RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock a Change Order No. 1 to a Contract (Bid
No. 224-03/RS) with Pharr and Company to cover the expenses incurred for additional
quantities of work due to (1) changing from pneumatic to electronic controls on HVAC
equipment for more efficient and better control of the equipment; (2) adding security and
hardware features to 16 doors which allows better control and interaction with existing
control system; (3) unexpected conditions found after main slab was demolished; and (4)
upgrading facility from BSL-3 to BSL-3+. A copy of said Change Order No. 1 is
attached hereto and incorporated in this Resolution as if fully set forth herein and shall be
included in the minutes of the Council.
Passed by the City Council this 25th day of
ATTEST:
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
1.41 L s/14f-
Harlan Stauffe , acili Manager
APPROVED AS TO FORM:
J M. Knight
Assistant City Attorney
ke/ccdocs/ ChangeOrder.1. Pharr and Co.
May 12, 2004
CITY OF LUBBOCK
CHANGE ORDER Resolution No. 2004—RO244
CHANGE ORDER #: One 1
CONTRACTOR: Pharr and Company
DATE: May 3, 2004 CITY OF LUBBOCK BID#: 224-03/RS
PROJECT NAME: Bio-Safety Level 3 Laboratory Facility Construction
Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE
CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins,
Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2) decrease or increase the quantity of
work to be performed or materials, equipment, or supplies to be furnished. All work that alters the nature of the thing to be
constructed or that is not an integral part of the project objective must be let out for public bid by the Purchasing Department.
Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not
covered by the specifications and drawings of the project (attach additional pages if necessary):
1.
CCR#1
Replace the pneumatic controls with electronic controls.
($4,000.00)
2.
CCR#2
Add hardware and security items for various doors in and around the BSL-3 Facility.
39,826.00
3.
CCR#3
Soil work associated with investigating existing below grade slabs and foundations.
7.770.38
4.
CCR#4
Installation of dilution tank which serves the BSL-3 Facility.
3,691.00
TOTALS (74 days added to contract.) $47,287.38
Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing
Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including
material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain
unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs.
111:0
A.
B.
C.
D.
F.
G.
This Change 0
(1) CONTR T(
4 ed s to
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
DESCRIPTION AMOUNT
ORIGINAL CONTRACT VALUE: $1,004,500.00
AMOUNT OF THIS CHANGE ORDER: Council approval required if over 525,000 $e�jz87
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):,]�"
AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00
TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $47,287.38
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25%,Maximum
NEW CONTRACT AMOUNT (A+E): $1,051,787.38
(5) Victor Kilmab, Purchasing Manager
Change Orders over $25, 000 reqyffl
CITY
.SS d `_._ S5 0
Date (2)PROJE T ARCHITECT/ENGINEER Date
Approved as to Form:
�y
Date CityAt at'D e
F { p
Date (6) Lou Fox - CAY Mara Date
the following signatures:
5/25/04 ATT " 5/25/04
Date (8) Rebe a Garza, City Secretary Date
PUR-045 (Rev 7/03)
FEB.17.2004 11:46AM PHARR CONSTRUCTION
N0. 1731 P, 1
PrL7l R Of COjWAj TY
General Contracom
Commercial Conssrrrction
February 17, 2004
Parkhill, Smith & Cooper, Inc.
4222 - 85ie Street
Lubbock. Texas 79423
ATTENTION: BILL NOONAN
REFERENCE: BYO -SAFETY LEVEL 3 LABORATORY FACILITY
CHANGE REQUEST #1
P.O. Bax 2791
Lubbeck, Tams 7NO8
(806) 763-5263
Fax (806) 763 5843
Armstrong Mechanical Co., Inc. has voluntarily submitted a cost savings proposal for the
above referenced project. They propose to replace the pneumatic controls with electronic
controls for a deduct of S4,000.00.
Please advise of the action you wish taken on this proposed construction change request. If you
have any questions, do not hesitate to contact our office.
Respectfully Submitted,
P11ARR & COMPANY
'
d �" �
John K. Pharr
JKP/j s
PHARR & COMPA AT
General Contractors
Commercial Construction
March 30, 2004
Parkhill, Smith & Cooper, Inc.
4222 - 85`h Street
Lubbock, Texas 79423
ATTENTION: - BILL NOONAN
APR 01 '004
RECEIVED
PSC
REFERENCE: BIO-SAFETY LEVEL 3 LABORATORY FACILITY
CHANGE REQUEST #2
P.O. Box 2791
Lubbock, Texas 79408
(806) 763-5263
Fax (806) 763-5843
Bill,
PHARR & COMPANY proposes to add the hardware specified in CCR #2 to match and
coordinate with the installation of the security system for the following price:
General Conditions $ 1,500.00
Labor to Install Hardware 5,328.00
Finish Hardware and Electronic Hardware
& Hook up (Western Building Specialties, Inc.) 26,637.00
Security Additions (CCES, Inc.) 321.00
Subtotal $ 33,786.00
Mark-up 5,068.00
Bond Overrun 972.00
TOTAL
$ 39,826.00
This change request will require a sixty (60) day time ex.ension. No painting for existing
doors has been figured into this price. If painting is necessary it will be done on a time and
material basis.
Please advise of the action you wish taken on CCR #2. If you have any questions, do not
hesitate to contact our office.
Respectfully Submitted,
PHARR & COMP
ZJohn K. Pharr
Vice President
y,k r
s k e e t
APR,14,2004 4:01PM PHARR CONSTRUCTION
i2o2�y
NO.3063 P, 1
r DD� �+ �,�» A P0. Bon 2791
M" & l� O Y PAW Lubbock, Texas 79408
Gnwd ConWdCAW7 (806) 763-5263
Qmmenid c4mbuction Fax (806) 763-5843
April 14, 2004
Parkhill, Smith & Cooper, Inc.
4222 - 85r° Street
Lubbock, Texas 79423
ATTENTION: BELL NOONAN
REFERENCE: BIO-SAFETY LEVEL 3 LABORATORY FACILITY
CHANGE REQUEST 43
PHARR & COMPANY proposes to complete Change Request #3 (see breakdown) for the
following price:
General Conditions
$ 3,000.00
Investigation
1,340.48
Soil Testing
205.00
Excavation
662.92
Extra Form Work
377.72
Extra Concrete
640.00
Extra Concrete Labor
365.93
Subtotal
$ 6,592.05
Mark-up
988.81
Bond Ovemm
192,52
TOTAL
$ 70770.39
This change request will require a fourteen (14) day time extension. Please advise of the action
you wish taken on CCR #3. If you have any questions, do not hesitate to contact our
office.
Respectfully Submitted,
PHARR & COMPANY
John K. Pharr
Vice President
JKP/js _