Loading...
HomeMy WebLinkAboutResolution - 2012-R0390 - Execute Sec. 5304 Grant - TXDOT - Fixed Route System Analysis - 10_11_2012Resolution NO. 2012--RO390 October 11, 2012 Item No. 5.17 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, a Section 5304 Grant, Contract No. 513051`7134 with the Texas Department of Transportation for a fixed route system analysis, and all related documents. Said grant is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council on October 11, 2012 i-..'A GLEN OB . SUN, MAYOR ATTEST: Rebe ca Garza, City Secretary APPROVED AS TO CONTENT: �C Bill Howert erector Community e opment Citibus Lia' n APPR VFD AS O FORM: Chad Weaver, Assistant City Attorney vwxcdocs/RES.Citibus- Sec.5304 Grant Agrmt September 26, 2012 1 Resolution No.2012-R0390 PGA: SECTION 5304 FEDERAL- PLANNING TRANSIT PROVIDER: Citibus FTA GRANT #: TX-80-X-021 CFDA #: 20.515 TXDOT PROJECT #: PLN 1301(05) PROJECT GRANT AGREEMENT #: 51305F7134 MASTER GRANT AGREEMENT #: 512XXF7081 FEDERAL TRANSIT ADMINISTRATION NOT RESEARCH AND DEVELOPMENT STATE OF TEXAS § COUNTY OF TRAVIS § FEDERAL PLANNING FISCAL YEAR 2013 PROJECT GRANT AGREEMENT THIS PROJECT GRANT AGREEMENT (PGA) is made by and between the State of Texas, acting through the Texas Department of Transportation, called the "State," and City of Lubbock (Citibus) , called the "Transit Provider." WITNESSETH WHEREAS, 49 United States Code Section 5304, Planning, provides that eligible recipients may receive federal funds for public transportation planning; and WHEREAS, Texas Transportation Code Chapter 455 authorizes the State to assist the Transit Provider in procuring aid for the purpose of establishing and maintaining public and mass transportation projects and to administer funds appropriated for public transportation under Texas Transportation Code Chapter 456; and WHEREAS, the U.S. Secretary of Transportation approved the State's request for funding; and WHEREAS, the Governor of the State of Texas has designated Texas Department of Transportation to receive federal funds under the Section 5304 grant program; and WHEREAS, the Transit Provider submitted a Fiscal Year 2013 Grant Application, Part I (GA Part 1) (if applicable) for state financial assistance, and the Texas Transportation Commission approved the application by Minute Order Number 113232; and WHEREAS, the Transit Provider must execute a GA Part I (if applicable) and a Fiscal Year Grant Application, Part II (GA Part 11) each fiscal year grant period for consideration for new state and federal grants; and WHEREAS, a Master Grant Agreement (MGA) between the Transit Provider and the State has been adopted and states the general terms and conditions for grant projects developed through this PGA; NOW THEREFORE, the State and the Transit Provider agree as follows: City of Lubbock (Citibus) Project Grant Agreement #51305F7134 Fed 5304 Planning Page 1 of 3 Revised 07/28/2011 AGREEMENT ARTICLE 1. GRANT TIME PERIOD This PGA becomes effective when fully executed by both parties or on October 1, 2012, whichever is later. This PGA shall remain in effect until September 31, 2013, unless terminated or otherwise modified in an Amendment. This PGA will not be considered fully executed until both parties have executed a MGA, and the Transit Provider has submitted the GA Part I (if applicable) and the GA Part II (federal funds only) to the State. The time period of this PGA cannot be extended past the MGA, without exception. Any cost incurred before or after the contract period shall be ineligible for reimbursement. ARTICLE 2. PROJECT DESCRIPTION A. The Transit Provider shall complete the public transportation project described in the GA Part 1, the Attachment A - Approved Project Description, and the Attachment B — Project Budget. Attachments A and B are attached to and made a part of this agreement. The Transit Provider shall complete the project in accordance with all of the documents associated with the MGA and with all applicable federal and state laws and regulations. B. If applicable, the Transit Provider shall begin competitive procurement procedures by issuing an invitation for bids or a request for proposals no later than sixty (60) days after the effective date of this grant agreement for the purchase of the approved line items referenced in Attachment A. No later than sixty (60) days after the issuance of public notification, the Transit Provider shall publicly open all bids or privately review proposals. The Transit Provider shall enter into a binding agreement with a supplier no later than thirty (30) days after the opening of an acceptable bid or proposal. The Transit Provider shall notify the department in writing when it is necessary to exceed these deadlines. ARTICLE 3. COMPENSATION The maximum amount payable under this PGA without modification is 100,000.00 and 0 Transportation Development Credits, provided that expenditures are made in accordance with the amounts and for the purposes authorized in the GA Part I, the Attachment A, Attachment B and Attachment C. The original and one copy of the invoice are to be submitted to the following address: Texas Department of Transportation Attn: Lynn Castle Public Transportation Coordinator 135 Slayton Road Lubbock, Texas 79404-5201 ARTICLE 4. AMENDMENTS Except as noted in the MGA, changes in the scope, objectives, cost, or duration of the project authorized in this agreement shall be enacted by written amendment approved by the parties before additional work may be performed or additional costs incurred. Any amendment must be executed by both parties within the grant period specified in Article 1, Grant Time Period. ARTICLE 5. INCORPORATION OF MGA PROVISIONS This PGA incorporates all of the governing provisions of the MGA in effect on the date of final execution of this PGA, unless an exception has been made in this agreement. City of Lubbock (Citibus) Project Grant Agreement #51305F7134 Fed 5304 Planning Page 2 of 3 Revised 07/28/2011 ARTICLE 6. SIGNATORY WARRANTY Each signatory warrants that the signatory has necessary authority to execute this agreement on behalf of the entity represented. THIS AGREEMENT IS EXECUTED by the State and the Transit Provider in duplicate. THE TRANSIT PRO Signatu /4'- i� Glen C bertson Typed, Printed, or Stamped Name Mayor Title 10-11-12 Date THE STATE OF TEXAS' Sign�tur. Lynn Castle Typed, Printed, or Stamped Name Public Transportation Coordinator Title Date List of Attachments A - Approved Project Description B - Project Budget C — Coordinated Call Application dated 10/1312011 City of Lubbock (Citibus) Project Grant Agreement #51305F7134 Fed 5304 Planning Page 3 of 3 Revised 07/28/2011 APPROVED RECIPIENT ATTEST: Reber a Garza City Secretary Date: 10-11-12 APPROVED AS TO CONTENT: 13 � �,� " ) Bill erton Co triunity Developme Director APPROVED AS TO FORM: Chad Weaver Assistant City Attorney ATTACHMENT A APPROVED PROJECT DESCRIPTION 1. The Citibus Section 5304, State Planning Proposal, dated October 13, 2011, is incorporated into this PGA as Attachment C and outlines the scope of work to be performed by a consultant. 2. The timeline on page 16 of the proposal is adopted as the official timeline for the project. 3. The consultant contract will contain a timeline, specific deliverables, and a line item budget. 4. TxDOT will approve the scope of services in advance of the execution of a contract between the transit provider and the consultant. City of Lubbock (Citibus) Project Grant Agreement #: 51305F134 Fed 5304 Planning Page 1 of 1 Attachment A ATTACHMENT B PROJECT BUDGET 1. The budget on Attachment C pages 29-30 reflects a request for transportation development credits in lieu of local, non-federal match. Instead, the Transportation Commission awarded cash, not transportation development credits. 2. As a result, funding for this project is as follows: FTA Section 5304 $ 80,000 State funds from TxDOT 20,000 Transportation Development Credits 0 Total $100,000 3. A line item budget will be developed as part of the consultant contract. City of Lubbock (Citibus) Project Grant Agreement #51305F134 Fed 5304 Planning Page 1 of 1 Attachment B ATTACHMENT C Application for State Planning Funding October 13, 2011 Follows City of Lubbock (Citibus) Project Grant Agreement # 51305F7134 Fed 5304 Planning Page 1 of 1 Attachment C Cltl@� PO Ba 2000 ahbmk Tx 74d57 801 TPxn% Av? , 1 ,oW(k, Tx 74g0' p Q06. 117 ?MC -'W67122012 www ca&,s com October 13, 2011 Mr. Eric Gleason Director Public Transportation Division Texas Department of Transportation 125 East 11th Street Austin, Texas 78701 Dear Mr. Gleason, Citibus is pleased to submit an application for State Planning funding. In 1990, Citibus was fortunate to contract with Linda Cherrington for a fixed route system analysis. The product of that project yielded a pulsing, fixed route structure that was able to take Lubbock public transportation into the Zi" century. However, in recent years, our community has witnessed tremendous residential and commercial growth, with very few additional dollars to support expanded route opportunities. It Is our hope that by seeking State Planning funds to support an updated route analysis, the agency's route efficiency and geographic coverage can be enhanced. Additionally, by engaging in this project, Citibus Is developing a contingency route plan in the event that future federal funding shortfalls force us to reduce route services. This proposal will also Improve regional connectivity, as tuhhnck wrvpa as the huh of the 5Outh Plains region, and generates economic strength from outlying rural communities as well as intercity bus passengers who pass through on Greyhound. We request your consideration of this route analysis as Citibus continues to build a strong local and regional transportation legacy for our citizens. Sincerely, John L. Wilson General Manager ' F citi(C'l�3 SECTION 5304 STATE PLANNING PROPOSAL FY13 TxDOT COORDINATED CALL r TABLE OF CONTENTS PROPOSER INFORMATION ................................................................................ 4 PROJECT SUMMARY SHEET.............................................................................. 5 EVALUATION CRITERIA ......... ...................................... - -................................. 6 I. PROJECT DESCRIPTION... ......... ...... ................................................... 6 II. PROJECT PLANNING AND COORDINATION.................................................. 7 III. DEMONSTRATION OF NEED................................................................... 9 IV. BENEFITS OF THE PROJECT................................................................... 12 V. PROJECT/SERVICE EVALUATION............................................................ 14 VI. PROJECT MANAGEMENT AND PERSONNEL ................................................. 16 VII. PROJECT BUDGET.............................................................................. 18 VIII. STATE TRANSPORTATION GOALS............................................................ 19 ATTACHMENT A - OBLIGATION CERTIFICATION ............ . . ...................... . ...... . ........... 20 ATTACHMENT B - SERVICE AREA MAPS............................................................... 21 ATTACHMENT C - LETTERS OF ENDORSEMENT.. . - - . ............................................... 24 A. LUBBOCK PUBLIC TRANSIT ADVISORY BOARD ............................................. 25 B. LUBBOCK METROPOLITAN PLANNING ORGANIZATION. ................. .................. 26 C. SOUTH PLAINS COMMUNITY ACTION Assoc IATION/SPARTAN........................ 27 ATTACHMENT D - LETTERS OF COMMITMENT......................................................... 28 ATTACHMENT E - PROJECT BUDGET................................................................... 29 Page , 3 F'ROPOISER INFORMATION f 1. Legal Name of Proposer: Citibus/City of Lubbock 2. Name of Parent Company, if applicable: NIA 3. Proposer Physical Address Information (must include all the following information): Physical Address: 801 Texas Avenue City: Lubbock County: Lubbock State: Texas Zip Code: 1 79401 4. Proposer Mailing Address Information if different: Mailing Address: PO Box 2000 City: Lubbock County: Lubbock State: Texas Zip Code: 79457 5. Website URL, if available: www.citibus.com 6. Payee Identification (PIN) Number (14 digits): 17560005906001 7. Type of Organization (Mark all that are applicable): ❑ Rural Transit District ❑ Private Non -Profit Organization ® Urban Transit District ❑ Private For -Profit Organization ❑ Metropolitan Planning Organization ❑ Private Consultant ❑ Metropolitan Transit Authority ❑ State Transit Association [� Governmental Entity ❑ University ❑ Native American Tribe / Indian Tribal ❑ Other: Organization 7. Primary Contact 8. Financial Officer Name: John L. Wilson Name: Michael Mangum Title: General Manager Title: CFO/Assistant General Manager Phone: 806-712-2001 Phone: 806-712-2005 Fax: 806-712-2012 Fax: 806-712-2012 Email: jwilson@citibus.com Email: mmangum@citibus.com 10. Signature Authority Name: John L. Wilson Title: General Manager Phone: 806-712-2001 Fax: 806-712-2012 Email: jwilson@citibus.com 11. Services to be procured competitively. List all services which you plan to procure competitively. Fixed Route System Analysis 12. Partnering Entities Please list any and all entities that are considered partners in this application. Citibus (Greyhound & SPARTAN are not partners, but they could benefit via connectivity.) Page [ 4 PROJECT SUMMARY SHEET 1. Indicate below all requested sources of funding: ❑ JARC ❑ NF ® SPA ❑ RTAP ❑ ICB ❑ RD 2. Project Name with Brief Project Description: Citibus Fixed Route System Analysis Proposal entails the selection of a consulting firm to work with Citibus staff in analyzing the fixed route system, making recommendations for improvement and developing a contingency route structure in the event that services are reduced on account of decreased funding levels. 3. Type of Project: (Capital, Marketing, Facility, Operating Assistance, Planning, Training, Technical Assistance, Research, State Administrative, Project Administration or Other): Planning 4. List all Counties Served by this Project: Primary: Urban Lubbock County Secondary: Bailey, Cochran, Crosby, Dickens, Floyd, Garza, Hale, Hockley, King, Lamb, rural Lubbock, Lynn, Motley, Terry, and Yoakum (via rural system SPARTAN). All other counties accessible via Greyhound Lines, and any other over -the -road carriers that interline with Greyhound. 5. This project serves approximately what percentage of urbanized and nonurbanized areas? Urbanized: 95% Nonurbanized: 5% Total: 100% Page 15 PROJECT DESCRIPTION 1.1 With the city of Lubbock experiencing population growth at a rapid rate, PROJECT Citibus/City of Lubbock wishes to submit a request for State Planning funding DESCRIPTION to subsidize a fixed route system analysis to be completed through consultant services. The selected consulting firm will be tasked with working with Citibus staff in analyzing the existing fixed route system, making recommendations for improvement and developing a contingency route structure in the event that the agency's grant funding levels decrease. It is anticipated that the procurement and analysis process will take less than one year to complete. In response to the city's recent 13.1 % population growth and Texas Tech University's intent to add 8,000 students before 2020, the need for an analysis and reconfiguration of the fixed route system could not come at a better time. With the civic growth that our community has recently witnessed, as well as an increase in manufacturing- and industrial -based businesses relocating to Lubbock, public transportation and access to employment and educational opportunities will be at the forefront of community planning efforts for years to come. Citibus' nine -route system serves as the city of Lubbock's only urban public transportation system. The route system navigates among roughly 50 square miles of Lubbock's 123A square mile land area, covering 125 total one-way lane miles. The last comprehensive route analysis occurred in 1990, and staff feels that it is imperative to revisit the route structure after 21 years. This effort is undertaken for multiple reasons, but most importantly, Citibus wishes to grow its transportation services so that Lubbock can continue to strive to become a region hub. The selected consultant will be required to assess the existing transit system, and to recommend improvements at current funding levels, at incremental levels, and without funding constraints. They shall also seek traditional and non-traditional methods of public outreach and participation. Meetings with Citibus staff, the Lubbock Public Transit Advisory Board, the Lubbock Metropolitan Planning Organization, the City of Lubbock, and other entities will also be necessary. Through this proposal, Citibus is requesting $100,000 in State planning funds with 20,000 Transportation Development Credits to serve as local match. Requested funds would yield an enhanced fixed route system that would provide enhanced transportation connectivity for Lubbock and the surrounding counties for decades to come. Page i 6 II. PROJECT PLANNING AND COORDINATION 1.2.1 The need to study the existing fixed route system for improvements is COORDINATED critical. This need has been conveyed multiple times in the South Plains TTRAAtNSPORTATION Regional Coordination Group's Regional Transportation Plan, more so than any other proposed coordinated effort dating back to the implementation of the Plan in 2006. The project, as identified as both a `Barrier' and an `Unmet Need', is illustrated in the following passages: Barrier I How it obstructs coordinated service Constrained urban service area Because of the utilization of limited Federal funds for operating assistance, Citibus is not able to grow the system to meet increasing needs. This impact ripples throughout our community and region — for example, Workforce Solutions assists residents in finding jobs, but in many cases, newly -hired individuals are unable to attain transportation to their job if it is not on the fixed route system. (Regional Transportation Plan, South Plains Region, Chapter 6 — Needs Assessment, page 18) Unmet Need Lack of transportation options to employment locations not on route systems Fixed route service expansion Remediation Stra Continue to seek interested employers/employees; consider development of regional park and ride facilities; seek ways to strengthen over -the -road bus systems as well as the connections between rural and urban services. Citibus continues to seek available funding to return to operating fixed route service at thirty -minute headways all day, rather than solely at peak hours. Expansion could also entail an overall restructure to the route system and/or the addition of service to unserved or underserved areas of the city. (Regional Transportation Plan, South Plains Region, Chapter 6 — Needs Assessment, ,page 21) If this request is selected for funding, the beneficiaries of this route analysis will not be limited to Lubbock's residents and travelers alone. Clients of SPARTAN Transportation, the rural transit provider based in Levelland, and Greyhound, the intercity bus provider, will both reap the benefits of enhanced connectivity. A restructured route system will enable their passengers to travel to any number of local destinations, including those who facilitate employment, educational, medical and social/recreational functions. Agencies that participate in the South Plains Regional Coordination Group will also stand to benefit, as their clients frequently utilize the fixed route system to get to their appointments and engagements. For example, many clients of DARS/DRS (Department of Assistive and Rehabilitative Services/Division of Rehabilitative Services), West Texas Vocational Corporation and Workforce Solutions of the South Plains use Page17 Citibus' route services to transport their clients to necessary work placement, training and interviewing assistance throughout the 15-county region. Citibus is confident that this analysis will "generate efficiencies that will permit increased levels of service", as stated in Texas Transportation Code Chapter 461. This analysis proposal will serve to "further the state's efforts to reduce air pollution" by cultivating the shared -ride aspect of the fixed route system, and reduce the number of passenger vehicles on the road. 1.2.2 First and foremost, Citibus' passengers and their transportation needs are CONSULTATION! & the impetus for this route analysis. A budgetary shortfall in the fall of 2011 PARTICIPATION enabled Citibus staff to seek public involvement and input on proposed service reductions that threatened to increase headways from 30 minutes at peak times to hourly all day. Comments for this proposed reduction were received, and many unmet needs were conveyed from passengers of all classes and demographics. While many of the comments were specific to route frequency, many called for later hours for workers and parents, enhanced connectivity at peak times and access to retail near the City's westernmost boundary. The outpouring of opinions from passengers, advocates, and business owners affirmed that an analysis of the existing route system was necessary. Other groups and committees that have been consulted include Citibus' governing body, the Lubbock Public Transit Advisory Board, and the South Plains Regional Coordination Group. Both groups concur with the need to follow through with this analysis, and it is reasonable to assume that if funded by TxDOT, members of both groups could collaborate with Citibus staff in the consultant selection process. 1.2.3 Citibus is actively engaged in planning efforts led by the Lubbock OTHER Metropolitan Planning Organization (see Letter of Endorsement in COORDINATION Attachment C . The proposed project is documented on page 50 of their EFFORTS ) p p p l P g Lubbock Metropolitan Transportation Plan: FY 2007-2032. Specifically, the passage calls for the completion of "boarding and alighting surveys, marketing surveys, focus groups, and other processes designed to gain insight into consumer opinions of the service." The route analysis, identified as a "Fixed Route Review", was programmed to be undertaken in FY 2007, which conveys the lack of available discretionary funding received in the years since. Citibus also actively coordinates and employs the assistance of its governing board, the Lubbock Public Transit Advisory Board (LPTAB). This project was first proposed by a Board member in late 2009, as it was suggested that more passengers were requiring access to destinations that were not located along the fixed route service. In 2010, a request for proposal was drafted by the City of Lubbock, and five firms submitted proposals. Shortly thereafter, the project was halted because the anticipated funding never materialized. Nevertheless, the route analysis project is still supported by the LPTAB, as referenced with the Letter of Endorsement located in Attachment C. Page 18 Ill. DEMONSTRATION OF NEED 1.3.1 Justification for carrying out this comprehensive analysis project is evident is DEMONSTATED multiple ways. The most obvious reason why this project is critical to the future NEED of Lubbock is on account of the duration of time that has elapsed since the last study. Performed by Linda Cherrington in 1990, the last study produced a pulse -based route system that allowed for enough local growth to take Lubbock into the 21 st century. Based on passenger demand, routes have been added, removed and consolidated in recent years. A fresh perspective from a knowledgeable consultant would provide further insight on route optimization, passengers` needs, fare equity, and future route development. Over the past year, Citibus staff has received multiple requests to incorporate neighborhoods, shopping centers and business complexes into its existing fixed route system. However, with budgetary challenges and funding uncertainty at the federal level, the agency is unable to simply incorporate a new location into the route, unless the requested destination is already located on an existing route. In no particular order, recent service requests that are unable to be immediately fulfilled with bus service include: • Canyon West Shopping Center (Marsha Sharp Frwy @ Milwaukee Ave) • 82"d Street & Milwaukee Ave area • North by Northwest area (Erskine St from N Frankford to N Quaker Ave) • Service to 82"d Street, from University Ave to Interstate 27 • Lubbock Business Park (Interstate 27 @ Yucca Lane) • Lubbock Preston Smith International Airport The ability to have the potential demand of these destinations assessed would affirm their possible inclusion into a future route structure. For a geographical summary of the existing service area, as well as destinations that have recently been requested, please reference the map included in Attachment B. Another demonstration of need is witnessed in the growing population statistics that Lubbock is currently experiencing. Actual and projected population statistics for Lubbock and Texas Tech University are illustrated below: City of Year Lubbock •.. POPUlation Growth 1970 149,101 - 1980 173,979 16.7% 1990 186,206 7.0% 2000 199,564 7,2% 2010 229,573 15.0% 2020* 246,102 7.2% 2030* 261,361 6.2% 2040* 266,326 1.9% 2050* 286,035 7.4% Texas Tech Year __ 1980 Univ Fall Enrollment Enroliment 23,043 Growth - 1985 23,457 1.8% 1990 25,363 8.1% 1995 24,185 -4.6% 2000 24,558 1.5% 2005 28,001 14.0% 2010 31,637 13.0% 2015* 35,500 12.2% 2020* 40,000 12.7% Page 19 In the population/enrollment charts shown on the previous page, the asterisk beside the year shows figures projected by either the City of Lubbock Planning Department or Texas Tech University. It's noteworthy that the 2010 population figure (229,573) came in significantly higher than the projected population of 216,116, an increase of 6.2%. As noted in the charts, Texas Tech administrators are planning on enrollment reaching 40,000 by 2020. Seeing as how Tech students comprise roughly 5-10% of fixed route ridership during the Fall/Spring semesters, these growing figures will continue to justify the need to prepare for greater utilization and local geographic coverage. On the City of Lubbock Planning Department's website, they claim, "Employment growth is the primary factor affecting the City Of Lubbock's population trends. New job creation is necessary to retain the population growth from natural increase (number of births minus number of deaths). Without increased employment Lubbock will have a net out -migration of people." The fixed route system serves as a primary mode of transportation for passengers seeking transportation to and from their places of employment, institutes of education, and medical appointments. A 2007 Marketing Survey indicated that 71 % of passengers utilize the bus service for non- recreational/non-shopping purposes. These statistics are summarized in the chart below: Both Citibus staff and South Plains Regional Coordination Group (SPRCG) stakeholders continue to address topics such as job creation and cultivating rural and intercity bus connectivity in Lubbock and the region. These efforts can be found in two upcoming SPRCG tasks for the FY 2012 Work Plan: Task 4 — Research local businesses that have unmet needs in getting workers to/from their places of business, and Task 5 — Research effective methods for connecting individuals in rural communities to Greyhound's transportation and freight services. Additionally, with the recent construction and marketing of the Lubbock Business Park on North Interstate 27, there is no better time than now to address business connectivity through enhanced public transportation and route service analysis. Page 10 1.3.2 The Fixed Route System Analysis, if funded, will fulfill the agency's needs and FINAL meet the expected result by assessing the following operational, capital and EXPECTED tannin RESULT planning aspects: • realignment of current routes • recommendations for alternate headways • analysis of peak service • areas for new route development • areas to reduce service • analysis of Saturday headways recovery time • restructuring fixed route services • consideration of rural transit integration • consideration of intercity bus integration • relative cost effectiveness (projected cost per rider, per service mode) • justification and implications of restructured services • ridership implications • budgetary implications • staffing/labor implications • capital implications • implementation timeframes From these recommendations, staff will attain geographically -specific routes based on existing boarding/alighting information, demographics and potential demand. Staff is not preferential to a pulsing or hub -and -spoke route design, as long as it offers passengers the necessary efficiency and connectivity that their schedules require. It is anticipated that route schedules, headways, bus stops, shelter/bench locations, and other variable factors will be constructed with assistance from internal operations staff. Citibus staff is confident that a consultant's assessment and recommendations will re-establish a foundation on which a new, more improved route system can be developed. These recommendations, as well as the opportunity for Citibus' passengers and staff to engage in the planning process, will assist in accomplishing a successful route structure that will sustain the transportation needs of urban, rural and intercity passengers. Page II IV. BENEFITS OF THE PROJECT 1.4.1 The bulk of the goals associated with the restructuring of the fixed route GOALS, system center on increasing operational efficiency. This will be OBJECTIVES & OUTCOMES accomplished through a number of methods, but specifically, the p g analysis should focus on reducing travel times, increasing the service area, and increasing ridership. As stated previously, recommendations 1 4 2 should also include ways to better integrate Citibus' route system with GOALS & Greyhound and with regional rural transit providers. OBJECTIVES SUPPORT In previous years, fixed route ridership has generated just under one OUTCOMES million passenger trips (not including Texas Tech campus service). It is imperative that this number be increased, with an ideal outcome of 1,000,000 to 1,500,000 annual passenger trips. A ridership figure within this range would confirm greater utilization of our public transportation service within the community, which will enhance federal and state formula -based funding allocations. Pertaining to individual routes, Citibus staff and Lubbock Public Transit Advisory Board members consider route elimination if any given route is a consistent tow - performer, meaning, the route measures below 60 percent of the system average in one of four categories. Ultimately, it would be highly beneficial if all restructured routes performed in the 80-90 percentile or above. Improved efficiency is also visible through contingency planning. In an economic environment of funding shortfalls, constrained budgets and other financial challenges, it is imperative to have a backup plan, particularly as it pertains to the operational aspect of the organization. Staff has determined that having a contingency fixed route system would be highly beneficial in the event that service reductions are necessary based on funding decreases. This "Plan B" route structure will likely include abbreviated routes and longer headways operated by fewer bus operators. To implement an abbreviated route structure would not be ideal to Citibus' passengers' transportation needs, however, it could still accomplish some level of bus service in the event that funding continues to decrease. During the proposed service reduction/fare increase hearings of Fall 2011, many passengers were vocal about the existing fixed route operation, as well as changes that they would like to see if additional funding were to materialize. Passenger suggestions included, but were not limited to: • fixed route service operating beyond 7:30pm • better frequency during morninglaftemoon peak hours • service to new retail areas in south and west Lubbock • route service on Sundays Page112 It is possible that if suggested by the consultant (provided that Citibus possesses the necessary staff and equipment resources), some of these passenger suggestions could materialize. That is why it is critical to consider the needs and requests of Citibus' passengers as a critical objective of this route restructuring process. Of particular interest to operations and managerial staff is the ability for any new, recommended routes to alleviate demand response (DRS) trips and trip costs. The agency's current cost is roughly $20 per DRS trip, which is significant considering the agency generates over 100,000 passenger trips per fiscal year. One goal of this analysis and route restructuring effort is to reduce the number of annual DRS trips to 80,000-90,000, and allowing the cost savings to offset other operating expenses. As referred to in Section 1.3.1, the 586-acre Lubbock Business Park has recently been developed as a means to deliver "a state-of-the-art location for future business growth." Currently, six businesses, mostly manufacturing facilities in nature, occupy the site. As future development commences, there will be an estimated 42 additional lots on the site awaiting interested tenants. This area presents an ideal expansion opportunity for which Citibus will be able to take advantage. Not only would fixed route or park -and -ride service to the Lubbock Business Park affirm the agency's commitment to employment -based public transportation, it would serve to cultivate a transit culture among non -transit dependent citizens within its community. This is one of many goals that staff strives for in all of its service endeavors and through its regional coordination efforts. 1.4.3 This route analysis and the information generated will be specific to the PROJECT Lubbock area only, and cannot be duplicated in other locations. DUPLICATION IN OTHER LOCATIONS There are a number of 'front-end' elements in the evaluation process that could be duplicated elsewhere. For instance, many of the analysis tasks, from the public participation efforts, to the collaboration with staff members, to the collection of demographic data, are standardized. However, the `back end' tasks, such as the geographical routing, operator scheduling and contingency planning cannot be duplicated as Lubbock has variables and considerations that are dissimilar to other communities. 1.4.4 Citibus staff is not immediately aware of any innovate approach(es) that INNOVATIVE could be proposed by the selected consulting staff. However, the APPROACH TO agency open to "outside the box" considerations, as long as it DESCRIBED g y Is p g NEED supports efforts to enhance our passengers' experience while increasing the efficiency and effectiveness of the fixed route system. Page 13 V. PROJECT/SERVICE EVALUATION 1.5.1 Success for this proposed project will be measured in two phases: a) the EVALUATION selection of the consultant and b) the performance of the implemented OF SUCCESS routes. Proposed consultants will be screened, interviewed and selected based on the following weighted criteria: Demonstrated Related Experience (33%) • Successful experience in projects of a similar type and setting ■ Demonstrated experience in coordination of projects, specifically those with multiply entities ■ Demonstrated experience in leading/facilitating public meetings ■ Timely and cost effective experience in document preparation ■ Successful experience in meeting project timetables and project budgets Proposed Project Approach or Methodology (33%) ■ Ability of consultant to provide trained and experienced staff to accomplish work in time allotted ■ Understanding the expectation and goals of Citibus • Description of the general approach to be taken by the consultant Consultant's Fees and Costs (33%) ■ Demonstrated successful previous budget performance and experience in meeting project budgets ■ Description of approach to budgeting and bidding ■ Techniques employed to control costs so that project stays within the established budget ■ Techniques employed to manage project so that it remains on schedule It is imperative that the selected consultant have a significant amount of route evaluation experience, and must have success in implementing suggested routes and fare strategies. Adherence to cost is also critical, as Citibus will be relying solely on grant funding and Transportation Development Credits to support this project. The evaluation of the restructured routes will be measured through various performance indicators, many of which have already been identified in Sections 1.4.1 and 1.4.2. The two primary measures of success are increased utilization (ridership) and enhanced efficiency (on -time performance + four performance categories). As stated previously, an increase in ridership that would result in additional 150,000 to 500,000 passenger trips would certainly be viewed as successful. Beyond Citibus' local passengers, it is estimated that on any given weekday, Greyhound, SPARTAN and Citibus scheduled services comprise between 1,800 and 2,000 passengers, the majority of which pass through the Downtown Transfer Plaza to use the restroom, purchase a snack from the vending machine, or seek route information Pagell4 from dispatch. If rural and intercity bus passengers were enticed by access to local retail and other destinations of interest, the agency could see more utilization from its intermodal passengers, enabling greater tax revenue for the City of Lubbock. On -time performance percentages ranging from 97-100% would greatly improve customer satisfaction. Accomplishing anywhere from 1.10 to 1.40 passengers per route mile would greatly improve upon the agency's existing 0.90 to 1.00 figure, signaling a tremendous increase in efficiency. Finally, the ability of every restructured fixed route to consistently perform in the 80-90 percentile in all four performance categories (revenue per service mile, revenue per service cost, passengers per service mile, and passengers per service mile) would confirm success of the restructuring project. Other factors, such as interest generated from new route passengers as well as those that are able to relinquish the paratransit service, are often difficult to quantify, but are viewed as measures of success. The recruitment and retention of new route passengers is crucial to sustaining the service. This effort can be cultivated through advertising campaigns and free- or reduced -ride promotions. A successful fixed route system will also have the ability to minimize the number of paratransit trips taken in lieu of route services. This requires more effort on the part of employees involved in client assessments, but the agency could experience significant short- and long-term cost savings in doing so. Participation and buy -in from local businesses, whether through individual route/shuttle arrangements, vinyl advertising or route sponsorship deals, can greatly enhance efforts toward promoting public transportation in the community. The agency employs a Director of Sales and Marketing to cultivate regional business relationships, tout Citibus' benefits, and generate advertising revenue. Revenue brought in from vinyl wraps and in -bus advertising is able to be applied toward expenses where match funding is not readily available. If new interest is generated, and businesses and employers can get on -board with the restructured route system, success can be seen in the form of additional revenue to offset expenses. Page '115 VI. PROJECT MANAGEMENT AND PERSONNEL 1.6.1 With a tremendous amount of work necessary to complete an analysis of PROJECT Citibus' fixed route system, as well as the related tasks (demographic TIMELINE data collection, public involvement process, meeting with bus operators and stakeholders, etc), it is estimated that this process will be completed roughly eleven months from the time the contract is signed until the analysis is completed. See the following implementation schedule for estimated project completion. Month Project Task _ Apr 2012 Citibus is notified of TxDOT's intent to pursue PLN project funding through Texas Transportation Commission • Formal RFQIRFP preparation begins Sept 2012 Funding awarded and Project Grant Agreement authorized • Project goes before Lubbock City Council for approval • City solicits proposals from consultants___ Oct 2012 e Selection of consultant firm is made • Service contract is negotiated and scope defined • Passenger surveys/public participation element commences Aug 2013 All programmed phases of the Fixed Route System Analysis are completed and summarized • Final billings are submitted to TxDOT 1.6.2 PROJECT STAFF PROJECT STAFF 8 EXPERIENCE Manager, Y John Wilson, General Manag will have ultimate authority over all phases and aspects of the Fixed Route System Analysis. Mr. Wilson currently serves as McDonald Transit Association's Managing Director for Texas and Oklahoma. In addition, he has served since 1983 as General Manager of Citibus in Lubbock, Texas, and Senior Vice President of McDonald Transit Associates. Mr. Wilson has been affiliated with Intercity Bus projects since the incorporation of Greyhound in 2008; he can be contacted at: John Wilson 806-712-2001 (office) jwilson@citibus.com Michael Mangum, Assistant General Manager/CFO, will be responsible for all financial duties related to the State Planning project. Mr. Mangum has worked at Citibus since 2001, serving as the Chief Financial Officer and, since 2006, as the Assistant General Manager. He is responsible for all financial duties required to run the transit system and its $10 million budget. He has experience in grants management Page116 and Federal reporting requirements. In his capacity as Assistant General Manager, he has direct supervision of other departments within the Citibus organization. Michael Mangum 806-712-2005 (office) mmangumCcitibus 00111 Brad Patrick, Compliance and Procurement Officer, will provide procurement oversight, and will serve as a liaison between Citibus and the selected consulting firm. Mr. Patrick was hired in 2010 as Compliance and Procurement Officer after having held the position of General Manager of Abilene Transit Management since 2006. His responsibilities include grant writing, preparation of the annual Technical Study Report, and other special studies and reports. Brad Patrick 806-712-2000 x252 (office) bpatrlck('2acltibus corn PROJECT MANAGER The lead consulting firm will not be selected until proposed funding is approved by the Texas Transportation Commission. It is Citibus' intent to solicit interest from qualified consultants listed in association databases, including APTA, Texas Transit Association and South West Transit Association. Although not required, preference will be given to Texas -based consultants familiar with the importance of urbanlrurallintercity bus connectivity and ongoing regional coordination efforts. Page 117 VII. PROJECT BUDGET 1.7.1 Illustrated below are the specific costs associated with Citibus' Fixed DETAILED Route System Analysis. If Transportation Development Credits are LINE STEM g BUDGET available, Citibus will request these as a leveraging mechanism. All expenses are expected to be incurred in FY 2013. 1 7 2 According to FTA TEAM -web, the Fixed Route System Analysis would TOTAL COST be programmed as 44.26.14 -- "Planning for Transit Systems Management/Operations to Increase Ridership". TXDOT PROJECT COST Local Federal TDCs A. Capital Costs - - - Fixed Route System Analysis - $100,000 20,000 B. Administrative Costs - - - C. Operating Costs - - - TOTAL PROJECT COST - $100,000 20,000 GRANT FUNDING SOURCES Local State Federal FY 2013 FTA 5304 State Planning funds - - $100,000 (no local match required per TxDOT officials) - - - TOTAL FUNDING SOURCES - - $100,000 Please see Attachment E for requested budget information. 1.7.3 At the time of writing, Citibus/City of Lubbock does not possess the LOCAL. MATCH required match to pursue the project identified in this PLN proposal. Therefore, the agency seeks Transportation Development Credits in pursuit of the Fixed Route System Analysis. The project positively contributes to the coordination and connectivity of the region, and the agency is hopeful that it will be funded in an effort to assist in meeting the transportation needs of our community's current and future residents. Page 18 VIII. STATE TRANSPORTATION GOALS Citibus' request for Section 5304 State Planning funding in support of a Fixed Route System Analysis supports TxDOT's goals in the following ways: ORGANIZATIONAL This proposal to analyze and eventually restructure Citibus' fixed STRATEGY TO route system will be of tremendous value to existing passengers of ADDRESS the urban system, as well as those traveling by way of intercity bus MULTIMODAL NEEDS (Greyhound) and the primary rural system (SPARTAN Transportation). This strategy incorporates all existing elements of regional transportation, and will be versatile enough to address future means of connectivity such as passenger rail or others that evolve in the future. ENHANCE SAFETY As with all transportation services provided, safety is the operational cornerstone of Citibus. With the fixed route system playing an integral role in regional connectivity, safety and utilization of defensive driving techniques is of the upmost importance. Citibus' requirement of all fixed route operators is that they engage in 160 hours of preliminary training, with two weeks spent in the classroom and two weeks spent on the road before route service begins, as well as continuing education training. MAINTAIN The proposed Fixed Route System Analysis does not threaten the EXISTING SYSTEM existing Texas transportation system, as all transportation services will be maintained. With recent growth in Lubbock and beyond, ENHANCE SYSTEM Citibus staff feels that it would compromise our community's CONNECTIVITY progress by not considering expansion of its fixed route services to enhance transportation services for those traveling through the urban and rural areas, as well as those utilizing intercity bus service. PROMOTE Citibus' willingness to incorporate Greyhound's operation for the CONGESTION sake of regional intermodal coordination, speaks volumes about its RELIEF intent to reduce congestion by incorporating urban, rural or intercity transportation. It is also the agency's hope that a project of this nature will enhance public transportation usage within our community, and will encourage opportunities for passengers to park - and -ride and utilize bicycles. FACILITATE Funding strategies among multimodal providers already exist, and MULTIMODAL can only be enhanced with expanded route infrastructure. Citibus' FUNDING arrangement with Greyhound ensures that it receives a commission STRATEGIES on all ticketing and freight sales, while Citibus and SPARTAN are beneficiaries of Medical Transportation contract revenue. Both of these funding sources are critical in offsetting the agency's expenses. Other collaborative efforts and strategies to provide revenue are frequently considered as obstacles and opportunities arise. Page 1 1 R ATTACHMENT A - OBLIGATION CERTIFICATION As an authorized official of the Citibus/Cityof Lubbock I certify to the following: 1. The organization will participate in a continuous, comprehensive dialogue throughout the life of the project including but not limited to: ♦ On -site monitoring by TxDOT personnel ♦ Timely submission of required reports ♦ Timely written notification of events that will affect the outcome of the project. 2. The organization will comply with all applicable federal, state and local laws and regulations. This includes but is not limited to: ♦ Grant agreements ♦ Applicable federal program circulars and similar federal guidance ♦ Safety ♦ Environment ♦ Accessibility. 3. The organization has the resources to provide the required match. * At the current time, Citibus/City of Lubbock does not possess the required match to pursue the project identified in this PLN proposal. Therefore, the agency seeks Transportation Development Credits in pursuit of the Fixed Route System Analysis. The project positively contributes to the coordination and connectivity of the region, and the agency is hopeful that it will be funded in an effort to assist in meeting the transportation needs of our City's current and future residents. 4. The organization uses generally accepted accounting standards for its financial recordkeeping functions. S. Proposer Affirmation: This is Certification that compensation has not been received for participation in the preparation of the specifications for this RFP. Signed: Printed/Typed Name: John L. Wilson Title; General Manager Date: October 13, 2011 Page 20 ATTACHMENT B — SERVICE AREA MAPS Citibus Fixed Route Service Area (current) Page 121 ATTACHMENT B — SERVICE AREA MAPS (continued) 15-County South Plains Region � Kvka�•- I I � Tim iAtIL A M1 BAILL�Y( H A L E� FLOYOQ1`L!Y 1 I 1COCHRAN ; HOCKLEY I a�K I CroseYto� I I li LsvNgnE i t C R O$ 9 Y 1 RR Y' O Asl M I a j` post . t. i Ot I V f.+1 LYNN Y G A R tyt b cK� EN6 GI,t1M1. Downtown Transfer Plaza area map (with Fixed Route system connectivity) Glenrftoodacre Blvd. 0 Cillbus Office 9TH Police i)EPI, 10TH Municod Y Squaw Vr U. W L�6 MAIN a d ¢ d in Cerl�er a Ca�ro7Yiouae AOL y BROADV Woaaorce 13TH Downtown 1�� r Transfer ■ 14TH ¢ Plaza a 15TH x N 18TH 27 17TH Page 122 M m oa N w er,■�u..,r+xta �.� sa.s+aswr2M e.rra,M�tao Fanw�rrr.rrpe r.«�www+ $IMNQwMR .............-......--...._.._....-- .._.__.__......_............... .............__., D LUBBOCK REGION s —� VMae i;; VMWMetaoo Z ►Kyon d D A SPARTAN'S RURAL SERVICE AREA € RECENT REQUESTS FOR ROUTE SERVICE co c.n1e. - ' Ree.eAFe L ��a3ks�� { `•:J 1� ., � m �� er D Frnewwr��os D A 1./ ,sa a yyy per, C m* M rm l e s rm rA Rd nw d C R PM ~•• •fat, sr Town Ar d L;.> CeunerW" f#•�wA-�IwM `r. ,!1� •�,. �. u � IVa INS kftiwlftd 19" 1i0wTi1 ATTACHMENT C - LETTERS OF ENDORSEMENT Letter(s) of Endorsement are the mechanism for documenting coordination or support of the project with the appropriate local public transportation providers, agencies that provide employment or human service transportation, and other appropriate agencies/individuals (non- financial or in -kind support). Three (3) Letters of Endorsement are included within this State Planning proposal: A. Lubbock Public Transit Advisory Board B. Lubbock Metropolitan Planning Organization C. South Plains Community Action Association/SPARTAN Page 124 C.AAANVAY, hICAUBON & COMPAXv, L.L.P. CyRnsun Pumic AccourrAm - 7822 flatx"o AvLxur. IvnbocK, Trva.� 79423.194.2 TF:i.rznoNF 8061795-0470 FAx 8W792-; 491 VVIA .LURRU( �CF,t.C�li Bvi&N C. BiLm uzn, C.P.AJA.B.1'., C.Y.A. EYA,ii. 1,1ietuirit[,'-tuhhorknpa.coni October 17, 2011 Mr. Eric Gleason Public Transportation Division Director Texas Department of Transportation 125 East Iith Street Austin, Texas 78701 Dear Mr. Gleason, The Lubbock Public Transit Advisory Board supports the City of Lubbock/Citibus' grant application for the funding of a comprehensive fixed route study. Every year, tests of thousands of local passengers rely on Citibus to get them to and from their destinations, whether for employment, medical, educational, retail, or recreational purposes. While these nine routes still serve the population effectively and efficiently, it has been determined by Citibus staff as well as the Lubbock Public Transit Advisory Board that after almost two decades, the fixed route system should be analyzed for potential improvements. Improvements and analysis of the system would identify existing and future areas of growth, shortcomings in the existing system, and would assist with determining where services can be reduced or removed in the event of future funding shortfalls. As the Board has witnessed with recent public hearings to consider service reductions and fare increases, it is evident that our community retles heavily on Citibus' fixed route service. It is imperative to the future stability of the route system that we promote the value of the service, and that intercity travel patterns and fare strategies are assessed so that our passengers' long- term utilization of the service remains at the forefront of our decision -making process. The fixed route system analysis would assist in promoting local and regional coordination efforts with SPARTAN Transportation and Greyhound, and the Lubbock public Transit Advisory Board has given their full support to this effort. Sincerely, Sr a nnett� Ch7'i .pan, Lubbock Pubic Iransit Advisory Board Pagel25 Lubbock Metropolitan Planning Organization c r..". b6a N11 tons*** cl.. — Wooth►6 To"her dtllril Y I = xsa rwW I.�r r« is I%P_ 916 Main, Suite 415 Wta6o[k TX 79"1 806.775.1676 (tax) W6.775.1675 Cn C....t T... hl.ry. September 27, 201 F .1..,oa Comm � t � Mr. Eric Gleason, Director t, u.lr1. Public Transportation Ili%ision cw texas Department of Transportation Im A-D.-.* 125 Fast I Irh %treet r.mrt s►o., Austin, l exas 78701 0,.* F+ kwo. M. `""`"`"" Mar Mr. Gleason: 1 na d,w�rrl If Y.wr.r..aa sr.. wawa. As Li+.ecutivc Dirwor of tiic Lubbock Metropolitan Planning Organization it is my rra"aP""dW "a'"A" pleasure to offer the Metropolitan Planning Organization's support to Cilibus for their q, onion %rft PINt P t grant application for 5304 funding for a nixed Route System Analysis planning study. up hw 4lUsu 'I he last route analysishcstructuring was performed twenty-one years ago and is in serious need of update. This request for grant ftntding will enable Ciiibus to enhance we(r.: its fixed route efficiency. develop alternative routes, butter asw-is customer needs. and I.ae.er...e, develop contingency fare strategies. ht.. I w_b ra.bb"C r.. r.rh.a razz. The work to be performed in this analysis is consistent with the courdinaled planning oe1A►wa mquirement pursuant to the stipulated planning activities contained in Section 5303 for d wwm"m metropolitan arras. I trust you will agree that the proposed activities support the '►fiat MR1ei R economic vitality of the nk4ropolitan area and will increase the safety-, security and accessibility of the system as well as pnmeote energy conservation. rnr al r.u.p.11rr. `-'r,�." I trust you will find the application complete and timely, and that ymi will give it your c.*°`IWbM careful attention. Should you have any questions, or need additional backup o„"o"wulRul c inhumation, plravc call me at $06-775-1676. rhr,rl " I 0 n1 MF.i c«gYe Affter...cats.« r.A.. Sin •rely, I:.1 .► .Irrd RVAh. vr1.t. � � q i.ea.a ln.a 11. David !ones, tixecutivc Director l.ahaA ftkm Nper.,1 I ubtxrck Metropolitan Planning{kgaitiration e11+. stun In. Ll�rnw� N ►arts �i. Ties. D-34 buffs al Am ft T— Y.6tr,.aw shalo 'M0 r.1w1 mv— (; W.6.e1 vim Stan It bw a,...., K.....a b.... UHtell 7rswnelaa iUt 7u 1�In�_•" .Il�l.11Gnl i� t.d1!!OM Page126 P.O. Box 610 411 Austin levelland, Texas 79336 (806) 894-6104 Fox: (806) 894.1363 October 13, 2011 Eric Gleason Director, Public Transportation Division Texas Department of Transportation 125 East 11" Street Austin, Texas 78701 Dear Mr Gleason: I am writing regarding the Citibus proposal to TxbOT requesting Section 5304 funding for the analysis and future restructuring of Citibus' fixed route system, which has not been overhauled in over two decades. Fixed route connectivity is vital to the Lubbock community and to the region as a whole From a rural perspective. SPARTAN's passengers that are transported into the city from any of our rural areas are dependent upon the destinations served by Citibus and its route system. Whether visiting local medical facilities or receiving employment or training from any of its educational facilities, the ability of our passengers to connect to any route from the Downtown Transfer Plaza stimulates our economy while enhancing access within our region. This proposed project promotes regional coordination at its foundation, and I strongly believe that a system -wide route analysis would serve to strengthen the system and its connectivity for its rural and intercity passengers in the years to come Sincerely, Brian Baker Director of Transportation SPCAA I SPRTD flf Community 10ACtion I a or r M r R■ rr I r Equal Employment Opportunity Page 27 ATTACHMENT D - LETTERS OF COMMITMENT Letter(s) of Commitment is the mechanism for documenting when an entity/project partner actively pledges support (financial or in -kind) and/or actual participation or use in the ro'ect. This form of letter must state exactly what the writer is committing to provide or use, describe the nature of the commitment and be signed by a person fully authorized to bind the entity. No Letters of Commitment have been secured, as Citibus has not been able to secure a willing donor to subsidize the proposed fixed route system analysis. Page: 28 ATTACHMENT E - PROJECT BUDGET Attachment E RFP Project Budget Worksheet • FY 2013 (Sept tat, 2012 to Aug 31st 2013) InRut irrtorrna6otl in Yellow Cella Ptopasarhwma:icnhUefewofLywh k FY 2013 Budget Page 1 of 1 Mark beWw oath appkicahla Program P t Name: _ PLR X Ffxed Route Sy Analysis RTAP ICB RD JARC SU - Small Urban JARC NU Nan Urban NF SU . Small Urban NF NU . Nan Urban Eltrdwt law Two: t+eo Summary 0 Ma#chlwg Funds Ham. I,• ..d. ell Tinto an0 tacal 1Undr ehat will ba aitl in mai_h iha fedarai tu-de Agenq has enough I" FurrAa. Pefeerriago alb t.. Federal Funds OnFr Ca Raj Cost 6100.000.00 10000% ratio Cost Adminlwedan Cost Total I 51000ww t0000% Page129 Attachment E RFP Project Budget WWorksheat • Cumulative Budget IFY 2013 thru 2015) Input Information In Yella>w Cella Prr rNOW01c. MbusniffofLubbock — Marl below each a livable, rogrem, Prolea Name: PLN X FI%ed Route a40M is RTAP ICO RU JARC SU - Smell Wben JARC NU - Non Urban NF SU - Small Urban IIF NU . Non Urban A. CAPITAL COSTS Au cads DORCTIlYfion it boon Tow PLR Fbc d Route System Analysis dd N 14 SIMON 00 • s,eo .eo rcm 0escn n Tale] Gross Op.EaGny SnWonal Fare Box Reverve Not Operating Subtotal FY 2013 Cumulative Budget Page 1 of 1 BIMOeI iotel FeMnl I Fed% 1 SW* iota% tarsi LOeM% Older oiler% r m Tow% Tdel� ,00 ADI Sim-" 1440%1 1 1 1 34MM I 1a0Jlen summary of LoiWifuna 81Fni1 ory of MitclAng Fundi bola, Inc It all state and Sorel lun0r Thal will he urad W mMrh the ra4erel du J1. Agency I= enough local funds. Perwrifelle of Budget - Federal Funds On C■ telCoat 5100,00000 10000Ya rafi Cast Admirdsnation Cost Total $100.00000 10000% Budget Comments: fixed Route System Analysis is not expected to extend beyond FY 2013. Page 30