.0 Milwaukee Plan and Profile - 2 C29.0 Iola Plan and Profile C30.0 Driveway Cross Sections C31.0 Erosion Control Plan - Complex C32.0 Erosion Control Plan - North C33.0 Miscellaneous Details C34.0 Miscellaneous Details C35.0 Lift Station Details C36.0 Miscellaneous Details C37.0 Miscellaneous Details C38.0 Miscellaneous Details C39.0 C40.0 C41.0 Exhibit A Listing of Addenda Addendum No. 1 Dated February 16, 2007 Addendum No. 2 Dated February 27, 2007 Addendum No. 3 Dated March 5, 2007 General Conditions Part of Owner/ CM Agreement Dated 1/30/2007 Supplementary General Conditions Reference Project Manual Dated 1/30/2007 Exhibit A 4 AMENDMENT NO. 1 TO AGREEMENT Between Owner and Construction Manager City of Lubbock Youth Sports Complex Lubbock, Texas Exhibit B — Listing of Allowances Signage Building Testing (Soils/Conc) Bldg. Scoreboard Structure Site Dirt Testing Site Concrete Testing $10,000.00 $20,000.00 $70,000.00 $35,000.00 $40,000.00 Resolution No. 2007-RO234 EXHIBIT B Exhibit B AMENDMENT NO. 1 TO AGREEMENT EXHIBIT C Between Owner and Construction Manager Resolution No. 2007—R0234 City of Lubbock Youth Sports Complex Package A and Package B Lubbock, Texas Exhibit C — Clarifications and Assumptions Exhibit C Proj: Lubbock, Texas Blda Area: 28,042 1 sf Loc: I Site Area: NNIMsf Acres Estimator: J'.'R Owner: City of Lubbock Schedule: Arch: MWMIPSC Subcontract 420t7 Bond Rate: Date: 1.50% Code Descri tion SubcontractorNendor Subs Matl's Labor Total $ISf General Conditions K&ARM 10,000 567,400 20.23 Allow: Signage Bldg Arch f 10,000 0.36 Allow: Testing (SoilslConc) Bld Arch 20,000 20,000 0,71 Allow: Scoreboard Structure Arch 70,000 70,000 2.50 Allow: Site Dirt Testing LLCI 35,000 35,000 1.25 Allow: Site Con c Testing LLCI 40,000 40,000 1.43 PART ONE 0 0.00 2230 Site Clearing Butler wldirt 0 2,472,446 0.00 88.17 2300 Site Dirt Work Butler A-M, Topsoil _ Butler wldirt 0 0.00 2317 Utility Excvn/B/F with 0 0.00 2540 Sanita Sewer Weaver Weaver 220,607 7.87 Wet Well (Lift Station) wlss 0 0.00 11311 Sub. Waste Water Lift Station Weaver wlss 0 0.00 2665 Water S stem Weaver wlss 0 0.00 Storm Drain RCP Butler 134,065 134,065 4.78 Headwalls/Safty End Treatment Butler wldirt 0 0.00 2741 Asphalt Paving/Base Butler wldirt 0 0.00 Pvmt Stripping I Butler wldirt 0 0.00 Site Si na a (HC, etc) Butler wldirt 0 0.00 2751 Curb/Gutter Butler wldirt 0 0,00 Approaches Butler wldirt 0 0.00 Valley Gutter Butler wldirt 0 0.00 Swales Butler wldirt 0 0.00 Letdown Structures none 0 0.00 Sidewalk- Interior Complex Butler wldirt 0 0.00 Sidewalk- Site Butler wldirt 0 0.00 2764 Pavement Joint Sealant LLCI 42,000 42,000 1.50 2920 Landscape Tom's wlfield 0 0.00 SWPPP 18,500 18,500 0.66 SWPPP Maint with 0 0.00 0 0.00 PART TWO 0 0.00 0 0.00 2110 Building Site/Dirt Butler wldirt 0 0.00 2282 Termite Control 3,950 3,950 0.14 2830 Chain Link Fence/Gates =iiA 692,885 692,885 24.71 Recap LEFS Sports Complex REDESIGN May 07 1 of 4 6/7/2007 11:19 AM Proj:. Bldg Area: Lubbock, Texas Site Area: 28,042 sf JMR Loc: sf Acres Estimator: 1.50% Owner: City of Lubbock Schedule: Arch: MWM/PSC Subcontract = Bond Rate: Date. Code I Description I SubcontractorNendor Subs Matl's Labor Total $/Sf 3300 Building Concrete Work LLCI Wfiff7l,W 560,000 19.97 Building Reinfo ing LLCI W&W wlst wlconc 0 0.00 2780 Unit Pavers D&L 19,950 19,950 0.71 4200 Masonry D&L 668,750 668,750 23.85 4721 Cast Stone D&L wlmasy 0 0.00 0 0.00 5400 Cold -Formed Mtl Frg Henley 138,100 , , 138,100 4.92 5501 Misc. Metal Fabrications LLCI W&W 280,230 9.99 Mt1 Stair Nosings w/fab's 0 0.00 Reinforcing Steel wlfab's wlconc 0 0.00 6100 Rough Carpent LLCI 35,000 35,000 1.25 6402 Millwork Hunter 63,777 63,777 2.27 SS Tops Target 8,160 8,160 0.29 0 0.00 7211 Building Insulation with 0 0.00 Safing Insulation NONE 0 0.00 7600 Flsh /Sht Mtl none 0 0.00 7700 Roof Hatches w/fab's w/mtl bldg 0 0.00 7901 Joint Sealants LLCI 30,000 30,000 1.07 0 0.00 8110 Hollow Metal LLCI RSM 7,500 15,113 22,613 0.81 8330 OH Coiling Doors OH 111,520 111,520 3.98 8410 Alum Entrances/Storefronts Horizon 32,223 32,223 1.15 8710 Finish Hardware LLCI RSM 7,500 18,406 25,906 0.92 8800 Glass/Glaze Horizon w/alum 0 0.00 9301 Tile Diamomd J 4,320 4,320 0.15 9511 Acoustical Henley w/mtI frg 0 0.00 9650 Resilient Flooring none 0 0.00 9900 Painting Xcel 60,922 60,922 2.17 0 0.00 10160 Toilet Partitions CommWare 55,986 55,986 2.00 10500 Metal Lockers I Vaughn 4,980 4,980 0.18 10522 Fire Extinguishers/Cabs LLCI Duo 2,000 4,882 6,882 0.25 10800 Toilet Accessories CommWare wl art'ns 0 0.00 0 0.00 10950 Windscreen I Trans Texas wlfence 0 0.00 Fence Guard 36 ea Trans Texas wlfence 0 0.00 Recap LEE'S Sports Complex REDESIGN May 07 2 of 4 6/7/2007 11:19 AM Pro': ;: Lubbock, Texas Bld Area: 28,042 sf Loc: Site Area: sf Acres Estimator: JMR Owner: City of Lubbock Schedule: Arch: MWM/PSC Subcontract Date: Bond Rate: 1.50% Code Description SubcontractorNendor Subs Matl's Labor Total $ISf Pitching Rubbers (72 ea) LLCI 6,000 6,000 0.21 Flagpoles (12 ea) W&W wlst 0 0.00 Home Plate 72 ea) LLCI 7,000 7,000 0.25 1st,2nd,3rd Bases (192 ea) LLCI 55,000 55,000 1.96 Sporturf (10,300 sf) none 0 0.00 Batting Cage Nets (12 ea) none 0 0.00 Batting Cage Backdrop (12 ea) none 0 0.00 Outfield Distance Markers 36 Trans Texas w/fence 0 0.00 Weather Vanes (12 ea) LLCI 2,000 2,000 4,000 0.14 CMU Vent Louvers 2 ea) LLCI CHE 100 650 750 0.03 Copula Louvers Neff w/mtl bldg 0 0.00 Misc. Hardware none 0 0.00 13010 Softball Field Constm Tom's 804,185 804,185 28.68 13121 Shade Shelters (32 ea) (x 5591) Neff 865,000 0 0.00 13122 Metal Building Systems 865,000 30.85 Dugout Roof I Neff w/mtl bids 0 0.00 MU Bldg Insulation w/mtl bldg 0 0.00 Mtl Bldg Erection w/mtl bldg 0 0.00 Anchor Bolts 1 7,800 with 7,800 0.28 13124 Aluminum Bleachers (32 ea) (x 5932) 0 0.00 0 0.00 15210 Bldg Plumbing wlhvac 0 0.00 15320 Bldg HVAC Armstrong 311,985 311,985 11.13 0 0.00 16000 Bldg Electrical Acme 975,000 975,000 34.77 Site Electrical with 0 0.00 Lt Pole Bases ( 36 ea) LLCI 21,600 21,600 0.77 Sports Lighting 0 0.00 PART THREE 0 0.00 Irrigation System (4 Quads) 620,000 22.11 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 113 D 0.00 Fee/Mo.: 1 1 $31,323 jAddCheck -1 ok 1 9,890,411 1 244,081 1 0 1 10,134,492 1 361.40 Recap LEFS Sports Complex REDESIGN May 07 3 of 4 6/7/2007 11:19 AM Proj: ;, " ` _, Bldg Area: 28,042 sf Estimator: JMR Loc: Lubbock, Texas Site Area: sf Acres n Owner: City of Lubbock Schedule: Arch: MWMIPSC # Subcontract Date: Bond Rate: 1.50% Code Description SubcontractorNendor Subs Matl's Labor Total $1Sf % General Conditions 5.38% Percent Cost: 97.6% 2.4% 0.0% Approx Cost Beakdown (MISC) LAB BURDEN 35.00% 35.00% 0 0.00 Bldrs. Risk $0 Sales Tax EXEMPT 0.00% 0 0.00 Site $0 $0.00 Gen. Liab. $0 Sub Total 10,134,492 361.40 OPL $0 B.R./G.L./OPL 0 0.00 Buildin $10,541,686 $375.92 P&P Bond 1 $0 Pee 4.0% 407,194 14.52 10,541,686 375.92 P & P Bond Time Adjusted) 0 Total With Bond GM Amount 11,700,000 Recap LEE'S Sports Complex REDESIGN May 07 4 of 4 6/7/2007 11:1 S