HomeMy WebLinkAboutResolution - 2010-R0072 - Contract 10-022-F-022-NJPA Talon For Demolition Of Godeke Library - 02/09/2010Resolution No. 2010-R0072
February 9, 2010
Item No. 5.18
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCV :
THAT the Mayor of the City of Lubb(
a2to execute for and on behalf of the City c
-NJPA for demolition of the old Gode
lliance (NJPA) Indefinite Quality Const
City of Lubbock and Talon/LPE of Amarillo, 1
Contract is attached hereto and incorporated in this
and shall be included in the minutes of the City Coui
rized and
(_ �t No. 10-
{Q nal Joint
veen the
Said
i herein
Passed by the City Council on February 9, 2010
TOM MARTIN, MAYOR
ATTEST;
Rebec _ Garza, City Secretary
APPROVED AS TO CONTENT:
Mark KeAwqA, Ass'Mant City Manager
Chief Information Officer
APPROVED AS TO FORM:
-�x4u—(4�
Chad Weaver, Assistant City Attorney
vwxcdocs/RES.Contract-Talon LPE-Library demo
January 27, 2010
Resolution No. 2010—R0072
City of Lubbock Job Order
This .lob Order is governed by all terms and conditions of the Contract referenced below which is hereby
incorporated by reference.
Owner: Wesley Everett. Director of Facilities Management for —Facilities
NJPA Contract Number: TX04-061908-TAL, National Joint PoNvers Alliance (NJPA), Indefinite Quantity
Construction Contract.
Contract .lob Order Number: 10-022-F-022-NJPA
Contractor: Talon/LPE
Date of Contract: September 25, 2008
.lob Order Date: January 25, 2010
SL1111n1a1-V and Description of Statement of Worl. attached hereto: Demolition of the Old Godeke Branch
Library
Talon .lob Order Number: 009107.00 and Insurance requirements per Exhibit A, hereto attached.
Value of pre -priced work: S 76,851.29
Value ot' non -pre -priced work: S235.37
Payment and Perlornlance Bonds: $ 1,976.58
Total Fixed Price stipulated sunl for this .lob Order (.lob Order Su111): $ 79,063.24
Notice to Proco-1 Date for thisJob Order: To be issued after Citv Council approval
hxpectcd Con �/ ', n1-cler: To be determined after City Council approval
liquidated D J -2` 3 forth in Agreement): $25 per day
1?
CONTRAC CITY OF LUBBOCK, TEXAS (OWNER)
T al CROL,PI: Tom Martin, Mayor
i3y:
PRINTED NAME: BRiDGER HOWARD
TITLE: PROJECT MANAGER
C0Mi)1-ETE ADDRESS:
Company: Talon/LPE
Address: 921 N. Bivins Street
City, State, Zip: Amarillo. Texas 79107
ATTEST:
Rebec�-aGar�zaCi`tySecretary
APPROVED AS TO CONTENT:
a-, �) �2ACt
Ocwner's Representative
lA
.—( N
Direct r
API'RZT FORM:
City Attorney
Detailed Scope of Work
To: Select a Contractor Project Manager in People
Date Printed: February 01, 2010
Work Order Number: 009107.00
Work Order Title: Godeke Library Demolition
Brief Scope: Godeke Library Demolition
Resolution No. 2010-R0072
From: Select a TGG Project Manager in People
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the
items set forth below shall be considered part of this scope of work.
Detailed Scope:
This proposal is for the demolition of the Godeke Library.
1. No reseeding of site has been included in this proposal.
2. Disposal fees to be waived by the City of Lubbock Landfill.
3. 700' of temporary fence has been included for this proposal.
4. Talon/LPE will not be responsible for the new irrigation system installed at the site.
5. All footings and slab associated with the building foundation will remain in place.
7. Mold remediation is not included in this proposal.
8. Electrical re-routing is a budgetary estimate only.
9. This proposal does not include the removal of the South parking lot, North Parking lot, flatwork or circle driveway.
10. Take down light fixtures and remove lamps and ballast for owner disposal. Containers to be provided by the City of
Lubbock and all waste to be picked up and disposed of by the City of Lubbock.
11. Remove all existing switch gear in closet and salvage for the owner to remove from the site.
12. Install one floor standing box with a panel board, time clock, contactor and GFI outlets.
13. Reuse one existing panel and contactor to be installed in the new power box.
14. The free standing power box will act as a power center to feed the parking lot lights and to provide construction
powerduring remediation and demolition of the existing building.
15. This proposal does not include repairs to the pole lights or existing circuiting.
16. A diagram has been sent with this proposal which outlines the electrical SOW.
17. No contengency has been included.
Detailed Scope of Work Page 1 of 1
EZ/QC - Southwest 2/1/2010
Page 1 of 6 of Proposal - CSI
Contractor's Price Proposal Summary - CSI
Print Date: 3anuary
Contract Number:
TX04-061908-TAL
Work Order Number:
009107.00
Work Order Title:
Godeke Library Demolition
Contractor:
Talon/LPE
Proposal Value:
$ 79,063.24
Proposal Name:
Godeke Library Demolition
Resolution No. 2010-R0072
I IQC,
C-44(
Subtotal for Section-01:
$21,544.17
Subtotal for Section-02:
$50,694.86
Subtotal for Section-05:
$25.84
Subtotal for Section-06:
$1,265.38
Subtotal for Section-13:
$370.09
Subtotal for Section-16:
$5,162.90
Proposal Total $79,063.24
This proposal total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding of the line totals and sub -totals.
The Percentage of NPP on this Proposal: 0.2977%
Price Proposal Summary - CSI Page 1 of 6
EZ/QC - Southwest 1/22/2010
Page 2 of 6 of Proposal - CSI , IQC
Contractor's Price Proposal Detail - CSI
Print Date: January 22, 2010
Contract Number:
TX04-061908-TAL
Work Order Numbe 009107.00
Work Order Title:
Godeke Library Demolition
Contractor:
Talon/LPE
Proposal Value:
$ 79,063.24
Proposal Name:
Godeke Library Demolition
Record Section - Item ModiufierUOM Description Line Total
Section-01
1 01352-0010 HR Electrician,Note: Line items in the CTC include appropriate costs to cover labor. $3,500.83
These items will be requested specifically by the owner for miscellaneous work not
covered in the CTC.
Quantity Unit Price Factor Total
Installation 80.00 x $35.65 x 1.2275 = $3,500.83
Salvage switch gear (2 men, 5 days)
2 01352-0010
HR Electrician,Note: Line items in the CTC include appropriate costs to cover labor.
$3,500.83
These items will be requested specifically by the owner for miscellaneous work not
covered in the CTC.
Quantity Unit Price Factor
Total
Installation 80.00 x $35.65 x 1.2275 =
$3,500.83
Troubleshooting, tracing, coordinating
3 01352-0010
HR Electrician, Note: Line items in the CTC include appropriate costs to cover labor.
$5,426.29
These items will be requested specifically by the owner for miscellaneous work not
covered in the CTC.
Quantity Unit Price Factor
Total
Installation 124.00 x $35.65 x 1.2275 =
$5,426.29
Flour. lighting demolition (3 men 5 days)
4 01352-0010
HR Electrician, Note: Line items in the CTC include appropriate costs to cover labor,
$1,750.42
These items will be requested specifically by the owner for miscellaneous work not
covered in the CTC.
Quantity Unit Price Factor
Total
Installation 40.00 x $35.65 x 1.2275 =
$1,750.42
Tie in exterior lighting to power box
5 01560-0016
LF Temporary 6' High Chain Link Fence Panel, Self Standing, Up To 6 Month Rental,
$7,123.18
Include_ s Set -Up And Removal
Quantity Unit Price Factor
Total
Installation 700.00 x $8.29 x 1.2275 =
$7,123.18
6 01 MOD-0037 0037
For Quantities > 100 To 250 (> 30.5 m To 76.2m), Deduct
-$191.49
Quantity Unit Price Factor
Total
Installation 200.00 x $-0.78 x 1.2275 =
$-191.49
7 01590-0070
DAY 20' Personnel Lift, Electric
$434.11
Quantity Unit Price Factor
Total
Installation 5.00 x $70.73 x 1.2275 =
$434.11
Subtotal for Section-01:
$21,544.17
Section-02
Price Proposal Detail - CSI Pape 2 of 6
EZ/QC - Southwest 1/22/2010
Page 3 of 6 of Proposal - CSI
C'A1(Q:C1'
Record
Section - Item
ModiufierUOM Description
Line Total
Section-02
8
02111-0009
CCF Demo Steel Framed Building With Bulldozer/Excavator Remove Building
$36,681.00
Quantity Unit Price
Factor _
Total
Installation 1,907.00 x $15.67 x
1.2275 =
$36,681.00
12716 sq. ft.
9
02MOD-0006
0006 For Quantities > 1000 To 2000, Add
$3,353.28
Quantity Unit Price
Factor
Total
Installation 1,740.00 x $1.57 x
1.2275 =
$3,353.28
'12716 sq. ft.'
10
02119-0014
CYM Hauling On Paved Roads, First 15 Miles
$5,202.82
Quantity Unit Price
Factor
Total
Installation 9,419.00 x $0.45 x
1.2275 =
$5,202.82
Landfill is approximately 5 miles from site
11
02205-0020
CY Loading Excess Material For Removal From Bulk Excavation
$5,457.76
Quantity Unit Price
Factor
Total
Installation 1,884.00 x $2.36 x
1.2275 =
$5,457.76
Subtotal for Section-02:
$50,694.86
Section-05
12 05506-0005
LF Unistrut Channel 1-5/8" Wide x 13/16" High, 16 Gauge
$25.84
Quantity Unit Price
Factor
Total
Installation 5.00 x $4.21 x
1.2275 =
$25.84
Subtotal for Section-05:
$25.84
Section-06
13 06110-0057
SF 2"x4" (5cm x 10cm) Wall Framing At 12" On Center
$1,265.38
Quantity Unit Price
Factor
Total
Installation 1,242.00 x $0.83 x
1.2275 =
$1,265.38
Material for crates
Subtotal for Section-06:
$1,265.38
Section-13
14 13281-0062
SF 10 Sf To 500 Sf Floor Tile Or Linoleum, Single Layer Or First Of Multiple Layers
$370.09
Quantity Unit Price
Factor
Total
Installation 150.00 x $2.01 x
1.2275 =
$370.09
Subtotal for Section-13:
$370.09
Section-16
15 16023
Polaris Lugs
$235.39
NPP Task
Quantity Unit Price
Pactor
Total
Installation 8.00 x $23,97 x-
1.2275 :
$235,39
16 16120-0113 MLF #8 AWG Cable - Type THHN-THWN, Underground Feeder And Branch Circuit $63.38
Quantity Unit Price Factor Total
Installation 0.06 x $860.54 x 1.2275 = $63.38
Price Proposal Detail - CSI Pape 3 of 6
EZIQC - Southwest 1/22/2010
Page 4 of 6 of Proposal - CSI / IQC
CA(
Record
Section - Item
ModiufierUOM Description
Line Total
Section-16
17
16120-0120
MLF #3/0 AWG Cable - Type THHN-THWN, Underground Feeder And Branch Circuit
$645.63
Quantity Unit Price Factor
Total
Installation 0.09 x $5,844.14 x 1.2275 =
$645.63
18
16120-0991
MLF #6 AWG 1/c Bare Stranded Copper Cable, Installed On Poles
$34.78
Quantity Unit Price Factor
Total
Installation 0.03 x $944.58 x 1.2275 =
$34.78
19
16131-0526
EA 1/2" x 2" Long PVC Coated Conduit Nipple
$34.03
- anrRr t1 t F c, ac►nr
Installation 2.00 x $13.86 x 1.2275 =
$34.03
20
16131-0645
EA RGS 1/2" Plastic Bushing Set With Locknuts, Mounted Exposed On Flat Wall
$11.64
Quantity Unit Price Factor
Total
Installation 2.00 x $4.74 x 1.2275 =
$11.64
21
16131-0868
LF 1-1/4" EMT Conduit, Mounted Exposed On Flat Wall
$41.74
Quantity Unit Price Factor
Total
Installation 10.00 x $3.40 x 1.2275 =
$41.74
22
16131-0901
EA 1-1/4" EMT Compression Coupling, Mounted Exposed On Flat Wall
$12.84
Quantity Unit Price Factor
Total
Installation 2.00 x $5.23 x 1.2275 =
$12.84
23
16134-0039
EA 2-1/2" Deep Two Gang Sectional Box, With 20 A Single Receptacle - Complete
$80.55
Quantity Unit Price Factor
Total
Installation 2.00 x $32.81 x 1.2275 =
$80.55
24
16134-0137
EA Blank Cover - Stamped, 2 Gang
$9.94
Quantity Unit Price Factor
Total
Installation 2.00 x $4.05 x 1.2275 =
$9•94
25
16135-0133
EA 60"x48"x12" NEMA 12 Floor Mounted Cabinet Enclosure, Double Door
$2,953.50
Quantity Unit Price Factor
Total
Installation 1.00 x $2,406.11 x 1.2275 =
$2,953.50
26
16135-0150
EA 12"x12"x6" NEMA 311 Enclosure, With Hinged Cover
$186.81
-IT Orir-a Factor
Total
Installation 1.00 x $152.19 x 1.2275 =
$186.81
27
16140-0009
EA 1 Gang, 20 A. GFI, Duplex Receptacle AssemblyNote: Includes box, receptacle
$194.24
and ever plate
Quantity Unit Price Factor
Total
Installation 4.00 x $39.56 x 1.2275 =
$194.24
28
16140-0154
EA 40 A, SPST, 125 V, Standard Time Switch
$62.20
Quantity Unit Price Factor
Total
Installation 1.00 x $50.67 x 1.2275 =
$62.20
29
16190-0006
EA One Hole Steel Conduit Strap, 1-1/4"
$4.32
Quantity Unit Price Factor
Total
Installation 4.00 x $0.88 x 1.2275 =
$4.32
30
16452-0002
EA 1/2" Diameter x 10' Long Copper -Clad Ground Rods
$53.42
Quantity Unit Price Factor
Total
Installation 1.00 x $43.52 x 1.2275 =
$53.42
Price Proposal Detail - CSI Pape 4 of 6
EZ/QC - Southwest 1/22/2010
Page 5 of 6 of Proposal - CSI /
C'j(QC)
Record Section - Item ModiufierUOM Description Line Total
Section-16
31 16453-0002 EA 1/2" Ground Rod Clamp $10.73
Quantity Unit Price Factor Total
Installation 1.00 x $8.74 x 1.2275 $10.73
32 16470-0328 EA 70-100 Amp, Type EHB, 3 Pole Circuit Breaker Panel Mounted, WRI, 600 V, $446,70
Molded Case
Quantity Unit Price Factor Total
Installation 1.00 x $363.91 x 1.2275 = $446.70
33 16502-0492 EA Photocell Plug-in For Any Lighting Fixtures $81.06
Quantity Unit Price Factor Total
Installation 1.00 x $66.04 x 1.2275 = $81.06
Subtotal for Section-16: $5,162.90
Proposal Total $79,063.24
This proposal total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding of the line totals and sub -totals.
The Percent of NPP on this Proposal: 0.29772%
Price Proposal Detail - CSI Page 5 of 6
EZIQC - Southwest 1/22/2010
L
Client#:20117 TALOLPE Res. No. 2010—ROO72
ACORD„" CERTIFICATE OF LIABILITY INSURANCE IF 12/23/09[MM10DJYYYY
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
Willis of Texas, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
1800 Washington, Suite 400 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
9 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
P0Box 1149
Amarillo, TX 79105-1149
INSURED
Talon/LPE, Ltd.
921 N. Bivins Street
Amarillo, TX 79107
CAVI=RAf;Fl4
INSURERS AFFORDING COVERAGE
NAIC III
INSURER A: Ironshore Specialty Ins.
25445
INSURERB: Ironshore Specialty Ins.
124
INSURER c: Texas Mutual Insurance Company
22945
INSURERD: America First Insurance
12696
INSURER E:
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS S UBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
LTR
NSR
TYPE OF INSURANCE
POLICYNUMBER
PATE (MMID CTIVE
POACY E PtRATION
LIMITS
A
GENERAL LIABILITY
000065300
12/31 /09
12/31/10
EACH OCCURRENCE
$1,000,000
X COMMERCIAL GENERAL LIABILITY
DAMAGE TO RENTED
$300000
CLAIMS MADE a OCCUR
MED EXP (Any one person)
$25 000
PERSONAL & ADV INJURY
$1 00O 000
X PD Ded:10,000
GENERAL AGGREGATE
$2 000 000
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG
$2 00O 000
POLICY PRO LOC
D
AUTOMOBILE LIABIUTY
BA8369955
12/31 /09
12/31/10
COMBINED SINGLE LIMIT
X ANY AUTO
(Ea accident)
$1,000,000
BODILY INJURY
$
ALL OWNED AUTOS
SCHEDULED AUTOS
(Per person)
BODILY INJURY
S
X HIRED AUTOS
X NON -OWNED AUTOS
(Peracddent)
PROPERTY DAMAGE
S
(Per accident)
GARAGE LIABILITY
AUTO ONLY -EA ACCIDENT
S
OTHER THAN EA ACC
S
ANY AUTO
$
AUTO ONLY: AGG
B
EXCESSIUMBRELLA LIABILITY
000065500
12131 /09
12/31/10
EACH OCCURRENCE
$9 00O 000
X1 OCCUR CLAIMS MADE
AGGREGATE
$9 000 000
a
$
DEDUCTIBLE
S
X RETENTION $10000
C
WORKERS COMPENSATION AND
TSF0001155583
12/31/09
12131 /10
X WC STATU- O R
C
EMPLOYERS' LIABILITY
E.L. EACH ACCIDENT
$1 00O 000
ANY PROPRIETOR/PARTNER/EXECUTIVE
E.L. DISEASE - EA EMPLOYEE
$1,000,000
OyFFICER/MEMBER EXCLUDED?
Il', describe under
SPECIAL PROVISIONS below
E.L. DISEASE- POLICY LIMIT
$1,000,000
A
OTHER
000065300
12/31/09
12/31MO
$1,000,000 Occurrence
Professional Liab
I
$1,000,000 Aggregate
Pollution Llab
I
I
Claims Made
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICI Es / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS
It Is hereby understood and agreed that the certificate holder is an
additional Insured on the general liability and the general liability Is
primary, A waiver of subrogation applies on the general liability,
automobile and workers compensation coverage. The general liability does
(See Attached Descriptions)
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATIOI
City of Lubbock DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL In DAYS WRITTEN
1626 13th Street NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
Lubbock, TX 79414 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
REPRESENTATIVES.
REPRESENTATIVE
ArnRn ,jG mni/nm 4 —s i 4#RA7RG120
LGM 0 ACORD CORPORATION 191
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
t
DESCRIPTIONS (Continued from Page 1)
' I not exclude XCU Coverage.