HomeMy WebLinkAboutResolution - 2015-R0114 - Professional Service Agreement: Parkhill, Smith & Cooper (LBB Airfield Repair) - 04/09/2015Resolution No. 2015-R0114
April 9, 2015
Item No. 5.12
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, an amendment to that
certain Professional Services Agreement for Construction Phase Services for LBB
Airfield Asphalt Repair Package 3, between the City of Lubbock and Parkhill, Smith &
Cooper, Inc., and related documents, the terms of said amendment being attached hereto
and incorporated in this Resolution as if fully set forth herein and shall be included in the
minutes of the Council.
by the City Council this April 9 , 2015.
TTEST:
AS TO CONTENT:
Director of Aviation
AS TO FORM:
GTEPeC. R RTSON, MAYOR
.es.Agtmt-Amend No. 1 -Prof Servs-Parkhi11,Smith&Cooper,Ltd
13.15
OOPER
FOX
Resolution No. 2015-R0114
ML Kely Cankpbd, AAE.
DiedordAvislion
Lubbock Prasbn SmNh b lemakrW Airport
Admirkh tion Woe, 2nd Floor
5401 N. Meft LWwr KkV Jr. 8fvd., Lk* 389
Lubbock, Tapas 79103
Ra: ArautAWW Ns, t b AW9sm nt for Rrolewkm Services,
Cansbudlon PIwas Services for LfIB Al Halo' Asphalt Rap* Package 3
Dear Ms. Cempb*
March 4, 2015
As regk1 1 we hove prepared Amendment No. 1 for oonshiction phase services ralated to the LBB AWW
Asphalt Repair Pecloge 3 project Refer to the deb" fee shsels attadred for arm kemizabon of the scope of
services. The centrad amendment modifies the scope of professional services kckxhW In our oAgkmal
agreement dated February 27, 2015.
The seeps of prclewionat services to be provided aligns with the allotted owbact tine of 202 calendar drys
to SW c 4 plstl o Professional services required in excess of 202 calendar days shd be oonsidarod
addbxW services and paid for acoom" tD Agreement for Engineering Services Exhibft A, A2.01 (18) and
Exhibit B, 84.02.
Teak 48iD Lump Sum Fee for Bidding Phase Services
Task SOON Lump Sum Fee for Co *ruction Admh*abve
Servrow 4`IN�'?v� i
Task BRPR Moony Rats Fee vd NTE amount for Project Rsakkm t project
Rsprew *Wn (RPR) Senkm
Task 7CLO Lump Sum fora for Projed Cbwart Services
Task 9SSC Rentwasble Fee vAth NTE Amount for SubcorwjbM
Services (S vett, Tom")
TOTAL AMENDMENT NO.1
$ 15,300
$ 50,100
$153,300
$ 13,275
$ 80,000
$311,975
Ms. Kelly Campbell, A.A.E. Page 2 March 4, 2015
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
February 27, 2015 and to provide the approved Task 4, 5, 6, 7, and 9 services under the provisions of
EXHIBIT B - PAYMENTS TO THE ENGINEER, PARAGRAPH B4.01 (Lump Sum and Hourly Rate Method) of
the contract. Any necessary additional services will be provided according to EXHIBIT B - PAYMENTS TO
THE ENGINEER, PARAGRAPH B4.02. Compensation for Tasks 4, 5, 6, 7, and 9 services shall not exceed
the total above without Owner's written approval.
If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our office.
We will take receipt of this signed letter as our notice to proceed with these services. We look forward to
working with you in completing this project. If you have any questions please call either Maris Haberer or John
Hamilton.
Sincerely,
PARKHILL, SMITH & COOPER, INC.
By
/2h T. amilton, PE
Sed-fori Director/Firm Principal
By
Mark D. Haberer, PE
Project Manager/Firm Principal
IN TRIPLICATE
MDH/as
Enclosures
X1201412121.14NDMIMCONTRACTSFlN %Canpbell wntraa artenMenlljN mdh.tloc
Accepted by:
CITY OF LUBB CK
By
Glen RoW,rtson
Mayor
Attest
By -
becca Garza
Gtity Secret3ry
Approved as to Content:
-Y�Campbe
Director of Aviation
... -. __ _
�i I
, LW OF ,
WIF
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Airfield Asphalt Repair P3
JOB NO.:
01-2721-14
1
TASK:
4BID
DATE:
03/04/15
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROJ. MANAGER:
MDH
MARKUP ON REIMB:
15.00%
MARKUP ON DIRECTS:
15.00%
$15, 300
TOTAL FEE:
$15,
LABOR:
$15,106
LABOR:
$15,106
DIRECTS:
$191
SUBTOTAL:
$15,297
REIMBURSABLE. CONSULTANTS:
REIMBURSABLE. EXPENSES:
REMM.
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$191
TOTAL FEE:
$15,297
LABOR BUDGETS:
DESCRIPTION
LABOR CODE
SS or PL Level
HOURS
RATE
COSTS
Sr Project Manager Civil/Struct
X5
PL VI
33
$190.00
$6,270
Prof Eng II Civil/Struct
X8
PL IV
24
$140.00
$3,360
Eng HI -1 CiviVStruct
Y3
PL Ill
30
$118.00
$3,540
CADD II
E6
SS II
$78.00
Project Assistant (PASS)11
P4
SS III
8
$86.00
$688
Word Processor
W6
SS II
16
$78.00
$1,248
Page 1 of 3
EE ESTIMATING SHEET PROJECT: tan Aar,;e A:Onau amv, l'r JOB NO.: 01-2721-14 TASK: 4um
SALARY Discipline, Title, Labor Code, Bates
1
2
3
4
5
6
7
Staff 7niials(optionan-->
MDH
RAM
SLS
LLP
SLM
ABS
CADD_PASS_
CARD PASS_
CADD PASS_
Staff Discipline -->
Civil_Struct
Civil_Struct
civil Stnu;t
Clerical
Clerical
Clerical
Sr Project
Project
Manager
Prof Engll
Eng III -1
Aasislant
Staff Title —>
Ch9struct
Givdl$truct
Civ11/Strucl
CADDB
(PASS)B
Word Processor
Support Staff (SS) or Professional Level (PL),
PL VI
PL IV
PLM
SS H
SS IB
SS B
Labor Cade-->
X5
X8
Y3
E6
P4
W6
ailing Rate—>
$190.00
$140.00
$118.00
$78.00
$86.00
$78.00
TASK
Trips
TOTAL
Modify specifications per I OG release
14
16
8
12
50
Prepare CSPP
2
4
4
4
14
Allied and present at GA meeting
2
2
4
Submit original bid docum®ts to Col, Purchasing
1
1
1
3
Advertise project (by CoL Purchasing)
Ian distribution (by CoL Purchasing)
Prepain, potential bidder's list
2
2
Conduct Pre -Bid Conference
I
3
3
6
are agenda and issue minutes
1
2
3
Miscellaneous addenda, bidder questions
2
2
8
4
16
Attend Bid Opening
1
1
1
2
Evaluate bids and prepare recommendation
2
I
2
1
6
Coordinate and host pre -award meeting with
Contractor and LBB
2
1
3
Attend LBB Airport Advisory Board Meeting
I
I
Attend Lubbock City Council Meeting
I
1
BUDGET SUBTOTALS: HOURS/ T's-
2
331
241
30
i 8
16
111
SALARY
1 $6,270 1
$3,360
1 $3,540
1
1 $688
1 $1,2481
$15,106
Page 2 of 3
E ESTIMATING SHEET PROJECT:
LBB Airfield Asphalt Rept JOB NO. 0 1 -2721-14
TASK: 4BID
DIRECTS
DIRECT CONSULTANT COSTS
SUBTOTAL
611 Structural Consultant
612 Mech/Elec Consultant
613 Environ/Civil Consultant
614 Architectuml Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant - Acoustical Consultant
618 Other Consultant -AV/ IT Conaultant
618 Other Consultant
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 Tmvel
Motel Days @
Men @ /Man -day =
Air Travel Air Pare @
Men @ /Man =
Parking Days @
/Day =
Car Rental Days @
/Day =
Mileage 19 Miles @
$0.575
@ 2 Trips =
$21.85
SUBTOTAL
S22
622 Reproductions
Blacklme Prints
34" x 22"
Shts @
$2.50 /Sht @ Sets =
36"x24"
Shts @
52.75 /Sht @ Sets =
42" x 30
Shts @
$325 /Sht @ Sets =
Other
sf @
$0.55 /sf @ Sets =
Mounting Foam Board
Boards @
$10.00 lea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @ Submittals
=
8-12" x I l" B&W 200
Originals @
$0.09 /Sht @ I Sets =
$18.00
8-12" x 11" Color 100
Originals @
50.55 /Sht @ 1 Sets =
$55.00
II"x1T' B&W 50
Originals@
$0.18 /Sht @ 1 Sets =
$9.00
11"x17" Color 50
Originals@
$1.05 /Sht @ 1 Sets =
$52.50
Binding Cost
Sets @
$2.00 /Set =
Laminating
Slots @
$2.00 /Sht =
Scan to file
Bum to CD/DVD
CD/DVD@
$13.50/each =
Scan Spas
Originals @
$0.15 /Sht —
Scan Drawings
Originals @
$1.50 /Sht =
SUBTOTAL
$135
623 Models/Renderings/Photos
Shots@ /Shot
624 Telephone 5 Calls@
$2.00
/Call
SIO
625 Meals Days @
Man @ /Man -day
626 Field Supplies
628 Postage Mailings @
/Mailing (Standard)
628 Postage Mailings @
/Mailing (Overnight)
630 Misc Reimbursable Exp
632 Temporary Personnel
636 Field Equip Rental
639 TDLR Review /Inspection Fees
643 NM Gross Receipt Tax
TOTAL DIRECT EXPENSES $166
Page 3 of 3
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Airfield Asphalt Repair P3
JOB NO.:
01-2721-14
1
TASK:
5CON
DATE:
03/04/15
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROJ. MANAGER:
MDH
MARKUP ON REIMB:
15.00%
MARKUP ON DIRECTS:
15.00%
$50,100
TOTAL FEE:
$50,114
LABOR:
$49,020
LABOR:
$49,020
DIRECTS:
$1,094
SUBTOTAL:
$50,114
REIMBURSABLE. CONSULTANTS:
REIMBURSABLE. EXPENSES:
REMB.
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$1,094
TOTAL FEE:
$50,114
LABOR BUDGETS:
DESCRIPTION
LABOR CODE
SS or PL Level
HOURS
RATE
COSTS
Sr Project Manager Civil/Struct
X5
PL VI
90
$190.00
$17,100
Prof Eng H Civil/Struct
X8
PL IV
27
$140.00
$3,780
Eng III -I CiviUStruct
Y3
PL III
186
$118.00
$21,948
Project Assistant (PASS) II
P4
SS III
72
$86.00
$6,192
Page 1 of 3
FEE ESTIMATING SHEET PROJECT: 1,11B Atr04nd mpewr Rin,"Pi JOB NO.: 01-2721-14 TASK: Scor
SALARY Discipline, Title, Labor Code, Rates
1
2
3
4
5
6
7
Staff lnitials(optionali
MDH
RAM
SLS
SLM
CARD -
PASS -Staff Discipline-->
Civil -Strut
Civil_Struct
CivO_SWct
Clerical
Sr Project
Pmject
Manager
Pmf Eng I
Eag M-1
Assistant
Staff Title—
CiviVStmG
Civl/SWct
Ciwl/Stmct
(PASS)H
PL VI
PL Pf
PL II
SSM
Support Staff (SS) or Professional Level (PL) --- >
Labor Code-->
X5
X8
Y3
P4
Billing Rate-->
$190.00
$140.00
$118.00
$86.00
TASK
T's
TOTAL
CONSTRUCTION PHASE (202 calendar days to
Final Completion)
Conduct Preconstruct on Conference
2
2
4
Prepare agenda and Issue minutes
1
3
Coordinate subconsultents
4
2
2
8
Review submittals
2
2
4
4
12
Site visits Q 1/wk and 2hrs/ea (25 weeks total)
28
16
40
56
BI -weekly progress meetings (including pre -
pave) (15 total meetings)
15
20
20
30
70
Dally Coots. with RPR, Contractor and Owner
15
15
70
100
Review test reports and field data
2
2
16
4
24
Respond to RFfs (assume 1/month)
4
4
8
4
20
Prepare change orders (assume 2 for project)
2
4
4
2
12
Monthly contractor pay requests including final (7
total)
7
7
7
21
weather days, etc.
2
7
7
16
Final inspection and prepare punch list
1
6
6
2
14
Prepare stints. (7 total)
7
7
14
UDGEf SUBTOTALS: HOURS/ Trips441
901
27
1861
72
375
SALARY
1
1 $17,1001
$3,780
1 $21,9481
$6,192
1$49,020
Page 2 of 3
FEE ESTIMATING SHEET PROJECT:
LBB Airfield Asphalt Repo JOB NO. 01 -2721-14
TASK 5CON
IILECTS
DIRECT CONSULTANT COSTS
SUBTOTAL
611 Structural Consultant
612 Mech/Elec Consultant
613 Environ/Civil Consultant
614 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
618 Other Consultant-Kitchen/ Food Consultant
618 Other Consultant - Acoustical Consultant
618 Other Consultant-AV/IT Consultant
618 Other Consultant
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 Travel
Motel Days @
Men @ /Man-day =
AG Travel AG Fare @
Men @ /Man —
Parking Days @
/Day =
Car Rental Days@
/Day —
Mileage 30 Miles@
$0.575
@ 44 Trips =
$759.00
SUBTOTAL
$759
622 Reproductions
Blackline Prints
34" x 22"
Slits @
$2.50 /Sht @ Sets =
36"x24"
Shts @
$2.75 /Slit @ Sets =
42" x 30
Slits @
$3.25 /Sht @ Sets =
Other
sf@
$0.55 /sf @ Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals@
$0.15 /Sht @ Submittals=
8-12" x 11" B&W 300
Originals @
$0.09 /Sht @ I Sets =
$27.00
8-12" x I V Color 100
Originals @
$0.55 /Slit @ 1 Sets =
$55.00
I1"x17" B&W 100
Originals@
$0.18 /Slit @ I Sets =
$18.00
ll"x17" Color 50
Originals@
$1.05 /Sht @ 1 Sets
$52.50
Binding Cost
Sets @
$2.00 ISO =
Laminating
Shts @
$2.00 /Sht =
Scan to file
Burn to CD/DVD
CD/DVD@
$13.50/each =
Scan Specs
Originals @
$0.15 /Sht =
Scan Drawings
Originals@
$1.50 /Sht =
SUBTOTAL
$153
623 Models/Rendimngs/Photos
Shots @ /Shot
624 Telephone 10 Calls @
$2.00
/Call
$20
625 Meals Days @
Men @ /Man-day
626 Field Supplies
628 Postage 10 Mailings @
$2.00 /Mailing (Standard)
S20
628 Postage Mailings @
/Mailing (Overnight)
630 Misc Reimbursable Exp
632 Temporary Personnel
636 Field Equip Rental
639 TDLR Review / Inspection Fees
643 NM Gross Receipt Tax
TOTAL DIRECT EXPENSES $952
Page 3 of 3
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Airfield asphalt Repair P3
JOB NO.:
01-2721-14
1
TASK:
6RPR
DATE:
03/04/15
FEE TYPE:
Hourly Rate w/Max
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROD. MANAGER:
MDH
MARKUP ON REM:
15.00%
MARKUP ON DIRECTS:
15.00%
$153,300
TOTAL FEE:
$153,3
LABOR: 5149,160
LABOR:
$149,160
DIRECTS:
SUBTOTAL: 5149,160
REIMBURSABLE. CONSULTANTS:
REIMBURSABLE. EXPENSES:
$4,166
REIMB. $4,166
DIRECT CONSULTANTS:
DIRECT EXPENSES:
TOTAL FEE: $153,326
LABOR BUDGETS:
DESCRIPTION
LABOR CODE SS or PL Level HOURS
RATE COSTS
RPR III
R2 PL IH 1,356
$110.00 $149,160
Eng M-1 Civil/Struct
Y3 PL III
$118.00
Page 1 of 3
FEE ESTIMATING SHEET PROTECT: Inn el.6Cd WWW Rr,@,, P3 JOB NO, .1.721.11 TASK: .RPR
SALARY Discipline, Title, Labor Code, Ratcs
Stafflnitials(optional)—
StaffDisciplint, -
StaffTi0,; >RPR
SupportStaff(SS) or Pm&asional Level (PL),
Lebo, Code,
Billin Rift —>
1
2
3
4
5
6
7
JTP
SLS
RPRs Techs
Civil Send
III
Eng HI-1
CiviVStruc4
PL III
PL W
R2
Y3
$110.00
$118.00
TASK
Trips
TOTAL
CONSTRUCTION PHASE (202 calendar days to
final completion)
Pre-project preparation, etc (7 days @ 8hrlday)
RPR Full Time from NTP through Final
Completion Q ghrslday M-F + 4.5hralday Sat.
ISO
56
1300
56
1,300
BUDGET SUBTOTALS: HOURS/ Tri -
ISO
Il
135
SALARY
I
I 5149,160
I
5149,160
Page 2 of 3
FEE ESTIMATMG SHEET PROJECT:
LEE Airfield asphalt Reps, JOB NO. 01 -2721-14 TASK: 6RPR
IMB[JiLSABLES
REIMBURSABLE CONSULTANT COSTS
SUBTOTAL
511 Structural Consultant
512 Mech/Elec Consultant
513 Environ/Civil Consultant
514 Architecture] Consultant
515 Testing Consultant (Geotech, CMT, TAB, etc.)
516 Surveying Consultant
518 Other Consultant - Kitchen / Food Consultant
518 Other Consultant- Acoustical Consultant
518 Other Consultant- AV/ IT Consultant
518 Other Consultant
TOTAL REIMBURSABLE CONSULTANT
O
REIMBURSABLE EXPENSES
521 Travel
Motel Days @
Men @ /Man -day
=
Air Travel Air Fare @
Men @ /Man
=
Parking Days @
/Day
=
Car Rental Days @
/Day
=
Mileage 35 Miles @
$0.575
@ 180 Trips
= $3,622.50
SUBTOTAL
$3.623
522 Reproductions
Blackliae / Color Plots
34" x 22"
Shut @
52.50 /Sht @
Sets =
36" x 24"
Shot @
52.75 /Sht @
Sets =
42" x 30
Shu @
$3.25 /SM @
Sets =
Other
sf@
$0.55 /sf @
Sets =
Mounting Foam Board
Boards @
SI0.00 /ea @
Printing.
Set Up Fee
Originals@
$0.15 /Sht @
Submittals=
8-12" x 1I" B&W
Originals @
$0.09 /Sht @
Sets =
8-12" x 1 V Color
Originals @
$0.55 /Sht @
Sets =
11"x 17" B&W
Originals @
$0.18 /Sht @
Sets =
11"x17" Calor
Originals@
$1.05 /Sht @
Sets =
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Shut @
$2.00 /Shu
=
Scan to file
Bum to CD/DVD
CD/DVD@
$13.50 /each
=
Scan Specs
Originals @
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
=
Sl1Rl U'[Al
523 Models(Renderin otos
Shots @ /Shot
524 Telephone Calls @
/Call
525 Meals Days @
Men @ /Man -day
526 Field Supplies
528 Postage Mailings @
/Mailing (Standard)
528 Postage Mailings @
/Mailing (Overnight)
530 Misc Reimbursable Exp
532 Temporary Personnel
536 Field Equip Rental
539 TDLR Review/inspection Fees
543 NM Gross Receipt Tax
TOTAL REIMBURSABLE EXPENSES $3,623
Page 3 of 3
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Airfield Asphalt Repair P3
JOB NO.:
01-2721-14
1
TASK:
7COS
DATE:
03/04/15
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROJ. MANAGER:
MDH
MARKUP ON RERVIB:
15.00%
MARKUP ON DIRECTS:
15.00%
$13,275
TOTAL FEE:
$13,2 5
LABOR:
$13,080
LABOR
$13,080
DIRECTS:
$195
SUBTOTAL:
$13,275
REIMBURSABLE. CONSULTANTS:
REIMBURSABLE. EXPENSES:
REMB.
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$195
TOTAL FEE:
$13,275
LABOR BUDGETS:
DESCRIPTION
LABOR CODE
SS or PL Level
HOURS
RATE
COSTS
Sr Project Manager Civil/Struct
X5
PL VI
14
$190.00
$2,660
Prof Eng H Civil/Struct
X8
PL IV
10
$140.00
$1,400
Eng III -1 CiviUStruct
Y3
PL III
32
$118.00
$3,776
Project Assistant (PASS) II
P4
SS III
26
$86.00
$2,236
RPR III
R2
PL IH
16
$110.00
$1,760
CADD II
E6
SS II
16
$78.00
$1,248
Page 1 of 3
EE ESTIMATING SHEET PROJECT: 1101 mreee cornea Rmair 1'3 JOB NO.: 01.M1.14 TASK: 7cos
SALARY Discipline, Tek, Labor Code, Rates
1
2
3
4
5
6
7
Staflnitials (options)) --a
CM Strucl
Civil Sttva
Civil SWU
Clerical
RPRs_Tmbs
Clerical
Staff Discipline—
Sr Project
Project
Manager
Prof Eng E
Eng IR -1
Assistant
Staff Title —
CiviVStruct
CivUStruct
Cmmtruct
(PASS)I1
RPR M
CADD B
Support Staff (SS) or Profarcional Level (PL)—
PL VI
PL IV
PL IR
SS ID
PL ID
SS11
Labor Code —
X5
X8
Y3
P4
R2
F6
Riffling Rate --- >
$190.00
$140.00
$118.00
$86.00
$110.00
$78.00
TASK
Trips
TOTAL
Project Final Report
8
8
24
24
8
72
Record drawings
2
2
4
16
24
Revise ALP docum®ts (layout drawing only) (not in
Project scope)
}date Part 139 Signage and Marking Plan (not in
roject scope)
Update 5010 Data (not in pmject scope)
ut project into AGIS (not included in scope)
plate Airport CbarUDiagram (not in project scope)
Warranty inspection (1 year following final
cornplestion)
2
4
4
2
8
18
UDGEf SUBTOTALS: HOURS/Trips-
2
14
10
32
26
16
16
11
SALARY
$2,660
$1,400
1 $3,776
$2,236
$1,760
$1,248
S13,080
Page 2 of 3
FEE ESTIMATING SHEET PROJECT:
LBB Airfield Asphalt Reps JOB NO. 01-2721-14
TASK: 7COS
DIRECTS
DIRECT CONSULTANT COSTS
SUBTOTAL
611 Structural Consultant
612 Mech/Elec Consultant
613 Environ/Civil Consultant
614 Architectural Consultant
615 Testing Consultant (Genteel, CMT, TAB, etc.)
616 Surveying Consultant
618 Other Consultant - Kitchen/ Food Consultant
618 Other Consultant- Acoustical Consultant
618 Other Consultant - AV/ IT Consultant
618 Other Consultant
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 Travel
Motel Days @
Man @ /Man -day -
Air Travel Air Fare @
Man @ /Man -
Parking Days @
/Day -
Car Rental Days @
/Day -
Mileage 35 Was@
$0.575
@ 2 Trips =
$40.25
SUBTOTAL
S40
622 Reproductions
Blackfvre Prints
34"x22"
Shts @
$2.50 /Sht @ Sets =
36"x24"
Shts @
$2.75 /Sht @ Sets =
42" x 30
Shts @
S3.25 /Sht @ Sets =
Other
sf@
S0.55 /sf @ Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing.
Set Up Fee
Originals @
S0.15 /Sht @ Submittals =
8-1/2"x11" B&W 100
Originals@
50.09 /Sht @ I Sets =
$9.00
8-1/2"x 11" Color 50
Originals @
$0.55 /Sht @ I Seta =
$27.50
11"x 17" B&W 40
Originals @
$0.18 /Sht @ 5 Sets =
$36.00
11"x 17" Color 10
Originals @
$1.05 ISM @ 5 Sets =
$52.50
Binding Cost 2
Sets @
$2.00 /Set =
$4.00
Laminating
Shts @
$2.00 /Sht =
Scan to file
Born to CD/DVD
CD/DVD@
$13.50/each =
Scan Specs
Originals@
$0.15/Sht =
Scan Drawings
Originals@
$1.50 /Sht =
SUBTOTAL
$129
623 Models/Renderings/Phows
Shots @ /Shot
624 Telephone Calls @
/Call
625 Meals Days @
Men @ /Man -da
626 Field Supplies
628 Postage Mailings @
/Mailing (Standard)
628 Postage Mailings @
/Mailing (Overnight)
630 Misc Reimbursable Exp
632 Temporary Personnel
636 Field Equip Rental
639 TDLR Review / Inspection Fees
643 NM Gross Receipt Tax
TOTAL DIRECT EXPENSES $16911
Page 3of3
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Sairfield Asphalt Repair P3
JOB NO.:
01-2721-14
1
TASK:
9SSC
DATE:
03/04/15
FEE TYPE:
Hourly Rate w/Max
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROJ. MANAGER:
MDH
MARKUP ON REUVIB:
15.00%
MARKUP ON DIRECTS:
15.00%
$80,000
TOTAL FEE:
$80,W9
LABOR:
LABOR:
DIRECTS:
SUBTOTAL:
REIMBURSABLE. CONSULTANTS:
$80,019
REIMBURSABLE. EXPENSES:
REBVBI. $84,453
DIRECT CONSULTANTS:
DIRECT EXPENSES:
TOTAL FEE: $84,453
LABOR BUDGETS:
DESCRIPTION
LABOR CODE SS or PL Level HOURS
RATE COSTS
Page 1 of 2
FEE ESTIMATING SHEET PROJECT:
LBB Sairfield Asphalt Rep JOB NO. 01-2721-14 TASK: 9tS43,877
REIMBURSABLES
REIMBURSABLE CONSULTANT COSTS
511 Structural Consultant
512 MecIvElec Consultant
513 Envimn/Civil Consultant
514 Architectural Consultant
515 Testing Consultant (Geotech, CMT, TAB, etc.)
CMT Engineering
516 Surveying Consultant
Parkhill, Smith and Cooper, Inc.
$29,560
518 Other Consultant - Kitchen / Food Consultant
518 Other Consultant - Acoustical Consultant
518 Other Consultant-AV/IT Consultant
518 Other Consultant
TOTAL REIMBURSABLE CONSULTANTS
$73,437
REIMBURSABLE EXPENSES
521 Travel
Motel Days @
Men @ /Man -day =
Air Travel Air Fam @
Men @ /Man =
Parking Days @
/Day =
Car Rental Days @
May =
Mileage Miles@
$0.560
@ Trips =
SUBTOTAL
522 Reproductions
Blackline / Color Plots
34" x 22"
Shia @
$2.50 /Sht @ Sets =
36"x 24"
Shia @
$2.75 /Sht @ Sets =
42" x 30
Shia @
$3.25 /Sbt @ Sets =
Other
sf@
$0.55 /sf @ Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals@
$0.15 /Sht @ Submittals=
8-12"x II" B&W
Originals@
$0.09 /Sht @ Sets =
8-12" x I I" Color
Originals @
$0.55 /Sht @ Sets =
1 V x 17" B&W
Originals @
$0.18 /Slit @ Sets =
11"x17" Color
Originals@
$1.05 /Sht @ Sets =
Binding Cost
Sets@
$2.00 /Set =
Laminating
Shia @
$2.00 /Sht =
Scan to file
Bum to CD/DVD
CD/DVD @
$13.50 /eacb =
Scan Specs
Originals @
$0.15 /Sht =
Sean Drawings
Originals @
$1.50 /Sht =
SUBTOTAL
523 Models/Rendomigs/Photos
Shots @ /Shot
524 Telephone Calls @
/Call
525 Meals Days @
Men /Man -day
526 Field Supplies
528 Postage Mailings@
/Mailing (Standard)
528 Postage Mailings @
/Mailing (Overnight)
530 Misc Reimbursable Exp
532 TemporaryPersonnel
536 Field Equip Rental
539 TDLR Review / Inspection Fees
543 NM Gross Receipt Tax
TOTAL REIMBURSABLE EXPENSES
Page 2 of 2
CMT
Engineering
March 3td, 2015
Mr. Mark D. Haberer, P.E.
Firm Principal
Parkhill, Smith $ Cooper, Inc.
4222 85'" Street
Lubbock, Texas 79423
Re: Construction Materials Testing
Lubbock Preston Smith International Airport
LBB Airfield Asphalt Repair — Package 3
Lubbock,Texas
Dear Mr. Haberer:
We greatly appreciate the opportunity to provide you with a fee proposal for the
construction materials testing at the subject project in Lubbock, Texas.
The attached proposal is based on the Summary of Testing document provided by you
and our projection of the construction schedule. This proposal should not be taken as a
lump sum proposal as all testing will be billed on an as needed basis according to the
fees shown on the attached proposal dated December 4, 2014.
Level IA HMAC Technician rates have been used to cover the daily testing of hot -mix
such as asphalt content, lab molded density, in-place air voids, bulk gravity and rice
gravity. Level IB HMAC Technician rates have been used to cover the field testing such
as thermal profiles, segregation profiles and joint density.
We look forward to working with you on this project. If you have any questions or need
any additional information please feel free to contact me.
Sincerely,
Bryan Wilson, P.E.
Vice President
CMT Engineering, Inc.
Texas Registered Engineering Firm 13112
12804 County Road 2500 Lubbock, TX 79404 — Office 806.771.7283 — Fax 806.771.7062
BWilson@CMTEngineeringLabs.com
CMT Engineering, Inc
12804 County Road 2500
Lubbock TX 79404
Office (806) 771-7283
Fax (806) 771-7062
Construction Materials Testing
Fee Proposal
NvCMT
rEngineering
Client: Parkhill, Smith & Cooper, Inc.
Project: LBB Airfield Asphalt Repair - Package 3
Location: LPSI - Lubbock, Texas
Date: 3/3/2015
Laboratory Testa
Solis
Fes
Extension
Standard Proctor 4" maid
$
160.00
11
$
1,760.00
Standard Proctor 6" mold
$
210.00
11
$
2,310.00
Atterbera Limits
$
70.00
22
$
1540.00
Classification of soils inc washed rad
$
75.00
22
$
1,650.00
Flax Base
Standard Proctor 6" Mold
$
210.00
10
$
2,100.00
Bulk Gravity I Moisture Correction
$
50.00
10
$
500.00
Wet Ball Mill
$
250.00
2
$
500.00
Atterberg Limits
$
70.00
2
$
140.00
Washed Gradation
$
75.00
4
$
300.00
Trlaxlal(Strength and Class
$
1,600.00
2
$
3,200.00
Aggregates
Dry Gradation
$
60.00
1
$
60.00
Washed Gradation
$
75.00
1
$
75.00
Magnesium Soundness
$
350.00
1
$
350.00
L.A. Abrasion
$
325.00
1
$
325.00
Micro Deval
$
325.00
1
Flat and Mongated
$
100.00
1
$
100.00
Crushed Face Count
$
75.00
1
$
75.00
Decant
$
75.00
1
$
75.00
Deleterious
$
75.00
1
$
75.00
Sand
Sand Equivalent
$
125.00
1
$
125.00
Hot Mix
Hamburg Wheel Tracking
$
500.00
1
$
500.00
Abson Recovery W extraction
$
250.00
1
$
250.00
Field Testing*
Nuclear Field Density 3 min
$
25.00
200
$
5,000.00
Flex Base depth Check
$
30.00
130
$
3,900.00
Slum
$
25.00
31
$
775.00
Entrained Air
$
35.00
31
$
1,085.00
Temperature
$
5.00
31
$
155.00
Concrete Cores per inch min 4°
$
25.00
70
$
1,750.00
Making Beams ea 4 min Incld breaks
$
60.00
20
$
1,200.00
Technician I Engineering I Administrative
Technician Hourly (Two hour minimum
$
59.00
100
$
5,900.00
Technician Overtime Houd
$
69.00
20
$
1,380.00
Level 1A within 30 miles of CMT Lubbock office $
625.00
5
§
3,125.00
Level 1 B within 30 miles of CMT Lubbock office $
625.00
5
$
3125.00
[Administrative/Clerical 1 hr minimum monthly)$
59.00
8
$
472.00
Fatlmated Total
1 $
43877.00
Field testing is billed in addition to Tech hourly rates
•• Hourly rates apply portal to portal, between 8:00 am and 5:00
pm, Monday lhmugh Friday. Overtime rates will be applied when
servloes are provided outside of the before mentioned hours.
F
S
is
_ r�
i aIIF/�IIN�[II1�-�I
I I e I�EYj
3
i
1 a:
PARKHII I. SMITH K CnnRFR
bl�
cl \
KEY NOTES
L
9
4
't t'ln't—ernat'iopn'al Airport
Leg
LOB AIRFIELD
ASPHALT REPAIR
PACKAGE 3
PHASE 2
PHASING AND SAFM
PLAN
. ......
F�l
.
...
ALENDAR DAYS)
GENERAL NOTES
.................
EM
tMM
—N-
4
4
't t'ln't—ernat'iopn'al Airport
Leg
LOB AIRFIELD
ASPHALT REPAIR
PACKAGE 3
PHASE 2
PHASING AND SAFM
PLAN
L
a
>..1.x ew wee.sem�emi wiwaewum e.w m � ase xe..rl Vwa+..nr
/ Y
I
4 Adp
� e !�S
I
�i III
_.—._._—•_ _• ____�___
Ell
I s T
r
y
I
I
1
op
I
i
sl -7
—I—.
ff �• Z
ZI
g 66 gg g�
a
d
gg
6 a—Z—
y
9
�� yam Pi 8
1 9
i o m m i
z PGRKHII I SMITH R C(]n PRR
P
PARKHILLSMITH&COOPER
1
1
Citv of Lubbock, Texas
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
ITB 15 -12205 -TF LPSIA Airfield Asphalt Repair Package Three
February 17 2015
3:00 PAI
4tLubbock Preston Smith
International Airport
ALTERNATE 1 BID ITEMS
At -1
GP Section 05 C00backw MMl"floa
1
LS
Lon. SOar&DIn P.Nn9
11820 Un1Yemity Avenue
Lubbock, TX 78423
MITCHELL ENTERPRISES
PO BOX 3109
SHERMAN,TX 75091
WEST TEXAS PAYING
DUININCK, INC.
4701 N. HIGHWAY 377
ROANOKE.TX78282
$100000.00
Na
DendolkIn LIQuI
Msaam
I Oak
I Unit P71u
Aa,.Ual
Unit
Prig
Amount
UNIT PRICE
AMOUNT
Unit
prig
I Igor"
1)00000
BIDITEMS
31]]60.00
A14
DEDUCT: TxDOT Ram 247. Type A finale 4 Caa tad AgWs" Sam Cama. 6'Tldtlawe,
11mbMdand lnela0ed
-23
BY
1200
78 40.00
1023
fl614.80
$1x00
; .00
AIN
332( .00
1
GPsecaon OS Conhactw M7bilirnNon
1
LS
679000.00
578000.00
310824.)6
510824 ]6
100000.00
$100,000
$400,00000
SE00000.DO
2
ttm P-101 Remweand Dia e0 Cora Iw
40
SY
350.00
W.M.00
8.78
V.951
3w,00
$2000.00
SIM
$1200.00
3
Dam P -tot Roula end Seal Creta Ia Ae Pavement Can ke B..a 110't.1'
3 060
LF
38.00
$18,30,00
2.6
$7.M.d0
.DO
4,480.
$4.00
$12 240.OD
4
Ilam P-101 Melalel used for Sealina Oatlm In BlNminaus Pavements
40
Gallon
3175.00
$7000.00
MAE
$2,420.00
15o.
$2.DDD.00
.00
$2000.00
5
It.. P-152 Excavation
3950
Cy
$7.00
116650.00
410.m
$37,376.00
M.
$73,000.
$15.00
35475000
8
Item P 152 Embaalarmnl
280
CY
S8.00
12250.00
1.]8
5."o
$50.00
1250000
$12.
S31n.00
7
ham P-152 GmdI endT IInU bAnm
10280
BY
SO
$51,450.00
3.70
SM.073.00
.00
s514W00
00
1740.00
e
Item P 152 Gnadl a aP e'1y4aknms
26960
BY
$107,400,00
.16
5111.696MI
$IN
S187,950
$1
$93,976.00
9
nem P-154 anal SUOWaa Or TM knaaa
2885D
BY
$4.]2
126 732.00
7.
$187,M.W
15
M.75040
10
Rem P -156T Ai, anJ Wats Pollution SUB Ermim aal SINOn Canal
1
LS
$7,500.00
P.M.00
361.94
36361.94
1160.000.00
4150,001100
$24000.00
324000.00
11
TxDOT IWn 247,T)11aA Grade 2, GmsIaed ABPa6Ye Base Ltlm., V T Innes$. IvnWled
end laahaw
230x1
BY
12.00
$276,20.00
16.
$373,614,50
14.00
SM.M.00
14.00
280.00
12
TzDOT Ilam 341. Typo D. Dans"naded WN upHW(OCIOA. T TNcaran, IUNeHad ane
ImWlad
2540
TON
$w.00
W.300.00
SISODD
$457.200.00
$130.00
200.00
S1%.0CI
$310,700.00
13
TxDOT Item 341 Tmpa D Dens reded M+Nx 6 Ben.
1
I LS
1 518,416.00
$18,416.00
$22,860.00
$10,510.00
16,510.
519.685.0D
19886.00
14
Hurl P501 PONak Cement Concrete Painanwat T7Nclmeai, 1
3.870
1 BY
1 583.00
43810.00
$112.37
318771.90
$126.00
83750.00
3120.00
1464,400.00
15
Ilam P502 Bituminous Puma Coet Intl Inwla YInabnwd 02
8.080
Ga1on
.00
0300.00
$7.26
$M.515SO
$7.00
420.
so
$0,360.00
U1
Item Pffi Ok4emla Rismey wd Tax1aaw Painim
91625
1525
$11870.00
1.21
2758.80
.50
11400.00
.00
maw
17
ann P. Run anal Pel
64)0
SF
V.W
$19,410.00
1.50
70&
$19,410.00
on
$19,410.00
19
Hem P4D1 Rekmd COY TV EOmlalm
28780
1 SY
1 x2.00
W.M.00
.
sa&axi
S2.50
950.00
00
38034000
111
1
27
BY
I "M
MAW. 00
1.
$40310,00$7
$1N.600,00
1.75
$48650.00
20
Mm MC wety andP
8
Ma
14500.00
m.
soAO
$15,0000.00
$8000000
21
Rem ML Ulll RabCatiT
$15.M.00
15000.00
16000.00
15000000
15000.00
515000.00
$15000.00
BASS BID SUBTOTAL
"A)7T4o
t+7$+n+.N
$2,207,/u
s2.564.ue
ALTERNATE 1 BID ITEMS
At -1
GP Section 05 C00backw MMl"floa
1
LS
$30000.00
001)
$5000.00
00000
$100000.00
$100000.00
$500000.00
Msaam
A14
DEDUCT: Item P-162 Exmrvtlon
660
CY
)DO
.00
1024
704.00
$30.00
1)00000
16.00
31]]60.00
A14
DEDUCT: TxDOT Ram 247. Type A finale 4 Caa tad AgWs" Sam Cama. 6'Tldtlawe,
11mbMdand lnela0ed
-23
BY
1200
78 40.00
1023
fl614.80
$1x00
; .00
AIN
332( .00
A14
DEDUCT: TxDOT Ran 341 Type D, Damega Monk=ot (IX ), TTNtldwe.
M1enlehed and lnsmlled
4 0
TON
s14500
41MOS.00.00
180.00
346] 00
smw
3330 00
5166.00
-$36]]00.00
A14
DEDUCT: TxDOT Nam 341 0 Mmk I OCKIA 5%Bonus
.1
L4
st 41500
16416.00
22860.00
660.00
1661000
516610.00
s16M.m
316886.00
A14
DEDUCT: Nam P501 Par6Mal Cement Conwela Paveman TTNtivmn Bme Bid lbm 12
41,57V
BY
$63.00
43810.00
.37
3316771.90
12b.00
346] 750.00
5120.00
34m 0000
A1.7
San, P-501 Pcmand Canront concrete Pwemanl 6' Rac
288110
SY
.00
51812800.00
MAE
$202808600
12500
$336000000
"1.36
468.00
A14
Horn P501 PoNertl Cement Concrete Pavement 6%bonen
1
LS
$967"00
N676B.00
51218".78
12168076
201800.00
520180000
$14]32026
$1473]8.38
A13
DEDUCT: Nem P61t Refined Coal Tar Emulsion
-23020
9Y
".00
,540040.00
".22
378428.40
am
457550 OD
"00
3690".00
At -10 Nam MC Sen adPnmi
TEBNATE I SUBSOTAL
1
Mo
81$
000000
SBM.00
"05,50$
$16000.00
315000.00
"M8,310
$15000.00
616000.00
ALTERNATE 2 BID REMB
A2.1 Mm T{Ot AOtlilimYwsttae Seed n ulca 2]800 SY 33.011 WAODOO "27"]WW ft 00 $2]60000 $100 52780000
TERNATE2SUBTOTAL "A08 $27,"0 sT