HomeMy WebLinkAboutResolution - 2004-R0060 - Agreement For Improvement Of Railroad Crossings - Northern And Santa Fe Rail - 02_05_2004Resolution No. 2004-R0060
February 19, 2004
Item No. 23
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, an Agreement for the
improvement to railroad crossings on Avenue K north of 1" Street, DOT No. 017 511L,
by and between the City of Lubbock and The Burlington Northern and Santa Fe Railway
Company, and related documents. Said Agreement is attached hereto and incorporated in
this resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council this 19th day c
ATTEST:
Garza, City Secretary
APPROVED AS TO CONTENT:
Craig'Arder, Managing Director of Planning & Transportation
APPROVED AS TO FORM:
City Attorney
as:ccdocs/RR Agrmt-Avenue K
February 4, 2004
Resolution No. 2004—R0060
CITY
ORIGINAL
COPY emu
NqW
AGREEMENT
INSTALLATION OF CROSSING SURFACE MATERIAL
AVENUE K GRADE CROSSING
DOT NO.017 511L, RAILROAD MILEPOST 0.41 ON SPUR TRACK
LUBBOCK, TEXAS
This is a letter agreement wherein The Burlington Northern and Santa Fe Railway Company, hereinafter called Company, agrees
that the existing crossing surface at Avenue K is to be removed and new concrete crossing surface is to be installed to a crossing surface
width of 64 feet on the one track for a total crossing surface length of 64 feet. To accomplish this work, the City of Lubbock, Texas,
hereafter called Agency, and the Company, agree as follows:
1) The work will be performed at the expense of the Company. Said work will consist of the installation of concrete crossing
surface material including upgrades to the track to accommodate new concrete crossing surface material, to adequately include
all vehicular driving lanes, based on a width of 64 feet from the end of crossing to end of crossing, including walkways.
2) The Agency agrees to share in the cost of the project and pay the Company a lump sum amount of $18,750 (Eighteen
thousand seven hundred and fifty dollars and no cents) for work described above in addition to closing Avenue M (DOT No.
014933U).
3) The Company will order the concrete crossing surface material from a qualified supplier and after installation of the material,
the Agency will be billed on basis of Paragraph 2 above.
4) The Company, at its own cost and expense, will maintain the crossing surface in a satisfactory manner and will make ample
provisions for such maintenance, provided, however, that the Company shall be entitled to receive any contribution toward the
cost of such maintenance as may be now or hereafter made available by reason of any law, ordinance, regulation, order, grant, or
by other means or sources.
5) The Agency will provide all barricades, lights, and traffic control devices necessary for detouring vehicular traffic at the
crossing, during construction of the crossing involved. This work will be performed at the expense of the Agency.
6) The Agency further agrees to allow the Company to drain the crossing area into the existing Agency storm sewers, if
available, near the crossing. The drain pipes and filter fabric will be furnished and installed by the Company.
7) The Agency agrees to furnish and place asphalt on roadway approaches to match the elevation of the new concrete crossing
surface. The Agency further agrees to maintain both roadway approaches.
8) The Company, at its own cost and expense will furnish and place asphalt beneath the track structure to provide further
subgrade stability.
9) Both parties agree to the requirements of Title VI of the Civil Rights Act of 1964, which by reference is made a part of this
agreement.
The work proposed above is agreeable to the Company under the terms and consideration stated herein. If this is satisfactory and
agreeable to the Agency, please indicate concurrence in the space provided.
EXECUTED by the Railroad this 2nd day of February, 2004
THE BURLINGTON NORTHERN AND SANTA FE
RAILWAY COMPANY
By:
Timothy J. Huya, Manager u lic Proje
Cornell Street Crossing Surface Renewal Agreement Page 1 of 2 02-02-2004
`L Uv L-1 — tom- w Le U
EXECUTED by the City this 19th day of February , 2004
CITY (
LN
ATTEST:
Rebecca Garza, City Secret
APPROVED AS TO CONTENT:
raig armer, Managing Director of Planning & Transportation
APPROVED AS TO FORM:
r
John M. Knight, Ass' nt City orney
Cornell Street Crossing Surface Renewal Agreement Page 2 of 2 02-02-2004
t
Resolution No. 2004-R0060
-----------------------------------------------------------------------------------------------------------------------
***** MAINTAIN PROPRIETARY CONFIDENTIALITY *****
-----------------------------------------------------------------------------------------------------------------------
THE B. N. S. F. RAILWAY COMPANY
FHPM ESTIMATE FOR
CITY OF LUBBOCK
-------------------------------------------------------------------------------------------------------------------------
LOCATION:- LUBBOCK TO AVENUE K DETAILS OF ESTIMATE PLAN ITEM: PTR017511L VERSION: 1
---------------------------------------------------------------------------------------------------------------------------
PURPOSE, JUSTIFICATION AND DESCRIPTION
LUBBOCK, TX: REPLANK AVENUE K - DOT # 017511L - PURINA SPUR
BNSF PUBLIC PROJECTS IS ENTERING INTO AN AGREEMENT WITH THE CITY OF LUBBOCK, TX. TO RENEW
THE EXISTING CROSSING SURFACE THROUGH AVENUE K ON THE PURINA SPUR WITH A 64, 136 LB.
CONCRETE CROSSING.
THIS IS A PROPOSAL WITH THE CITY OF LUBBOCK BILLABLE FOR A LUMP SUM OF $18,750.00.
ROADMASTER - VICTOR LOPEZ
DESCRIPTION QUANTITY U/M COST TOTAL $
-------------------------------------------- -------- ----- ----------------- -----------
LABOR
BUILD TRACK PANELS - REPLACEMENT
48.00
MH
880
PLACE FIELD WELDS - CAP
32.00
MH
640
REPLACE PUBLIC CROSSING - TOTAL REHAB
128.00
MH
2,347
SIGNAL FIELD LABOR - CAP
21.00
MH
464
SURFACE TRACK - REPLACEMENT - CAP
24.00
MH
477
UNLOAD BALLAST - REPLACEMENT - CAP
12.00
MH
220
UNLOAD CROSSING MATERIAL - PUBLIC - CAP
32.00
MH
587
WORK TRAIN - BALLAST
36.00
MH
1,064
PAYROLL ASSOCIATED COSTS
5,386
EQUIPMENT EXPENSES
3,529
DA LABOR OVERHEADS
6,081
PERDIEM EXPENSES
150
INSURANCE EXPENSES
1,052
TOTAL LABOR COST
----------------------
22,877
22,877
MATERIAL
BALLAST, FROM PEDERNAL, NM. (NM, AO
200.00
NT
2,106
RAIL, TRANSN,LH,NEW 136-NEW 115,25 FT
2.00
EA
1,880
RAIL, TRANSN,RH,NEW 136-NEW 115,25 FT
2.00
EA
1,880
RAIL, 136 LB NEW WELDED, PREMIUM :
208.00
LF
2,492
TIE, TRK,10',PRE-PLATED,PANDROL,6",ROUND HOLE
62.00
EA
4,846
WELDKIT, GENERIC FOR ALL RAIL WEIGHTS
4.00
KT
212
CONC 136 08-SEC WITH FILLER FOR WOOD
64.00
FT
9,789
SIGNAL MATERIAL
2.70
DAY
405
MATERIAL HANDLING
580
ONLINE TRANSPORTATION
2,047
OFFLINE TRANSPORTATION
176
TOTAL MATERIAL COST
----------------------
26,413
26,413
OTHER
ASPHALT PLACED BY CONTRACTOR
60.00
NT
10,500
SIGNAL LEASED VEHICLE
2.70
DAY
135
TOTAL OTHER ITEMS COST
----------- -----------
10,635
10,635
PROJECT SUBTOTAL 59,925
CONTINGENCIES 0
BILL PREPARATION FEE 300
GROSS PROJECT COST 60,225
LESS COST PAID BY BNSF 41,475
TOTAL BILLABLE COST 18,750
2
4