HomeMy WebLinkAboutResolution - 2004-R0592 - Change Order For The Mackenzie Ampitheatre - David Wood Construction - 12_16_2004Resolution No. 2004—RO592 December 16, 2004 Item No. 32 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order with David Wood Construction in the amount of $83,711 for the Mackenzie Amphitheater and Mackenzie Border Fence projects. Said Change Order is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 16th day of ATTEST: Re ecca Garza, City Secretary APPROVED AS TO C NTENT: Corbin Pemberton Parks and Recreation Director APPROVED AS TO FORM: City Attorney gs:ccdocs/Chorder-David Wood Const-Mackenzie Amphitheater.res Dec. 7, 2004 December , 2004. GAL, MAYOR Resolutiou.No. 2004—RO592 December 16, 2004 CITY OF LUBBOCK Item No. 32 CHANGE ORDER CHANGE ORDER #: Three (3) CONTRACTOR: David Wood Construction LP DATE: December 6. 2004 BID#: 152-03/115 CONTRACT ID#: 152-03/RS PROJECT NAME: Mackenzie Park Amphitheater Construction Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2) decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This DOES NOT mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an integral part of the proiect objective must be let out for public bid by the Purchasing Department. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary): (1) Revised Seating:. The construction of a seating concept of every other seat for entire seating bowl in lieu of solid concrete seating at the lower seating bowl and 2.7 to 1 slope grass seating at the upper seating bowl, as accepted in the orieinal base bid. The work includes realignment of the seating to increase from eleven concrete shelves to twelve retaining wall/grass terraces. The concrete finish of the walks will be changed form sand blasted to a broom finish. It is required to change over the fuel source of the Generator from natural gas to LP. The change includes the replacement of the fuel supply system and necessary fuel line to the new fuel source. This change order increases the Contract amount from Account Mackenzie Park Amphitheater 905.9145.9246.30000 by $17,637.00 and time increases by 43 days. (2) Wall/Border Fence: The construction of a new masonry screen wall at the upper limit of the seating bowl required to demise the property of the amphitheater from the Fair Grounds. The work includes realignment of the amphitheater entry and accessibility ramps and reduction of the upper landscape area. This change order increases the Contract amount from Account Mackenzie Park Border Fence Phase 1905.9196.9246.30000 by $66,074.00 and time increases by 104 days. (3) Time and order of completion: The Contract time of three hundred silty five (365) consecutive calendar days was adiusted by 105 days with change orders #1 Et #2 (Net 470). This change order will increase the Contract time by 147days (Net 617). The Weather days approved to date will increase the Contract time by 84 days (Net 7011. New Completion date of October 21, 2005. Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. Page 1 of 2 PUR-045 (Rev 11104) ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $ 2,039,500.00 B. AMOUNT OF THIS CHANGE ORDER: Council approval required If over $25,000 } 0� C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):� D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 24,962.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 108,673.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25x Maximum G. NEW CONTRACT AMOUNT (A+E): $ 2,148,173.00 H. THE CONTRACT CONSTRUCTION TIME 15 EXTENDED BY: 336 DAYS (Weather and Change Order related days) (1) CONTRACTOR Date (2) PROJECT ARC /ENGINEER D to Approved as to Content: Apgroyihi as to Form: 7 (3) OWNER' REP ENTATIVE D t (4) Cityto a to (5) Victor Kilman, urchasing Manager Date ( ou Fox, City Man er Date Change Orders over $25,000 require the following signatures: CITY OF 14BBOCK 100, ATTEST: 12/16/Ur+ Q sLQ"', a �w. 12/16/04 Date (8) Re ecca Garza, City Secretary Date Page 2 of 2 PUR-045 (Rev 11/04) David wood Construction November 16.IN4 Mr. Craig Wuemche City of Lubbock Parka & Recreation 1010 96 Streat Lubbock, Texas 7%01 Re: Mackenzie Hark Amphitheater -Change Request #3 - REVISED 12/06/04 Dear Craig, The following br aakdawn provided details the scope of work and additional day requests associated with the seating bowl and nmotny wall changes. CHANGE ORDER 3 SEATING CHANCE 3.1 REVISE SEATING AND DIRT WORK (ADD SEATING) 27,200.00 (DOWELS FOR SEATING TO BE DRILLED) 3.2 STEEL 0"AR) 6,955.00 33 IRRIGATION $1000.00 3A LANDSCAPE (4,000 S.F. HYDRO MULCH) 9W.00 3.5 GENERAL CONDITIONS / SUPERVISION 6,820.00 22 DAYS @ 310.00 3.6 CONVERT GENERATOR TO L.P. 450.00 3.7 FURNISH AND INSTALL LP. TANK AND LINES 1,860.0o 3.8 BOND 737.00 3.9 CONTRACTOR'S FEE 3,992.00 SUBTOTAL 53,894.00 3.10 DEDUCT DIRT AND CONCRETE (27,873.00) 3.11 DEDUCT HANDRAILS (9,814.00) 3.12 DEDUCT ELECTRICAL (1,065-00) 3.13 DEDUCT SANDBLAST FINISH ON SIDEWALKS (ZSQQ.OQ) TOTAL SEATING CHANGE 17,637.46 WALIJBO1RDER FENCE — SP FAIRGROUNDS 3.14 MASONRY — (L & No 27,625.00 REG. SXSX16 CMU (APPROX. 200 L.F) 3.15 REINFORCEMWT OMAR) 5,466.00 3.16 STEEL — WELD PLATES (TOP Of MASONRY WALL) 215.W 33@&"EA 3.17 GENERAL CONDITIONS / SUPERVISION 26,970.00 87 DAYS ® 310.00 3.18 BOND 3.19 CONTRACTORS FEE TOTAL WALL/BORDER CHANGE TOTAL CHANGE ORDER 3 A SEATING CHANGE DAYS 3.21 SCOPE OF WORK CHANGE - ADD WALL 3.22 WORK STOPPAGE - DELAY ADD WALL G2NI R= &UMMARY CHANGE ' ORIGINAL CONTRACT CHANGE ORDER 93 PREVIOUS CHANGES (C.0.1 &2) NEW CONTRACT AMOUNT CHANGE ORDER DAYS C.O.*1 C.O. $2 C.O. N3 WEATHER DAYS TOTAL CONSTRUCTION EXTENSION REVISED COMPLETION DATE OCTOBER 21, 2005 904.00 4.894.00 66,074.00 03,711.00 43 DAYS 87 DAYS 17 DAYS 2,039,500.00 $3,711.00 24,962 00 2,153,173.00 84 DAYS 21 DAYS 147 DAYS 34 DAYS 336 DAYS , --- --- - - - IN THE EVENT NO DECISION IS RENDERED AND THESE ISSUES AND POSTPONED UNTIL THE JANUARY 7TM COUNCIL MEETING, (22) ADDITIONAL DELAY DAYS WILL BE ADDED TO THE PROJECT. THESE ADDITIONAL DELAY DAYS WILL 13E BILLED @ S310.00 PER DAY TOTALLJNC S6,820.00 DAVID WOOD CONSTRUCTION RESERVES THE RIGHT TO RE-EVALUATE CHANGE ORDER PRICING TN THE EVENT THAT THE CHANGE ORDER AS SUBMITTED IS NOT ACCEPTED IN FULL. RESPEXTFUl LY SUBMITTED, DAVID COGGINS DAVID WOOD CONSTRUCTION