HomeMy WebLinkAboutResolution - 2010-R0436 - Amendment To Professional Service Contract - Parkhill Smith & Cooper, Inc. - 09_16_2010Resolution No. 2010-RO436
September 16, 2010
Item No. 5.19
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Amendment #3 to an Agreement for
Professional Services, Construction Phase for LBB Runway 08126 and Taxiway
Improvements Phase 2, by and between the City of Lubbock and Parkhill Smith &
Cooper, Inc., and related documents. Said Amendment #3 is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council on September 16, 2010
TOM MARTIN, MAYOR
ATTEST:
Rebe a Garza, City Secretary
APPROVED AS TO
Loomis, Director of Aviation
APPROV AS TO FORM:
had Weaver, Assistant City Attorney
vwxcdocs/RES.Airport-Amend #3-PSC
August 20, 2010
PARKHILL MITH&COOPER
Resolution No. 2010-RO436
July 26, 2010
Mr. James W. Loomis, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Administration Office, 2nd Floor
5401 N. Martin Luther King Jr. Blvd., Unit 389
Lubbock,Texas 79403
Re: Amendment No. 3 to Agreement for Professional Services,
Construction Phase Services for LBB Runway 08/26 and Taxiway Improvements Phase 2
Dear Mr. Loomis:
As requested, we have prepared Amendment No. 3 for construction phase services related Phase 2 of the
LBB Runway 08/26 and Taxiway Improvements project. Refer to the detailed fee sheets attached for an
itemization of the scope of services. This amendment corresponds to the construction project duration of
340 calendar days. The contract amendment modifies the scope of professional services included in our
original agreement dated January 14, 2010. Construction phase services for Phases 3 and 4 of the LBB
Runway 08/26 and Taxiway Improvements project will be negotiated prior to the start of construction for
each phase.
Task 1 - Lump Sum Fee for Construction Phase Services (PSC)
(Construction administration, Resident Project Representative, etc.) $519,800
Task 2 - Reimbursable Fee for Construction Phase Services (PSC Subs)
(Construction administration, site visits, etc.) $113,300
Task 3 — Surveying and Testing Services related to Phase 2 construction,
(Reimbursable expenses/fees not to exceed) $387,100
Task 4 - Reimbursable Fee for Construction Phase Services (Fiber Optic Cable Sub)
(Construction administration, site visits, etc.) $17,250
TOTAL $1,037,450
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
January 14, 2010 and to provide the additional Task 1 through Task 4 services under the provisions of the
contract, EXHIBIT B - PAYMENTS TO THE ENGINEER, PARAGRAPH B4.02. Compensation for
Construction Phase - Tasks 1-4 Services shall not exceed $1,037,450 without Owner's approval.
Amarillo
El Paso
Lubbock
Midland 4222 85th Street LubbockTexas 79423 806,473.2200 Fax 806,473,3500
Mr. James Loomis, A.A.E. Page 2 July 26, 2010
If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our
office. We will take receipt of this signed letter as our notice to proceed with these services. We look
forward to working with you in completing this project. If you have any questions please call either Mark
Haberer or me.
Sincerely,
PARKHILL, SMITH & COOPER, INC.
1
By 1 _
Jbhn T. Hamilton, PE
firm Principal
IN TRIPLICATE
JTH/If
Enclosures
1�datal\pro)ects\201012709,10ODMIMCONTRACTSFINALbontract amendment 3,doc
Accepted by:
CITY OF LUBBOCK
By ��- WM4 —
Tom Martin
Mayor
Attest:
By
Q -0,, - -
Re ecca Garza
City Secretary
Approved as to Content:
James W. Loomis, A A.E.
Director of Aviation
Approved a to orm:
By
Chad Weaver
City Attorney
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LBB 8126 P2 CST
JOB NO.:
01-2706-08
TASK:
1CST
DATE:
07/26/10
FEE TYPE:
Lump Sum
PREPARED BY:
M DH
PRINCIPAL:
IM
PROJ. MANAGER:
MDH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00% $519,800
FEE:
$51 , 14
LABOR:
$501,972
OVERHEAD:
REIMB. CONSULTANTS:
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$15,515
LABOR BUDGETS:
CODE
DESCRIPTION HOURS
COSTS
01
Finn Principal
117
$16,380
03
Engineer
537
$67,125
11
Resident Project Representat
3,564
$324,324
03
Engineer
132
$14,256
07
Engineer -in -Training
809
$73,619
14
CADD Operator
48
$3,408
18
Clerical
44
$2,860
Page 1 of 1
FEE ESTIMATING SHEET PROJECT:
Lee ane P2 CST
JOB NO.:
:a—�
TASK: 1CST
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP
ENG
RPR
EM
of
CAW UK CLMCAL
TASK
01
03
11
03
07
14 18
Trips
$140.00
$125.00
$91.00
S1O&W
$81M
$71.00 $65.00
TOTAL
RPR (340 calendar day construction period)
Preconstructlon Conference
1
2
2
290 Days at 10 Hrs/ Day
290
2900
2,900
'2nd RPR 45 Days at 12 Hrs/ Day
45
540
640
20 Pre/Post Days at 4.5 Hrs/ Day
10
90
90
CONSTRUCTION PHASE
Conduct Preconstr Conference, minutes
1
1
2
4
2
9
Coord baseline surveys, benchmark
1
1
2
Site visits, notes, progress meetings
98
48
168
60
384
660
Coord. with RPR, Contractor, Owner
24
16
240
40
240
536
Routine change orders
8
8
8
24
Review submittals
16
24
40
80
Pay estimates including final
18
40
58
Certifications, guarantees $ warrantles
8
8
16
Final inspection and notes/findings
4
16
16
36
MISCELLANEOUS ITEMS
QC/PM (12 mos. @ 2 hrs./mo.)
24
24
Prepare stmts. (12 @ 1 hr.)
12
12
Weekly Progress Reports (0.5 hr. each)
24
24
48
Coordination with Owner
16
16
CLOSEOUT PHASE
Update AGIS(to be Included in Phase 3)
Record drawings
8
8
24
48
88
Warranty insp,
4
4
4
2
14
Addnl. compliance insps.
4
4
4
4
16
Final test and QC rpt.
8
16
40
16
80
BUDGET SUBTOTALS: HOURS/ Trips -
469
117
537
3564
132
809
48 44
5251
11
SALARY
1 $16,380
$67,125
$324,324
$14,256
$73,619
$3,408 $2,860
$501,972
Page 1 of 1
EE ESTIMATING SHEET PROJECT:
DIRECTS
LBB 6/26 P2
T JOB NO.: 01-2706-08
TASK
1CST
DIRECT CONSULTANT COSTS
SUBT TAL
611 STRUCTURAL CONSULTANTS
612 MECH/ELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
616 OTHER CONSULTANTS
TOTAL DIRECT
CONSULTANTS
DIRECT EXPENSES
621 TRAVEL/LODGING
MOTEL DAYS @
AIR TRAVEL AIR FARE @
PARKING DAYS @
CAR RENTAL DAYS @
MILEAGE 55 MILES @
$0.500
MEN ® /MANDAY
MEN ® /MAN
/DAY
/DAY
@ 469 TRIPS
=
=
=
=
= $12.697.50
SUBTOTAL
$12,898
622 REPRODUCTIONS
BLUELINE PRINTS 50
SEPIA PRINTS
PRINTING:
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX 1000
SHTS @
SHTS @
ORIGINALS
SETS @
SETS @
SHTS @
$2.55 @ 5 SETS = $637.50
$8.51 SETS =
$0.15 /ORI. _
$0.08 /SHT 225 SHEETS =
$2.00 /SET =
$0.08 /SHT = $80.00
SUBTOTAL
$718
623 MODEL/RENDERINGS/PHOTOS
Shots /Shot
624 TELEPHONE 300 Calls
3.00 /Call
$900
625 MEALS DAYS @
MEN @ /MANDAY
628 FIELD SUPPLIES
$400
628 POSTAGE 100 Mallin s @
$5.00 /Mallin
500
629 PUBLICATIONS 6 SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 100 Pages
$1.00
100
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CARD HOURS @
$8.00 /HOUR
636 FIELD EQUIP RENTAL
848 SOFTWARE
TOTAL DIRECT
EXPENS
15,515
Page 1 of 1
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LBB 8126 P2 CST
JOB NO.:
01-2706-08
TASK:
2SUB
DATE:
07/26/10
FEE TYPE:
Hourly Rate w/Max
PREPARED BY:
MDH
PRINCIPAL:
JTH
PROJ. MANAGER:
MI]H
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REHAB:
15.00%a
PROFIT ON DIRECTS:
15.00'%
$113,300
FEE:
$11 , 74
LABOR:
OVERHEAD:
REIMB. CONSULTANTS:
$98,499
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
LABOR BUDGETS:
CODE
DESCRIPTION HOURS COSTS
01
Firm Principal
03
Engineer
11
Resident Project Representat
03
Engineer
07
Engineer -in -Training
14
CADD Operator
18
Clerical
Page 1 of 1
FEE ESTIMATING SHEET
REIMBURSABLES
PROJECT:
LBS 8/28 P2
CST JOB NO.: 01-270 TASK 2 US
REIMBURSABLECONSULTANT COSTS
SUBTOTAL
511 STRUCTURAL CONSULTANTS
512 MECH/ELEC CONSULTANTS
CP Cnossno and Associates
98,499
513 ENV & CIVIL CONSULTANTS
514 LANDSCAPE CONSULTANTS
515 TESTING CONSULTANT:
516 SURVEYING CONSULTANTS
517 INTERIOR DESIGN CONSULTANT:
18 OTHER CONSULTANTS
REIMBURSABLE EXPEN E
521 TRAVEL/LODGING
MOTEL
AIR TRAVEL
PARKING
CAR RENTAL
MILEAGE
DAYS ®
AIR FARE @
DAYS @
DAYS @
MILES ®
$0.345
MEN @ /MANDAY =
MEN ® /MAN =
/DAY =
/DAY =
@ TRIPS =
SUBTOTAL
522 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING:
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX
SHTS @
SHTS ®
ORIGINALS
SETS @
SETS ®
SHTS ®
$2.55 @ B SETS =
$8.51 @ SETS =
@ $0.15 /ORI. _
$0.08 /SHT Q 250 SHEETS =
$2.00 /SET =
$0.08 /SHT =
SUBTOTAL
523 MODEL/RENDERINGS/PHOTOS
Shots /Shot
524 TELEPHONE
Calls
$2.00 /Call
525 MEALS
DAYS @
MEN /MANDAY
525 FIELD SUPPLIES
525 POSTAGE
Mailings
2.00 /Makin
529 PUBLICATIONS & SUBSCRIPTIONS
530 MISC REIMBURSABLE EXP
531 FAX
Pages
1.00
532 TEMPORARY PERSONNEL
533 DRAFTING SUPPLIES
534 OFFICE SUPPLIES
535 CADD
HOURS
$6.00 /HOUR
536 FIELD EQUIP RENTAL
8 SOFTWARE
REIMBURSABLE EXPENSE
Page 1 of 1
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LBB 8/26 P2 CST
JOB NO.:
01-2706-08
TASK:
3S&T
DATE:
07/26/10
FEE TYPE:
Hourly Rate w/Max
PREPARED BY:
MDH
PRINCIPAL:
JTH
PROJ. MANAGER:
MDH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00010
PROFIT ON DIRECTS:
15.0001*
$387,100
FEE:
$3 ,131
LABOR:
OVERHEAD:
REIMB. CONSULTANTS:
$336,636
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
LABOR BUDGETS:
CODE
DESCRIPTION HOURS COSTS
01
Firm Principal
03
Engineer
11
Resident Project Representat
03
Engineer
07
Engineer -in -Training
14
CADD Operator
18
Clerical
Page 1 of 1
T NG
EIMBURSABLES
C
..
I B JUMNT
COSTS
SUBTOTAL
UL MWErMS
MECRMLEC CONSULTANTS
a CIVIL CONSULTANTS
LANDSCAPE MRSOEMYS
TESTINGU A!
Rodriguez Tednq
$312,636
r inu -)NSUITMM
wnn burveyng
$24,000
517
INTEMOR D
All "as -built" survey to be done in Phase 3
5
LEIMBURSABLE
5
tR
MOTEL
AIR TRAVEL
PARKING
CAR RENTAL
MILEAGE
DAYS C
AIR FARE
DAYS
DAYS ®
MILES
$0.345
MEN ® /MANDAY
MEN ® /MAN
[DAY
/DAY
TRIPS
=
■
=
=
=
SUBTOTAL
522
RoRODUCTIMS
BLUELINE PRINTS
SEPIA PRINTS
PRINTINGi
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX
SHTS
SHTS ®
ORIGINALS
SETS ®
SETS ®
SHTS @
$2.55 @ 8 SETS =
$e„51 SETS -
$0.15 IORI.
$0 OB /SHT 250 SHEETS =
$2.00 /SET =
$0.00 /SHT =
SUBTOTAL
523
/
S
hot
524
TELEPHONEs
/ots
WI
MLALZJ
DAY
DA
926
FIELD SUPPLIES
529
P09TOE
Malllngs;Ea
n
929
PUBLICXTF5M SMORIPTIUNG
530 MISC REIMBURSABLE EXP
531
FAX
Pages
$1.00
OERSONNEL
533
DRAFTING SUPPLIES
E Uirs
35
M50
HZ50RS
8
FIELD EQUiP RENTAL
sa
Page 1 of 1
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
1BB 8/2+6 P2 CST
JOB NO.:
0Il 27+06-08
TASK:
40C
DATE:
07aW10
FEE TYPE:
Homiy Rare w/Mas
PREPARED BY:
MDH
PRINCIPAL:
JIH
PROJ. MANAGER:
NDH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.0476
PROFIT ON DIRECTS:
15.001
$17,250
FEE:
$174,0
LABOR:
OVERHEAD:
REIMB. CONSULTANTS:
$15,000
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
LABOR BUDGETS:
CODE
DESCRIPTION HOURS COSTS
01
Firm Principal
03
Engineer
11
Resident Project Representat
03
Engineer
07
Engineer -in -Training
14
CADD Operator
18
Clerical
Page 1 of 1
HE
EIMBU RSABLES
SD
.--LBB
826 P2 CST
J O.: 0-
IMBURSABLE
SUBTOTAL
11 STRUCTURAL CONSULTANTS
CONSULTANTS
513 ENV 3 CIVIL WOUCM
14 LANDSCAPE CONSULT TS
515 TESTING CONSULTANTS
18 SURVEYING UL
517 INTERIOR DESIG
518 OTHER CONSULTANTS
Ncom (FOC) (wil only be spent H change order
Issued during phase 2 for construction of FOC
Improvements)
$15,000
TOTAL REIMBURSABLE CONSULTANTS
REIMBURSABLE MEMO
521 TRAVEL/LODGING
MOTEL
AIR TRAVEL
PARKING
CAR RENTAL
MILEAGE
DAYS @
AIR FARE ®
DAYS @
DAYS
MILES
$0.345
MEN @ /MANDAY =
MEN @ /MAN =
/DAY =
/DAY =
@ TRIPS =
SUBTOTAL
522 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING.
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX
SHTS @
SHTS ®
ORIGINALS
SETS ®
SETS @
SHTS
$2.55 8 SETS =
$8.51 @ SETS =
$0.15 /ORI. _
$0.08 /SHT ® 250 SHEETS =
$2.00 /SET =
$0.08 /SHT =
SUBTOTAL
523 MODELIRENDERINGWPHOTOS
Shots Q /shot
4 TELEPHONE
Calls
52.00 /Call
525 MEALS
AYSMEN
@ 7M A A
B FIELD UPPLIE
528 POSTAGE
Mallings
$2,00a
n
529 PUBLICAT-15—N77SUBSCRIPTIONE
530 MISC REIMBURSABLE
31 FAX
P
1.00
532 TEMPORARY PERSONNEL
IMTRAFTIM LE
534 OFFICE SUPPLIES
HOURS is
$6.GO /H UR
536 FIELD EQUIP RENTAL
48 SOFTWARE_
TOTAL KEIM50=1
Page 1 of 1