Loading...
HomeMy WebLinkAboutResolution - 2004-R0244 - Contract To Provide Aid In Disasters - South Plains Association Of Governments - 05/25/2004Resolution No. 2004-RO244 May 25, 2004 Item No. 35 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 1 to a Contract (Bid No. 224-03/RS) with Pharr and Company to cover the expenses incurred for additional quantities of work due to (1) changing from pneumatic to electronic controls on HVAC equipment for more efficient and better control of the equipment; (2) adding security and hardware features to 16 doors which allows better control and interaction with existing control system; (3) unexpected conditions found after main slab was demolished; and (4) upgrading facility from BSL-3 to BSL-3+. A copy of said Change Order No. 1 is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 25th day of ATTEST: Rebecca Garza, City Secretary APPROVED AS TO CONTENT: 1.41 L s/14f- Harlan Stauffe , acili Manager APPROVED AS TO FORM: J M. Knight Assistant City Attorney ke/ccdocs/ ChangeOrder.1. Pharr and Co. May 12, 2004 CITY OF LUBBOCK CHANGE ORDER Resolution No. 2004—RO244 CHANGE ORDER #: One 1 CONTRACTOR: Pharr and Company DATE: May 3, 2004 CITY OF LUBBOCK BID#: 224-03/RS PROJECT NAME: Bio-Safety Level 3 Laboratory Facility Construction Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2) decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. All work that alters the nature of the thing to be constructed or that is not an integral part of the project objective must be let out for public bid by the Purchasing Department. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary): 1. CCR#1 Replace the pneumatic controls with electronic controls. ($4,000.00) 2. CCR#2 Add hardware and security items for various doors in and around the BSL-3 Facility. 39,826.00 3. CCR#3 Soil work associated with investigating existing below grade slabs and foundations. 7.770.38 4. CCR#4 Installation of dilution tank which serves the BSL-3 Facility. 3,691.00 TOTALS (74 days added to contract.) $47,287.38 Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. 111:0 A. B. C. D. F. G. This Change 0 (1) CONTR T( 4 ed s to ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. DESCRIPTION AMOUNT ORIGINAL CONTRACT VALUE: $1,004,500.00 AMOUNT OF THIS CHANGE ORDER: Council approval required if over 525,000 $e�jz87 PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):,]�" AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00 TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $47,287.38 PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25%,Maximum NEW CONTRACT AMOUNT (A+E): $1,051,787.38 (5) Victor Kilmab, Purchasing Manager Change Orders over $25, 000 reqyffl CITY .SS d `_._ S5 0 Date (2)PROJE T ARCHITECT/ENGINEER Date Approved as to Form: �y Date CityAt at'D e F { p Date (6) Lou Fox - CAY Mara Date the following signatures: 5/25/04 ATT " 5/25/04 Date (8) Rebe a Garza, City Secretary Date PUR-045 (Rev 7/03) FEB.17.2004 11:46AM PHARR CONSTRUCTION N0. 1731 P, 1 PrL7l R Of COjWAj TY General Contracom Commercial Conssrrrction February 17, 2004 Parkhill, Smith & Cooper, Inc. 4222 - 85ie Street Lubbock. Texas 79423 ATTENTION: BILL NOONAN REFERENCE: BYO -SAFETY LEVEL 3 LABORATORY FACILITY CHANGE REQUEST #1 P.O. Bax 2791 Lubbeck, Tams 7NO8 (806) 763-5263 Fax (806) 763 5843 Armstrong Mechanical Co., Inc. has voluntarily submitted a cost savings proposal for the above referenced project. They propose to replace the pneumatic controls with electronic controls for a deduct of S4,000.00. Please advise of the action you wish taken on this proposed construction change request. If you have any questions, do not hesitate to contact our office. Respectfully Submitted, P11ARR & COMPANY ' d �" � John K. Pharr JKP/j s PHARR & COMPA AT General Contractors Commercial Construction March 30, 2004 Parkhill, Smith & Cooper, Inc. 4222 - 85`h Street Lubbock, Texas 79423 ATTENTION: - BILL NOONAN APR 01 '004 RECEIVED PSC REFERENCE: BIO-SAFETY LEVEL 3 LABORATORY FACILITY CHANGE REQUEST #2 P.O. Box 2791 Lubbock, Texas 79408 (806) 763-5263 Fax (806) 763-5843 Bill, PHARR & COMPANY proposes to add the hardware specified in CCR #2 to match and coordinate with the installation of the security system for the following price: General Conditions $ 1,500.00 Labor to Install Hardware 5,328.00 Finish Hardware and Electronic Hardware & Hook up (Western Building Specialties, Inc.) 26,637.00 Security Additions (CCES, Inc.) 321.00 Subtotal $ 33,786.00 Mark-up 5,068.00 Bond Overrun 972.00 TOTAL $ 39,826.00 This change request will require a sixty (60) day time ex.ension. No painting for existing doors has been figured into this price. If painting is necessary it will be done on a time and material basis. Please advise of the action you wish taken on CCR #2. If you have any questions, do not hesitate to contact our office. Respectfully Submitted, PHARR & COMP ZJohn K. Pharr Vice President y,k r s k e e t APR,14,2004 4:01PM PHARR CONSTRUCTION i2o2�y NO.3063 P, 1 r DD� �+ �,�» A P0. Bon 2791 M" & l� O Y PAW Lubbock, Texas 79408 Gnwd ConWdCAW7 (806) 763-5263 Qmmenid c4mbuction Fax (806) 763-5843 April 14, 2004 Parkhill, Smith & Cooper, Inc. 4222 - 85r° Street Lubbock, Texas 79423 ATTENTION: BELL NOONAN REFERENCE: BIO-SAFETY LEVEL 3 LABORATORY FACILITY CHANGE REQUEST 43 PHARR & COMPANY proposes to complete Change Request #3 (see breakdown) for the following price: General Conditions $ 3,000.00 Investigation 1,340.48 Soil Testing 205.00 Excavation 662.92 Extra Form Work 377.72 Extra Concrete 640.00 Extra Concrete Labor 365.93 Subtotal $ 6,592.05 Mark-up 988.81 Bond Ovemm 192,52 TOTAL $ 70770.39 This change request will require a fourteen (14) day time extension. Please advise of the action you wish taken on CCR #3. If you have any questions, do not hesitate to contact our office. Respectfully Submitted, PHARR & COMPANY John K. Pharr Vice President JKP/js _