Loading...
HomeMy WebLinkAboutResolution - 2013-R0129 - Contract - L Howard Construction Inc.- Water Line - 05/01/2013 (3)Resolution No. 2013-RO129 May 1, 2013 Item No. 5.9 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 11219 for Southeast Water Reclamation Plant 2nd feed water line, by and between the City of Lubbock and L. Howard Construction, Inc., of Abernathy, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on May 1, 2013 GL ROB TSON, MAYOR ATTEST: Rebe ca Garza, City Secret+"-) APPROVED AS TO CONTENT: P, /� J- I't"i R. Keith Smith, P.E., Chief Operating Officer APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vw:ccdocs RES.Contract-L. Howard Construction, Inc. April 19, 2013 BOND CHECK BEST RATING LICENSED IN TEXAS DATE BY: CONTRACT AWARD DATE: May 1, 2013 CITY OF LUBBOCK SPECIFICATIONS FOR Southeast Water Reclamation Plant (SEWRP) 2nd Feed Water Line ITB 13-11219-MA CONTRACT # 11219 PROJECT NUMBER: 91035.9241.30000 ,-o)3- go taq city of ock TEXAS CONTRACT PREPARED BY: PURCHASING AND CONTRACT MANAGEMENT OFFICE I ?!' City of Lubbock Bid ITB 13-11219-MA t_ Contractor Checklist Before submitting your bid, please ensure you have completed and included the following documents in the order they are listed. The contractor is only to submit (1) one original unbound copy of every item listed. Carefully read and understand the plans and specifications and properly complete the BID SUBMITTAL FORM. Bid submittal form MUST be completed in blue or black ink or by typewriter. Signatures must be original, in blue or black ink, and by hand. The bidder binds himself on acceptance of his bid to execute a contract and any required bonds, according to the accompanying forms, for performing and completing the said work within the time stated and for the prices stated below. In case of a discrepancy between the Unit Price and the Extended Total for a Bid item, the Unit Price will be taken."Include corporate seal and Secretary's signature. Identify addenda received (if any). Include firm's FEDERAL TAX ID number or Owner's SOCIAL SECURITY number. 2. A/ Include BID BOND or CASHIER'S OR CERTIFIED CHECK as your bid surety. Failure to provide a bid surety WILL result in automatic rejection of your bid. 3. Complete and sign the CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT. Contractor's signature must be original. 4. Clearly mark the bid number, title, due date and time and your company name and address on the outside of the envelope or container. 5. V Ensure your bid is RECEIVED by the City of Lubbock Purchasing and Contract Management Office prior to the deadline. Late bids will not be accepted. 6. Complete and sign the SAFETY RECORD QUESTIONNAIRE. All "YES" responses must be explained in detail and submitted with Bid. 7. Complete and sign the SUSPENSION AND DEBARMENT CERTIFICATION. Include firm's FEDERAL TAX ID number or Owner's SOCIAL SECURITY number. 8. Complete and submit the LIST OF SUB -CONTRACTORS. DOCUMENTS REQUIRED WITHIN SEVEN BUSINESS DAYS AFTER CLOSING: 9. Complete and submit the FINAL LIST OF SUB -CONTRACTORS. FAILURE TO PROVIDE ANY OF THE ABOVE MAY RESULT IN YOUR BID BEING DEEMED NON -RESPONSIVE AND, THEREFORE, NOT FURTHER EVALUATED. PLEASE INCLUDE THIS COMPLETED PAGE AS THE FIRST PAGE OF YOUR BID SUBMITTAL. a t ftWkeD W tJ5`TVa �R:4 (Type or Print Company Name) !_,iar 22, 2013 5:01:53 PM CDT p, 13 PAGE INTENTIONALLY LEFT BLANK art_, L INDEX 1. NOTICE TO BIDDERS 2. GENERAL INSTRUCTIONS TO BIDDERS 3. BID SUBMITTAL — (must be submitted by published due date & time) 3-1. UNIT PRICE BID SUBMITTAL FORM 3-2. CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT 3-3. SAFETY RECORD QUESTIONNAIRE 3-4. SUSPENSION AND DEBARMENT CERTIFICATION 4. LIST OF SUB -CONTRACTORS 5. PAYMENT BOND 6. PERFORMANCE BOND 7. CERTIFICATE OF INSURANCE 8. CONTRACT 9. GENERAL CONDITIONS OF THE AGREEMENT 10, DAVIS BACON WAGE DETERMINATIONS 11. SPECIAL CONDITIONS (IF APPLICABLE) 12. SPECIFICATIONS 3 PAGE INTENTIONALLY LEFT BLANK NOTICE TO BIDDERS ITB 13-11219-MA Sealed bids addressed to Marta Alvarez, Director of Purchasing and Contract Management , City of Lubbock, Texas, will be received in the office of the Purchasing and Contract Management Office, City Hall, 1625 13th Street, Room 204, Lubbock, Texas, 79401, until 3:00 p.m. on April 17th 2013 , or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the following described project: Southeast Water Reclamation Plant 2nd Feed Water Line After the expiration of the time and date above first written, said sealed bids will be opened in the office of the Purchasing and Contract Management Office and publicly read aloud. It is the sole responsibility of the bidder to ensure that his bid is actually in the office of the Purchasing and Contract Management Office for the City of Lubbock, before the expiration of the date above first written. Bids are due at 3:00 p.m. on the 17th April, 2013 , and the City of Lubbock City Council will consider the bids on the 9th May 2013 , at the City Hall, 1625 13th Street, Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities. The successful bidder will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful bidder will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $50,000. Said statutory bonds should be issued by a company carrying a current Best Rating of "A" or better. THE BONDS MUST BE IN A FORM ACCEPTABLE TO THE CITY ATTORNEY AND MUST BE DATED THE SAME DATE THAT THE CONTRACT WAS AWARDED. The estimated budget for this project is $185,000. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than 5% of the total amount of the bid submitted as a guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within ten (10) business days after notice of award of the contract to him. FAILURE OF THE BIDDER TO INCLUDE BID SECURITY WITH THE BID SUBMITTAL SHALL CONSTITUTE A NONRESPONSIVE BID AND RESULT IN DISQUALIFICATION OF THE BID SUBMITTAL. It shall be each bidder's sole responsibility to inspect the site of the work and to inform himself regarding all local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the bid submitted. There will be a non -mandatory pre -bid conference on April 4th 2013 at 10:00 a.m., at City Hall in the Purchasing Conference Room 204, 1625 13`h Street, Lubbock, Texas. Attention of each bidder s particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the Purchasing and Contract Management Office of the City of Lubbock, which document is specifically referred to in this Notice to Bidders. Each bidder's attention is further directed to Texas Government Code, Chapter 2258, _r Prevailing Wage Rates, and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale. The City of Lubbock hereby notifies bidders that in regard to any contract entered into pursuant to this advertisement, minority and women business enterprises shall be afforded equal opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, disability, or national origin in consideration for an award. The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -bid meetings and bid openings are available to all persons regardless of disability. If you require special assistance, please contact the Purchasing and Contract Management Office at (806) 775-2572 or write to Post Office Box 2000, Lubbock, Texas 79457 at least 48 hours in advance of the meeting. CITY OF LUBBOCK J'W arta A vaYez DIRECTOR OF PURCHASING AND CONTRACT MANAGEMENT f .t GENERAL INSTRUCTIONS TO BIDDERS 1 BID DELIVERY TIME & DATE 1.1 The City of Lubbock is seeking written and sealed competitive bids to furnish Southeast Water Reclamation Plant 2nd Feed Water Line per the attached specifications and contract documents. Sealed bids will be received no later than 3:00 p.m. , on 17'h April , 2013 at the office listed below. Any bid received after the date and hour specified will be rejected and returned unopened to the bidder. Each bid and supporting documentation must be in a sealed envelope or container plainly labeled in the lower left-hand corner: "ITB 13-11219-MA Southeast Water Reclamation Plant 2nd Feed Water Line " and the bid opening date and id time. Bidders must also include their company name and address on the outside of the envelope or container. Bids must be addressed to: Marta Alvarez, Director of Purchasing City of Lubbock 1625 13th Street, Room 204 Lubbock, Texas 79401 1.2 Bidders are responsible for making certain bids are delivered to the Purchasing and Contract Management Office. Mailing of a bid does not ensure that the bid will be delivered on time or delivered at all. If bidder does not hand deliver bid, we suggest that he/she use some sort of _ delivery service that provides a receipt. 1.3 Bids will be accepted in person, by United States Mail, by United Parcel Service, or by private courier service. No bids will be accepted by oral communication, telephone, electronic mail, telegraphic transmission, or telefacsimile transmission. THE CITY WILL NOT ACCEPT FAX BIDS. 1.4 The City of Lubbock reserves the right to postpone the date and time for opening bids through an addendum. 2 PRE -BID MEETING 2.1 For the purpose of familiarizing bidders with the requirements, answering questions, and issuing addenda as needed for the clarification of the Invitation to Bid (ITB) documents, a non - mandatory pre -bid meeting will be held on April 4th 2013 at 10:00 a.m., at City Hall in the Purchasing Conference Room 204, 1625 13'h Street, Lubbock, Texas All persons attending the meeting will be asked to identify themselves and the prospective bidder they represent. 2.2 It is the bidder's responsibility to attend the pre -bid meeting though the meeting is not mandatory. The City will not be responsible for providing information discussed at the pre -bid meeting to bidders who do not attend the pre -bid meeting. 3 ADDENDA & MODIFICATIONS 3.1 Any changes, additions, or clarifications to the ITB are made by ADDENDA information available over the Internet at www.bidsyne.com. We strongly suggest that you check for any addenda a minimum of forty-eight hours in advance of the response deadline. BUSINESSES WITHOUT INTERNET ACCESS may use computers available at most pRILIk libraries. 3.2 Any bidder in doubt as to the true meaning of any part of the specifications or other documents may request an interpretation thereof from the Purchasing and Contract Management Office. At Y q � g g the request of the bidder, or in the event the Purchasing and Contract Management Office deems the interpretation to be substantive, the interpretation will be made by written addendum issued by the Purchasing and Contract Management Office. Such addenda issued by the Purchasing and Contract Management Office will be available over the Internet at www.bidsyne.com and will become part of the bid package having the same binding effect as provisions of the original ITB. NO VERBAL EXPLANATIONS OR INTERPRETATIONS WILL BE BINDING. In order to L r have a request for interpretation considered, the request must be submitted in writing and must be received by the City of Lubbock Purchasing and Contract Management Office no later than five (5) calendar days before the bid closing date. 3.3 All addenda, amendments, and interpretations of this solicitation shall be in writing. The City of Lubbock shall not be legally bound by any amendment or interpretation that is not in writing. Only information supplied by the City of Lubbock Purchasing and Contract Management Office in writing or in this ITB should be used in preparing bid responses. All contacts that a bidder may have had before or after receipt of this ITB with any individuals, employees, or representatives of the City and any information that may have been read in any news media or seen or heard in any communication facility regarding this bid should be disregarded in preparing responses. 3.4 The City does not assume responsibility for the receipt of any addendum sent to bidders. 4 EXAMINATION OF DOCUMENTS AND REQUIREMENTS 4.1 Each bidder shall carefully examine all ITB documents and thoroughly familiarize itself with all requirements before submitting a bid to ensure that their bid meets the intent of these specifications. 4.2 Before submitting a bid, each bidder shall be responsible for making all investigations and examinations that are necessary to ascertain conditions and requirements affecting the requirements of this Invitation to Bid. Failure to make such investigations and examinations shall not relieve the bidder from obligation to comply, in every detail, with all provisions and requirements of the Invitation to Bid. 4.3 Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall be given to the Purchasing and Contract Management Office and a clarification obtained before the bids are received, and if no such notice is received by the Purchasing and Contract Management Office prior to the opening of bids, then it shall be deemed that the bidder fully understands the work to be included and has provided sufficient sums in its bid to complete the work in accordance with these plans and specifications. If bidder does not notify Purchasing and Contract Management Office before bidding of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are sufficient and adequate for completion of the project. It is further agreed that any request for clarification must be submitted no later than five (5) calendar days prior to the bid closing date. BID PREPARATION COSTS 5.1 Issuance of this ITB does not commit the City of Lubbock, in any way, to pay any costs incurred in the preparation and submission of a bid. Li 5.2 The issuance of this ITB does not obligate the City of Lubbock to enter into contract for any services or equipment. 5.3 All costs related to the preparation and submission of a bid shall be paid by the bidder. 6 TRADE SECRETS CONFIDENTIAL INFORMATION AND THE TEXAS PUBLIC INFORMATION ACT 6.1 If you consider any portion of your bid to be privileged or confidential by statute or judicial decision, including trade secrets and commercial or financial information, clearly identify those portions. 6.2 The City of Lubbock will honor your notations of trade secrets and confidential information and decline to release such information initially, but please note that the final determination of whether a particular portion of your bid is in fact a trade secret or commercial or financial information that may be withheld from public inspection will be made by the Texas Attorney General or a court of competent jurisdiction. In the event a public information request is received for a portion of your bid that you have marked as being confidential information, you will be notified of such request and you will be required to justify your legal position in writing to the Texas Attorney General pursuant to Section 552.305 of the Government Code. In the event that it -_ is determined by opinion or order of the Texas Attorney General or a court of competent jurisdiction that such information is in fact not privileged and confidential under Section 552.110 of the Government Code and Section 252.049 of the Local Government Code, then such information will be made available to the requester. 6.3 Marking your entire bid CONFIDENTIAUPROPRIETARY is not in conformance with the Texas Open Records Act. 7 LICENSES PERMITS TAXES The price or prices for the work shall include full compensation for all taxes, permits, etc. that the bidder is or may be required to pay. UTILIZATION OF LOCAL BUSINESS RESOURCES Prospective bidders are strongly encouraged to explore and implement methods for the utilization of local resources, and to outline in their bid submittal how they would utilize local resources. CONFLICT OF INTEREST 9.1 The bidder shall not offer or accept gifts or anything of value nor enter into any business arrangement with any employee, official or agent of the City of Lubbock. 9.2 By signing and executing this bid, the bidder certifies and represents to the City the bidder has not offered, conferred or agreed to confer any pecuniary benefit or other thing of value for the receipt of special treatment, advantage, information, recipient's decision, opinion, recommendation, vote or any other exercise of discretion concerning this bid. 10 CONTRACT DOCUMENTS 10.1 All work covered by the contract shall be done in accordance with contract documents described in the General Conditions. 10.2 All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by said contract documents. 11 PLANS FOR USE BY BIDDERS It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without charge or forfeiture of deposit. The contract documents may be examined without charge as noted in the Notice to Bidders. 12 BIDDER INQUIRIES AND CLARIFICATION OF REQUIREMENTS 12.1 It is the intent and purpose of the City of Lubbock that this request permit competitive bids. It shall be the bidder's responsibility to advise the Purchasing and Contract Management Office if any language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this ITB to a single source. Such notification must be submitted in writing and must be received by the City of Lubbock Purchasing and Contract Management Office no later than five (5) calendar days before the bid closing date. A review of such notifications will be made. 12 2 NO BIDDER SHALL REQUEST ZANY INFORMATION: VERBALLY ALL REQUESTS FOR ,ADDITIONAL INFORMATION OR CLARIFICATION, CONCERNING . THIS' _. INVITATION TO BID .(ITB) MUST BE SUBMITTED IN,WRITING NU LATER THAN FIVE (5) CALENDAR DAYS PRIOR TO THE.BID CLOSING DATE AND ADDRESSED. I Marta Alvarez, Director of Purchasing and Contract Management City of Lubbock Purchasing and Contract Management Office 1625 131h Street, Room 204 Lubbock, Texas 79401 Fax: 806-775-2164 Email: malvarez@mylubbock.us Bidsync: www.bidsync.com 13 TIME AND ORDER FOR COMPLETION 13.1 The construction covered by the contract documents shall be substantially completed within 90 (NINETY) from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful bidder. 13.2 The Contractor will be permitted to prosecute the work in the order of his own choosing, provided, however, the City reserves the right to require the Contractor to submit a progress schedule of the work contemplated by the contract documents. In the event the City requires a progress schedule to be submitted, and it is determined by the City that the progress of the work is not in accordance with the progress schedule so submitted, the City may direct the Contractor to take such action as the City deems necessary to ensure completion of the project within the time specified. 14 PAYMENT All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the contract documents. 15 AFFIDAVITS OF BILLS PAID The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified. 16 MATERIALS AND WORKMANSHIP The intent of these contract documents is that only materials and workmanship of the best quality and i grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the site will not relieve the Contractor of full responsibility of complying with this provision. The specifications for materials and methods set forth in the contract documents -, provide minimum standards of quality, which the Owner believes necessary to procure a satisfactory project. 17 GUARANTEES 17.1 All equipment and materials incorporated in the project and all construction shall be guaranteed against defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects appear within ONE year from date of final acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner (City of Lubbock). 17.2 Notwithstanding any provisions contained in the contractual agreement, the Contractor represents and warrants fault -free performance and fault -free result in the processing date and date -related data (including, but not limited to calculating, comparing and sequencing) of all hardware, software and firmware products delivered and services provided under this Contract, individually 9 or in combination, as the case may be from the effective date of this Contract. Also, the Contractor warrants calculations will be recognized and accommodated and will not, in any way, result in hardware, software or firmware failure. The City of Lubbock, at its sole option, may require the Contractor, at any time, to demonstrate the procedures it intends to follow in order to _y comply with all the obligations contained herein. 17.3 The obligations contained herein apply to products and services provided by the Contractor, its sub -contractor or any third party involved in the creation or development of the products and services to be delivered to the City of Lubbock under this Contract. Failure to comply with any of the obligations contained herein, may result in the City of Lubbock availing itself of any of its rights under the law and under this Contract including, but not limited to, its right pertaining to termination or default. 17.4 The warranties contained herein are separate and discrete from any other warranties specified in this Contract, and are not subject to any disclaimer of warranty, implied or expressed, or limitation to the Contractor's liability which may be specified in this Contract, its appendices, its schedules, its annexes or any document incorporated in this Contract by reference. 18 PLANS FOR THE CONTRACTOR The contractor will, upon written request, be furnished up to Eve sets of plans and specifications and related contract documents for use during construction. Plans and specifications for use during construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of the work contemplated by the Contractor. 19 PROTECTION OF THE WORK The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of completion to Contractor. The City reserves the right, after the bids have been opened and before the contract has been awarded, to require of a bidder the following information: (a) The experience record of the bidder showing completed jobs of a similar nature to the one covered by the intended contract and all work in progress with bond amounts and percentage completed. (b) A sworn statement of the current financial condition of the bidder. (c) Equipment schedule. 20 TEXAS STATE SALES TAX 20.1 This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act. 20.2 The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the materials to be incorporated into the work without paying the tax at the time of purchase. 21 PROTECTION OF SUBSURFACE LINES AND STRUCTURES It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construction of the project contemplated by these contract documents. The City of Lubbock agrees that it will furnish Contractor the location of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such underground lines or structures cut or damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the City of Lubbock, Texas, at Contractor's expense. 10 22 BARRICADES AND SAFETY MEASURES The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger signals, and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and replaced by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the project. 23 EXPLOSIVES 23.1 The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor from the City. In all cases where written permission is obtained for the use of explosives, the Contractor shall assume full responsibility for all damage, which may occur as a direct or indirect result of the blasting. In addition, in all cases where explosives are authorized to be used, the Contractor shall use utmost care so as not to endanger life or property and the Contractor shall further use only such methods as are currently utilized by persons, firms, or corporations engaged in similar type of construction activity. 23.2 Explosive materials shall not be stored or kept at the construction site by the Contractor. 23.3 In all cases where explosives are to be used during the construction of the project contemplated by this contract, it shall be the duty of the Contractor to notify each utility company having structures (above or below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and such notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem necessary to protect their property from injury. Such notice, however, shall not relieve the Contractor of responsibility for any damage resulting from his blasting operations. 24 CONTRACTOR'S REPRESENTATIVE The successful bidder shall be required to have a responsible local representative available at all times while the work is in progress under this contract. The successful bidder shall be required to furnish the name, address and telephone number where such local representative may be reached during the time that the work contemplated by this contract is in progress. 25 INSURANCE 25.1 The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) days in advance of cancellation,or change. All policies shall contain an agreement on the part of the insurer waiving the right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted before contract execution. 25.2 PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF INSURANCE ALONG WITH A COPY OF THE ADDITIONAL INSURED ENDORSEMENT. THE INSURANCE CERTIFICATES , FURNISHED SHALL NAME THE CITY OF LUBBOCK AS AN ADDITIONAL INSURED TO ON AUTO/GENERAL LIABILITY ON A PRIMARYAND NON CONTRIBUTORY BASIS TO INCLUDE PRODUCT-COMP/OP AND PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK AS REQUIRED BELOW, OR IN THE ALTERNATIVE, SHALL BE ACCOMPANIED BY A 11 STATEMENT FROM THE CONTRACTOR TO THE EFFECT THAT NO WORK ON THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE __. CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. THE ADDITIONAL INSURED ENDORSEMENT SHALL INCLUDE PRODUCTS AND COMPLETE OPERATIONS. 26 LABOR AND WORKING HOURS 26.1 Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in these contract documents. The wage rate that must be paid on this project shall not be less than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The bidders' attention is further directed to the requirements of Texas Government Code, Chapter 2258, Prevailing Wage Rates providing for the payment of the wage schedules above mentioned and the bidder's obligations thereunder. The inclusion of the schedule of general prevailing rate of per diem wages in the contract documents does not release the Contractor from compliance with any wage law that may be applicable. Construction work under the contract requiring an inspector shall not be performed on weekends or holidays unless the following conditions exist: 26.1.1 The project being constructed is essential to the City of Lubbock's ability to provide the necessary service to its citizens. 26.1.2 Delays in construction are due to factors outside the control of the Contractor. The Contractor is approaching the penalty provisions of the contract and Contractor can show he has made a diligent effort to complete the contract within the allotted time. 26.2 Before construction work requiring an inspector is to be performed on Sunday or holidays, the Contractor must notify the Owner's Representative not less than three full working days prior to the weekend or holiday he desires to do work and obtain written permission from the Owner's Representative to do such work. The final decision on whether to allow construction work requiring an inspector on Sunday or holidays will be made by the Owner's Representative. 26.3 In any event, if a condition should occur or arise at the site of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life. 27 PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount, not less often than once each week. The Contractor and each of his subcontractors shall keep a record showing the name and occupation of each worker employed by the Contractor or subcontractor in the construction of the public work and the actual per diem wages paid to each worker. This record shall be open at all reasonable hours to inspection by the officers and agents of the City. The Contractor must classify employees according to one of the classifications set forth in the schedule of general prevailing rate of per diem wages, which schedule is included in the contract documents. The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, sixty dollars ($60) for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such laborer, workman or mechanic is paid less than the wages assigned to his particular classification as set forth in the schedule of general prevailing rate of per diem wages included in these contract documents. L, 28 PROVISIONS CONCERNING ESCALATION CLAUSES 12 29 30 31 Bids submitted containing any conditions which provide for changes in the stated bid price due to increases or decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the bidder without being considered. PREPARATION FOR BID 29.1 The bidder shall submit his bid on forms furnished by the City, and all blank spaces in the form shall be correctly filled in, stating the price in numerals for which he intends to do the work contemplated or furnish the materials required. Such prices shall be written in ink, distinctly and legibly, or typewritten. In case of discrepancy between the unit price and the extended total for a bid item, the unit price will be taken. A bid that has been opened may not be changed for the purpose of correcting an error in the bid price. 29.2 If the bid is submitted by an individual, his name must be signed by him or his duly authorized agent. If a bid is submitted by a firm, association, or partnership, the name and address of each member must be given and the bid signed by a member of the firm, association or partnership, or person duly authorized. If the bid is submitted by a company or corporation, the company or corporate name and business address must be given, and the bid signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign bids must be properly certified and must be in writing and submitted with the bid. The bid shall be executed in ink. 29.3 Each bid shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and endorsed on the outside of the envelope in the following manner: 29.3.1 Bidder's name: L. Howard Construction Inc. 29.3.2 Bid for 13-11219-MA Southeast Water Reclamation Plant 2nd Feed Water Line " Bid submittals may be withdrawn and resubmitted at any time before the time set for opening of the bids, but no bid may be withdrawn or altered thereafter. 29.4 Pursuant to Texas Local Government Code 252.043(g), a competitive sealed bid that has been opened may not be changed for the purpose of correcting an error in the bid price. THEREFORE, ANY CORRECTIONS TO THE BID PRICE MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR TO BID OPENING. BOUND COPY OF CONTRACT DOCUMENTS Bidder understands and agrees that the contract to be executed by bidder shall be bound and will include the following: (a) Notice to Bidders. (b) General Instructions to Bidders. (c) Bidder's Submittal. (d) Statutory Bonds (if required). (e) Contract Agreement. (f) General Conditions. (g) Special Conditions (if any). (h) Specifications. (i) Insurance Certificates for Contractor and all Sub -Contractors. (j) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders. If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered incorporated by reference into the aforementioned contract documents. QUALIFICATIONS OF BIDDERS The bidder may be required before the award of any contract to show to the complete satisfaction of the City of Lubbock that it has the necessary facilities, ability, and financial resources to provide the service specified therein in a satisfactory manner. The bidder may also be required to give a past history and 13 i references in order to satisfy the City of Lubbock about the bidder's qualifications. The City of Lubbock may make reasonable investigations deemed necessary and proper to determine the ability of the bidder to perform the work, and the bidder shall furnish to the City of Lubbock all information for this purpose that l._ may be requested. The bidder's bid may be deemed not to meet specifications or the bid may be rejected if the evidence submitted by, or investigation of, the bidder fails to satisfy the City of Lubbock that the bidder is properly qualified to carry out the obligations of the contract and to complete the work described therein. Evaluation of the bidder's qualifications shall include: (a) The ability, capacity, skill, and financial resources to perform the work or provide the service required. (b) The ability of the bidder to perform the work or provide the service promptly or within the time specified, without delay or interference. (c) The character, integrity, reputation, judgment, experience, and efficiency of the bidder. (d) The quality of performance of previous contracts or services. (e) The safety record of the Contractor and proposed Sub -Contractors Before contract award, the recommended contractor for this project may be required to show that he has experience with similar projects that require the Contractor to plan his work efforts and equipment needs with City of Lubbock specifications in mind. Demonstration of experience shall include a complete list of ALL similar municipal and similar non -municipal current and completed projects for the past three (3) years for review. This list shall include the names of supervisors and type of equipment used to perform work on these projects. In addition, the Contractor may be required to provide the name(s) of supervisor(s) that will be used to perform work on this project in compliance with City of Lubbock specifications herein. 32 BID AWARD 32.1 The City of Lubbock reserves the right to reject any or all bids, reject any particular item on a bid, and to waive immaterial formalities and to accept the offer most advantageous to the City of Lubbock in its sole discretion. Unless otherwise specified herein, the City shall award the bid based on the total bid for Bid Items 1 through 20 plus the sum of any Alternate Bids or Options the City may select. 32.2 All bids are evaluated for compliance with specifications before the bid price is considered. Response to specifications is primary in determining the best low bid. Failure to comply with the specifications may result in disqualification of the bid. 32.3 In case of tie bids, preference will be given to local bidders. Consistent and continued tie bidding C may be cause for rejection of bids by the City of Lubbock and/or investigation by the Attorney General to determine possible Anti -Trust violations. 32.4 Before the City may award a bid to a nonresident bidder, the nonresident bidder's bid must be lower than lowest bid submitted by a responsible Texas bidder by the same margin or amount that a Texas bidder would be required to underbid the nonresident bidder in the nonresident bidders' home state. 32.5 Any contract made, or purchase order issued, as a result of this Invitation to Bid, shall be entered into the State of Texas and under the laws of the State of Texas. In connection with the performance of work, the Bidder agrees to comply with the Fair Labor Standard Act, Equal Opportunity Employment Act, and all other applicable Federal, State, and Local laws, regulations, and executive orders to the extent that the same may be applicable. 32.6 NO INDIVIDUAL OF ANY USING DEPARTMENT HAS THE AUTHORITY TO LEGALLY AND/OR FINANCIALLY COMMIT THE CITY TO ANY CONTRACT, AGREEMENT OR PURCHASE ORDER FOR GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED BY THE REQUIREMENTS OF THIS INVITATION TO BID. 32.7 The estimated budget for this project is $185,000. 14 roa 33 ANTI -LOBBYING PROVISION 33.1 DURING THE PERIOD BETWEEN THE BID CLOSE DATE AND THE CONTRACT AWARD, BIDDERS, INCLUDING THEIR AGENTS AND REPRESENTATIVES, SHALL NOT DIRECTLY DISCUSS OR PROMOTE THEIR BID WITH ANY MEMBER OF THE LUBBOCK CITY COUNCIL OR CITY STAFF EXCEPT IN THE COURSE OF CITY -SPONSORED INQUIRIES, BRIEFINGS, INTERVIEWS, OR PRESENTATIONS, UNLESS REQUESTED BY THE CITY. 33.2 This provision is not meant to preclude bidders from discussing other matters with City Council members or City staff. This policy is intended to create a level playing field for all potential bidders, assure that contract decisions are made in public, and to protect the integrity of the bid process. Violation of this provision may result in rejection of the bidder's bid. 34 PREVAILING WAGE RATES 34.1 Bidders are required to comply with Texas Government Code, Chapter 2258, Prevailing Wage Rates, with respect to the payment of prevailing wage rates for the construction of a public work, including a building, highway, road, excavation, and repair work or other project development or improvement, paid for in whole or in part from public funds, without regard to whether the work is done under public supervision or direction. A worker is employed on a public work if the worker is employed by the contractor or any subcontractor in the execution of the contract for the project 34.2 A worker employed on a public work by or on behalf of the City of Lubbock shall be paid not less than the general prevailing rate of per diem wages for the work of a similar character in the locality in which the work is performed, and not less than the general prevailing rate of per diem wages for legal holiday and overtime work. 34.3 The State of Texas has adopted the Federal Davis -Bacon wage rates for use in Texas i '; pursuant to and in accordance with the Texas Government Code, Section 2258.022. tj Bidders may access the U. S. Department of Labor web site at the following web address to obtain the rates to be used in Lubbock County: h!tp://www.wdol.gox,/dba.aspx �J 34.4 It shall be the responsibility of the successful bidder to obtain the proper wage rates from the web site for the type of work defined in the bid specifications. 34.5 A contractor or subcontractor who violates Texas Government Code Section 2258.023 shall pay to the City of Lubbock sixty dollars ($60) for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the contract. BED SUBMITTAL FORM PAGE INTENTIONALLY LEFT BLANK I I BID SUBM I TTAL FORM UNIT PRICE BID CONTRACT DATE: It — 11- 113 PROJECT NUMBER: 91035- Southeast Water Reclamation Plant 2nd Feed Water Line Bid of Lt._�-0wk1GD '0HSj�CuC/T1 %&k I ) NIC (hereinafter called Bidder) To the Elonorabte Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) Ladies and Gentlemen: The Bidder, in compliance with your Invitation to Bid for the construction of Southeast Water Reclamation Plant 2nd Feed Water Line , having carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other related contract documents and the site of the intended work, and being familiar with all of the conditions surrounding the construction of the intended project including the availability of materials and labor, hereby intends to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications and contract documents, within the time set forth therein and at the price stated below. The bidder binds himself on acceptance of his bid to execute a contract and any required bonds, according to the acemmnanvina Fnrmc_ FAr nPrfnrmincr anri rmmnlatino tha ...:.i . ...L ....+G S.. A.— aS.........a_a_J ___i ITEM DESCRIPTION QTY (+/-) U/M UNIT COST EXTENDED COST I Mobilization - Contractor mobilization including move -in, set up, move -out and clean up cost. I LS g19j �2.OJ S, 322.ery Provide and maintain a Traffic Control Plan - 2 Preparation, approval from COL Traffic Engineering, I LS t 1�2.5 , 0,D and all other work considered incidental to this item. Provide and maintain a SWPPP - Including 3 preparation, NOI, NOT, and all other work considered incidental I LS -1�4`�"t to this item. Locate, survey and stake alignment for water lines 4 basedon water utility locations and contract I LS 2�2 2 Q, Op 2�_Z, dsexisting 5 Trench Safety - Completely designed and placed under the supervision of TX Prof. Engr as needed. 1 LS 2 j OC�p .vJ 2� coo. 0 v Furnish and install 8" C-900 DR-18 approved water 6 pipe in open cut trench, backfilled to 95% compaction, and tested as herein specified, including all equipment, 1377 LF ����IPj.Q� tools, and labor to perform work. Furnish and install 6" C-900 DR-I8 approved water 7 pipe in open cut trench, backfilled to 95% compaction, and tested as herein specified, including all equipment, 1023 LF 2. ( , 00 tools, and labor to perform work. ............... -.. .. _....... ......... ._ ... .. .. .. ._._. _.. City of Lubbock Bid ITB 13-1 12194Tf ITEM DESCRIPTION QTY (+/-) U/M UNIT COST EXTENDED COST Furnish 16" diam. (1/2" thick) steel encasement in 8 open cut trench as herein specified, including all 18 LF G' pp 2 l `f'2 , O,D equipment, tools, and labor to perform work. Furnish and install 8" C-900 DR-18 approved water 9 pipe inside casing and tested as herein specified, 18 LF �J i 00 including all spacers, joint restraints, equipment, tools, , and labor to perform work. Furnish and bore 12" (3/8" thick) steel encasement as 10 herein specified, including all equipment, tools, and 160 LF j 2-1 , 00 let, 3(0 labor to perform work. Furnish and install 6" C-900 DR-18 approved water 11 pipe inside casing and tested as herein specified, including all spacers, joint restraints, equipment, tools, 160 LF 2 •O o �� c�. �• DO and labor to perform work. Furnish and install 6" C-900 DR-18 approved water 12 pipe under existing paving by caseless bore as herein 43 LF specified, including all joint restraints, equipment, tools, and labor to perform work. Furnish and install 8" Gate Valves and boxes as herein 13 specified, including all equipment, tools, and labor to 3 EA 'j2� ,p �}rjl t -f5.07 perform work. Furnish and install 6" Gate Valves and boxes as herein 14 specified, including all equipment, tools, and labor to 3 EA 1, 2$0. OD 3, `12 0.00 perform work. Furnish and install 10"x6" tapping sleeves & valves as 15 herein specified, including all equipment, tools, and I EA '31 J52.5, 00 3, �j- DU labor to perform work. Furnish and install 6"x4" tapping sleeves & valves as 16 herein specified, including all equipment, tools, and 1 EA 214 (p c7. OD labor to perform work. Provide ductile iron fittings (bends, tees, reducers & 17 plugs) for all water lines, including all equipment and labor 885 LB I S . Oc`-7. required for installation. 1 Provide 6" Reduced Pressure Zone (RPZ) device, 18 connections, riser pipe and fittings as herein specified, including all equipment, tools and labor to perform 1 EA , 300 OO work. 19 Provide "Hot Box" and concrete pad for RPZ 1 EA 30 , 00 �J%� , 20 Flowable backfill as approved, complete and in place per COL Specifications. 50 CY O.O a �� 000. 00 Extended Total: $ l; �- - -- - - Bidder's- Initials--- 3 J Ka4*11_I'21 7A IR• 17•RA iMI Wir-I 1 City of Lubbock Bid ITB 13-11219-MA Enclosed with this bid is a Cashier's Check or Certified Check for Dollars ($) or a Bid Bond in the sum of L 1(4f+T Tj+o1,t5tars (AAMIAed which it is agreed shall be collected and retained by the Owner as liqu � d e��tN W by the Owner and the undersigned fails to execute the necessary contract documents, insurance certificates, and the required bond (if any) with the Owner within ten (10) business days after the date of receipt of written notification of acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned upon demand. Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract t' documents made available to him for his inspection in accordance with the Notice to Bidders. Pursuant to Texas Local Government Code 252.043(g), a competitive sealed bid that has been opened may not be changed for the purpose of correcting an error in the bid price. THEREFORE, ANY CORRECTIONS TO THE BID PRICE MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR TO BID OPENING. (Seal if Bidder is a Corporation) A T: Sec tary Bidder acknowledges receipt of the following addenda: Addenda No. �_ Date - -13 Addenda No. Date Addenda No. Date Addenda No. Date MAYBE Firm: L", r Date: �j IN Aut &izedSigpature w Q- (Printed or Typed Name) L , & W k" Company 38o ern- _ Address City, County MA-5 , 1q;11 State Zip Code Telephone: 601,_ - $31-5o 1f-�_ Fax: OO (n - ?�jL — I n4l -i FEDERAL TAX ID or SOCIAL SECURITY No. I'S -213OC-43 EMAIL: 1 h oWj Vd C-011 5 t C' Va,l Dry , tL,-.eS-bma ieL3(,?Wi✓rj5-t-it"k,,ne-t AA�r 7'? 7(1�4 F•M •C.'3 OpA f`1'1T PAGE INTENTIONALLY LEFT BLANK City of Lubbock Bid ITB 13-11219-MA Bidder hereby agrees to commence the work on the above project on a date to be specified in a written "Notice to Proceed" of the Owner and to substantially complete the project within 90 (NINETY) CALENDER DAYS thereafter as i stipulated in the specifications and other contract documents. Bidder hereby further agrees to pay to Owner as liquidated damages the sum of $ 100 (ONE HUNDRED) for each consecutive calendar day in excess of the time set forth herein above for completion of this project, all as more fully set forth in the general conditions of the contract documents. Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with instruction number 28 of the General Instructions to Bidders. bidding. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the The Bidder agrees that this bid shall be good and may not be withdrawn for a period of SEVENTY (70) calendar days after the scheduled closing time for receiving bids. The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees to commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on which he has bid; as provided in the contract documents. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent (5%) of the total µamount of the bid submitted as a guarantee that bidder will enter into a contract, obtain all required insurance policies, and execute all necessary bonds (if required) within ten (10) business days after notice of award of the contract to him Bidder's Initials L hA—'Y) 'N)lq R-Al-F'A DhA (`nT THE AMERICAN INSTITUTE OF ARCHITECTS KNOW ALL MEN BY THESE PRESENTS, thatwe L. Howard Construction, Inc. as Principal, hereinafter called the Principal, and Texas Bonding Company a corporation duly organized under the laws of the State of California as Surety, hereinafter called the Surety, are held and firmly bound unto City of Lubbock as Obligee, hereinafter called the Obligee, in the sum of Five (5%) percent of the total amount bid Dollars ($ 5% ) for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, The Principal has submitted a bid for Southeast Water Reclamation Plant 2nd Feed Water Line ITB 13-11219-MA NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 17th day of April tJK-l.Q., (IVinress) Brad Ballew (Ivimevs) 2013 L. Howard Construction, Inc. (principal) (Beall (fflle) Texas Bonding Company David S. Ballew, (Tide) Attorney -In -Fact 1 � • L, (I ALA DOCUMENTA310 . BID BOND. AIA © . FEBRUARY lg70 EHEAM._._..--..-_ FRUCAN._— ---w__ INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W. WASHINGD TTON, D.C. 20006 �J POWER OF ATTORNEY F AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS: That American Contractors Indemnity Company, a California corporation, Texas Bonding Company, an assumed name of American Contractors Indemnity Company, United States Surety Company, a Maryland corporation and U.S. Specialty Insurance Company, a Texas corporation (collectively, the "Companies"), do by these presents make, constitute and appoint: t David S. Ballew or William Kim Wade of Austin, Texas its true and lawful Attorneys) -in -fact, each in their separate capacity if more than one is named above, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include riders, amendments, and consents of surety, providing the bond penalty does not exceed *******Ten Million******* Dollars This Power of Attorney shall expire without further action on March 18, 2015. This Power of Attorney is granted under and by authority of the following resolutions adopted by the Boards of Directors of the Companies: Be it Resolved that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney -in -Fact may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seat of the Company heretofore or hereafter affixed to anyl power of attorney or any certificate relating" thereto by facsimile, and any power of attorney or certificate hearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. " IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 3`a day of October, 2011. AMERICAN CONTRACTORS INDEMNITY COMPANY =-.TEXAS BONDING COMPANY Corporate Seals UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY nuouwrnrrr : 1A�CTgs ", U r NOW Oa nr n g°oN ......... <,•'% ```nE Fr%- e O COgylnsur O a4; '•;0 's ?1Pi'S S •it, ••1� •per ?eci acrx tax ur`fne :<_ =mi iv 5w; �z: Ni a Ed- B `.�� ` '° '' '' ='`• F Daniel P. A uilar Vi e y�:, ......•''r sr.,. 5.....•� g c Presi ent tl AWT;o`�o .,, •.............t°j -- riri it ran nmw,onP" - nnm,nn"","`` State of California County of Los Angeles SS: On this 3'a day of October, 2011, before me, Deborah Reese, a notary public, personally appeared Daniel P. Aguilar, Vice President of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person(s), or the entity upon behalf of which the persons) acted, executed the instrument. - I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal.�� rAa6 OE50 NEESE cw...ston • loam Signature _/r _4ar ,L ,ztCej�4-. (Seal) Not" POW .e,arenw Los Argots Gpuattt couxif. Ex ka wr ra. mrs + I, Jeannie Lee, Assistant Secretary of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Los Angeles, California this 1 7th day of April 1`2013 3 Corporate Seals r , ....... nar r „ ,awnaoraa ` i, d°��N�CT�gJi c`q�S SUf/F�.y pN4fNG C'''. nSl lnsura�oa': `_'• •F;? `N! l isq£ ; y°i' E t _ O- --`Bon(CI70. $TCl`$OITC� '� sar�+.a f<= wti �s my 3;. :r:4: y�... ,..:. :,s. s Jeannie Lee, � �sistant Secretary Agency No. 17029 iiii�F:•` * �° ' gTFOFjc�a`: #..• n mnpnn""` ` nruw " , un„ ...uu,,,nn„`O'': PAGE INTENTIONALLY LEFT BLANK I 1 City of Lubbock Bid ITB 13-11219-MA I' CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT To Be Completed by Bidder and Agent Must be submitted with Bid I, the undersigned Bidder, certify that the insurance requirements contained in this bid document have been reviewed by me and my Insurance Agent/Broker. If I am awarded this contract by the City of Lubbock, I will be able to, within ten (10) business days after being notified of such award by the City of Lubbock, furnish a valid insurance certificate to the City meeting all of the requirements defined in this bid. �J t4� a"�r--Q Ci I tko t-S a &-Q- Contra for (Original Signature) Contractor (Print) CONTRACTOR'S BUSINESS NAME: ',. ROw &V—D x1v I'll, I m- (Print or Type) CONTRACTOR'S FIRM ADDRESS: S46o P-M / 1 0 NOTE TO CONTRACTOR If the time requirement specified above is not met, the City has the right to reject this bid and award the contract to another contractor. If you have any questions concerning these requirements, please contact the Director of Purchasing & Contract Management Office for the City of Lubbock at (806) 775-2572. []` BID 13-11219-MA - Southeast Water Reclamation Plant 2nd Feed Water Line PAGE INTENTIONALLY LEFT BLANK City of Lubbock Bid iTB 13-11219-MA SAFETY RECORD QUESTIONNAIRE ° The City of Lubbock City Council desires to avail itself of the benefits of Section 252.0435 of the Local Government Code, and consider the safety records of potential contractors prior to awarding bids on City contracts. Pursuant to Section 252.0435 of the Local Government Code, City of Lubbock has adopted the following written definition and criteria for �- accurately determining the safety record of a bidder prior to awarding bids on City contracts. The definition and criteria for determining the safety record of a bidder for this consideration shall be: The City of Lubbock shall consider the safety record of the bidders in determining the responsibility thereof. The City may consider any incidents involving worker safety or safety of the citizens of the City of Lubbock, be it related or caused by environmental, mechanical, operational, supervision or any other cause or factor. Specifically, the City may consider, among other things: a. Complaints to, or final orders entered by, the Occupational Safety and Health Review Commission (OSHRC), against the bidder for violations of OSHA regulations within the past three (3) years. b. Citations (as defined below) from an Environmental Protection Agency (as defined below) for violations within the past five (5) years. Environmental Protection Agencies include, but are not necessarily limited to, the U.S. Army Corps of Engineers (USACOE), the U.S. Fish and Wildlife Service (USFWS), the Environmental Protection Agency (EPA), the Texas Commission on Envirommental Quality (TCEQ), the Texas Natural Resource Conservation Commission (TNRCC) (predecessor to the TCEQ), the Texas Department of State Health Services (DSHS), the Texas Parks and Wildlife Department (TPWD), the Structural Pest Control Board (SPCB), agencies of local governments responsible for enforcing environmental protection or worker safety related laws or regulations, and similar regulatory agencies of other states of the United States. Citations include notices of violation, notices of enforcement, suspension/revocations of state or federal licenses or registrations, fines assessed, pending criminal complaints, indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments. C. Convictions of a criminal offense within the past ten (10) years, which resulted from bodily harm or death. - d. Any other safety related matter deemed by the City Council to be material in determining the responsibility of the P t3' bidder and his or her ability to perform the services or goods required by the bid documents in a safe environment, both for the workers and other employees of bidder and the citizens of the City of Lubbock. In order to obtain proper information from bidders so that City of Lubbock may consider the safety records of potential contractors prior to awarding bids on City contracts, City of Lubbock requires that bidders answer the following three (3) questions and submit them with their bids: QUESTION ONE Has the bidder, or the firm, corporation, partnership, or institution represented by the bidder, or anyone acting for such firm, corporation, partnership or institution, received citations for violations of OSHA within the past three (3) years? YES NO Ved If the bidder has indicated YES for question number one above, the bidder must provide to City of Lubbock, with its bid submission, the following information with respect to each such citation: Date of offense, location of establishment inspected, category of offense, final disposition of offense, if any, and penalty assessed. Bidder's Initials City of Lubbock Bid ITB 13-11219-MA QUESTION TWO Has the bidder, or the firm, corporation, partnership, or institution represented b the bidder, or anyone actin for such P Y Y g firm, corporation, partnership or institution, received citations for violations of environmental protection laws or regulations, of any kind or type, within the past five years? Citations include notice of violation, notice of enforcement, suspension/revocations of state or federal licenses, or registrations, fines assessed, pending criminal complaints, indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments. YES NO V ri If the bidder has indicated YES for question number two above, the bidder must provide to City of Lubbock, with its bid submission, the following information with respect to each such conviction: I Date of offense or occurrence, location where offense occurred, type of offense, final disposition of offense, if any, and penalty assessed. QUESTION THREE Has the bidder, or the firm, corporation, partnership, or institution represented by bidder, or anyone acting for such firm, corporation, partnership, or institution, ever been convicted, within the past ten (10) years, of a criminal offense which resulted from serious bodily injury or death? YES NO V If the bidder has indicated YES for question number three above the bidder must provide to City of Lubbock with its bid q � P h' submission, the following information with respect to each such conviction: Date of offense, location where offense occurred, type of offense, final disposition of offense, in any, and penalty assessed. ACKNOWLEDGEMENT THE STATE OF TEXAS COUNTY OF LUBBOCK t I certify that I have made no willful misrepresentations in this Questionnaire nor have I withheld information in my statements and answers to questions. I am aware that the information given by me in this questionnaire shall be investigated, with my full permission, and that any misrepresentations or omissions may cause my bid to be rejected. W Signatuhi Li L r F SIck" Title 2 �� City of Lubbock Bid ITB 13-11219-MA SUSPENSION AND DEBARMENT CERTIFICATION Federal Law (A-102 Common Rule and OMB Circular A-110) prohibits non -Federal entities from contracting with or making sub -awards under covered transactions to parties that are suspended or debarred or whose principals are suspended or debarred. Covered transactions include procurement contracts for goods or services equal to or in excess of $50,000 and all non -procurement transactions (e.g., sub -awards to sub -recipients). Contractors receiving individual awards of $50,000 or more and all sub -recipients must certify that their organization and its principals are not suspended or debarred by a Federal agency. 1 Before an award of $50,000 or more can be made to your firm, you must certify that your organization and its principals are not suspended or debarred by a Federal agency. I, the undersigned agent for the firm named below, certify that neither this firm nor its principals are suspended or debarred by a Federal agency. COMPANY NAME: L - RD AkKQ �,D W>_T KAA & 1 OtQ , I W .v FEDERAL TAX ID or SOCIAL SECURITY No. -1 15 - 2- e5(o q 0*3 - Signature of Company Official: W C_'% t._.3 Printed name of company official signing above: 2-A Date Signed: +- 11 - 13 R h..-�]�l nl�A9 G.l�A.C�J fIAR /�ilT PAGE INTENTIONALLY LEFT BLANK I I LIST OF SUB -CONTRACTORS PAGE INTENTIONALLY LEFT BLANK f Li City of Lubbock Bid ITB 13-11219-MA BID 13-11219-NU - Southeast Water Reclamation Plant 2nd Feed Water Line LIST OF SUB CONTRACTORS Company Name 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.- L J 13. 14. 15. 16. I I' Company I +AV\jfW-X—> ('%j)N'C�'rVAAe-T10K1 I" — IVA Address 5bD FM '5+ City, County State Zip Code Telephone: Oc>(,, - Fax: b Q - 1661- - (oam -1 Location Services Provided Minority Owned Yes No 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 L THIS FORM SHALL BE COMPLETED AND RETURNED ALONG WITH YOUR PROPOSAL LIF NO SUB -CONTRACTORS WILL BE USED PLEASE INDICATE SO 2 L 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. City of Lubbock BID 13-11219-AIA - Southeast Water Reclamation Plant 2nd Feed Water Line FINAL LIST OF SUB CONTRACTORS Company Name Location Services Provided K D 14(5 Company L-,ft, yqkV-,D OJDQ"��AACMQ�11. 19C, Address 13�('j0 F--tJl '51- city, County State Zip Code Telephone lb Olb Fax: t)0( 9 3z - tog -7 Bid ITB 13-11219-Ml Minority Owned Yes No 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 L L H THIS FORM SHALL BE COMPLETED AND RETURNED WITHIN 7 DAYS OF BID CLOSING. IF NO SUB -CONTRACTORS WILL BE USED PLEASE INDICATE 80. 3 ,A-, 00 WWI r—Al -r,Z one rnr PAYMENT BOND L, PAGE INTENTIONALLY LEFT BLANK Best's Credit Rating Center - Company Information for American Contractors Indemnity ... Page 1 of 2 American Contractors Indemnity Company I% Print this page (?) A.M. Best 9: 011019 NAIC Y: 10216 FEIN t: 954290651 Address: 601 S. Figueroa Street Suite 1600 Assigned to titrrtetsl tf@�rleis Los Angeles, CA 90017 companies ceaw United States that have in -, AWer Web: www.hccsurety.com our opinion, Phone: 310-649-0990 a superior ability to meet their Fax: 310-645 9274i ongoing insurance obligations. Based on A.M. Best's analysts, 058391 - HCC Insurance Holdings. Inc is the AMB Ultimate Parent and identifies the topmost entity of the corporate structure. View a list of operating insurance entities in this structure. I Best's Credit Ratings - Strength_Ratinq View Definition —� _Financial Rating: - MASUpat(W Financial Size VII ($50 Million to $100 Category: Million) Outlook: Stable Action: Affirmed Effective Date: September 26, 2012 u Nmtes Under Review Bear$ Rates Best's Credit Rating Analyst Office: A.M. Best Company, Oldwick NJ Senior Financial Analyst: Richard Barracato Assistant Vice President: Joseph M. Roethel low -Term Issuer Credit Rating _ View Definition �_-- Long-Term: aa- Outlook: Stable Action: Affirmed Effective Date: September 26, 2012 Roports and News Visit Best's News and Analysis site for the latest news and Dress releases for this company and its A.M. Best Group. tl AMB Credit Report • Insurance Professional - includes Best's Financial Strength Rating and rationale along with comprehensive analytical commentary, detailed a j business overview and key financial data. — Report Revision Date: 1/31/2013 (represents the latest significant change). Historical Reports are available in AMB Credit Report - Insurance Professional Archive Best's Executive Summary Reports (Financial Overview) - available in three versions, these presentation style reports feature balance sheet. Income statement, key 160; financial performance tests including profitability, liquidity and reserve analysis. Data Status: 2013 Bests Statement File - P/C, US Contains data compiled as of 5/23/2013 Quality Cross Checked. • Single Company - five years of financial data specifically on this company. • Comparison - side -by -side financial analysis of this company with a peer group of up to five other companies you select. • Composite - evaluate this company's financials against a peer group composite. Report displays both the average and total composite of your selected peer group fsBesCs Key Rating Guide Presentation Report - includes Best's Financial Strength Rating and financial data as provided in the most current edition of Bases Key Rating Guide products. (Quality Cross Checked). Financial and Analytical Products—�_.__,•�----___ _— -- —_--�---_�— -- -_� Best's Key Ratina Guide - P/C US & Canada — Best's Statement File - P/C. US Best's Statement File - Global Best's State Line - P/C. US Best's Executive Summary Report - Comparison Property/Casualty Best's Executive Summary Report - Composite - Property/Casualty Best's Regulatory Center Best's Insurance Expense Exhibit (I ) - PIC, US Best's Schedule F (Reinsurance) - P/C. US Best's Schedule D (Municipal Bonds) - US Best's Coroorate Changes and Retirements - PIC, USICN Best's Reauiatory Center Market Share Reports Best's Schedule P (Loss Reserves) - P/C.US Best's Schedule D (Corporate Bonds) - US Best's Insurance Reoorts - Online - P/C US & Canada Best's Schedule DA (Short Term Investmentct - arr R i M i 1S European Union Disclosures A.M. Best Company and its subsidiaries are not registered as External Credit Assessment Institutions (ECAI) in the European Union (EU). Credit ratings Issued by A.M. Best Company and its subsidiaries can not be used for regulatory purposes In the EU as per Directive 2006/48/EC. Australian Disclosures A.M. Best Credit Ratings are statements of opinion and not statements of fact. They are not recommendations to buy, hold or sell any securities or any other form of financial product, including insurance policies and are not a recommendation to be used to make investment/purchasing decisions. A.M. Best Asia -Pacific Ltd is registered as a Credit Rating Agency in Australia and holds a Financial Services Licence number 411055 under the Corporations Act of 2001. A.M. Best Asia -Pacific Ltd credit ratings and any other related research are not Intended for and must not be distributed to any person In Australia other than a wholesale client, as defined In the Corporations Act of 2001, Chapter T. The A.M. Best websites are not Intended for use by Australian users who are not defined as wholesale users. 8 p STATUTORY PAYMENT BOND PURSUANT TO SECTION 2253.021(a) OF THE TEXAS GOVERNMENT CODE (CONTRACTS MORE THAN $50,000) Bond No. 1000997645 KNOW ALL MEN BY THESE PRESENTS, that L. Howard Construction, Inc. (hereinafter called the Principal(s), as Principal(s), and Texas Bonding Company (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of One Hundred Seventy -Four Thousand Seven Hundred Sixty -Three Dollars ($174,763) lawful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the 1st day of MM, 2013, to BID 13-11219-MA, Southeast Water Reclamiation Plant 2nd Feed Water Line and said Principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to remain in frill force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this 16th day of May 2013. Texas Bonding Company Surety (Title) David S. Ballew, Attorney -In -Fact L. Howard Construction (Company Name) By r AT t_�L^ _C� (Printed Name) (Si ture) 101_9,S/� �c [ (Title) No Text POWER OF ATTORNEY AMMUCAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED 'STATES SURP Y COMPANY U.S. SPECIALTY INSURANMUOMPANY M—OW)MAIEN BY THESE PPXSENf s: !That American Contrac rs tt mntty Obtnpao a Califomia rporation, Texas ura� wuu va uaaMVa apnaal�:lV W4I1t;14 AG lA ttl4i4li44R4. __- -. -' IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporate seals to be hereto- affix*this 10th day of December, 2012. AMERICAN CONTRACIO�S INPLMNTTY COMEANY_I' BONDINGICOMPANY - Corpor UNITED STATES kikiT}C COMPANY U.S. SPI.C_ IALTgINRURAIVMCOMPANY - \� liin `, oZ,'tMCrDA:4jfa`�g �alWnnnq.. \tllllr111I4/a�., Innn - — — - `fir f � qi emr�A HH f 10 Xf P yd k. 14i i, 011 f= 0{ y: �""" ►� ,,�,,, ¢ y - j,�� Daniel P.'Aguilar, Vice Pres�it�ent _ � s4Lfs6rRNttp+ j' 'irrumnm `�nP- State of California -,- am Co of- ,os Angeles SS: On 10th day of December, 2012, before me, Vanessa Wright, a notary public, personally appeared Daniel P. Aguilar, Vice President of American Contractors Indemnity Company, Texas Bonding Company; United States Surety Company and U.S. SpecialtyInsurance Company who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within -instrument and acknowl&�to me that he executed the same in his nuthnriyed ennanitw d fikat-hv --his cionahire nn the instrument -the Le and correct. K KC,my K i Kant Koray" M socusqy tra ::=er Pe< c r !y Piper ^ f iif t,d( 61 ,e, tnlogriapll ** Hidden PL���Yrilogr�;Iph ° ('01 )i Itta klii ° Color m a'I:t'.:i'I " Art,fimal V ,r Ci`.i,rk ^ 1 rr iic"o Wa C r tn— CIS a t t.(' m, Com Rub % Ani,-Copy Coin Stub '. �* G.r , ,t1P(:' r'rUiE't`.ii:'i't r i i print r io:cckoo ,. ili croprmt Protecmien . l t r m Ar "d Fme Kant IKoPyRai Knn,'t Kopy°' K; Sec r .y Paper Ce=u ty Prr, ee� mi .uteri 4C`(ic:Grt PaniuPray+Pt Cuirtr it'teYch t is e i VI o- r l is Ar ificiat Wa.,2rmark AnU .Cpy C o R- io r elni-Copy t";om PM) u Eraswc, Prot i,i a'e .;;t EY'U^^ r'r(ktCf..SEC1Et ^ t (tl1 t;:V t-c... E, , UYr Security Features Box, Ctlflcmprin' C .::tGri a Mwr(,7f not Prote"4:i(N' Acid Free a Acid F-rr'. U.S. Specialty Insurance Company lir a THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION To obtain information, make a complaint or assert a claim, or if you have a dispute concerning your premium, you should call the Surety's toll free telephone number for information at: 1-800-486-6695. You may also write to the Surety at: U.S. Specialty Insurance Company 601 S. Figueroa St., Suite 1600 Los Angeles, CA 90017 Important Time Limitation Regarding Warranty Notwithstanding anything to the contrary in the Construction Contract and Bond, in no event shall Surety have any obligation for any loss occurring or claim made by Obligee more than twenty-five (25) months after the date on which Principal has substantially completed the work under the Construction Contract. Exclusion of Liability for Mold, Mycotoxins, Fungi & Environmental Hazards Notwithstanding anything to the contrary in the Construction Contract and Bond, the Bond to which this Rider is attached does not provide coverage for, and the Surety thereon shall not be liable for, molds, living or dead fungi, bacteria, allergens, histamines, spores, hyphae, or mycotoxins, or their related products or parts, not for any environmental hazards, bio-hazards, hazardous materials, environmental spills, contamination, or cleanup, nor the remediation thereof, nor the consequences to persons, property, or the performance of the bonded obligations, of the occurrence, existence, or appearance thereof. Important Notice Regarding Calculation of Premium Adjustments to the contract price entitle the Surety to adjust premium charged for the adjustment in risk to Surety. Notwithstanding anything to the contrary in the Construction Contract and Bond, adjustments to the contract price or the premium charged shall not change the Bond amount, unless the contract price is increased no more than 10% of the original contract price. HCCSZZ564805/08 No Text F STATUTORY PAYMENT BOND PURSUANT TO SECTION 2253.021(a) OF THE TEXAS GOVERNMENT CODE a (CONTRACTS MORE THAN $50,000) KNOW ALL MEN BY THESE PRESENTS, that (hereinafter called the Principal(s), as Principal(s), and (hereinafter called the Surety(s), as Surety(s), are held and fumly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of One Hundred Seventy -Four Thousand Seven Hundred Sixty -Three Dollars ($174,763) lawful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the 1st day of May, 2013, to BID 13-11219-MA, Southeast Water Reclamiation Plant 2°d Feed Water Line and said Principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal V shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect; F PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this day of 2013. Surety (Company Name) *By: (Title) By: (Printed Name) (Signature) (Title) z i The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby designates an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. Surety * By: (Title) Approved as to form: City of Lubbock By: City Attorney * Note: If signed by an Office of the Surety Company there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. G The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby designates David S. Ballew an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. Texas Bonding Company Surety * By ~\ (Title) David S. Ballew, Attorney -in -Fact Approved as to form: City of L bb By: Ci ttorney * Note: If signed by an Office of the Surety Company there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. No Text PERFORMANCE BOND PAGE INTENTIONALLY LEFT BLANK r f I Ll STATUTORY PERFORMANCE BOND PURSUANT TO SECTION 2253.021(a) OF THE TEXAS GOVERNMENT CODE (CONTRACTS MORE THAN $100,000) Bond No. 1000997645 KNOW ALL MEN BY THESE PRESENTS, that L. Howard Construction, Inc. (hereinafter called the Principal(s), as Principal(s), and Texas Bonding Company (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of One Hundred Seventy -Four Thousand Seven Hundred Sixty -Three Dollars ($174,763) lawful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the lst day of May, 2013, to BID 13-11219-MA, Southeast Water Reclamation Plant 2°d Feed Water Line and said principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this 16th day of May 12013. Texas Bonding Company Surety C * BY.. (Title) David S. Ballew, Attorney -In -Fact L. Howard Construction, Inc. (Company Name) By: 4 . ' fr' t�)64 V 0( (Printed me) (,} , (Signa ` re) py�>!J>g Ir (Title) rol r "" Al STATUTORY PERFORMANCE BOND PURSUANT TO SECTION 2253.021(a) OF THE TEXAS GOVERNMENT CODE (CONTRACTS MORE THAN $100,000) KNOW ALL MEN BY THESE PRESENTS, that called the Principal(s), as Principal(s), (hereinafter and (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of One Hundred Seventy -Four Thousand Seven Hundred Sixty -Three Dollars ($174,763) lawful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the 1st day of May, 2013 , to BID 13-11219-MA, Southeast Water Reclamation Plant 2"d Feed Water Line and said principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said a article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this day of )2013. } Surety (Company Name) * By: Lt� (Title) By: (Printed Name) (Signature) (Title) 2 9 The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby designates an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. Surety *By. (Title) Approved as to Form City of Lubbock By: City Attorney * Note: If signed by an Office of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. 3 No Text The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby designates David S. Ballew an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. Texas Bonding Company Surety (Title) David S. Ballew, Attorney -In -Fact Approved as to Form City of ck By:'c City Attorney * Note: If signed by an Office of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. 1 CERTIFICATE OF INSURANCE 1", PAGE INTENTIONALLY LEFT BLANK CERTIFICATE OF INSURANCE TO: CITY OF LUBBOCK DATE: P.O. BOX 2000, Room 204 LUBBOCK, TX 79457 TYPE OF PROJECT: THIS IS TO CERTIFY THAT (Name and Address of Insured) is, at the date of this certificate, insured by this Company with respect to the business operations hereinafter described, for the typed of insurance and in accordance with the provisions of the standard policies used by this company, the further hereinafter described. Exceptions to standard policy noted hereon. TYPE OF INSURANCE POLICY NUMBER EFFECTIVE EFFECTIVE LIMITS DATE DATE GENERAL LIABILITY ❑ Commercial General Liability General Aggregate $ ❑ Claims Made Products-Comp/Op AGO $ ❑ Occurrence Personal & Adv. Injury $ ❑ Owner's & Contractors Protective Each Occurrence $ ❑ Fire Damage (Any one Fire) $ $ Med Exp (Any one Person) AUTOMOTIVE LIABILITY ❑ Any Auto Combined Single Limit $ ❑ All Owned Autos Bodily Injury (Per Person) $ ❑ Scheduled Autos Bodily Injury (Per Accident) $ ❑ Hired Autos Property Damage $ ❑ Non -Owned Autos GARAGE LIABILITY ❑ Any Auto Auto Only - Each Accident $ ❑ Other than Auto Only: Each Accident $ Aggregate $ ❑ BUILDER'S RISK ❑ 100% of the Total Contract Price $ ❑ INSTALLATION FLOATER $ EXCESS LIABILITY ❑ Umbrella Form Each Occurrence $ Aggregate $ ❑ Other Than Umbrella Form $ WORKERS COMPENSATION AND EMPLOYERS' LIABILITY The Proprietor/ ❑ Included Statutory Limits Partners/Executive ❑ Excluded Each Accident $ Offices are: Disease Policy Limit $ Disease -Each Employee $ OTHER The above policies either in the body thereof or by appropriate endorsement provide that they may not be changed or canceled by the insurer in less than the legal time required after the insured has received written notice of such change or cancellation, or in case there is no legal requirement, in less than five days in advance of cancellation. FIVE COPIES OF THE CERTIFICATE OF INSURANCE (Name of Insurer) MUST BE SENT TO THE CITY OF LUBBOCK By: Title: The Insurance Certificates Furnished shall name the City of Lubbock as Additional Insured on Auto /General Liability and provide a Waiver of Subrogation in favor of the City of Lubbock. IT SHALL BE THE CONTRACTOR'S. THE ADDITIONAL INSURED ENDORSEMENT SHALL INCLUDE PRODUCTS AND COMPLETE OPERATIONS. CONTRACTORCHECKLIST A CONTRACTOR SHALL: (1) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (3) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project; (4) obtain from each person providing services on a project, and provide to the governmental entity: (A) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (B) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (6) notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (7) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed in at least 19-point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERFICATE OF INSURANCE ALONG WITH A COPY OF THE ADDITIONAL INSURED ENDORSEMENT. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS A ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY ON A PRIMARY AND NON CONTRIBUTORY BASIS TO INCLUDE PRODUCT-COMP/OP AND PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK AS REQUIRED BELOW, OR IN THE ALTERNATIVE, SHALL BE ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO THE EFFECT THAT NO WORK ON THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKER'S COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. THE ADDITIONAL INSURED ENDORSEMENT SHALL INCLUDE PRODUCTS AND COMPLETE OPERATIONS. REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must (see reverse) be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment and materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at 512-305-7238 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." and (8) contractually require each person with whom it contracts to provide services on a project, to: (A) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; 03) provide a certificate of coverage to the contractor prior to that person beginning work on the project; (C) include in all contracts to provide services on the project the language in subsection (e) (3) of this rule; (D) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (E) obtain from each other person with whom it contracts, and provide to the contractor: (i) a certificate of coverage, prior to the other person beginning work on the project; and (ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (F) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (G) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (H) contractually require each other person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they are providing services. PAGE INTENTIONALLY LEFT BLANK CONTRACT PAGE INTENTIONALLY LEFT BLANK U 1 CONTRACT 11219 i-- STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered into this 1_` day of May, 2013 , by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to do so, hereinafter referred to as OWNER, and L. Howard Construction Inc of the City of Abernathy, County of Hale and the State of Texas hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements described as follows: BID 13-11219-MA - Southeast Water Reclamation Plant 2nd Feed Water Line and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to complete the said construction in accordance with the contract documents as defined in the General Conditions of Agreement. L. Howard Construction Inc _'s bid dated April 17th. 2013 is incorporated into and made a part of this agreement. The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the contract documents. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the bid submitted therefore, subject to additions and deductions, as provided in the contract documents and to make �4 payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County, Texas in the year and day first above written. CONTRACTOR: W A41Ara4� PRINTED N E: O 4! r TITLE: /` ', COMPLETE ADDRESS: L Company L N'pwAr�o C, Address City, State, Zip ATTEST: Co orate Secretary a Rebecipa Garza, City Secretary APPROVED AS TO CONTENT: rOW /" '6hn , P. Chief Wate Utilities Engineer TurpinJ ` R. Keith Smith P.E. , Chief Operating Officer AP OV AS FORM :t: City Attorney PAGE INTENTIONALLY LEFT BLANK F GENERAL CONDITIONS OF THE AGREEMENT PAGE INTENTIONALLY LEFT BLANK GENERAL CONDITIONS OF THE AGREEMENT 1. OWNER Whenever the word Owner, or First Party, are used in this contract, it shall be understood as referring to the City of Lubbock, Texas. Z. CONTRACTOR Whenever the word Contractor, or Second Party, is used, it shall be understood to mean the person, persons, co- partnership or corporation, to wit L. Howard Construction Inc. who has agreed to perform the work embraced in this contract, or their legal representative. 3. OWNER'S REPRESENTATIVE Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as referring to, City of Lubbock, or its representative John Turpin, P.E., Chief Water Utilities Engineer, so designated who shall inspect constructions; or to such other representatives, supervisors, architects, engineers, or inspectors as may be authorized by said Owner to act in any particular manner under this agreement. Engineers, supervisors or inspectors shall act for the Owner under the direction of Owner's Representative, but shall not directly supervise the Contractor or persons acting on behalf of the Contractor. I4. CONTRACT DOCUMENTS The contract's documents shall consist of the Notice to Bidders, General Instructions to Bidders, Bid, Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the Agreement (if any), Specifications, Plans, Insurance Certificates, and all other documents made available to Bidder for inspection in accordance with the Notice to Bidders. The above described materials are sometimes referred to herein as the "contract" or "contract documents". S. INTERPRETATION OF PHRASES Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed," or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's Representative. 6. SUBCONTRACTOR The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for performance of work on the project contemplated by these contract documents. Owner shall have no responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated by these contract documents, but said Subcontractors shall look exclusively to Contractor for any payments due Subcontractor. The City reserves the right to approve or disapprove the selection of any subcontractor(s). 7. WRITTEN NOTICE Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an Office of the corporation for whom it is intended, or if delivered at or sent certified mail to the last business address known to the party who gives the notice. 8. IN 10, 11 12. CONTRACTOR'S RESPONSIBILITIES Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well known, technical or trade meaning shall be held to refer such recognized standards. All work shall be done and all materials furnished in strict conformity with the contract documents. SUBSTANTIALLY COMPLETED The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. LAYOUT Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative shall check the Contractor's layout of all major structures and any other layout work done by the Contractor at Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all work in accordance with the Plans and Specifications. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE The Contractor shall be furnished copies of all Plans and Specifications without expense to Contractor and Contractor shall keep one copy of same consistently accessible on the job site. RIGHT OF ENTRY The Owner's Representative may make periodic visits to the site to observe the progress or quality of the executed work and to determine, in general, if the work is proceeding in accordance with the contract documents. Owner's Representative shall not be required to make exhaustive or continuous onsite inspections to check the quality or quantity of the work, nor shall Owner's Representative be responsible for the construction means, methods, techniques, sequences or procedures, or the safety precautions incident thereto. Notwithstanding the Owner's Representative's rights of entry hereunder, the Owner's Representative shall not be responsible for the Contractor's failure to perform the work in accordance with the Contract Documents. 13. LINES AND GRADES All lines and grades shall be furnished whenever Owner's Representative deems said lines and grades are necessary for the commencement of the work contemplated by these contract documents or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall suspend its work in order to permit Owner's Representative to comply with this requirement, but such suspension shall be as brief as practical and Contractor shall be allowed no extra compensation therefore. The Contractor shall give the Owner's Representative ample notice of the time and place where lines and grades are needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by Contractor, its Subcontractors, or its employees, such stakes, marks, etc., shall be replaced by the Owner's Representative at Contractor's expense. 14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's Representative has the authority to review all work included herein. The Owner's Representative has the authority to stop the work whenever such stoppage may be necessary to ensure the proper execution of the contract. The Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work which are to be paid for under the contract documents, and shall determine all questions in relation to said work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the execution of this contract on the part of said Contractor. The decision of the Owner's Representative shall be conclusive in the absence of written objection to same delivered to Owner's Representative within fifteen (15) calendar days of any decision or direction by Owner's Representative. In the absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. 15. SUPERINTENDENCE AND INSPECTION It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from time to time such subordinate engineers, supervisors, or inspectors as the said Owner's Representative may deem proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is furnished and said work is done in accordance with the specifications therefore. The Contractor shall furnish all reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper inspection and examination of the work. The Contractor shall regard and obey the directions and instructions of any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are consistent with the obligations of this Agreement and accompanying plans and specifications provided, however, should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor may within fifteen (15) calendar days make written appeal to the Owner's Representative for its decision. In the absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. 16. CONTRACTOR'S DUTY AND SUPERINTENDENCE The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to Owner's Representative. The superintendent shall represent the Contractor in its absence and all directions given to superintendent shall be binding as if given to the Contractor. It is expressly agreed that adequate supervision by competent and reasonable representatives of the Contractor is essential to the proper performance of the work and lack of such supervision shall be grounds for suspending operations of the Contractor. The work, from its commencement to completion, shall be under the exclusive charge and control of the Contractor and all risk in connection therewith shall be borne by the Contractor. The Owner or Owner's Representatives shall not be responsible for the acts or omissions of the Contractor, or any subcontractors, or any of Contractor's agents or employees, or any other persons performing any of the work. 17. CONTRACTOR'S UNDERSTANDING It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the nature and location of the work, the confirmation of the ground, the character, quality and quantity of materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, and the general and local conditions, and all other matters which in any way affect the work under the contract documents. No oral agreement or conversation with any Office, agent, or employee of the Owner, or Owner's Representative either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained. Subject to the rights of Owner as set forth in Paragraph 23 hereof, all modifications and/or amendments to the contract documents, shall be in writing, and executed by Owner's Representative and Contractor. 18. 19. 20. 21. Unless otherwise specified herein, all loss, expense or damage to Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the work, shall be sustained and borne by the Contractor at its own cost and expense. CHARACTER OF WORKERS The Contractor agrees to employ only orderly and competent workers, skillful in the performance in the type of work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall inform Contractor in writing that any man or inen on the work, are, in Owner's Representative's sole opinion, incompetent, unfaithful, disorderly, or otherwise unacceptable to Owner or Owner's Representative, such man or men shall be discharged from the work and shall not again be employed on the work without the Owner's Representative's written consent. CONSTRUCTION PLANT The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution and completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted. The building of structures for the housing of men or equipment are permitted only at such places as the Owner's Representative shall consent or direct, and the sanitary conditions of the grounds in or about such structure shall at all times be maintained in a manner satisfactory to the Owner's Representative. SANITATION Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Owner's Representative and their use shall be strictly enforced. OBSERVATION AND TESTING The Owner or Owner's Representative shall have the right at all tunes to observe and test the work. Contractor shall make necessary arrangements and provide proper facilities and access for such observation and testing at any location wherever such work is in preparation or progress. Contractor shall ascertain the scope of any observation that may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each part of the work shall be ready for such observation. Owner or Owner's Representative may reject any such work found to be defective or not in accordance with the contract documents, regardless of the stage of its completion or the time or place of discovery of such errors and regardless of whether Owner's Representative has previously accepted the work through oversight or otherwise. If any such work should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Representative, be uncovered for examination at Contractor's expense. In the event that u:.y Yale ;,� .... Y.ulA �s V�lllg ldvkx WU yr ulaitiiiacttirCd $t a tv�a LGIL where it is not convenient for Owner or Owner's Representative to make observations of such work or require testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish Owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests shall be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the contract documents. If any such work which is required to be inspected, tested, or approved is covered up without written approval or consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of any such tests, inspections or approvals, and any work which meets the requirements of any such 4 t tests or approvals but does not meet the requirements of the contract documents shall be considered defective, and shall be corrected at the Contractor's expense. Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by Owner, Owner's Representative, or other persons authorized under the contract documents to make such inspections, tests, or approvals shall relieve the Contractor from its obligation to perform the work in accordance with the requirements of the contract documents. 22. DEFECTS AND THEIR REMEDIES It is expressly agreed that if the work or any part thereof, or any material brought on the site of the work for use in the work or selected for the same, shall be deemed by the Owner or Owner's Representative as unsuitable or not in conformity with plans, specifications and/or contract documents, the Contractor shall, after receipt of written notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy such work so that it shall be in full accordance with the contract documents. It is further agreed that any remedial action contemplated as hereinabove set forth shall be at Contractor's expense. 23. CHANGES AND ALTERATIONS The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in the line, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of this contract and the accompanying bond. If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of work, and the increased work can fairly be classified under the specifications, such increase shall be paid according to the quantity actually done and at the unit price established for such work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make such changes or alterations as shall make useless any work already done or material already furnished or used in said work, then the Owner shall recompense the Contractor for any material or labor so used, and for actual expenses incurred in preparation for the work as originally planned. 24. EXTRA WORK The term "extra work" as used in this contract shall be understood to mean and include all work that may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, alteration or addition to the work as shown on the plans and specifications or contract documents and not covered by Contractor's bid, except as provided under Changes and Alterations herein. It is agreed that the Contractor shall perform all extra work under the direction of the Owner's Representative when presented with a written work order signed by the Owner's Representative; subject, however, to the right of the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the compensation to be paid to the Contractor for performing said extra work shall be determined by the following methods: Method (A) - By agreed unit prices; or Method (B) - By agreed lump sum; or Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is commenced, then the Contractor shall be paid the lesser of the following: (1) actual field cost of the extra work, plus fifteen (IS%) percent; or (2) the amount that would have been charged by a reasonable and prudent Contractor as a reasonable and necessary cost for performance of the extra work. 25. In the event said extra work be performed and paid for under Method (C)(1), then the provisions of this paragraph shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together with all expenses incurred directly on account of such extra work, including Social Security, Old Age Benefits, Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation and all other insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be kept and records of these accounts shall be made available to the Owner's Representative. The Owner's Representative may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for the use of machinery and equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and compensate Contractor for its profit, overhead, general superintendence and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "actual field cost." No claim for extra work of any kind shall be allowed unless ordered in writing by Owner's Representative. In case any orders or instructions appear to the Contractor to involve extra work for which Contractor should receive compensation or an adjustment in the construction time, Contractor shall prior to commencement of such extra work, make written request to the Owner's Representative for a written order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and the Owner's Representative insists upon its performance, the Contractor shall proceed with the work after making written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as provided under Method (C) (1). If Contractor does not notify Owner's Representative before the commencement of any extra work, any claim for payment due to alleged extra work shall be deemed waived. DISCREPANCIES AND OMISSIONS It is further agreed that it is the intent of the contract documents that all work described in the bid, the specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that such price shall include all appurtenances necessary to complete the work in accordance with the intent of these contract documents as interpreted by Owner's Representative. Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall be given to the Owners' Representative and a clarification obtained before the bids are received, and if no such notice is received by the Owner's Representative prior to the opening of bids, then it shall be deemed that the Contractor fully understands the work to be included and has provided sufficient sums in its bid to complete the work in accordance with these plans and specifications. If Contractor does not notify Owner's Representative before bidding of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are sufficient and adequate for completion of the project. It is further agreed that any request for clarification must be submitted no later than five (5) calendar days prior to the opening of bids. 26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of work with the rate of progress required under this contract, the Owner or Owner's Representative may order the Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall comply with such order. If, at any time, the working force of the Contractor is inadequate for securing the progress herein specified, the Contractor shall, if so ordered in writing, increase its force or equipment, or both, to such an extent as to give reasonable assurance of compliance with the schedule of progress. -t 27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC AND GENERAL INDEMNITY The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workers' Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the safety of employees and others on or near the work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in Construction" of Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The Contractor, its sureties and insurance carriers shall defend, indemnify and hold harmless the Owner and all of its Offices, agents and employees against any all losses, costs, damages, expenses, liabilities, claims and/or causes of action, whether known or unknown, fixed, actual, accrued or contingent, liquidated or unliquidated, including, but not limited to, attorneys' fees and expenses, in connection with, incident to, related to, or arising out of, the Contractor's or any subcontractor's, agent's or employee's, in any manner whatsoever, omission, execution and/or supervision of this contract, and the project which is the subject matter of this contract. The safety precautions taken shall be the sole responsibility of the Contractor, in its sole discretion as an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given by the Owners or the Owner's Representative concerning omissions under this paragraph as the work progresses, are intended as reminders to the Contractor of its duty and shall not be construed as any assumption of duty to supervise safety precautions by either the Contractor or any of its subcontractors. 28. CONTRACTOR'S INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change shall be provided ten (10) calendar days in advance of cancellation or change. All policies of insurance, required herein, including policies of insurance required to be provided by Contractor and its subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self- insurance, rights to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by virtue of payment of any loss under such insurance or self-insurance. All certificates of insurance submitted to the City in conformity with the provisions hereof shall establish such waiver. The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverage's shall be submitted prior to contract execution. PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS OF COMPLETE OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK, OR IN THE ALTERNATIVE, SHALL BE ACCOMPANIED BY A STATEMENT FROM THE CONTRACTOR TO THE EFFECT THAT NO WORK ON THIS PARTICULAR PROJECT SHALL BE SUBCONTRACTED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. COPIES OF THE ENDORSEMENTS ARE REQUIRED. 7 A. B. C. D. E. F. Commercial General Liability Insurance (Primary Additional Insured and Waiver of Subrogation required) The contractor shall have Comprehensive General Liability Insurance with limits of $1,000,000 Combined Single Limit in the aggregate and per occurrence to include: Products & Completed Operations Hazard Contractual Liability Personal Injury & Advertising Injury WITH HEAVY EQUIPMENT ENDORSEMENT Owner's and Contractor's Protective Liability Insurance. For bodily injuries, including accidental death and or property damage, - NOT REQUIRED. Comprehensive Automobile Liability Insurance (Waiver of Subrogation Required) The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than; Bodily Injury/Property Damage, $1,000,000 Combined Single Limit, to include all owned and non -owned cars including: Employers Non -ownership Liability Hired and Non -owned Vehicles. Builder's Risk Insurance/Installation Floater Insurance - NOT REQUIRED. Umbrella Liability Insurance - NOT REQUIRED. Worker's Compensation and Employers Liability Insurance (Waiver of Subrogation required) Worker's Compensation Insurance covering all employees whether employed by the Contractor or any Subcontractor on the job with Employers Liability of at least $500,000 1. Definitions: Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC- 82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. Duration of the project - includes the time from the beginning of the work on the project until the Contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ("subcontractor" in Section _406.096, Texas Labor Code) - includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner - operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. 4. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project, the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. The Contractor shall obtain from each person providing services on the project, and provide to the governmental entity: (a) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity shall have on file certificates of coverage showing coverage for all persons providing services on the project; and (b) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 6 The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. 7. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. 8. The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 9. The Contractor shall contractually require each person with whom it contracts to provide services on the project, to: (a) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (b) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (c) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (d) obtain from each other person with whom it contracts, and provide to the Contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and L r G. (2) a new certificate of coverage showing extension of coverage, prior to the end of ' the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (g) contractually require each person with whom it contracts to perform as required by paragraphs (a) - (g), with the certificates of coverage to be provided to the person for whom they are providing services. 10. By signing this contract or providing or c6using to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who shall provide services on the project shall be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. 11. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach frorn the governmental entity. Proof of Coverage Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence of compliance with the above insurance requirements, signed by an authorized representative of the insurance company setting forth: (1) The name and address of the insured. (2) The location of the operations to which the insurance applies. (3) The name of the policy and type or types of insurance in force thereunder on the date borne by such certificate. (4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne by such certificate. (5) A provision that the policy may be canceled only by mailing written notice to the named insured at the address shown in the bid specifications. (6) A provision that written notice shall be given to the City ten days prior to any change in or cancellation of the policies shown on the certificate. (7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the job specifications. No substitute of nor amendment thereto will be acceptable. (8) If policy limits are paid, new policy must be secured for new coverage to complete project. (9) A Contractor shall: 10 �} (a) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (b) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (c) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project; (d) obtain from each person providing services on a project, and provide to the governmental entity: (i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (ii) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (g) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: REQUIRED WORKERS' COMPENSATION COVERAGE "The taw requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at 800-372-7713 or 512-804- 4000 (www.tdi.state.tx.us) to receive information of the legal requirements for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage, " and (h) contractually require each person with whom it contracts to provide services on a project, to: (i) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (ii) provide a certificate of coverage to the Contractor prior to that person beginning work on the project; 11 M 30. r� (...) p p j g m include in all contracts to provide services on the project the following language: "By signing this contract or providing or causing to be provided a certificate of coverage, the person signing this FJ contract is representing to the governmental entity that all employees of the person signing this contract who will provide services on the project will be covered by workers'-P-1 compensation coverage for the duration of the project, that the coverage will be based on proper reprinting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions."; (iv) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (v) obtain from each other person with whom it contracts, and provide to the + Contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (vi) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (vii) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that i materially affects the provision of coverage of any person providing services on the project; and (viii) contractually require each other person with whom it contracts, to perform as required by paragraphs (i)-(viii), with the certificate of coverage to be provided to the person for whom they are providing services. DISABLED EMPLOYEES Contractors having more than fifteen (15) employees agree to comply with the Americans with Disabilities Act of 1990, and agree not to discriminate against a qualified individual with a disability because of the disability of such individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee compensation, job training, and other terms, conditions, and privileges of employment. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS LABORERS MATERIALMEN AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees that it will indemnify and save the Owner and all of its Offices, agents and employees, harmless against any and all claims, liabilities, losses, damages, expenses and causes of action arising out of, in any way, manner or form, the demands of subcontractors, laborers, workmen, mechanics, material men and furnishers of F machinery and parts thereof, equipment, power tools, and supplies, incurred in the performance of this contract 12 and the project which is the subject matter of this contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. 31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material or process covered by letters patent or copyright by suitable legal agreement with the Patentee or owner thereof. Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and save the Owner, and all of its Offices, agents and employees harmless from any loss on account thereof, except that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular design, device, material or process or the product of a particular manufacturer or manufacturers is specified or required in these contract documents by Owner; provided, however, if choice of alternate design, device, material or process is allowed to the Contractor, then Contractor shall indemnify and save Owner, and all of its Offices, agents and employees harmless from any loss on account thereof. Notwithstanding anything herein to the contrary, if the material or process specified or required by Owner and/or this contract is an infringement, the Contractor shall be responsible for such loss unless it gives written notice of such infringement to the Owner's. Representative prior to bidding. 32. LAWS AND ORDINANCES The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and regulations, which in any manner affect the contract or the work, and without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, Contractor shall indemnify and save harmless the Owner, and all of its Offices, agents, and employees against any claims arising from the violation of any such laws, ordinances, and regulations, whether by the Contractor, its employees, or subcontractors. If the Contractor observes that the plans and specifications are at variance therewith, he shall notify the Owner's Representative in writing prior to bidding and any necessary changes shall be adjusted as provided in the contract for changes in the work. In the absence of timely written notification to Owner's Representative of such variance or variances within said time, any objection and/or assertion that the plans and specifications are at variance with any federal, state or local laws, ordinances or regulations shall be deemed waived. If the Contractor, its employees or subcontractors perform any work contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's Representative, Contractor shall bear all costs arising therefrom. The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as though embodied herein. 33. SUBCONTRACTING The Contractor agrees that it will retain personal control and will give its personal attention to the fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from its full obligations to the Owner, as provided by the contract documents. 34. TIME FOR SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning and time for completion as specified in the contract documents, of work to be done hereunder are essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in this contract shall be commenced as provided in the contract documents. 13 35. 36. 37 If the Contractor should neglect, fail, or refuse to substantially complete the work within the time herein specified, then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum of $100 (One -Hundred 1 PER DAY, not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and every working day that the Contractor shall be in default after the time stipulated for substantially completing the work. It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the substantial completion of the work described herein is reasonable time for the completion of the same, taking into consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality. The amount is fixed and agreed upon by and between the Contractor and the Owner because the actual damages the Owner would sustain in such event would be difficult and/or impossible to estimate, however, the amount agreed upon herein is a reasonable forecast of the amount necessary to render just compensation to Owner, and is expressly agreed to be not disproportionate to actual damages as measured at time of breach. IT IS FURTHER AGREED AND UNDERSTOOD BETWEEN THE CONTRACTOR AND OWNER THAT TIME IS OF THE ESSENCE OF THIS CONTRACT. TIME AND ORDER OF COMPLETION It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor shall be allowed to prosecute its work at such time and sessions, in such order of precedence, and in such manner as shall be most conductive to economy of construction; provided, however, that the order and time of prosecution shall be such that the work shall be substantially completed as a whole and in part, in accordance with this contract, the plans and specifications, and within the time of completion designated in the bid; provided, also, that when the Owner is having other work done, either by contract or by its own force, the Owner's Representative may direct the time and manner of constructing work done under this contract so that conflicts will be avoided and the construction of the various works being done for the Owner shall be harmonized. The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative, schedules which shall show the order in which the Contractor intends to carry on the work, with dates at which the Contractor will start the several parts of the work and estimated dates of completion of the several parts. TIME OF PERFORMANCE The Contractor agrees that it has submitted its bid in full recognition of the time required for the completion of this project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions of paragraph 34 hereinabove set forth and expressly agrees that it shall not be entitled to, nor will it request, an extension of time on this contract, except when its work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or other contractors employed by the Owner, or by changes ordered in the work, or by strike, walkouts, acts of God or the public enemy, fire or flood. Any request for extension shall be in writing with the written request for same setting forth all justifications, in detail, for the request, and submitted to Owner's Representative within twenty (20) calendar days of the occurrence of the event causing said delay. A failure by Owner's Representative to affirmatively grant the extension no later than twenty (20) calendar days of written submission by Contractor shall be deemed a denial, and final. Further, in the absence of timely written notification of such delay and request for extension, as provided herein, any request for extension by Contractor shall be deemed waived. HINDRANCE AND DELAYS In executing the contract, the Contractor agrees that in undertaking to complete the work within the time herein fixed, Contractor has taken into consideration and made allowances for all hindrances and delays incident to such work, whether growing out of delays due to unusual and unanticipated circumstances, difficulties or delays in securing material or workmen, or any other cause or occurrence. No charge shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this contract except where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in 14 which event, such expense as in the sole judgment of the Owner's Representative that is caused by such stoppage shall be paid by Owner to Contractor. 38. QUANTITIES AND MEASUREMENTS No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the specifications, plans and other contract documents are intended to show clearly all work to be done and material to be furnished hereunder. Where the estimated quantities are shown, and only when same are expressly stated to be estimates, for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing their bids offered for the work. In the event the amount of work to be done and materials to be furnished are expressly stated to be estimated, and only when same are expressly stated to be estimated, it is understood and agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of work done and materials furnished on the project. 39. PROTECTION OF ADJOINING PROPERTY The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way encountered, which may be injured or seriously affected by any process of construction to be undertaken under this agreement, from any damage or injury by reason of said process of construction; and Contractor shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent property. Without limiting, in any way, manner and form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees to indemnify, save and hold harmless the Owner, and any of its Offices, agents and employees, against any and all claims or damages due to any injury to any adjacent or adjoining property, related to, arising from or growing out of the performance of this contract. 40. PRICE FOR WORK In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the bid proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses incurred by Contractor and for well and truly performing the same and the whole thereof in the manner and according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's Representative. 41. PAYMENTS No payments made or certificates given shall be considered as conclusive evidence of the performance of the contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by �= Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner, Owner's agents and employees, which have not theretofore been timely filed as provided in this contract. 42. PARTIAL PAYMENTS On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application for partial payment or, if the Contractor does not submit such application, the Owner's Representative shall 15 43 44. 45. 46. determine the amount to be partially paid. Owner's Representative shall review said application for partial payment if submitted, and the progress of the work made by the Contractor and if found to be in order, shall prepare a certificate for partial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month. The determination of the partial payment by the Owner's Representative shall be in accordance with Paragraph 14 hereof. The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be retained until final payment, and further, less all previous payments and all further sums that may be retained by Owner under the terms of the contract documents. Any partial payment made hereunder shall not constitute a waiver by the Owner of any and all other rights to enforce the express terms of the contract documents, and all remedies provided therein, as to any and all work performed, to be performed and/or materials delivered hereunder, including, but limited to, work to which said partial payment is attributable. SUBSTANTIAL COMPLETION Contractor shall give Owner's Representative written notice of substantial completion. Within thirty-one (31) working days after the Contractor has given the Owner's Representative written notice that the work has been substantially completed, the Owner's Representative and/or the Owner shall inspect the work and within said time, if the work be found to be substantially completed in accordance with the contract documents, the Owner's Representative shall issue to the Owner and Contractor a certificate of substantial completion. Notwithstanding the issuance of a certificate of substantial completion, Contractor shall proceed with diligence to finally complete the work within the time provided in this contract. FINAL COMPLETION AND PAYMENT The Contractor shall give written notice to Owner's Representative of final completion. Upon written notice of final completion, the Owner's Representative shall proceed to make final measurement to determine whether final completion has occurred. If the Owner's Representative determines final completion has occurred, Owner's Representative shall so certify to the Owner. Upon certification by Owner's Representative of final completion, Owner shall pay to the Contractor on or before the 31st working day after the date of certification of final completion, the balance due Contractor under the terms of this agreement. Neither the certification of final completion nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the obligation for fulfillment of any warranty which may be required in the contract documents and/or any warranty or warranties implied by law or otherwise. CORRECTION OF WORK Contractor shall promptly remove from Owner's premises all materials condemned by the Owner's Representative on account of failure to conform to the contract documents, whether actually incorporated in the work or not, and Contractor shall at its own expense promptly replace such condemned materials with other materials conforming to the requirements of the contract documents. Contractor shall also bear the expense of restoring all work of other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such . condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative, Owner may remove and replace it at Contractor's expense. Neither the final payment, nor certification of final completion or substantial completion, nor any provision in the contract documents shall relieve the Contractor of responsibility for faulty materials or workmanship, and Contractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which shall appear within a period of one (1) year from the date of certification of final completion by Owner's Representative. PAYMENT WITHHELD 16 3 The Owner or Owner's Representative may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any certification to such extent as may be necessary to protect itself from loss on account of: (a) Defective work not remedied and/or work not performed. (b) Claims filed or reasonable evidence indicating possible filing of claims. (c) Damage to another contractor. When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, in the amount withheld, payment shall be made for amounts withheld because of them. 47. CLAIM OR DISPUTE It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with the Owner's Representative within fifteen (15) calendar days after the Owner's Representative has given any direction, order or instruction to which the Contractor desires to take exception. Timely written notice of dispute as provided in this contract of any decision by Owner's Representative or Owner shall be a condition precedent to the bringing and/or assertion of any action or claim by Contractor of any right under this Contract. If the matters set forth in the notice of dispute are not granted or otherwise responded to by Owner's Representative within fifteen (15) calendar days of receipt of notice of dispute by Owner's Representative, said objections shall be deemed denied. Any decision by the Owner's Representative, or deemed denial by the Owner's Representative, shall be final and conclusive in the absence of fraud. It is further agreed that the acceptance by the Contractor of the final payment shall be a bar to any and all claims of the Contractor, and constitute a waiver of the right to assert any claim against Owner, Owner's agents and employees and Owner's Representative, by Contractor. 48. NON-COMPLIANCE AND/OR ABANDONMENT BY CONTRACTOR In case the Contractor should (1) abandon and fail or refuse to resume work within fifteen (15) calendar days after written notification from the Owner or the Owner's Representative, or (2) if the Contractor fails to comply with the written orders of the Owner's Representative, when such orders are consistent with this contract, then the Surety on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall be delivered to the Contractor. In the event a bond is not required by law, or otherwise obtained by the Contractor, no further notice of such non-compliance to Contractor shall be required. After receiving said notice of abandonment or non-compliance , the Contractor shall not remove from the work any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for under paragraph 24 of this contract); it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. In the event the Contractor, or Surety, whichever is applicable, should fail to commence compliance with the notice hereinbefore provided within ten (10) calendar days after service of such notice, and/or shall fail to proceed with diligence to complete the project as contemplated and in compliance with all terms and provisions of the contract documents, then the Owner may exercise any and all remedies available to it pursuant to law, contract, equity or otherwise, including, but not limited to, providing for completion of the work in either of the following elective manners: (a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and supplies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time become due to the Contractor under and by virtue of this Agreement. In case such expense is less than the sum which would have been payable under this contract, if the same had been completed by the 17 49. 50. Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been completed by said Contractor, then the Contractor and/or its Surety shall pay the amount of such excess to the Owner; or (b) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspaper having a general circulation in the County of location of the work, may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case of any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and remain bound therefore. Should the cost to complete any such new contract prove to be less than that which would have been the cost to complete the work under this contract, the Contractor or his Surety shall be credited therewith. In the event the Owner's Representative elects to complete the work, as described above, when the work shall have been finally completed, the Contractor and his Surety shall be so notified and certification of completion as provided in paragraph 44 hereinabove set forth, shall be issued. A complete itemized statement of the contract accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to Contractor and his Surety, if applicable, whereon the Contractor or his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement within 30 days after the date of certification of completion. In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when the Contractor and/or his Surety, if applicable, shall pay the balance shown to be due by them to the Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and/or his Surety, if applicable. Should the cost to complete the work exceed the contract price, and the Contractor and/or his Surety, if applicable, fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and his Surety, if applicable, at the respective addresses designated in this contract; provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his Surety, if applicable, subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) calendar days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety, if applicable. Such sale may be made at either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery, equipment, tools, materials, or supplies that remain on the jobsite and belong to persons other than the Contractor or his Surety, if applicable, to their proper owners. The remedies provided to Owner by law, equity, contract, or otherwise, shall be cumulative, to the extent permitted by law. It is expressly agreed and understood that the exercise by Owner of the remedies provided in this paragraph shall not constitute an election of remedies on the part of Owner, and Owner, irrespective of its exercise of remedies hereunder, shall be entitled to exercise concurrently or otherwise, any and all other remedies available to it, by law, equity, contract or otherwise, including but not limited to, liquidated damages, as provided in paragraph 34, hereinabove set forth. LIMITATION ON CONTRACTOR'S REMEDY The remedies of Contractor hereunder shall be limited to, and Owner shall be liable only for, work actually performed by Contractor and/or its subcontractors as set forth in the contract documents, and Owner shall not be liable for any consequential, punitive or indirect loss or damage that Contractor may suffer in connection with the project which is the subject matter of this contract. BONDS 18 The Contractor is required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the Contractor is required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $50,000. All bonds shall be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do business in the State of Texas. It is further agreed that this contract shall not be in effect until such bonds are so furnished. 51. SPECIAL CONDITIONS In the event special conditions are contained herein as part of the contract documents and said special conditions conflict with any of the general conditions contained in this contract, then in such event the special conditions shall control. 52. LOSS OR EXPENSE DUE TO UNUSUAL OR UNANTICIPATED CIRCUMSTANCES Unless otherwise specified herein, all loss, expense or damage to the Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance or from unusual obstructions or difficulties, naturally occurring, man made or otherwise, which may be encountered in the prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense. 53. INDEPENDENT CONTRACTOR Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority to direct, supervise, and control its own employees and to determine the method of the performance of the work covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's work during Contractor's performance and to carry out the other prerogatives which are expressly reserved to and vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or corporation. 54. CLEANING UP The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at the completion of the work Contractor shall remove all such debris and also its tools, scaffolding, and surplus materials and shall leave the work room clean or its equivalent. The work shall be left in good order and condition. In case of dispute Owner may remove the debris and charge the cost to the Contractor. 55. HAZARDOUS SUBSTANCES AND ASBESTOS Hazardous Substances (herein so called), as deemed in the Comprehensive Environmental Response, `. Compensation, and Liability Act (42 U.S.C.S. §9601(14)) and the regulations promulgated thereunder, as same may be amended from time to time, hydrocarbons or other petroleum products or byproducts and/or asbestos, in any form, shall not (i) be utilized, in any way, manner or form, in the construction of, or incorporation into, the Project; or (ii) be brought upon, placed, or located, by any party, on the Project site, or any other property of the City, without the written consent of the Owner's Representative. If Contractor believes that the utilization of a Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos is necessary in the construction of the Project, or that it is necessary to place and/or otherwise locate upon the site of the Project or other property of the City, a Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos, Contractor shall notify the Owner's Representative, and request consent therefrom, at least twenty (20) days prior to such action. Owner's Representative may grant or deny the request of Contractor and provide whatever requirements such consent, if granted, is conditioned upon, in its sole and absolute discretion. If the request of Contractor is not granted, or otherwise not responded to, by Owner's Representative within five (5) days of the receipt of said request, said request shall be deemed to be denied. 19 56. RVA 58. In the event Owner's Representative shall consent to the request of Contractor, Contractor shall be responsible for ensuring that all personnel involved in the Project are (i) trained for the level of expertise required for proper performance of the actions contemplated by this Contract and, in particular, in all aspects of handling, storage, disposal and exposure of Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos; and (ii) are provided and utilize all protective equipment, including without limitation, personal protective gear, necessary to provide protection from exposure to Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos. NONAPPROPRIATION All funds for payment by the City under this contract are subject to the availability of an annual appropriation for this purpose by the City. In the event of non -appropriation of funds by the City Council of the City of Lubbock for the goods or services provided under the contract, the City will terminate the contract, without termination charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this contract is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this contract, cancellation shall be accepted by the Seller on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this contract beyond the date of termination. THE CITY RIGHT TO AUDIT At any time during the term of this Contract and for a period of four (4) years thereafter the City or a duly authorized audit representative of the City, or the State of Texas, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided under this Contract. In the event such an audit by the City reveals any errors/overpayments by the City, Contractor shall refund the City the full amount of such overpayments within thirty (30) days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. NON -ARBITRATION The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, this provision shall control. 20 I DAVIS BACON WAGE DETERMINATIONS PAGE INTENTIONALLY LEFT BLANK EXHIBIT A General Decision Number: TX130007 01/04/2013 TX7 Superseded General Decision Number: TX20120007 State: Texas Construction Types: Heavy and Highway Counties: Armstrong, Carson, Crosby, Ector, Irion, Lubbock, Midland, Potter, Randall, Taylor and Torn Green Counties in Texas. HEAVY & HIGHWAY CONSTRUCTION PROJECTS Modification Number Publication Date 0 01/04/2013 * SUTX2011-002 08/02/2011 Rates Fringes CEMENT MASON/CONCRETE FINISHER (Paving & Structures) ... $ 13.55 ELECTRICIAN ...................... $ 20.96 FORM BUILDER/FORM SETTER Paving & Curb ............... $ 12.36 Structures .................. $ 13.52 LABORER Asphalt Raker ............... $ 12.28 Flagger.....................$ 9.30 Laborer, Common ............. $ 10.30 Laborer, Utility ............ $ 11.80 Work Zone Barricade Servicer.................... $ 10.30 POWER EQUIPMENT OPERATOR: Asphalt Distributer ......... $ 14.87 Asphalt Paving Machine ...... $ 13.40 Broom and Sweeper ........... $ 11.21 Crane, Lattice Boom 80 Tons or Less ................ $ 16.82 Crawler Tractor Operator .... $ 13.96 Excavator, 50,000 lbs or less ........................ $ 13.46 Front End Loader Operator, Over 3 CY................... $ 12.77 Front End Loader, 3CY or less ........................ $ 12.28 LoaderBackhoe.............. $ 14.18 Mechanic .................... $ 20.14 Milling Machine ............. $ 15.54 Motor Grader, Rough ........ $ 16.15 Motor Grader, Fine .......... $ 17.49 Pavement Marking Machine .... $16.42 Reclaimer/Pulverizer........ $ 12.85 Roller, Asphalt ............. $ 10.95 Roller, Other ............... $ 10.36 Scraper ..................... $ 10.61 Spreader Box ................ $ 12.60 Servicer ......................... $ 13.98 Steel Worker (Reinforcing) ....... $ 13.50 Lowboy -Float ................ $ 14.46 Single Axle ................. $ 12.74 Single or Tandem Axle Dump..$ 11.33 Tandem Axle Tractor with Semi ........................ $ 12.49 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non -union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four -digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates. 0000/9999: weighted union wage rates will be published annually each January. Non -Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non -union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: 'Rs Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION EXHIBIT B Prevailing Wage Rates Overtime Rate The rate for overtime (in excess of forty hours per week) shall be as required by the Fair Labor Standards Act. EXHIBIT C Prevailing Wage Rates Legal Holiday Rate The rate for legal holidays shall be as required by the Fair Labor Standards Act. PAGE INTENTIONALLY LEFT BLANK I SPECIFICATIONS I PAGE INTENTIONALLY LEFT BLANK SEWRP 2 ND FEED WATERLINE city of bock TEXAS TECHNICAL SPECIFICATIONS DECEMBER 2012 100 EG J OH N BA IER ....................... 94196 v 1 TABLE OF CONTENTS CITY OF LUBBOCK SEWRP 2ND FEED POTABLE WATER LINE DIVISION 1— GENERAL REQUIREMENTS 01010 Summary of Work ----------------------------------------------------------- 4 01019 Contract Considerations----------------------------------------------------1 01028 Change Order Procedures -------------------------------------- ------------ 3 01039 Coordination and Meetings ------------------------ —------------ ---------- 2 01140 Work Restrictions------------------------------------------------------------ 3 01300 Submittal Procedures ------- ----------------------------------- -------------- 4 01310 Progress Schedules---------------------------------------------------------- 2 01356 Storm Water Pollution Prevention Plan --------------------------------- 4 01400 Quality Requirements ------------------------------------------------------- 4 01410 Testing Laboratory Services ----------------------------------------------- 3 01555 Barricades, Signs, and Traffic Handling ---------- — -------------------- 1 01576 Waste Material Disposal---------------------------------------------------2 01700 Contract Closeout------------------------------------------------------------ 2 DIVISION 2 — SITE WORK 02260 Excavation Support and Protection -------------------------------------- 3 02317 Excavation and Backfill for Utilities -------------------------- — --------- 10 02320 Utility Backfill Materials --------------------------------------------------- 4 02445 Boring and Encasing-------------------------------------------------------4 02510 Reduced Pressure Zone Devices ----------------------------------------- 8 02665 Water Piping, Valves, and Fittings---------------------------------------14 DIVISION 3 — CONCRETE 03300 Cast -in -Place Concrete 0 SEWRP 2"a Feed Water Line Table of Contents December 2012 SECTION 01010 SUMMARY OF WORK PART 1 GENERAL 1.1 SUMMARY A. This section covers the description of the Work to be completed under these Specifications. B. The OWNER is the City of Lubbock. (1) The Owner's Representative is: John Turpin, P.E. Chief Water Utilities Engineer City of Lubbock O: (806) 775-2342 (2) The Project Manager is: Greg Baier, P.E. Civil Engineer Water Utilities Engineering City of Lubbock O: (806) 775-2394 C. Section includes: (1) Definitions (2) Project description (3) Permits and licenses (4) Access to site (5) Contractor's use of the premises (6) Project schedule (7) Security Procedures (8) Coordination requirements (9) Pre -construction meeting (10) Warranty 1.2 DEFINITIONS A. Furnish: To supply products to the project site, including delivering ready for unloading and replacing damaged and rejected products. B. Install: To put products in place in the work ready for the intended use, including unloading, unpacking, handling, storing, assembling, installing, erecting, placing, applying, anchoring, working, finishing, curing, protecting, cleaning, and similar operations. C. Provide: To furnish and install products. D. Indicated: Shown, noted, scheduled, specified, or drawn, somewhere in the contract documents. SEWRP 2"a Feed Water Line 01010-1 December 2012 1.3 PROJECT DESCRIPTION A. The purpose of this project is to provide a second potable water line feed to the South East Water Reclamation Plant (SEWRP) on 371h and Guava in Lubbock, TX. B. Major work items are: (1) Connect to existing 10" water line north of 50`h Street on Guava Ave. (2) Provide new 8" and 6" C-900 DR-18 water line, including reducers, shut-off gate valves and bends installed by trench or bore. (3) Provide one RPZ unit outside plant fence. (4) Connect new water line to existing line inside SEWRP facility premises. (5) Provide 6" C-900 DR-18 pressure -equalizing water line to join existing west water line and proposed east water line ahead of both RPZ boxes. (6) Repair streets, ditches and driveway approaches to prior conditions as required. C. The Contractor shall furnish all labor, equipment, and materials required for the complete construction of the work as shown on the drawings and specified herein. D. All work shall be performed in accordance with the most recent City of Lubbock Design Standards for Water and Sanitary Sewer construction. E. A maximum of 500 feet of trench open at a time. 1.4 Work shall also include restoration or replacement of all removed or damaged pavement, curb, sidewalk, gutter, shrubbery, fence, sod or other disturbed surfaces or structures in a condition equal to that before the work began to the satisfaction of the Engineer. 1.5 PERMITS AND LICENSES A. Contractor shall provide qualifications to the Owner upon request to display evidence of competency and authority to perform required work. B. Contractor shall be responsible for obtaining all required permits. C. Contractor shall submit copies of all permits, licenses, and similar permissions obtained, and receipts for fees paid, to the Owner. 1.6 ACCESS TO SITES A. Contractor shall limit access to the site to authorized personnel only. B. Contractor shall adequately barricaded open excavations and construction material and equipment as to prevent unauthorized personnel from accessing. C. The Owner shall locate and designate all manhole access points open and accessible for the work, and provide rights of access to these points. D. Contractor shall coordinate with the City Solid Waste Services to maintain trash pickup schedules when working with in the alley right of way. 1.7 CONTRACTOR'S USE OF THE PREMISES A. The space available to the Contractor for the performance of the work, either exclusively or in conjunction with others performing other construction as part of the project, is restricted to SEWRP 2"d Feed Water Line 01010-2 December 2012 1 the area shown on the site plan of the contract drawings unless the Contractor makes arrangements to use additional space with the Owner. B. The contractor shall ensure that any disturbed area is left in a condition equal to or better condition before finishing construction in the area. 1.8 PROJECT SCHEDULE A. The Work summarized above shall be substantially completed within 60 calendar days from the date of the Notice to Proceed. B. There will be a $300.00 per day liquidated damages for each day that exceeds the 60 day limit. C. Within five (5) business days after the date of the Substantial Completion Certificate, the Engineer shall issue a Final Punch List of items to be corrected prior to Final Completion. D. Punch list items shall be complete within 30 calendar days from the date of the Final Punch List. There shall be $100 day liquidated damages assessed for each day that exceeds the 30 day limit. PART 2 PRODUCTS Not used. PART 3 EXECUTION 3.1 SECURITY PROCEDURES A. Contractor shall limit access to the site to persons involved in the work. r- B. Contractor shall provide secure storage for materials for which the owner has made payments and which are stored on site. C. Contractor shall secure completed work as required to prevent loss or damage. D. Contractor shall secure sites by means of fencing, security guards, or other means to prevent damage, theft, safety hazards, or other problems on the site. E. The use of security personnel shall be cleared with the Owner. u 3.2 COORDINATION REQUIREMENTS A. Contractor shall inform the Owner when coordination of the work is required. B. If necessary, inform each party involved, in writing, of procedures required for coordination; include requirements for giving notice, submitting reports, and attending meetings. C. Coordinate shop drawings prepared by separate entities. D. Show installation sequence when necessary for proper installation. 3.3 PRE -CONSTRUCTION MEETING A. A pre -construction meeting will be held at City Hall within ten (10) days of the date of Notice to Proceed and prior to any construction taking place. 3.4 WARRANTY SEWRP 2"° Feed Water Line 01010-3 December 2012 A. Contractor shall warrant 100% of the project for one (1) year after the date of substantial acceptance of the work. B. On the eleventh (11) month from the date of final acceptance, an Owner's representative will schedule an inspection with the presence of the Contractor to inspect for defects and assessment of the work performed. C. Any work that is considered defective by the Owner's representative will be repaired. D. The Contractor shall remedy any defects in workmanship, and pay for any and all damages of any nature whatsoever resulting in defects at no cost to the Owner. END OF SECTION _1 SEWRP 2"d Feed Water Line 010104 December 2012 7 SECTION 01019 CONTRACT CONSIDERATIONS 1.1 SUMMARY A. This section covers the method for the Contractor to request payment for completed work. B. Section includes: (1) Schedule of Values (2) Application for Payment (3) Payment Retainage 1.2 SCHEDULE OF VALUES A. Contractor shall submit a Schedule of Values on Engineer approved Contractor's form within five (5) days after receiving the bid tabulation. B. Revise schedule to include approved Change Orders, with each Application for Payment. 1.3 APPLICATIONS FOR PAYMENT A. Submit two (2) copies of each application on Engineer approved Contractor's form. B. Utilize Schedule of Values for listing items in Application for Payment. C. Monthly, submit application for payment on or about the 1 Oth day of each month. D. Include an updated construction progress schedule, materials received, and manifest with each Application for Payment E. Submit the following along with the application for final payment: (1) The documentation for the completed project. (2) Signed affidavit from a Notary Public that all claims on this job have been settled and that all bills owed by the Contractor for the project including materials and labor have been paid. (3) One (1) year Contractor Warranty for work performed, signed and sealed by a Notary Public. 1.4 PAYMENT RETAINAGE A. The Owner will retain five (5) percent of each payment. B. Retainage will be released as final payment, upon completion of the Final Punch List. PART 2 PRODUCTS Not used. PART 3 EXECUTION Not used END OF SECTION SEWRP 2°° Feed Water Line 01019-1 December 2012 THIS PAGE INTENTIONALLY LEFT BLANK 1 1 SECTION 01028 CHANGE ORDER PROCEDURES PART1 GENERAL 1.1 SUMMARY A. This section covers the procedures to be followed for a change in Contract price or time. B. Section Includes: (1) Submittals (2) Documentation Of Change In Contract Sum/Price And Contract Time (3) Change Procedures (4) Construction Change Authorization (5) Stipulated Price Change Order (6) Unit Price Change Order (7) Time And Material Change Order (8) Execution Of Change Orders (9) Correlation Of Contractor Submittals 1.2 SUBMITTALS A. Submit the name of the individual authorized to receive change documents, and be responsible for informing others in Contractor's employ or Subcontractors of changes to the Work. B. Change Order Forms. 1.3 DOCUMENTATION OF CHANGE IN CONTRACT SUM/PRICE AND CONTRACT TIME A. Contractor shall maintain detailed records of work done on a time and material basis. B. Provide full information required for evaluation of proposed changes and to substantiate costs of changes in the Work. C. Document each quotation for a change in a cost or time with sufficient data to allow evaluation of the quotation. D. On request, provide additional data to support computations, including but not limited to: (1) Quantities of products, labor, and equipment. (2) Taxes, insurance, and bonds. (3) Overhead and profit. (4) Justification for any change in Contract Time. (5) Credit for deletions from Contract, similarly documented. E. Support each claim for additional costs, and for work done on a time and material basis, with additional information: (1) Origin and date of claim. (2) Dates and times work was performed, and by whom. (3) Time records and wage rates paid. (4) Invoices and receipts for products, equipment, and subcontracts, similarly documented. 1.4 CHANGE PROCEDURES SEWRP 2n° Feed Water Line 01028-1 December 2012 A. Changes to Contract Sum/Price or Contract Time can only be made by issuance of an official Construction Change Authorization or Contract Change Order. Discussions in the field or by phone or email, without proper documentation, do not authorize Contractor to perform tasks outside the scope of Work. Changes must be authorized as described in this Section. B. The Engineer will advise of minor changes in the Work not involving an adjustment to Contract Sum/Price or Contract Time as authorized by the Contract by issuing supplemental instructions by letter. C. The Engineer may issue a Proposal Request which includes a detailed description of a proposed change with supplementary or revised Drawings and Specifications. The Contractor shall prepare and submit an estimate within seven (7) days, or as specified in the Proposal Request. Estimate shall include the proposed change's full effect on the Work and the effect on the Contract Sum/Price and Contract Time, with full documentation and a statement describing the effect on Work by separate or other contractors. D. The Contractor may request clarification of Drawings, Specifications, or Contract documents or other information by submitting a Request for Information to the Engineer. Engineer may request a Proposal Request in response to a Request for Information. 1.5 CONSTRUCTION CHANGE AUTHORIZATION A. The Engineer may issue a document, signed by the Owner, instructing the Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order. B. The document will describe changes in the Work, and will designate the method of determining any change in Contract Sum/Price or Contract Time. C. The Contractor shall promptly execute the change in the Work. 1.6 STIPULATED PRICE CHANGE ORDER A. Based on accepted Proposal Request. 1.7 UNIT PRICE CHANGE ORDER A. For pre -determined unit prices and quantities, the Change Order will be executed on a fixed unit price basis. B. For unit costs or quantities of units of work which are not pre -determined, execute Work under a Construction Change Authorization. C. Changes in Contract Sum/Price or Contract Time will be computed as specified for Time and Material Change Order. 1.8 TIME AND MATERIAL CHANGE ORDER A. Submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract. B. The Engineer will determine the change allowable in Contract Sum/Price and Contract Time as provided in the Contract Documents. C. Maintain detailed records of work done on Time and Material basis. D. Provide full information required for evaluation of proposed changes, and to substantiate costs for changes in the Work. 1.9 EXECUTION OF CHANGE ORDERS A. The Engineer will issue Change Orders for signatures of parties as provided in the Conditions of the Contract. 1.10 CORRELATION OF CONTRACTOR SUBMITTALS SEWRP 20' Feed Water Line 01028-2 December 2012 A. Promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Sum/Price. B. Promptly revise progress schedules to reflect any change in Contract Time, revise sub - schedules to adjust time for other items of work affected by the change, and resubmit. C. Promptly enter changes in Project Record Documents. PART PRODUCTS Not used PART 3 EXECUTION Not used END OF SECTION SEWRP 2' Feed Water Line 01028-3 December 2012 THIS PAGE INTENTIONALLY LEFT BLANK SECTION 01039 COORDINATION AND MEETINGS PARTI GENERAL 1.1 SUMMARY A. Section Includes: (1) Coordination (2) Field Engineering (3) Pre -Construction Meeting (4) Progress Meetings 1.4 COORDINATION A. Coordinate scheduling, submittals, and Work of the various Sections of the Project to assure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later. B. Coordinate completion and cleanup of Work of separate Sections in preparation for Substantial Completion. C. After Owner occupancy of premises, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of Owner's activities. 1.5 FIELD ENGINEERING A. Locate and protect survey control and reference points. B. Verify set -backs and easements; confirm drawing dimensions, and elevations. C. Provide field engineering services. D. Establish elevations, lines, and levels, utilizing recognized engineering survey practices. E. Submit a copy of registered site drawing and certificate signed by Land Surveyor that the elevations and locations of the Work are in conformance with the Contract Documents. 1.6 PRE -CONSTRUCTION MEETING A. Schedule meeting within ten (10) days of date of Notice to Proceed. B. Procedures and processing of field decisions, submittals, and substitutions, applications for payments, RFIs, proposal request, Change Orders and Contract closeout procedures. C. Tentative agenda: (1) Use of premises by Owner and Contractor. (2) Distribution of executed Contract Documents. (3) Submission of list of Subcontractors, list of products and progress schedule. (4) Designation of personnel representing the parties in Contract and the Engineer. (5) Owner's requirements. (6) Construction facilities and controls provided by Owner. (7) Survey and layout. (8) Security and housekeeping procedures. (9) Schedules. (10) Procedures for testing. (11) Procedures for maintaining record documents. (12) Inspection and acceptance of products put into service during construction period. SEWRP 2°d Feed Water Line 01039-1 December 2012 D. Record minutes and distribute copies within five (5) days after meeting to Engineer, participants, and those affected by decisions made. 1.7 PROGRESS MEETINGS A. Schedule and administer meetings throughout progress of the Work at minimum monthly intervals. B. Make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings. C. Attendance Required: Job superintendent, major Subcontractors and suppliers, Engineer, as appropriate to agenda topics for each meeting. D. Tentative agenda: (1) Review minutes of previous meetings. (2) Review of Work progress. (3) Field observations, problems, and decisions. (4) Identification of problems which impede planned progress. (5) Review of submittals schedule and status of submittals. (6) Review of off -site fabrication and delivery schedules. (7) Maintenance of progress schedule. (8) Corrective measures to regain projected schedules. (9) Planned progress during succeeding work period. (10) Coordination of projected progress. (11) Maintenance of quality and work standards. (12) Effect of proposed changes on progress schedule and coordination. (13) Other business related to Work. E. Record minutes and distribute copies within five (5) days after meeting to Engineer, participants, and those affected by decisions made. PART PRODUCTS Not used PART 3 EXECUTION Note used END OF SECTION SEWRP 2"" Feed Water Line 01039-2 December 2012 SECTION 01140 WORK RESTRICTIONS PART1 GENERAL A. Section Includes: (1) Use Of Premises (2) Special Scheduling Requirements (3) Working Period (4) Utility Cutovers And Interruptions (5) Noise Restrictions (6) Advance Notice (7) Water For Construction (8) Work Area Limits 1.2 USE OF PREMISES A. Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated. B. Confine construction operations to within the limits of Right of Way, Alley Easements and Manhole locations, as shown on plans. C. Keep driveways and entrances serving premises clear and available to tenants, residents and emergency vehicles at all times, except when construction is immediately at that vicinity. Do not use these areas for parking or storage of materials. D. Schedule construction to minimize obstruction of driveways and entrances. 1.3 SPECIAL SCHEDULING REQUIREMENTS A. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the Work. B. Permission to interrupt utility service shall be requested in writing a minimum of fourteen (14) calendar days prior to the desired date of interruption. 1.4 WORKING PERIOD A. Regular working hours shall be within an eleven (11) hour period between 7:00 a.m. and 6:00 p.m., Monday through Friday, and an eight (8) hour period between 9:00 a.m. and 5:00 p.m. on Saturday. (1) Saturday work shall be restricted to those activities that do not require observation by the Owner. (2) The Owner reserves the right, at the Owner's discretion, to disallow work when it interferes with holiday times and traffic. B. No work shall be performed on the following holiday periods or days: (1) New Year's Day (2) Good Friday Holiday (3) Memorial Day Holiday (4) Independence Day Holiday SEWRP 2' Feed Water Line 01140-1 December 2012 (5) Labor Day Holiday (6) Thanksgiving Day Holiday plus the day before and the three days following Thanksgiving Day. (7) Christmas Week. If Christmas Day falls on Saturday, this will be defined as the week leading to Christmas Day. If Christmas Day falls on Sunday, this will be defined as the week following Christmas Day plus the Friday and Saturday prior to Christmas Day. C. Work outside regular working hours requires Owner's approval. (1) Make application twenty-one (21) calendar days prior to such work to allow arrangements to be made by the Owner for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. (2) Based on the justification provided, the Owner may approve work outside regular hours. (3) During periods of darkness, the different parts of the Work shall be lighted in a manner approved by the Owner. Lighting shall be such that it does not cause nuisance conditions. D. The Drawings contain specific requirements that affect certain areas of the Work. A. Sanitary sewer flow shall not be interrupted upstream of the Work. Bypass pumping of sanitary sewer flow upstream of the Work shall be the responsibility of the Contractor. B. Water service connections shall be re -connected in a timely manner following installation of the new water pipe. 1.6 NOISE RESTRICTIONS A. 75 dB limit at face of nearest structure during normal daylight hours. B. 65 dB limit at face of nearest structure during evening and nighttime hours in or near residential areas and for 24-hour working conditions that have received Owner approval. Evening and nighttime hours shall be defined as 6:00 p.m. to 7:00 a.m. C. The Contractor shall keep on -site a hand portable sound measurement device for both the Owner's and the Contractor's use for measuring noise levels. 1.7 ADVANCE NOTICE A. The Contractor shall provide a minimum of five (5) days advance written notice of construction to businesses and residences along the construction route. B. The advance written notice shall be in the form of a single page flyer to be placed by hand by the Contractor's forces in mailboxes, door handles, or handed to applicable individuals at each route building. C. The text for the advance written notice will be approved by the Owner. D. Reproduction shall be at the Contractor's expense. E. Distribution shall be at the Contractor's expense. F. Single page flyers shall be of a paper or post card color other than white to direct the recipient's attention to the information. G. The text shall contain the anticipated beginning date of inconvenience to the recipient and the anticipated duration of that inconvenience. H. The dates shall encompass the duration of driveway inconveniences and potential noise to the recipients on a single city block (i.e., the dates and durations shall reflect the time that the city block of interest will be affected by non-trafficability). SEWRP 2"° Feed Water Line 01140-2 December 2012 1.8 WATER FOR CONSTRUCTION A. Obtaining water for construction is the Contractor's sole responsibility. B. Water is available from the potable water system of the City of Lubbock for construction purposes. (1) The Contractor is responsible for all charges and arrangements for water consumption from the potable water system. (2) The Contractor shall make such arrangements directly with the City of Lubbock Water Utilities Department. (3) The City will not furnish potable water free of charge for the construction work. (4) The Contractor is responsible for any required metering and hauling. C. Water from park area lakes shall not be used for construction. D. This section does not preclude the Contractor from seeking other water sources for use in construction. Such water resources shall meet the purity requirements for the intended use. Such arrangements for water from other sources are the responsibility of the Contractor. PART PRODUCTS Not used PART 2 EXECUTION 2.1 WORK AREA LIMITS A. Prior to any construction, the Contractor shall mark the areas that need not be disturbed under this contract. B. Isolated areas within the general work area which are to be saved and protected shall also be marked or fenced. C. Monuments and markers shall be protected before construction operations commence. j D. Where construction operations are to be conducted during darkness, the markers shall be visible at all times. E. The Contractor's personnel shall be knowledgeable of the purpose for marking and/or protecting particular objects. END OF SECTION SEWRP 2"° Feed Water Line 01140-3 December 2012 THIS PAGE INTENTIONALLY LEFT BLANK SECTION 01300 SUBMITTAL PROCEDURES PART GENERAL 1.1 SUMMARY A. Section includes: (1) Submittal Procedures (2) Re -Submittal Requirements (3) Action Submittals (4) Proposed Products List (5) Shop Drawings (6) Information Submittals (7) Contractor's Review (8) Owner And Engineer Action 1.2 SUBMITTAL PROCEDURES A. Transmit each submittal with Contractor's standard transmittal letter including Contractor's name, address, and phone number. B. Identify Project, Contractor, Subcontractors or Suppliers, pertinent Drawings sheet and detail number(s), and specification Section number, as appropriate. C. Schedule submittals to expedite the Project and coordinate submission of related items. D. The Owner and Engineer reserve the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. E. Submittals may be delivered to the Engineer at the following address: Water Utilities Engineering 1625 13th Street Lubbock, Texas 79401 F. Allow enough time for submittal review, including time for re -submittals, as follows: (1) Time for review shall commence on the Owner or Engineer's receipt of submittal. (2) Allow fifteen (15) days for initial review of each submittal. (3) Allow additional time if processing must be delayed to permit coordination with subsequent submittals. (4) The Owner or Engineer will advise the Contractor when a submittal being processed J must be delayed for coordination. (5) If more than five (5) submittals are transmitted for review within any five (5) day period, the time allowed for review will be increased to twenty-one (2 1) days. (6) Where concurrent review of submittals by the Engineer, Owner, or other parties is required, allow twenty-one (2 1) days for initial review of each submittal. (7) If intermediate submittal is necessary, process it in same manner as initial submittal. (8) Allow fifteen (15) days for processing each resubmittal. G. No extension of the Contract Time will be authorized because of failure to transmit submittals sufficiently in advance of the Work to permit processing. H. Identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of the completed Work. L1,11 SEWRP 2"d Feed Water Line 01300-1 December 2012 I. Provide space for Contractor and Engineer review stamps. J. Distribute copies of reviewed submittals to concerned parties. Instruct parties to promptly report any inability to comply with provisions. K. Use only final submittals with mark indicating action taken by Owner or Engineer in connection with the construction. L. Submittals not requested will not be recognized or processed. 1111-m - 11:�Cililii LWIM A. Revise initial submittal as required and re -submit to meet requirements as specified. B. Identify all changes made since previous submittal. C. Mark as RESUBMITTAL. D. Re -use original transmittal number and supplement with sequential alphabetical suffix for each re -submittal (ie. 0001-A). PART 2 PRODUCTS 2.1 ACTION SUBMITTALS A. Prepare and submit Action Submittals required by individual Specification Sections. B. Submit three (3) copies of each submittal, unless otherwise indicated. (1) The three (3) copies will be retained by the Owner's representative. (2) Any additional copies that the Contractor may need for his operations will be in addition to the three (3) copies required. 2.2 PROPOSED PRODUCTS LIST A. Within fifteen (15) days after date of Notice to Proceed, submit complete list of major products proposed for use, with name of manufacturer, trade name, and model or catalog designation, and reference standards. B. For products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards. C. Collect information into a single submittal for each element of construction and type of product or equipment. D. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information unique to this Project. E. Include recommendations for application and use, compliance with specified standards of trade associations and testing agencies. F. Include notation of special coordination requirements for interfacing with adjacent work. G. After review, distribute in accordance with Article on Procedures above and provide copies for Record Documents described in Section 01700 — Contract Closeout. 2.3 SHOP DRAWINGS A. Prepare Project specific information, drawn accurately to scale. B. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. C. Include the following information, as applicable: (1) Dimensions SEWRP 2"d Feed Water Line 01300-2 December 2012 (2) Identification of products (3) Fabrication and installation drawings (4) Schedules (5) Design calculations (6) Compliance with specified standards (7) Notation of coordination requirements (8) Notation of dimensions established by field measurement D. For drawings larger than 11 x 17 inches, submit in the form of one reproducible transparency and one opaque reproduction. E. For drawings 11 x 17 inches and smaller, submit the number of opaque reproductions which Contractor requires, plus three (3) copies which will be retained by Engineer. F. Drawing size shall be minimum of 8'/2 x 11 inches and a maximum of 24 x 36 inches. G. Draw details to a minimum size of'h inch equal to 1 foot. H. After review, produce copies and distribute in accordance with SUBMITTAL PROCEDURES article above and for record document purposed described in Section 01700 — Contract Closeout. 2.4 INFORMATION SUBMITTALS A. Manufacturer's Instructions: (1) When specified in individual specification Sections, submit manufacturers' printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, in quantities specified for Product Data. (2) Identify conflicts between manufacturers' instructions and Contract Documents. (3) Indicate special procedures, conditions requiring special attention and special environmental criteria required for application or installation. B. Manufacturer's Certificates (1) When specified in individual specification Sections, submit manufacturers' certificate to Engineer for review, in quantities specified for Product Data. (2) Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference date, affidavits, and certifications as appropriate. (3) Certificates may be recent or previous test results on material or Product, but must be acceptable to the Engineer. C. Insurance Certificates and Bonds: (1) Prepare written information indicating current status of insurance or bonding coverage. (2) Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage. PART 3 EXECUTION 3.1 CONTRACTOR'S REVIEW A. Review each submittal and check for compliance with the Contract Documents. B. Note corrections and field dimensions. C. Mark with approval stamp before submitting to the Owner or Engineer. (1) Stamp each submittal with a uniform approval stamp. SEWRP 2"d Feed Water Line 01300-3 December 2012 r r 1 _ (2) Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that the submittal has been reviewed, checked, and approved for compliance with the Contract Documents. 3.2 OWNER AND ENGINEER'S ACTION A. The Owner or Engineer will not review submittals that do not bear the Contractor's approval stamp and will return them without action. B. The Owner or Engineer will review each submittal, make marks to indicate corrections or modifications required, and return it. C. The Owner or Engineer will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken, as follows: (1) No exception taken (2) Make correction noted rJ! (3) Revise and resubmit (4) Rejected D. The submittal stamp by the Owner or Engineer will also contain the following: 1 Checking is only for general conformance with the design concept of the project and () g� Y g � P p j general compliance with the information given in the Contract Documents. (2) Any action shown is subject to the requirements of the plans and specifications. (3) The Contractor is responsible for confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; and performing the Work in a satisfactory manner. ' E. The Owner or Engineer will review each submittal and will not return it, or will reject and return it, if it does not comply with the requirements. END OF SECTION H 9 SEWRP 2— Feed Water Line 01300-4 December 2012 SECTION 01310 PROGRESS SCHEDULES PART GENERAL 1.1 SUMMARY A. Section Includes: (1) Format (2) Content (3) Revisions To Schedules (4) Submittals (5) Distribution 1.2 FORMAT A. Sequence of Listings: The chronological order of the start of each item of Work. B. Scale and Spacing: To provide space for notations and revisions. C. Sheet Size: Minimum 8 1/2 x 11 inches D. Submit only if requested by the Engineer or Owner at preconstruction or coordination meeting. E. Maintain monthly updates to schedule. 1.3 CONTENT A. Show complete sequence of construction by activity, with dates for beginning and completion of each element of construction. B. Identify each item by specification Section number. C. Provide sub -schedules to define critical portions of the entire Schedule. D. Show accumulated percentage of completion of each item, and total percentage of Work completed, as of the first day of each month. E. Provide separate schedule of submittal dates for shop drawings, product data, samples, and dates reviewed submittals will be required from the Engineer. Indicate decision date for selection of finishes. 1.4 REVISIONS TO SCHEDULES A. Indicate progress of each activity to date of submittal, and projected completion date of each activity. B. Identify activities modified since previous submittal, major changes in scope, and other identifiable changes. C. Provide narrative report to define problem areas, anticipated delays, and impact on Schedule. Report corrective action taken, or proposed, and its effect. 1.5 SUBMITTALS A. Submit initial Schedules within ten (10) days after date established in Notice to Proceed. After review, resubmit required revised data within ten (10) days. B. Submit revised Progress Schedules with each Application for Payment. C. Submit the number of opaque reproductions which the Contractor requires, plus two (2) copies which will be retained by the Engineer. L SEWRP 2"d Feed Water Line 01310-1 December 2012 1.6 DISTRIBUTION A. Distribute copies of reviewed Schedules to project site file, Subcontractors, suppliers, and other concerned parties. B. Instruct recipients to promptly report, in writing, problems anticipated by projections indicated in Schedules. PART 2 PRODUCTS Not used PART 1 EXECUTION Not used END OF SECTION SEWRP 2"° Feed Water Line 01310-2 December 2012 SECTION 01356 STORM WATER POLLUTION PREVENTION MEASURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: (1) Contractor Responsibilities (2) Erosion and Sediment Controls (3) Components for Silt Fences (4) Components for Straw Bales (5) Storm Water Pollution Prevention Plan 1.2 CONTRACTOR RESPONSIBILITIES A. The Contractor shall implement, maintain, and update the Storm Water Pollution Prevention measures specified in the Storm Water Pollution Prevention Plan (SWP3) in a manner, which will meet the requirements of the Texas Pollution Discharge Elimination System (TPDES) General Permit No.TXR150000. B. The Contractor shall be responsible for any fines or penalties assessed by the appropriate a regulatory agency for failure to make required inspections, failure to properly document those inspections, failure to adequately implement and adjust the storm water pollution prevention measures specified in the SWP3 to adequately control pollutants, and/or any other fines or penalties assess by TCEQ or the EPA for failure to comply with any part of the permit - requirements. C. The Contractor shall submit a Notice of Intent and a Notice of Termination independently of the Owner. D. Fines leveled against the Owner by the TCEQ or the EPA for the Contractor's failure to comply with and maintain the SWP3 shall be paid by the Contractor. 1.3 EROSION AND SEDIMENT CONTROLS A. General (1) Structural measures shall be implemented to divert flows from exposed soils, temporarily store flows, or otherwise limit run-off and the discharge of pollutants from exposed areas of the site. (2) Structural practices shall be implemented as specified in the SWP3 and in a timely manner during the construction process to minimize erosion and sediment run-off. y B. Stabilized Ingress/Egress (1) Stabilized access to and from the construction site will be installed by the Contractor as soon as practical and in accordance with the SWP3. (2) In all cases, the Contractor shall ensure that any soil tracked off -site is cleaned from existing roads, alleys, and any adjacent properties as soon as possible. (3) The Contractor or other responsible party shall check for any pollutants (mud, silt, sand, cement, construction materials, etc.) tracked or washed off -site and perform necessary clean-up measures at the end of each work day. C. Silt Fences/Diversion Berms SEWRP 2"° Feed Water Line 01356-1 December 2012 (1) The Contractor shall provide silt fences and/or diversion berms as a temporary structural practice to minimize erosion and sediment runoff. (2) Silt fences and/or diversion berms shall be properly installed to effectively retain sediment immediately after completing each phase of work where erosion would occur in the form of sheet and rill erosion (e.g., clearing and grubbing, excavation, embankment, and grading.) (3) Silt Fences/Diversion Berms shall be kept in good and functional condition for as long as they are required and until they are removed from the site. D. Sand/Gravel Bags (1) The Contractor may provide sand/gravel bags as a temporary structural practice to minimize erosion and sediment runoff. (2) Bags shall be properly placed to effectively retain sediment immediately after completing each phase of work (e.g., after clearing and grubbing in an area between a ridge and drain, bags shall be placed as work progresses, bags shall be removed/replaced/relocated as needed for work to progress in the drainage area). (3) Sand/gravel bags must remain in good condition, or they shall be replaced. E. Site Stabilization (1) The Contractor shall disturb the least amount of site area as possible. (2) Stabilization measures to be implemented by the Contractor may include any of the following measures: (a) Temporary or permanent seeding or sodding (b) Mulching (c) Geotextiles (d) Vegetative buffer strips (e) Paving (f) Stabilization measures shall be implemented in accordance with the SWP3. PART 2 PRODUCTS 2.1 COMPONENTS FOR SILT FENCES A. Filter Fabric (1) The geotextile shall comply with the requirements of ASTM D 4439, and shall consist of polymeric filaments, which are formed into a stable network such that filaments retain their relative positions. (2) The filament shall consist of a long -chain synthetic polymer composed of at least eight - five (85) percent by weight of ester, propylene, or amide, and shall contain stabilizers and/or inhibitors added to the base plastic to make the filaments resistant to deterioration due to ultraviolet and heat exposure. (3) Synthetic filter fabric shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum of six (6) months of expected usable construction life at a temperature range of 0 to 120 degrees Fahrenheit. SEWRP 2"a Feed Water Line 01356-2 December 2012 1 (4) The filter fabric shall meet the following requirements: FILTER FABRIC FOR SILT FENCE PHYSICAL PROPERTY TEST PROCEDURE REQUIREMENT Grab Tensile ASTM D 4632 100 lbs. min. Elongation ASTM D 4632 30 % max. Trapezoid Tear ASTM D 4533 55 lbs. min. Permittivity ASTM D 4491 0.2 sec-1 AOS U.S. Std. Sieve ASTM D 4751 20 —100 B. Silt Fence Stakes and Posts (1) The Contractor may use either wooden stakes or steel posts for fence construction. (2) Wooden stakes utilized for silt fence construction shall have a minimum cross section of two (2) inches by two (2) inches when hardwood is used and two (2) inches by four (4) inches when pine is used, and shall have a minimum length of four (4) feet. (3) Steel posts (standard "U" or "T" section) utilized for silt fence construction shall have a minimum weight of 1.33 pounds per linear foot and a minimum length of four (4) feet. C. Identification, Storage, and Handling\ (1) Filter fabric shall be identified, stored, and handled in accordance with ASTM D 4873. 2.2 COMPONENTS FOR STRAW BALES A. Straw Bales (1) The straw in the bales shall be stalks from oats, wheat, rye, barley, rice, or from grasses such as Byhalia, Bermuda, etc., furnished in air-dry condition. (2) The bales shall have a standard cross section of fourteen (14) inches by eighteen (18) inches. All bales shall be either wire -bound or string -tied. (3) The Contractor may use either wooden stakes or #3 rebars to secure the straw bales to the ground. (4) Wooden stakes utilized for this purpose shall have minimum dimensions of two (2) inches by two (2) inches in cross section and shall have a minimum length of three (3) feet. (5) Rebar utilized for securing straw bales shall have a minimum diameter of 3/8 of an inch and a minimum length of three (3) feet. PART 3 EXECUTION 3.1 STORM WATER POLLUTION PREVENTION PLAN A. Storm Water Pollution Prevention Plan will be provided by the Contractor. B. The Contractor must keep a copy of the SWP3 on site at all times. C. A completed Notice of Intent (NOI) form must be submitted a minimum of forty-eight (48) hours prior to start of construction. ff D. No work will be permitted until NOI is filed. E. The SWP3 shall be continually updated as necessary to reflect current and changing conditions on site. F. Additional measures not specifically shown in the SWP3 may be used to control erosion from leaving the site. L SEWRP 2nd Feed Water Line 01356-3 December 2012 G. A completed Notice of Termination (NOT) form must be submitted prior to finalization of this contract. H. The Contractor shall furnish the Owner with a copy of the NOI and NOT. END OF SECTION SEWRP 2"" Feed Water Line 01356-4 December 2012 I SECTION 01400 QUALITY REQUIREMENTS PART GENERAL 1.1 SUMMARY A. Section Includes: (1) Definitions (2) Testing Requirements (3) Submittals (4) Quality Control (5) Repair and Protection 1.2 DEFINITIONS A. Quality Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and ensure that proposed construction complies with requirements. B. Quality Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that completed construction complies with requirements. 1.3 TESTING REQUIREMENTS A. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve the Contractor of responsibility for compliance with the Contract Document requirements. B. Specific quality control requirements for individual construction activities are specified in the sections that specify those activities. Requirements in those Sections may also cover production of standard products. C. Specified tests, inspections, and related actions do no limit the Contractor's quality control procedures that facilitate compliance with the Contract Document requirements. 1.4 SUBMITTALS A. Qualification Data: (1) For individuals employed by the Contractor who will perform testing as required by the various specification Sections, submit at least fourteen (14) days prior to being used on the project the capabilities and experience of such individuals and the types of tests that the individual will perform. (2) For outside testing agency employed by the Contractor, submit at least fourteen (14) days prior to being used on the project the name, address, and manager of such testing agency and the types of tests that the agency will perform. (a) Such testing agency shall be acceptable to the Owner prior to being used on the project. B. Reports: (1) Prepare and submit written reports within fourteen (14) days following the date of the test that include the following: (a) Date of issue (b) Project title and number. SEWRP 2"d Feed Water Line 01400-1 December 2012 r (c) Name, address, and telephone number of testing agency. If the individual is employed by the Contractor, use Contractor's name, address, and telephone number. P, (d) Dates and locations of samples and test (e) Names of individuals making tests (f) Description of the work and test method t (g) Identification of material, product, and specification Section. (h) Complete test or inspection data (i) Test results and interpretation of test results -' 0) Ambient conditions at time of sample taking and testing. (k) Comments and opinion on whether tested Work complied with the Contract Document requirements and the applicable specification Section. (1) Name and signature of individual performing the test if employee of the Contractor, or name and signature of testing agency responsible person. (m) For failing tests, recommendations on retesting unless specification Sections provide procedure for retesting. C. Professional Engineer Qualifications: (1) Where a Professional Engineer is required in the specification Sections, this means a i3 Professional Engineer who is legally qualified to practice in the jurisdiction where the project is located and who is experienced in providing engineering services of the kind indicated. ri D. Test Agency Qualifications: (1) An agency with the experience and capability to conduct testing indicated, as documented by ASTM E 548, and that has the capability and experience in the types of tests to be performed. E. Preconstruction Testing: (1) Testing agency shall perform preconstruction testing with specified requirements for performance and test methods. (2) The Contractor shall not perform preconstruction testing except through a third party testing agency. F. Testing Agency Responsibilities: (1) Submit certified written report of each test and similar Quality Assurance service to the Contractor. (2) Interpret tests and state in each report whether tested work complies with or deviates from the Contract Document requirements. 1.5 QUALITY CONTROL A. Owner Responsibilities: t (1) Where quality control services are indicated as Owner or Engineer's responsibility, such services may be performed by the Owner's forces or by a qualified testing agency to perform these services. (2) The Owner or Engineer will furnish the Contractor with names, addresses, and telephone numbers of testing agencies engaged by the Owner. B. Contractor Responsibilities: (1) Provide quality control services required in the various specification Sections. SEWRP 2 nd Feed Water Line 01400-2 December 2012 1 (2) Where third party testing is engaged by the Contractor, notify testing agency sufficiently in advance of the time and date when work that requires testing will be performed. (3) The Contractor shall not engage the same testing agencies as the Owner, unless Owner agrees in writing to such engagement. (4) Where testing is indicated as the Contractor's responsibility, submit certified written reports in duplicate of each testing service, whether performed by the Contractor's personnel or Contractor engaged testing agency. (5) Such reports shall include failing tests and retests. (6) Testing requested by the Contractor and not required by the Contract Documents are the Contractor's responsibility. (7) Where the Contractor's personnel are performing tests, provide individuals with appropriate equipment to perform the tests in accordance with the test method requirements. (8) Provide alternate equipment where the specified test method cannot be applied, and where alternative test methods and equipment must be employed to provide the necessary quality control. C. Retesting: (1) Regardless of whether original tests were the Contractor's responsibility, provide quality _- control services, including retesting, for construction that revised or replaced work that failed to comply with requirements established by the Contract Documents. D. Testing Agency Responsibilities: (1) Cooperate with the Engineer and Contractor in performance of duties. (2) Provide qualified personnel and necessary equipment to perform required tests and inspections. (3) Notify the Engineer or Contractor promptly of irregularities or deficiencies observed in the work during performance of its services. (4) Interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the requirements. (5) Submit a certified written report, in triplicate, of each test, inspection, and similar quality control service through the Contactor. (6) Do not release, revoke, alter, or increase requirements of the Contract Documents or approve or accept any portion of the Work. (7) Do not perform any duties of the Contractor. E. Associated Services: (1) Cooperate with agencies performing required tests, inspections, and similar quality control services, and provide reasonable auxiliary services as requested. fi (2) Notify agency sufficiently in advance of operations to permit assignment of personnel. (3) Provide the following: (a) Access to the Work. (b) Incidental labor and facilities necessary to facilitate tests and inspections. (c) Adequate quantities of representative samples of materials that require testing and inspecting. (d) Assist agency in obtaining samples. (e) Facilities for storage and field curing of test samples. SEWRP 2"d Feed Water Line 01400-3 December 2012 i I (f) Additional associated services required of the Contractor for testing access are listed in the specification Sections. (g) Delivery of samples to testing agencies. (h) Preliminary design mix proposed for use for material mixes that require control by testing agency. (i) Security and protection for samples and for testing and inspecting equipment at Project site. F. Coordination: (1) Coordinate sequence of activities to accommodate required quality assurance and quality control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting. (2) Schedule times for tests, inspections, obtaining samples, and similar activities. PART 2 PRODUCTS Not used PART 3 EXECUTION 3.1 REPAIR AND PROTECTION A. On completion of testing, inspecting, sample taking, and similar services, repair damaged construction, and restore substrates and finishes. B. Provide materials and comply with installation requirements specified in other Sections of these Specifications. C. Restore patched areas and extend restoration into adjoining areas in a manner that eliminates evidence of patching. D. Protect construction exposed by or for quality control service activities. E. Repair and protection are the Contractor's responsibility, regardless of the assignment of responsibility for quality control services. END OF SECTION SEWRP 2 nd Feed Water Line 01400-4 December 2012 SECTION 01410 TESTING LABORATORY SERVICES PART GENERAL 1.1 SUMMARY A. Section Includes: (1) Selection and Payment (2) Quality Assurance (3) Laboratory Responsibilities (4) Laboratory Reports (S) Limits on Testing Laboratory Authority (6) Contractor Responsibilities (7) Schedule of Inspections and Tests B. References: (1) ANSIIASTM D3740 — Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction. (2) ANSIIASTM E329 — Recommended Practice for Inspection and Testing Agencies for Concrete, Steel, and Bituminous Materials as Used in Construction. 1.2 SELECTION AND PAYMENT A. An independent firm, provided at the Contractor's expense, will perform inspection, tests, and other services specified in individual specification Sections and as required by the Engineer. B. Reports will be submitted by the independent firm to the Engineer, in triplicate, indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents. C. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested. D. Notify the Engineer and independent firm forty-eight (48) hours prior to expected time for operations requiring services. E. Make arrangements with independent firm and pay for additional samples and tests required for Contractor's use. F. Testing or inspecting does not relieve Contractor from performing Work to contract requirements. G. The cost associated with compliance testing shall be paid by the Contractor. H. Re -testing required because of non-conformance to specified requirements shall be performed by the same independent firm on instructions by the Engineer. I. Payment for re -testing will be paid by the Contractor. 1.3 QUALITY ASSURANCE A. Comply with requirements of ANSUASTM D3740R and ANSI/ASTM E329. B. Testing laboratory shall maintain a full time registered Engineer on staff to review services. SEWRP 2d Feed Water Line 01410-1 December 2012 C. Testing equipment shall be calibrated at reasonable intervals with devices of an accuracy traceable to either National Bureau of Standards (NBS) standards or accepted values of natural physical constants. 1.4 LABORATORY RESPONSIBILITIES A. Test samples of mixes submitted by Contractor. B. Provide qualified personnel at site. C. Cooperate with the Engineer and Contractor in performance of services. Fill D. Perform specified inspection, sampling, and testing of Products in accordance with specified standards. E. Ascertain compliance of materials and mixes with requirements of Contract Documents. F. Promptly notify Engineer and Contractor of observed irregularities or non-conformance of Work or Products. G. Perform additional inspections and tests required by the Engineer. A. After each inspection and test, promptly submit three (3) copies of laboratory report to the Engineer and to the Contractor. B. Laboratory test reports shall include: (1) Date issued (2) Project title and number (3) Name of inspector (4) Date and time of sampling or inspection (S) Identification of product and Specification Section (6) Location in the Project (7) Type of inspection or test (8) Date of test (9) Results of tests (10) Conformance with Contract Documents C. When requested by the Engineer, provide interpretation of test results. 1.6 LIMITS ON TESTING LABORATORY AUTHORITY A. Laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents. B. Laboratory may not approve or accept any portion of the Work. C. Laboratory may not assume any duties of the Contractor. D. Laboratory has no authority to stop the Work. 1.7 CONTRACTOR RESPONSIBILITIES _j A. Deliver to laboratory at designated location, adequate samples of materials proposed to be used which require testing, along with proposed mix designs. , B. Cooperate with laboratory personnel, and provide access to the Work. C. Provide incidental labor and facilities to provide access to Work to be tested, to obtain and handle samples at the site or at source of products to be tested, to facilitate tests and -t inspections, storage and curing of test samples. SEWRP 2 Id Feed Water Line 01410-2 December 2012 D. Notify the Engineer and laboratory 24 hours prior to expected time for operations requiring inspection and testing services. 1.8 SCHEDULE OF INSPECTIONS AND TESTS A. As indicated in individual Specification Sections. PART 2 PRODUCTS Not used PART 3 EXECUTION Not used END OF SECTION SEWRP 2"° Feed Water Line 01410-3 December 2012 THIS PAGE INTENTIONALLY LEFT BLANK SECTION 01555 BARRICADES, SIGNS, AND TRAFFIC HANDLING PART GENERAL 1.1 SUMMARY A. This item shall govern for providing, installing, moving, replacing, maintaining, cleaning, and removing upon completion of work, all barricades, portable barriers, signs, portable changeable message signs, cones, lights, and other such type devices and of handling traffic as indicated on the plans or as directed by the Engineer or Owner. B. Section Includes: (1) Description (2) Construction Methods (3) Traffic Control Plan (4) Maintenance PART 2 PRODUCTS 2.1 CONSTRUCTION METHODS A. All barricades, signs, and other types of devices shall conform to details shown on the plans or those indicated in the latest version of the Texas Manual on Uniform Traffic Control Devices (TMUTCD). B. All traffic control devices shall be crashworthy according to the guidelines set forth in the National Cooperative Highway Research Program (NCHRP) Report 350. PART 3 EXECUTION 3.1 TRAFFIC CONTROL PLAN A. The Contractor shall propose his own Traffic Control Plan (TCP) as necessary for phased construction. B. This plan must be approved in writing by the Engineer or Owner in order to be used. C. Prior to beginning work, the Contractor shall designate, in writing, a competent person who will be responsible and available on this project site or in the immediate area to insure compliance with the TCP. 3.2 MAINTENANCE A. All retro-reflective traffic control devices such as barricades, vertical panels, signs, etc., shall be maintained by cleaning, replacing, or a combination thereof such that during darkness and rain the retro-reflective characteristics shall equal or exceed the retro-reflective characteristics of traffic industry standard reflective panels. END OF SECTION SEWRP 2 "d Feed Water Line 01555-1 December 2012 THIS PAGE INTENTIONALLY LEFT BLANK -' SECTION 01576 WASTE MATERIAL DISPOSAL 17�w�4140:".0 0 1.1 SUMMARY A. Section Includes: (1) Submittals (2) Salvageable Material (3) Excess Material 1.2 SUBMITTALS A. Obtain and submit disposal permits for proposed disposal sites if required by local ordinances. B. Submit a copy of written permission from property owner, along with a description of property, prior to disposal of excess material adjacent to the Project. C. Submit a written and signed release from property owner upon completion of disposal work. D. Both written permission and signed release shall include hold -harmless clauses naming the City of Lubbock, Texas as the entities to be held harmless in any subsequent legal proceeding. E. Both property permissions and signed releases shall be attested to by a notary public. PART PRODUCTS Not used PART 3 EXECUTION 1.1 SALVAGEABLE MATERIAL A. Asphalt Pavement and Asphalt Stabilized Base shall conform to requirements of Section 02221— Removing Existing Pavements. 1.2 EXCESS MATERIAL A. Vegetation, rubble, broken concrete, debris, asphaltic concrete pavement, excess soil, and other materials not designated for salvage, shall become the property of the Contractor and shall be removed from the job site and legally disposed of at a proper facility such as the West Texas Region Disposal Facility (WTRDF). B. Excess material may be disposed at the WTRDF at no additional cost to the Owner. (1) There will be a tipping fee per ton for construction debris and for excess uncontaminated soil. (2) There will also be a fee per load for every truck that is not covered properly when coming to the landfill. (3) For a complete list of fees associated with the WTRDF, please call or go to the City's website at http://solidwaste.ei.lubbock.tx.us/disposal/fees.aspx. (4) All tipping fees shall be considered to be included in the Contractor's bid prices. SEWRP 2 Id Feed Water Line 01576-1 December 2012 C. Excess soil may be deposited on private property adjacent to the Project if approved by the Owner and when written permission is obtained from the property owner. D. Waste materials shall be removed from the site on a daily basis, such that the site is maintained in a neat and orderly condition. END OF SECTION SEWRP 2"" Feed Water Line 01576-2 December 2012 SECTION 01700 CONTRACT CLOSEOUT PART1 GENERAL 1.1 SUMMARY A. Section Includes: (1) Closeout Procedures (2) Final Cleaning (3) Adjusting (4) Project Record Documents (5) Warranties (6) Spare Parts and Maintenance Materials. 1.2 CLOSEOUT PROCEDURES A. Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for Engineer's inspection. B. Should the Engineer consider the work incomplete or defective: (1) The Engineer will promptly notify the Contractor in writing, listing the incomplete or defective work. (2) The Contractor shall take immediate steps to remedy the stated deficiencies and submit a second written certification that the work is complete. (3) The Engineer will re -inspect the Work. C. Provide submittals to the Engineer that are required by governing or other authorities. D. Submit final Application for Payment identifying total adjusted Contract Sum, previous payments, and sum remaining due. 1.3 FINAL CLEANING A. Execute final cleaning prior to final inspection. B. Clean site, sweep paved areas, rake clean landscaped surfaces. C. Remove waste and surplus materials, rubbish, and construction facilities from the site. D. Repair, patch, and touch-up marred surfaces to match adjacent finishes. 1.4 ADJUSTING A. Adjust operating Products and equipment to ensure smooth and unhindered operation. 1.5 PROJECT RECORD DOCUMENTS A. Maintain on site, one set of the following record documents; record actual revisions to the Work: (1) Contract Drawings (2) Specifications (3) Addenda (4) Change Orders and other Modifications to the Contract (5) Reviewed shop drawings, product data, and samples. SEWRP 2 "d Feed Water Line 01700-1 December 2012 B. Store Record Documents separate from documents used for construction. C. Record information concurrent with construction progress. D. Specifications: (1) Legibly mark and record at each Product section description of actual Products installed, including the following: (a) Manufacturer's name and product model and number. (b) Product substitutions or alternates utilized. (c) Changes made by Addenda and Modifications. E. Record Documents and Shop Drawings: (1) Legibly mark each item to record actual construction including: (a) Measured horizontal and vertical locations of underground utilities and appurtenances referenced to permanent surface improvements. (b) Field changes of dimension and detail. (c) Details not on original Contract Drawings. (d) Changes made by Addenda and Modifications. 1.6 WARRANTIES A. Provide duplicate notarized copies. B. Execute and assemble documents from Subcontractors, suppliers, and manufacturers. C. Provide Table of Contents and assemble with metal prong binder in durable plastic presentation cover. D. Submit prior to final Application for Payment. E. For items of Work delayed beyond date of Substantial Completion, provide updated submittal within ten (10) days after acceptance, listing date of acceptance as start of warranty period. 1.7 SPARE PARTS AND MAINTENANCE MATERIALS A. Provide products, spare parts, maintenance and extra materials in quantities specified in individual specification Sections. B. Deliver to project site and place in location as directed; obtain receipt prior to final payment. PART 2 PRODUCTS Not used PART 3 EXECUTION Not used END OF SECTION SEWRP 2" Feed Water Line 01700-2 December 2012 SECTION 02260 EXCAVATION SUPPORT AND PROTECTION PART1 GENERAL 1.1 SUMMARY A. This Section includes temporary excavation support and protection systems. B. Section Includes: (1) Submittals (2) Performance Requirements (3) Project Conditions (4) Materials (5) Preparation (6) Sheet Piling (7) Trench Boxes (8) Trenching Procedures 1.2 SUBMITTALS A. Shop Drawings for Information: (1) Prepared by or under the supervision of a qualified Professional Engineer for excavation support and protection systems. (2) Include Shop Drawings signed and sealed by a Texas Licensed Professional Engineer responsible for their preparation. B. Qualification data for installer and Professional Engineer. C. Photographs or videotape, sufficiently detailed, of existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by the absence of, the installation of, or the performance of excavation support and protection systems. 1.3 PERFORMANCE REQUIREMENTS A. Design, furnish, install, monitor, and maintain excavation support and protection system capable of supporting excavation sidewalls and of resisting soil and hydrostatic pressure and superimposed and construction loads. B. Provide professional engineering services needed to assume engineering responsibility, including preparation of Shop Drawings and a comprehensive engineering analysis by a qualified Professional Engineer. C. Prevent surface water from entering excavations by grading, dikes, or other means approved by the Engineer. D. Install excavation support and protection systems without damaging existing buildings, pavements, and other improvements adjacent to excavation. 1.4 PROJECT CONDITIONS A. Existing Utilities: (1) Do not interrupt utilities serving facilities occupied by Owner or others unless permitted in writing by the Engineer and then only after arranging to provide temporary utility services according to requirements indicated. SEWRP 2" Feed Water Line 02260-1 December 2012 B. Project Site Information: (1) Survey adjacent structures and improvements, employing a qualified professional engineer or land surveyor, establishing exact elevations at fixed points to act as benchmarks. (2) Clearly identify benchmarks and record existing elevations. (3) During installation of excavation support and protection systems, regularly resurvey benchmarks, maintaining an accurate log of surveyed elevations and positions for comparison with original elevations and positions. (4) Promptly notify the Engineer if changes in elevations or positions occur, or if cracks, sags, or other damage is evident in adjacent construction. PART 2 PRODUCTS 2.1 MATERIALS A. Provide materials that are either new or in serviceable condition. B. Structural Steel: ASTM A36/A 36M, ASTM A690/A 690 M, ASTM A 992/ A 992M. C. Steel Sheet Piling: ASTM A 328/A 328M, ASTM A 572/ A 572M, or ASTM A690/ A 690M; with continuous interlocks. PART 3 EXECUTION 3.1 PREPARATION A. Project structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards that could develop during excavation support and protection systems operations. B. Shore, support, and protect utilities encountered. C. Install excavation support and protection systems to ensure minimum interference with roads, streets, walks, and other adjacent occupied and used facilities. D. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. (1) Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction. E. Locate excavation support and protection systems clear of permanent construction so that forming and finishing of concrete surfaces is not impeded. F. Monitor excavation support and protection systems daily during excavation progress and for as long as excavation remains open. G. Promptly correct bulges, breakage, or other evidence of movement to ensure that excavation support and protection systems remain stable. H. Promptly repair damages to adjacent facilities caused by installing excavation support and protection systems. 3.2 SHEET PILING A. Before starting excavation, install one-piece sheet piling lengths and tightly interlock to form a continuous barrier. B. Limit vertical offset of adjacent sheet piling to sixty (60) inches. C. Accurately align exposed faces of sheet piling to vary not more than two (2) inches from a horizontal line and not more than 1:120 out of vertical alignment. SEWRP 2" Feed Water Line 02260-2 December 2012 L__ D. Cut tops of sheet piling to uniform elevation at top of excavation. 3.3 TRENCH BOXES A. Provide Engineer approved trench boxes sufficient for depth and width of open -cut trench. B. All exposed trench shall be protected. 3.4 TRENCHING PROCEDURES A. Provide shoring systems in accordance with the Contractor's submitted design to adequately resist earth pressures. B. Proceed with work in an orderly fashion. C. Install trench bracing systems as soon as possible after opening trenches. D. Do not allow workers in trench prior to installing trench bracing systems. E. Backfill trenches as soon as possible after completion of work. F. Stockpile excavated materials at three (3) feet away from edge of trench. G. Maintain barricades and signage as required by State and Local codes to protect open excavations. H. Do not allow surface water to enter excavations. I. Properly grade areas adjacent to trench excavations to control surface drainage away from excavations. J. If cut back method is allowed by Owner and is employed, maintain a clear distance of three (3) feet from edge of cut to avoid allowing loose material to enter trench. K. Cut back method may not be used where there is insufficient work area to employ it. L. Do not operate heavy equipment except for trench digging or pipe laying equipment within twenty (20) feet of edge of excavation. M. Haul trucks, if needed, may operate closer than twenty (20) feet to trench edge provided the Contractor deems it safe to do so. 3.5 REMOVAL AND REPAIRS A. Remove excavation support and protection systems when construction has progressed sufficiently to support excavation and bear soil and hydrostatic pressures. B. Remove in stages to avoid disturbing underlying soils or damaging structures, pavements, facilities, and utilities. a END OF SECTION SEWRP 2 nd Feed Water Line 02260-3 December 2012 THIS PAGE INTENTIONALLY LEFT BLANK SECTION 02317 EXCAVATION AND BACKFILL FOR UTILITIES PART 1 GENERAL 1.1 SUMMARY A. This section of the specifications includes information on excavation, trenching, foundation, embedment, and backfill for installation of utilities, including manholes and pipeline structures. B. Section Includes: (1) Definitions (2) References (3) Scheduling (4) Submittals (5) Tests (6) Equipment (7) Material Classifications (8) Accessories (9) Installation (10) Preparation (11) Protection (12) Excavation (13) Handling Excavation Materials (14) Trench Foundation (15) Ground Water Control (16) Pipe Embedment, Placement and Compaction (17) Trench Zone Backfill, Placement and Compaction (18) Field Quality Control (19) Disposal of Excess Material A. Pipe Foundation — Suitable and stable native soils that are exposed at the trench subgrade after excavation to depth of bottom of the bedding as shown on the Drawings, or foundation backfill material placed and compacted in over -excavations. B. Pipe Bedding — The portion of trench backfill that extends vertically from top of foundation up to a level line at bottom of pipe, and horizontally under one-third of the pipe O.D. C. Haunching — The material placed on either side of the pipe from the foundation to the springline of the pipe for rigid wall pipe, and horizontally from one trench sidewall to opposite sidewall, excluding the bedding section as shown on the plans. D. Initial Backfill — The portion of trench backfill that extends vertically from the top of haunching or cement stabilized backfill up to a level line immediately below pavement subgrade, and horizontally from on trench sidewall to opposite sidewall. E. Pipe Embedment — The portion of trench backfill that consists of bedding, haunching, and initial backfill. SEWRP 2 "d Feed Water Line 02317-1 December 2012 F. Trench Zone — The portion of trench backfill that extends vertically from top of pipe embedment up to a line immediately below pavement subgrade or up to final grade when not beneath paving. G. Backfill — Suitable material meeting specified quality requirements, placed and compacted under controlled conditions. H. Ground Water Control Systems — Installations external to trench, such as well points, eductors, or deep wells. Ground water control includes dewatering to lower ground water, intercepting seepage which would otherwise emerge from side or bottom of trench excavation, and depressurization to prevent failure or heaving of excavation bottom. Refer to Section 02240 — Dewatering. I. Surface Water Control — Diversion and drainage of surface water runoff and rain water away from trench excavation. Rain water and surface water accidentally entering trench shall be controlled and removed as a part of excavation drainage. J. Excavation Drainage — Removal of surface and seepage water in trench by sump pumping or other approved means. K. Trench Conditions are defined with regard to the stability of trench bottom and trench walls of pipe embedment zone. Maintain trench conditions that provide for effective placement and compaction of embedment material directly on or against undisturbed soils or foundation backfill, except where structural trench support is necessary. L. Dry Stable Trench — Stable and substantially dry trench conditions exist in pipe embedment zone as a result of typically dry soils or achieved by ground water control (dewatering or depressurization) for trenches extending below ground water level. M. Stable Trench with Seepage — Stable trench in which ground water seepage is controlled by excavation drainage. N. Stable Trench with Seepage in Clayey Soils — Excavation drainage is provided in lieu of or to supplement ground water control systems to control seepage and provide stable trench subgrade in predominately clayey soils prior to bedding placement. O. Stable Wet Trench in Sandy Soils — Excavation drainage is provided in the embedment zone in combination with ground water control in predominately sandy or silty soils. P. Unstable Trench — Unstable trench conditions exist in the pipe embedment zone if ground water inflow or high water content causes soil disturbances, such as sloughing, sliding, boiling, heaving, or loss of density. Q. Subtrench — Subtrench is a special case of benched excavation. Subtrench excavation below trench shields or shoring installations may be used to allow placement and compaction of foundation or embedment materials directly against undisturbed soils. Depth of a subtrench depends upon trench stability and safety as determined by the Contractor. R. Over -Excavation and Backfill — Excavation of subgrade soils with unsatisfactory bearing capacity or composed of otherwise unsuitable materials below top of foundation as shown on Drawings, and backfilled with foundation backfill material. S. Foundation Backfill Materials — Natural soil or manufactured aggregate of controlled gradation, to control drainage and material separation. Foundation backfill material is placed and compacted as backfill to provide stable support for bedding. T. Trench Safety Systems include both protective systems and shoring systems as defined in Section 02260 — Excavation Support and Protection U. Trench Shield (Trench Box) — A portable worker safety structure moved along the trench as work proceeds, used as a protective system and designed to withstand forces imposed on it by SEWRP 2' Feed Water Line 02317-2 December 2012 cave-in, thereby protecting persons within the trench. Trench shields may be stacked if so designed or placed in a series depending on depth and length of excavation to be protected. V. Shoring System — A structure that supports sides of an excavation to maintain stable soil conditions and prevent cave-ins, or to prevent movement of the ground affecting adjacent installations or improvements. 1.3 REFENCES A. ASTM D 558 — Test Methods for Moisture -Density Relations of Soil Cement Mixtures. B. ASTM D 698 — Test Methods for Moisture -Density Relations of Soils and Soil -Aggregate Mixtures Using 5.5-1b. Rammer and 12 inch Drop. C. ASTM D 1556 — Test Method for Density in Place by the Sand -Cone Method. D. ASTM D 2487 — Classification and Soils for Engineering Purposes. E. ASTM D 2922 — Test Method for Density of Soil and Soil -Aggregate in Place by Nuclear Methods (Shallow Depth). F. ASTM D 3017 — Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth). G. ASTM D 4318 — Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils. H. TxDOT Tex-101-E — Preparation of Soil and Flexible Base Materials for Testing. I. TxDOT Tex- 110-E — Determination of Particle Size Analysis of Soils. J. Federal Regulations, 29 CFR Part 1926, Standards -Excavation, Occupational Safety and Health Administration (OSHA). 1.4 SCHEDULING A. Schedule work so that pipe embedment can be completed on the same day that acceptable foundation has been achieved for each section of pipe installation, manhole, or other structures. 1.5 SUBMITTALS A. Conform to Section 01300 — Submittal Procedures B. Submit a written description for information only of the planned typical method of excavation, backfill placement, and compaction, including: (1) Sequence of work and coordination of activities. (2) Selected trench widths and dimensions of excavations. (3) Procedures for foundation and embedment placement, and compaction. (4) Procedure for use of trench boxes and other pre -manufactured systems while assuring specified compaction against undisturbed soils. C. Submit backfill material sources and product quality information in accordance with requirements of Section 02320 — Utility Backfll Materials. D. Submit record of location of pipe as installed, referenced to Texas North Central State Plane coordinate system (NAD83). (1) Include locations of utilities encountered that are not shown on drawings or rerouted for the convenience of the Contractor. (2) Give stations, coordinates, elevations, inverts, and gradients of installed pipe, casing, etc. E. Submit field density tests of trench backfill. F. Submit laboratory density compaction curves for each material. SEWRP 2" Feed Water Line 02317-3 December 2012 11 l 1.6 TESTS A. The Contractor is to perform backfill material source qualification testing in accordance with requirements of Section 02320 — Utility Backfill Materials. B. The Contractor shall have a competent, separate agency perform field density tests of trench backfill representative of each 200 linear feet of trench and each compacted layer. PART PRODUCTS 2.1 EQUIPMENT A. Perform excavation with hydraulic excavator or other equipment suitable for achieving the requirements of this Section. B. Use only hand -operated tamping equipment until a minimum cover of twelve (12) inches is obtained over pipes, conduits, and ducts. C. Do not use heavy compacting equipment until adequate cover is attained to prevent damage to pipes, conduits, or ducts. D. Do not use vibratory equipment until five (5) feet of cover over pipes, conduits, or ducts is obtained. E. Do not use vibratory equipment if adjacent structures could be affected. F. Use trench shields or other protective systems or shoring systems which are designed and operated to achieve placement and compaction of backfill directly against undisturbed native soil. 2.2 MATERIAL CLASSIFICATIONS A. Embedment and Trench Zone Backfill Materials: Conform to classifications and product descriptions of Section 02320 — Utility Backfill Materials. J 2.3 ACCESSORIES A. Warning Tape: Install twelve (12) inches below finished grade acid and alkali resistant 1J polyethylene film warning tape manufactured for marking and identifying underground utilities, six (6) inches wide and four (4) mils thick, continuously inscribed with a description of the utility; colored as follows: (1) Red —Electric (2) Yellow — Gas, oil, steam, and dangerous materials. (3) Orange — Telephone and other communications. (4) Blue — Water systems. (5) Green — Sewer systems. B. Locator Wire: Install continuously coated fourteen (14) gauge locating wire as indicated on LJ Plans. PART 3 EXECUTION 3.1 INSTALLATION A. Install flexible pipe to conform to the trench details shown in the drawings. B. Install rigid pipe to conform to the trench details shown in the drawings. 3.2 PREPARATION A. Establish traffic control to conform to requirements of Section 01555 —Barricades, Signs, and Traffic Handling and the drawings. t SEWRP 2" Feed Water Line 02317-4 December 2012 �i t s B. Perform work to conform to applicable safety standards and regulations. C. Employ a trench safety system as specified in Section 02260 — Excavation Support and Protection. D. Immediately notify the agency or company owning any existing utility line which is damaged, broken, or disturbed. E. Obtain approval from the Engineer and agency for any repairs or relocations, either temporary or permanent. F. Remove existing pavements and structures, including sidewalks and driveways, to conform to requirements of Section 02220 — Demolition, Removal, and Salvaging of Existing Material. G. Maintain permanent benchmarks, monumentation and other reference points, and unless otherwise directed in writing, replace those which are damaged or destroyed. 3.3 PROTECTION A. Protect trees, shrubs, lawns, existing structures, and other permanent objects outside of the construction limits. B. Protect and support above grade and below grade utilities, which are to remain. C. Restore damaged permanent facilities to pre -construction conditions unless replacement or abandonment of facilities are indicated on the Drawings. D. Take measures to minimize erosion of trenches and excavations. E. Do not allow water to pond in trenches or excavations. F. Where slides, washouts, settlements, or areas with loss of density or pavement failures or potholes occur, repair, recompact, and pave those areas at no additional cost to the Owner. G. The Contractor shall locate all existing underground lines, whether or not they are shown on the Drawings, sufficiently in advance of trenching operations to prevent any damage thereto. H. Verification of location, size, and burial depth of existing utilities shall be the complete responsibility of the Contractor. I. The Contractor is responsible for notifying pipeline and cable utility owners of the intention to cross said utility no less than seven (7) days prior to crossing the utility. J. Coordinate vertical separation requirements with utility owners and any other special construction considerations. K. Notify the Engineer if required changes in the vertical profile shown on the Drawings prior to constructing these changes. L. Trench digging machinery may be used to make the trench excavations except in places where operation of same would cause damages to pipelines, fences, or other existing structures either above or below ground; in such instances hand methods shall be employed. 3.4 EXCAVATION A. Perform excavation work so that pipe, conduit, or ducts can be installed to depths and alignments shown on the Drawings. B. Avoid disturbing surrounding ground and existing facilities and improvements. C. Determine trench excavation widths based on the requirements shown on the plans. D. Use sufficient trench width or benches above the embedment zone for installation of well point headers or manifolds and pumps where depth of trenches snakes it uneconomical or impractical to pump from the surface elevation. E. Provide sufficient space between shoring cross braces to permit equipment operations and handling of forms, pipe, embedment and backfill, and other materials. SEWRP 2"4 Feed Water Line 02317-5 December 2012 F. Upon discovery of unknown utilities, badly deteriorated utilities not designated for removal, or concealed conditions, discontinue work at that location. Notify the Engineer and obtain instructions before proceeding. G. Shoring of Trench Walls: (1) Install special shoring in advance of trench excavation or simultaneously with the trench excavation, so that the soils within the full height of the trench excavation walls will remain laterally supported at all times. (2) For all types of shoring, support trench walls in the pipe embedment zone throughout the installation. (3) Provide trench wall supports sufficiently tight to prevent washing the trench wall soil out behind the trench wall support. (4) Unless otherwise directed by the Engineer, leave sheeting driven into or below the pipe embedment zone in place to preclude loss of support of foundation and embedment materials. (5) Leave rangers, walers, and braces in place as long as required to support the sheeting, which has been cut off, and the trench wall in the vicinity of the pipe zone. (6) Employ special methods for maintaining the integrity of embedment or foundation material. (7) Before moving supports, place and compact embedment to sufficient depths to provide protection of pipe and stability of trench walls. (8) As supports are moved, finish placing and compacting embedment. (9) If sheeting or other shoring is used below top of the pipe embedment zone, do not disturb pipe foundation and embedment materials by subsequent removal. (10) Maximum thickness of removable sheeting extending into the embedment zone shall be the equivalent of a one (1) inch thick steel plate. (11) Fill voids left on removal of supports with compacted backfill material. H. Wherever necessary to prevent caving, the trench shall be adequately supported as required by the Drawings and Specifications. I. The Contractor is entirely responsible for assuring that trenches are adequately supported to protect both the workers and the public. J. Use of Trench Shields/Trench Boxes: (1) Make trench excavations of sufficient width to allow shield to be lifted or pulled feely, without damage to the trench sidewalls. (2) Move trench shields so that pipe, and backfill materials, after placement and compaction, are not damaged or disturbed, or the degree of compaction reduced. (3) When required, place, spread, and compact pipe foundation and bedding materials beneath the shield. (4) For backfill above bedding, lift the shield as each layer of backfill is placed and spread. (5) Place and compact backfill materials against undisturbed walls and foundation. (6) Maintain trench shield in position to allow sampling and testing to be performed in a safe manner. (7) Contractor shall provide trench shield for Owner's tests within the trench as required in paragraph 3.11.11 SEWRP 2 Id Feed Water Line 02317-6 December 2012 3.5 HANDLING EXCAVATION MATERIALS A. Use only excavated materials which are suitable as defined in this Section and conforming to Section 02320 — Utility Backfill Materials. B. Place material suitable for backfilling in stockpiles at a distance from the trench to prevent slides or cave-ins. C. Do not place stockpiles of excess excavated materials on streets and adjacent properties. D. Protect excess stockpiles for use on site. E. Maintain site conditions in accordance with Section 01500 —Temporary Facilities and Controls. 3.6 TRENCH FOUNDATION A. The trench shall be excavated to an even grade so that the bottom of the pipe will rest on the bottom of the trench over the entire length of the pipe. B. Any part of the trench excavated below grade shall be corrected by filling with approved material and compacting thoroughly. C. If ledge rock, rock fragments, or other unyielding material is encountered in the bottom of the trench, it shall be removed to a depth of six (6) inches below grade, refilled with selected material, and thoroughly compacted. D. Bell holes of ample dimensions shall be dug at each joint to permit the jointing of pipe to be made properly, and of sufficient depth to prevent the bell of the pipe from resting on undisturbed materials. 3.7 GROUND WATER CONTROL A. Should ground water become an issue, refer to Section 02240 — Dewatering. B. Provide a stable trench to allow installation in accordance with the Specifications. 3.8 PIPE EMBEDMENT, PLACEMENT AND COMPACTION A. Immediately prior to placement of embedment materials, the bottoms and sidewalls of trenches shall be free of loose, sloughing, caving, or otherwise unsuitable soil. B. Place embedment including bedding, haunching, and initial backfill as shown on the Drawings. C. For pipe installation, manually spread embedment materials around the pipe to provide uniform bearing and side support when compacted. `J D. Do not allow materials to free -fall from heights greater than twenty-four (24) inches above top of pipe. E. Perform placement and compaction directly against the undisturbed soils in the trench sidewalls, or against sheeting which is to remain in place. F. Do not place trench shields or shoring within height of the embedment zone unless means to maintain the density of compacted embedment material are used. G. If moveable supports are used in embedment zone, lift the supports incrementally to allow placement and compaction of the material against undisturbed soil. H. Do not damage coatings or wrappings of pipes during backfilling and compacting operations. I. When embeddingcoated or wrapped pipes, do not use crushed stone or other sharp, angular pp p p � �� b'u aggregates. J. Place haunching material manually around the pipe and compact it to provide uniform bearing and side support. SEWRP 2" Feed Water Line 02317-7 December 2012 K. If necessary, hold small -diameter or lightweight pipe in place with sand bags or other suitable means during compaction of haunch areas and placement beside the pipe. L. Shovel in -place and compact embedment material using pneumatic tampers in restricted areas, and vibratory -plate compactors or engine -powered jumping jacks in unrestricted areas. M. Compact each lift before proceeding with placement of the next lift. N. Water tamping and water jetting are not allowed. O. For flowable fill, such as cement stabilized backfill, vibrate flowable backfill with concrete vibrator to consolidate material under haunches. P. Install specified location tape and wire as shown on the drawings and per paragraphs 2.3.A and 2.3.B. 3.9 TRENCH ZONE BACKFILL, PLACEMENT AND COMPACTION A. Place backfill for pipe or conduits and restore as soon as practicable. B. Leave only the minimum length of trench open as necessary for construction. C. Maximum allowed open trench is limited to 200 feet unless otherwise approved by the Owner. D. Where damage to completed pipe installation work is likely to result from withdrawal of sheeting, leave the sheeting in place. (1) Cut off sheeting two (2) feet or move above the crown of the pipe. (2) Remove trench supports within five (5) feet from the ground surface. E. Place trench zone backfill in lifts and compact by methods selected by the Contractor. F. Fully compact each lift before placement of the next lift. G. Cement Stabilized Backfill/Lean Concrete Backfill: (1) Place in depths as shown on plans. (2) Use vibratory equipment to ensure placement under the haunches of the pipe. (3) Backfilling of the remaining trench depth after cement stabilized backfill has been placed shall not commence until the in -place cement stabilized backfill has attained a penetration resistance reading of at least thirty (30) when measured with a soil penetrometer according to ASTM D 1558 and using a one -tenth square inch needle. (4) This equates to a penetration resistance of approximately 300 pounds per square inch. (5) This is not a strength requirement of the cement -stabilized backfill, but a measure of the degree of curing of the cement stabilized backfill. (6) After a penetrometer reading of 30 is obtained on the cement stabilized backfill, then compacted backfill operations may commence. (7) The Contractor shall furnish and have on site a calibrated ASTM D 1558 soil penetrometer with one -tenth square inch needle. (8) The Contractor shall take no less than four (4) penetrometer readings, equally spaced on both sides of the pipe (8 readings total) in accordance with ASTM D 1558, for each day's trench length that is planned for controlled density backfill operations. (9) Such readings shall be taken prior to commencing backfill operations. H. Bedding Material: (1) Sand bedding shall be loosely placed in trench as shown on the Drawings. I. Gravel Embedment: (1) Place in depths as shown on plans SEWRP 2'd Feed Water Line 02317-8 December 2012 (2) Use vibratory equipment or shovel slicing to ensure placement under the haunches of the pipe. J. Native Material/Borrow Material (Pipe Installation): (1) Maximum lift thickness determined by Contractor to achieve uniform placement and required compaction, but not exceeding eight (8) inches. (2) Compaction by trench sheep's foot or by vibratory equipment to provide backfill densities at least equivalent to the surrounding undisturbed material or ninety-five (95) percent of the maximum dry density determined according to ASTM D 698. (3) Use of vibratory equipment limited as specified in paragraph 2.1. (4) Moisture content within two (2) percent of optimum determined according to ASTM D 698. K. Topsoil: (1) Maximum lift thickness determined by Contractor to achieve uniform placement and required compaction, but not exceeding eight (8) inches. (2) Compaction by trench sheep's foot or by vibratory equipment to provide backfill densities at least equivalent to the surrounding undisturbed material or ninety-five (95) percent of the maximum dry density detennined according to ASTM D 698. (3) Use of vibratory equipment limited as specified in paragraph 2.1. (4) Moisture content within two (2) percent of optimum determined according to ASTM D 698. 3.10 MANHOLES, JUNCTION BOXES, AND OTHER PIPELINE STRUCTURES A. Meet the requirements of adjoining utility installations for backfill of pipeline structures, as shown on the Drawings. 3.11 FIELD QUALITY CONTROL A. Test for material source qualifications as defined in Section 02320 — Utility Backfill Materials. B. Provide excavation and trench safety systems at locations and to depths required for testing and retesting during construction at no additional cost to the Owner. C. Tests will be performed by the Contractor on a minimum of three (3) different samples of each material type for plasticity characteristics, in accordance with ASTM D 4318, and for gradation characteristics, in accordance with Tex-101-E and Tex-110-E. Additional classification tests will be performed whenever there is a noticeable change in material gradation or plasticity. D. At least three (3) tests for moisture -density relationships will be performed initially for backfill materials in accordance with ASTM D 698. Additional moisture -density relationship tests will be performed whenever there is a noticeable change in material gradation or plasticity. E. The Contractor shall perform in -place density tests of compacted pipe foundation, embedment, and trench zone backfill soil materials will be performed according to ASTM D 1556, or ASTM D 2922 and ASTM D 3017, and at the following frequencies and conditions. F. A minimum of one test for every 200 linear feet of compacted trench zone backfill material for each compacted layer. G. Density tests will be distributed around the placement areas. Placement areas are foundation, bedding, haunching, initial backfill, and trench zone. SEWRP 2 Feed Water Line 02317-9 December 2012 H. The number of tests will be increased if compacting effort is variable and not considered sufficient to attain uniform density, as specified. I. Density tests may be performed at various depths below the fill surface by pit excavation. Material in previously placed lifts may therefore be subject to acceptance/rejection. J. Two (2) verification tests will be performed adjacent to in -place tests showing density less than the acceptance criteria. Placement will be rejected unless both verification tests show acceptable results. K. Recompacted placement will be retested at the same frequency as the first test series, including verification tests. L. Recondition, recompact, and retest at Contractor's expense if tests indicate Work does not meet specified compaction requirements. For hardened cement stabilized backfill with nonconforming density, core and test for compressive strength at Contractor's expense. M. Acceptability of crushed rock compaction will be determined by inspection. 3.12 DISPOSAL OF EXCESS MATERIAL A. Dispose of excess materials in accordance with requirements of Section 01576 —Waste Material Disposal. END OF SECTION SEWRP 2"° Feed Water Line 02317-10 December 2012 SECTION 02320 UTILITY BACKFILL MATERIALS PART 1 GENERAL 1.1 SUMMARY A. This Section of the specification covers materials related to the backfill of utilities. B. Section Includes: (1) "Concrete" sand (for use as pipe bedding). (2) Native soil materials. (3) Topsoil. (4) Crushed stone. (5) Cement stabilized backfill. C. Related Sections: (1) Drawings and General Provisions of the Contract, including General and Supplementary Conditions and other Division 1 specification sections apply to this section. (2) Section 01300 — Submittal Procedures (3) Section 01400 — Quality Requirements (4) Section 02317 — Excavation and Backfill for Utilities. 1.2 DEFINITIONS A. Refer to Section 02317 — Excavation and Backfill for Utilities. 1.3 REFENCES A. ASTM C 33 — Specification for Concrete Aggregate. B. ASTM C 40 — Test Method for Organic Impurities in Fine Aggregates for Concrete. C. ASTM C 123 — Test Method for Lightweight Pieces in Aggregate. D. ASTM C 131— Test Method for Resistance to Degradation of Small -Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. E. ASTM C 136 — Test Method for Sieve Analysis of Fine and Coarse Aggregates. F. ASTM C 142 — Test Method for Clay Lumps and Friable Particles in Aggregates. G. ASTM D 698 — Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lb/ft). H. ASTM D 1140 — Test Method for Amount of Materials in Soils Finer Than Number 200 Sieve. I. ASTM D 2487 — Classification of Soils for Engineering Purposes (Unified Soil Classification System). J. ASTM D 2488 — Standard Practice for Description and Identification of Soils (Visual -Manual Procedure). K. ASTM D 4318 — Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils. L. ASTM D 4643 — Method for Determination of Water (Moisture) Content of Soil by the Microwave Oven Method. M. TxDOT Tex- 101-E — Preparation of Soil and Flexible Base Materials for Testing. SEWRP 2"d Feed Water Line 02320-1 December 2012 N. TxDOT Tex- 104-E —Test Method for Determination of Liquid Limit of Soils (Part 1). O. TxDOT Tex-106-E —Test Method —Methods of Calculating Plasticity Index of Soils. P. TxDOT Tex-110-E — Determination of Particle Size Analysis of Soils. 1.4 SUBMITTALS A. Conform to Section 01300 — Submittal Procedures. B. Submit a description of source, material classification and product description, production method, and application of backfill materials. C. Submit test results for samples of off -site backfill materials. D. For each delivery of material, provide a delivery ticket which includes source location. 1.5 TESTS A. Perform tests of sources for off -site backfill material. B. Verification tests of backfill materials may be performed by the Owner, at the Owner's expense; however, failing tests will be charged to the Contractor. PART 2 PRODUCTS 2.1 MATERIAL DESCIRPTIONS A. "Concrete" Sand (1) Coarse -grained, well -graded, sand (natural, manufactured, or a combination of both) conforming to requirements of ASTM C 33. (2) Gradation shall conform to ASTM C 136 and the following limits. Sieve Percent Passing 3/8" 100 No. 4 95 to 100 No. 8 80 to 100 No. 16 50 to 85 No. 30 25 to 60 No. 50 10 to 30 No. 100 2 to 10 B. Native Soil Material for Backfill (1) Provide backfill material that is free of stones greater than six (6) inches, free of roots, waste, debris, trash, organic material, unstable material, non -soil matter, hydrocarbons, or other contamination. C. Topsoil (1) Provide topsoil material that is free of stones greater than three (3) inches, free of roots, waste, debris, trash, organic matter, unstable material, non -soil matter, hydrocarbons, or other contamination. (2) Surface should be made clear of rock and other debris before planting. (3) Use top two (2) feet of excavated material for topsoil backfill. This material shall be set aside to prevent mixing with other excavated material. Topsoil is only required in non -paved areas. SEWRP 2" Feed Water Line 02320-2 December 2012 D. Gravel Embedment (1) Gravel embedment shall be free of waste, trash, debris, organic material, unstable material, and other non -gravel matter. (2) Provide gravel embedment that meets the following gradation requirements: Sieve Percent Retained 3/8" 0 No. 4 5 to 15 No. 10 50 to 90 No. 40 90 to 100 (3) A minimum of four inches of gravel embedment will be placed under the pipe. This material will be used for backfill to the top of the pipe. This material MUST be shovel sliced to the haunch of the pipe and mechanically tamped to midpoint of the pipe. E. Cement Stabilized Backfill (1) Cement Content — 2 sack mix per cubic yard. (2) Water/Cement Ratio — 0.60. (3) Maximum aggregate size shall not exceed one and one half (1.5) inch diameter for backfilling pipe sizes forty-eight (48) inches and greater in diameter. (4) Maximum aggregate size shall not exceed one (1) inch diameter for backfilling sizes less than forty-eight (48) inches in diameter. 2.2 MATERIAL TESTING A. Ensure that material selected, produced, and delivered to the project meets applicable specifications and is of sufficiently uniform properties to allow practical construction and quality control. B. Source or Supplier Qualification: Perform testing, or obtain representative tests by suppliers, for selection of material sources and products. Provide test results for a minimum of three (3) samples for each source and material type. Tests samples of processed materials from current production representing material to be delivered. Tests shall verify that the materials meet specification requirements. Repeat qualification test procedures each time the source characteristic changes or there is a planned change in source location or supplier. Qualification tests shall include, as applicable: (1) Gradation: Complete sieve analyses shall be reported regardless of the specified control sieves. The range of sieves shall be from the largest particle through the No. 200 sieve. (2) Plasticity of material passing the No. 40 sieve. (3) Clay lumps. (4) Lightweight pieces. (5) Organic impurities. C. Production Testing: Provide reports to the Engineer from an independent testing laboratory that backfill materials to be placed in the Work meet applicable specification requirements. D. Native material requires testing only when questionable material is encountered. SEWRP 2 Id Feed Water Line 02320-3 December 2012 PART 3 EXECUTION 3.1 SOURCES A. Use of material encountered in the trench excavations is acceptable, provided applicable specification requirements are satisfied. If excavation material is not acceptable, provide from other approved source. Top two (2) feet of excavated material shall be used as topsoil. B. Identify off -site sources for backfill material at least fourteen (14) days ahead of intended use so that the Engineer may obtain samples from verification testing. C. Obtain approval for each material source by the Engineer before delivery is started. If sources previously approved do not produce uniform and satisfactory products, furnish materials from other approved sources. Materials may be subjected to inspection or additional verification testing after delivery. Materials which do not meet the requirements of the specifications will be rejected. Do not use material which, after approval, has become unsuitable for use due to segregation, mixing with other materials, or by contamination. Once a material is approved by the Engineer, expense for sampling and testing required to change to a different material will be at the Contractor's expense with no additional cost to the Owner. 3.2 MATERIAL HANDLING A. Establish temporary stockpile locations as practical for material handling and control. B. Cement stabilized backfill shall be consolidated upon placement by using concrete vibrators to ensure filling of voids, filling around and under haunches of pipe and filling of spaces between corrugations. Vibration shall not be applied to the utility pipe itself. 3.3 FIELD QUALITY CONTROL A. Quality Control (1) The Engineer may sample and test backfill at: i. Sources including borrow pits, production plants, and Contractor's designated off -site stockpiles. ii. On -site stockpiles. iii. Materials placed in the Work. (2) The Engineer may resample material at any stage of work or location if changes in characteristics are apparent. B. Production Verification Testing: The Owner's testing laboratory will provide verification testing on backfill materials, as directed by the Engineer. Samples may be taken at the source or at the production plant, as applicable. Contractor shall cooperate with the Owner and Engineer in allowing access to materials. END OF SECTION SEWRP 2" Feed Water Line 02320-4 December 2012 1 SECTION 02445 BORES AND ENCASEMENTS 1.1 WORK COVERED BY CONTRACT DOCUMENTS A. The section covers utility bores and placing steel encasement in open cut trenches. B. The encasement will be installed at the locations indicated on the attached plans. C. The contractor will be responsible for providing all labor, materials, equipment and incidentals necessary to accomplish the following: (1) Construction of the bore and bore pits or trench cut. (2) Installing the appropriate steel casing. (3) Installing the water supply pipe in the steel casing using the pipe manufactures recommended practices. (4) Backfill all excavations. (5) All traffic barricading and control. (6) All trench safety requirements. (7) Implementing a best management plan for the control of storm water runoff 1.2 CONTRACTOR USE OF SITE A. Limit use of site to allow: (1) Owner occupancy. (2) Contractor. B. Coordinate use of site under direction of Owner's Representative and TxDOT. C. Execute Work in a coordinated manner to avoid conflicts with Owner's operations or other Contractors. D. Move any stored products under Contractor's control, which interfere with operations of (1) Owner. (2) TxDOT right-of-way. E. Assume full responsibility for the protection and safekeeping of products furnished under this contract, stored on or off the site. 1.3 WORK SEQUENCE A. Construct Work to accommodate Owner's occupancy requirements during the construction period. B. Sequence and schedule shall balance Owner's occupancy and the requirements of adjacent utility work and construction schedules of other government agencies, however, Contractor's coordination for construction schedule and operations shall be with the Engineer or the Owner's Representative only. 1.4 SUBMITTALS A. Provide written plan with methods and materials to be used in bore and casing process. SEWRP 2"d Feed Potable Water Line 02445 — 1 December 2012 B. Provide shop drawings or manufacturer literature for casing spacers; include drawings of proposed locations within pipe casing. 1.5 STANDARDS A. All work shall be accomplished in accordance with the following standards: (1) AWWA C-206 "Field Welding of Steel Water Pipe" (2) AWWA C-210 "Liquid Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines" (3) AASHTO M-190 "Bituminous Coated Corrugated Metal Culvert Pipe and Pipe Arches" (4) AASHTO Standard Specifications for Highway Bridges, 1993. (5) ASTM A-36 "Carbon Structural Steel" (6) ASTM A-123 "Zinc (Hot Dipped Galvanized) Coatings on Iron and Steel Products" (7) ASTM A-135 "Electric — Resistance — Welded Steel Pipe" (8) ASTM A-139 `Electric — Fusion (Arc) — Welded Steel Pipe" (NPS4 and over) (9) ASTM A-153 "Zinc (Hot Dipped Galvanized) on Iron and Steel Hardware" (10) ASTM A-307 "Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength" (I1) ASTM A449 "Quenched and Tempered Steel Bolts and Studs" (12) ASTM A-568/M "Steel, Carbon, and High Strength, Low Alloy, Hot -Rolled and Cold - Rolled for Commercial Quality" (13) ASTM C-76 "Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe" (14) ASTM D4254 "Test Methods for minimum Index Density of Soils and Calculations of Relative Density" B. Additional standards contained in the City of Lubbock Public Works Engineering Design Standards and Specifications handbook also apply. 1.6 QUALITY ASSURANCE A. Installer's Qualifications (1) Installers shall be competent and experienced in boring work of equal scope. (2) Installers shall provide proof of successful, related work experience with references. B. Job Conditions (1) Where work is in the right-of-way of any government or corporate jurisdiction, the Owner will secure the appropriate permits or easements. The Contractor shall observe regulations, instructions and limitations of each right-of-way owner. Coordination shall be through Owner's representative. (2) Excavated material shall be kept off of roads and railroad tracks at all times. (3) No blasting is allowed at any time. (4) The Contractor shall protect existing pipelines and utilities. The Contractor shall verify location and elevation of all pipelines, power lines and communication cable in the construction area prior to execution. Verification of existing pipe and cable utilities shall be the sole responsibility of the Contractor. 1.7 OWNER OCCUPANCY A. Cooperate with Owner to minimize conflict, and to facilitate Owner's and other Contractor's operation. SEWRP 2"" Feed Potable Water Line 02445 — 2 December 2012 B. Schedule the Work to accommodate this requirement. PART 2 PRODUCTS 2.1 STEEL CASING A. Steel casing pipe shall have a minimum yield strength of 36 ksi. Casting shall meet ASTM A-36, ASTM A-568, ASTM A-135, ASTM A-139 or approved equal. B. The steel casing shall be new, free of any structural defects such as cracks, dents, bends or heavy rust. Used Casing may be used with the Owners Representative approval and inspection. Casing joints shall be fillet welded according to ASTM C-206. 2.2 CASING SPACERS A. Casings spacers shall be sized for 8" water line in a 16" steel casing to clear the bell and not center the line vertically within the casing. B. Approved casing spacers include: (1) Advance Products (2) BMW (3) Cascade (4) CCI Pipeline (5) Culpico (6) PSI C. Other casing spacers may be used with approval from the Owner Representative or the Engineer. 2.3 JOINT RETRAINT A. Uncased pipe bores are permitted with Engineer's approval. B. Approved joint restraint devices which prevent over -insertion: (1) EBAA Mega -Stop (for push direction only) (2) CertainTeed Certa-Lok (3) Other over -insertion protection devices must be submitted prior to approval. C. Contractor shall provide joint restraint materials and methods which do not conflict with pipe spacers. D. All uncased bore methods require Contractor to submit joint restraint manufacturer's literature for Engineer's approval. PART 3 EXECUTION 3.1 BORES A. Boring shall proceed from the low or downstream end of crossing unless otherwise specified or instructed. B. Water used for lubrication of cuttings in conjunction with boring operations shall be permitted. Jetting shall be prohibited. C. All bores under existing paving will be subject to the following precautions: (1) Auger Boring — Auger boring shall use a pilot hole to set precise, clear auger path. SEWRP 2"° Feed Potable Water Line 02445 — 3 December 2012 _x (2) Wet (Slick) Boring — Under highway and arterial street pavement, the use of wet boring techniques shall be subject to the approval of the Engineer on a case -by -case basis. (3) Impact Moling — Impact moling shall be used only for bore sizes 3" in diam. and smaller. Impact moling may be used for drilling pilot holes. (4) Pipe Jacking or Ramming — Continue jacking process to completion once it has begun to prevent the pipe from becoming firmly set in the embankment. (5) Microtunneling — Remote tunneling trenchers are allowed within the constraints and operational limitations set by manufacturer. D. The following precautions shall be observed in special circumstances: (1) Boring under Milwaukee Avenue: (a) Presence of existing sewer main requires that the Milwaukee Avenue bore be cased. (b) Boring pit shall be placed on the west side of Milwaukee Avenue and proceed to the east under the road. (c) No boring method shall be chosen which will potentially disrupt or endanger existing adjacent underground utilities. (d) Contractor is responsible for damage to existing pipe, cable and other utilities affected during construction. (e) Boring operations shall provide safe setbacks from the roadway to ensure continuous service during construction. (2) Boring under Parks roadways: (a) Method of boring and casing for Parks area is at the discretion of the Contractor. (b) Uncased bores are permitted in this portion of the construction. (c) Contractor must accommodate Parks activity as coordinated with Owner Representative. Operational methods and staging may be limited by Parks activity. E. Contractor shall be fully responsible to insure the boring methods used are safe and adequate for workers, installed pipe, property, the public, adjacent utilities and other site conditions. F. The bore must be at or near level. A tolerance of 112 % grade either positive or negative will be allowed. G. Contractor is responsible for removing all excavated material. H. Contractor shall be responsible for trench safety and all traffic control requirements. I. After installing the water pipe in the encasement the ends of the encasement must be sealed to prevent soil creep into the pipe. 3.2 PIPE INSTALLATION A. Contractor shall use approved joint restraint devices for pipe within casing. B. Contractor shall use approved spacers as specified to install pipe in casing. 3.3 OPEN TRENCH ENCASEMENT A. The water distribution pipe shall be installed in the same manner as the encased bores. The cost of installing the carrier pipe will include any appurtenances needed to protect the pipe as per manufacture recommendation. B. The ends of the encasement shall be sealed after the carrier pipe is installed. END OF SECTION SEWRP 2nd Feed Potable Water Line 02445 — 4 December 2012 SECTION 02510 REDUCED PRESSURE ZONE DEVICES FOR WATER DISTRIBUTION PART GENERAL 1.1 RELATED DOCUMENTS A. Drawings, Construction Contract Clauses, Supplementary Conditions and Division 1 — General Requirements apply to Work in this Section. 1.2 SCOPE OF WORK A. This Section includes backflow prevention by Reduced Pressure Zone (RPZ) devices on water -distribution piping and related components outside of a building. B. The Contractor shall provide RPZ devices as specified herein along with all installation, testing, cleanup and safety work required. 1.3 REFERENCED DOCUMENTS A. 40 CFR 141 B. 30 TAC 216,290 & 291 C. AWWA C511-89 D. Most recent version of the City of Lubbock Design Standards 1.4 DEFINITIONS & ABREVIATIONS A. ASME: American Society of Mechanical Engineers B. ASSE: American Society of Sanitary Engineering C. AWWA: American Water Works Association D. FM: Factory Mutual E. IAPMO: International Association of Plumbing and Mechanical Officials F. PVC: Polyvinyl Chloride (plastic pipe) G. OS&Y: Outside Screw & Yoke (valve) H. RPZ: Reduced Pressure Zone (device) I. UL: Underwriter Laboratories 1.5 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: Detail precast concrete vault assemblies and indicate dimensions, method of field assembly, and components. C. Coordination Drawings: For piping and specialties including relation to other services in same area, drawn to scale. Show piping and specialty sizes and valves, meter and specialty locations, and elevations. D. Field quality -control test reports. E. Operation and Maintenance Data: For water valves and specialties to include in emergency, operation, and maintenance manuals. SEWRP 2"a Feed Potable Water Line 02510 - 1 December 2012 1.6 QUALITY ASSURANCE A. Regulatory Requirements: (1) Comply with rules, regulations, codes and standards listed in 1.2 "Applicable Codes & Regulations." B. Construction Requirements: (1) Comply with the most recent release of the City of Lubbock Design Standards. 1.7 DELIVERY, STORAGE, AND HANDLING A. Preparation for Transport: Prepare valves according to the following: (1) Ensure that valves are dry and internally protected against rust and corrosion. (2) Protect valves against damage to threaded ends and flange faces. (3) Set valves in best position for handling. Set valves closed to prevent rattling. B. During Storage: Use precautions for valves according to the following: (1) Do not remove end protectors unless necessary for inspection; reinstall for storage. (2) Protect from weather; store indoors and maintain temperature higher than ambient dew - point temperature. (3) Support off the ground or pavement in watertight enclosures when outdoor storage is necessary. C. Handling: (1) Use sling to handle valves if size requires handling by crane or lift. (2) Rig valves to avoid damage to exposed parts. (3) Do not use hand wheels or stems as lifting or rigging points. D. Deliver piping with factory -applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe -end damage and to prevent entrance of dirt, debris, and moisture. E. Protect stored piping from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor when storing inside. F. Protect flanges, fittings, and specialties from moisture and dirt. G. Store plastic piping protected from direct sunlight. Support to prevent sagging and bending. 1.8 PROJECT CONDITIONS A. Interruption of Existing Water -Distribution Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary water -distribution service according to requirements indicated: (1) Notify the Engineer no fewer than 2 (two) days in advance of proposed interruption of service. (2) Do not proceed with interruption of water -distribution service without Owner's written permission. PART 2 PRODUCTS 2.1 BACKFLOW PREVENTION DEVICES A. Applicable Standards of Compliance: SEWRP 2"d Feed Potable Water Line 02510-2 December 2012 (1) All acceptable RPZs shall be listed or meet the requirements for approval by the following agencies: (a) ASSE 1013 (b) AWWA C511 (c) IAPMO (d) FM 1221 (must include shut-off valves) (e) UL 1469 (must include shut-off valves) (2) All acceptable RPZs shall meet the Lead Plumbing Law's 0% lead content and be ASTM 90500 compliant and ANSI Yd party certified. B. Reduced -Pressure -Principle Backflow Preventers: (1) The function and construction of RPZ device shall be as follows: (a) Body of RPZ shall be constructed of Ductile Iron. (b) Two (2) Check Valves shall be mechanically independent, stainless steel spring - loaded. Check valve clips and rings shall also be stainless steel. (c) Pressure Relief Valve shall be hydraulically dependent differential pressure relief valve with the sensing passage set in an integral cast ductile iron body, with a single access cover. (d) Include no less than four (4) vertical test cocks and two (2) shut-off valves (2) Operation: Continuous -pressure applications. (3) Pressure Loss: 12 psig maximum pressure drop, through middle 1/3 of flow range. (4) Design Flow Rate: 300 gpm (5) Body: Ductile iron (6) End Connections: Flanged (7) Configuration: narrow profile (Febco "N-Pattern" or similar) C. Approved Device Manufacturers: (1) Ames (2) Febco (3) Watts (4) Wilkins 1.2 PROTECTIVE ENCLOSURES A. Freeze -Protection Enclosures: (1) Manufacturers: Subject to compliance with requirements, provide products by one of the following: (a) EZ Box Model HEz (b) Hot Box (c) Safe-T-Cover (2) Description: Insulated enclosure designed to protect aboveground water piping, equipment, or specialties from freezing and damage, with heat source to maintain minimum internal temperature of 40 deg F when external temperatures reach as low as minus 34 deg F. (a) Standard: ASSE 1060. (b) Class I: For equipment or devices other than pressure or atmospheric vacuum breakers. SEWRP 2"d Feed Potable Water Line 02510 - 3 December 2012 (c) Class I-V: For pressure or atmospheric vacuum breaker equipment or devices. Include drain opening in housing. (i) Housing: Reinforced polyester or aluminum construction. 1. Size: Of dimensions as indicated on drawings, but not less than those required for access and service of protected unit. 2. Drain opening for units with drain connection. 3. Access doors with locking devices. 4. Insulation inside housing. 5. Anchoring devices for attaching housing to concrete base. (ii) Electric heating cable or heater with self-limiting temperature control. B. Enclosure Bases: (1) Description: 4-inch minimum thickness precast concrete, of dimensions required to extend at least 6 inches beyond edges of enclosure housings. Include openings for piping from below with opening sealed to prevent infiltration below base. PART 3 EXECUTION A. Refer to Sections 02240, 02260, 02317 and 02320 for all excavating, trenching, and backfilling. Ell 3.2 VALVE APPLICATIONS A. General Application: Use mechanical -joint -end valves for larger underground installation. Use threaded- or flanged -end valves for installation in vaults. Use ULIFMG, non -rising stem gate valves for installation with indicator posts. Use corporation valves and curb valves with ends compatible with piping, for smaller installation. B. Drawings indicate valve types to be used. Where specific valve types are not indicated, the following requirements apply: (1) Use the following for valves above ground: (a) Smaller Gate Valves: Bronze, rising or non -rising stems allowed unless otherwise indicated on drawings. (b) Larger Gate Valves: AWWA, ductile iron, OS&Y rising stem, metal seated (2) Pressure -Reducing Valves: Use for water -service piping aboveground to control water pressure. (3) Relief Valves: Use for water -service piping above ground. (a) Air -Release Valves: To release accumulated air. (b) Air/Vacuum Valves: To release or admit large volume of air during filling of piping. (c) Combination Air Valves: To release or admit air. (4) Detector Check Valves: Use for water -service piping above ground to detect unauthorized use of water. 3.3 PIPING SYSTEMS - COMMON REQUIREMENTS A. See Section 02665 "Water Works Piping' for basic piping construction. SEWRP 2nd Feed Potable Water Line 02510 - 4 December 2012 1 iI 3.4 PIPING INSTALLATION A. Water -Main Connection by Tapping: Tap water main according to requirements of water utility company and of size and in location indicated. (1) Make larger connections with tapping machine according to the following: (a) Install tapping sleeve and tapping valve according to MSS SP-60. (b) Install tapping sleeve on pipe to be tapped. Position flanged outlet for gate valve. (c) Use tapping machine compatible with valve and tapping sleeve; cut hole in main. Remove tapping machine and connect water -service piping. (2) Install gate valve onto tapping sleeve. Comply with MSS SP-60. Install valve with stem pointing up and with valve box. (3) Make smaller connections with drilling machine according to the following: (a) Install service -saddle assemblies and corporation valves in size, quantity, and arrangement required by utility company standards. (b) Install service -saddle assemblies on water -service pipe to be tapped. Position outlets for corporation valves. (c) Use drilling machine compatible with service -saddle assemblies and corporation valves. Drill hole in main. Remove drilling machine and connect water -service piping. (i) Install corporation valves into service -saddle assemblies. (ii) Install manifold for multiple taps in water main. (iii) Install curb valve in water -service piping with head pointing up and with service box. (4) Install PVC, AWWA pipe according to ASTM F 645 and AWWA M23. (5) Bury piping with minimum depth of cover over top of pipe at least 48 inches and according to the following: (a) Install underground piping with restrained joints at horizontal and vertical changes in direction. (b) Use restrained joint piping, thrust blocks, anchors, tie -rods and clamps, and other supports. 3.5 JOINT CONSTRUCTION A. See Section 02665 "Water Works Piping" for basic piping joint construction. B. Make pipe joints according to the following: (1) Ductile -Iron Piping, Gasketed Joints for Water -Service Piping: AWWA C600 and AWWA M41. (2) Ductile -Iron Piping, Gasketed Joints for Fire -Service -Main Piping: UL 194. (3) Ductile -Iron Piping, Grooved Joints: Cut -groove pipe. Assemble joints with grooved - end, ductile -iron -piping couplings, gaskets, lubricant, and bolts according to coupling manufacturer's written instructions. (4) PVC Piping Gasketed Joints: Use joining materials according to AWWA C900. Construct joints with elastomeric seals and lubricant according to ASTM D 2774 or ASTM D 3139 and pipe manufacturer's written instructions. (5) Install dielectric fittings in piping at connections of dissimilar metal piping and tubing. SEWRP 2"d Feed Potable Water Line 02510 - 5 December 2012 3.6 ANCHORAGE INSTALLATION A. Anchorage, General: Install water -distribution piping with restrained joints. Anchorages and restrained joint types that may be used include the following: (1) Concrete thrust blocks. (2) Locking mechanical joints. (3) Set -screw mechanical retainer glands. (4) Bolted flanged joints. (5) Heat -fused joints. (6) Pipe clamps and tie rods. B. Install anchorages for tees, plugs and caps, bends, crosses, valves, and hydrant branches. Include anchorages for the following piping systems: (1) Gasketed-Joint, Ductile -Iron, Water -Service Piping: According to AWWA C600. (2) Gasketed-Joint, PVC Water -Service Piping: According to AWWA M23. (3) Bonded -Joint Fiberglass, Water -Service Piping: According to AWWA M45. C. Apply full coat of asphalt or other acceptable corrosion -resistant material to surfaces of installed ferrous anchorage devices. 3.7 VALVE INSTALLATION A. AWWA Gate Valves: Comply with AWWA C600 and AWWA M44. B. AWWA Valves Other Than Gate Valves: Comply with AWWA C600 and AWWA M44. (1) Pressure -Reducing Valves: Install aboveground between shutoff valves. (2) Relief Valves: Comply with AWWA C512. Install aboveground with shutoff valve on inlet. 3.8 DETECTOR -CHECK VALVE INSTALLATION A. Install aboveground. B. Install for proper direction of flow. Install bypass with water meter, gate valves on each side of meter, and check valve downstream from meter. C. Support detector check valves, meters, shutoff valves, and piping on brick or concrete piers. 3.9 VACUUM BREAKER ASSEMBLY INSTALLATION A. Install pressure vacuum breaker assemblies of type, size, and capacity indicated. Include valves and test cocks. Install according to requirements of plumbing and health department and authorities having jurisdiction. B. Do not install pressure vacuum breaker assemblies in vault or other space subject to flooding. 3.10 BACKFLOW PREVENTER INSTALLATION A. Install backflow preventers of type, size, and capacity indicated. Include valves and test cocks. Install according to requirements of plumbing and health department and authorities having jurisdiction. B. Do not install backflow preventers that have relief drain in vault or in other spaces subject to flooding. C. Do not install bypass piping around backflow preventers. D. Support larger backflow preventers, valves, and piping with masonry piers or manufacturer prescribed supports. SEWRP 2"d Feed Potable Water Line 02510 - 6 December 2012 3.11 PROTECTIVE ENCLOSURE INSTALLATION A. Install concrete base level and with top approximately 2 inches above grade. B. Install protective enclosure over valves and equipment. C. Anchor protective enclosure to concrete base. 3.12 CONNECTIONS A. Connect water -distribution piping to existing water main as indicated on drawings. B. Ground equipment according to City standards. 3.13 FIELD QUALITY CONTROL A. Piping Tests: Conduct piping tests before joints are covered and after concrete thrust blocks have hardened sufficiently. Fill pipeline 24 hours before testing and apply test pressure to stabilize system. Use only potable water. B. Hydrostatic Tests: Test at not less than one -and -one-half times working pressure for two hours. C. Prepare reports of testing activities. 3.14 IDENTIFICATION A. Install continuous underground detectable warning tape during backfilling of trench for underground water -distribution piping. B. Locate below finished grade, directly over piping. Underground warning tapes are specified in Section 02300 "Earthwork." 3.15 CLEANING A. Clean and disinfect water -distribution piping as follows: (1) Purge new water -distribution piping systems and parts of existing systems that have been altered, extended, or repaired before use. (2) Use purging and disinfecting procedure prescribed by City of Lubbock Design Standards. (3) Flush piping system with clean, potable water until dirty water does not appear at points of outlet. (4) Use purging and disinfecting procedure prescribed by City of Lubbock Design Standards and AWWA C651 as follows: (a) Fill system or part of system with water/chlorine solution containing at least 50 ppm of chlorine; isolate and allow to stand for 24 hours. (b) Drain system or part of system of previous solution and refill with water/chlorine solution containing at least 200 ppm of chlorine; isolate and allow to stand for 3 hours. (c) After standing time, flush system with clean, potable water until no chlorine remains in water coming from system. (d) Submit water samples in sterile bottles to Engineer or City Representative in accordance with Section 01410 "Testing Laboratory Services." Repeat procedure if biological examination shows evidence of contamination. B. Reports: (1) Prepare reports of purging and disinfecting activities. SEWRP 2"d Feed Potable Water Line 02510 - 7 December 2012 (2) If adjacent water lines are newly installed provide disinfection, testing and reports in conjunction with purification and pre -service work required for new water lines. END OF SECTION I 9 SEWRP 2"a Feed Potable Water Line 02510 - 8 December 2012 s g1 1 SECTION 02665 WATER PIPING, VALVES, AND FITTINGS PART1 GENERAL 1.1 SUMMARY A. This section of the specifications covers all water piping, valves, and fittings required for the project. B. Section Includes: (1) Material Schedule (2) Submittals (3) References (4) Materials (5) Polyvinyl Chloride (PVC) Pipe (6) Ductile Iron Pipe (7) Concrete Cylinder Pipe (8) Pipe Fittings (9) Flexible Couplings and Flanged Coupling Adapters (10) Pipe Joints (11) Steel Casing (12) Valves (13) Fire Hydrants (14) Polyethylene Wrap (15) Joint Restraints (16) Concrete (17) General (18) Inspection (19) Responsibility for Materials (20) Handling Pipe and Accessories (21) Alignment and Grade (22) Manner of Handling Pipe and Accessories in Trench (23) Cleaning and Inspecting (24) Laying and Jointing PVC Pipe (25) Plugging Dead Ends (26) Fittings (27) Setting Valves, Valve Boxes, Fire Hydrants and Fittings (28) Thrust Restraint (29) Excavation, Trenching and Backfilling (30) Line Testing (31) Disinfection of Pipelines (32) Installation of Steel Pipe Casing and Pipe in Casing l ` SEVW 2" Feed Water Line 02665-1 December 2012 (33) Pipe Identifiers (34) Cleanup 1.2 MATERIAL SCHEDULE A. 6", 8", 10" and 12" lines shall be AWWA C 900, DR 18 PVC pipe. B. Ductile Iron Fittings (AWWA C 153) C. Tapping Sleeve (ductile iron or stainless steel) D. Gate Valves E. Valve Boxes F. Fire Hydrants (AWWA C 502) G. Mechanical Joint Restraints 1.3 SUBMITTALS A. Submit all manufacturers' data for all pipe and fittings including all pipe thickness class calculations, steel casing, and casing spacers. B. Submit affidavits of compliance with appropriate standards. C. Submit product warranties. D. Submit manufacturer's installation instructions. E. Submit manufacturer's loading, unloading, and storage requirements. F. Submit product information for pipe identification tape. G. Submit concrete mix design for concrete thrust blocking. 1.4 REFERENCES A. AWWA C 104 — Cement Mortar Lining for Ductile Iron Pipe and Fittings for Water. B. AWWA C 110 — Ductile Iron and Gray Iron Fittings, 3 inch through 48 inch, for Water. C. AWWA C 111— Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings. D. AWWA C 104 — Rubber Seated Butterfly Valves. E. AWWA 509 — Resilient Seated Gate Valves for Water Supply. F. AWWA C 900 — Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 inch through 12 inch, for water distribution. G. AWWA C 905 — Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 14 inch through 48 inch, for water transmission and distribution. H. AWWA C 301— Prestressed Concrete Pressure Pipe, Steel Cylinder Type, for Water and other Liquids. I. AWWA C 303 — Concrete Pressure Pipe, Bar Wrapped, Steel Cylinder Type J. ANSI/AWWA C-200 Standard for Steel Water Pipe 6 Inches and Larger K. ANSI/AWWA C-205 Standard for Cement -Mortar Protective Lining and Coating for Steel Water Pipe - 4 in. and Larger -Shop Applied L. ANSI/AWWA C-206 Standard for Field Welding of Steel Water Pipe M. ANSI/AWWA C-207 Standard for Steel Pipe Flanges for Water Works Service, 4" -144" N. ANSI/AWWA C-208 Standard for Dimensions for Fabricated Steel Water Pipe Fittings O. ANSI/AWWA C-209 Standard for Cold -Applied Tape Coatings for the Exterior of Special Sections, Connections, and Fittings for Steel Water Pipelines SEWRP 2"d Feed Water Line 02665-2 December 2012 P. ANSI/AWWA C-210 Standard for Liquid -Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines Q. ANSI/AWWA C-214 Standard for Tape Coating Systems for the Exterior of Steel Water Pipelines R. ANSI/AWWA C-216 Standard for Heat -Shrinkable Cross -Linked Polyolefm Coatings for the Exterior of Special Sections, Connections, and Fittings for Steel Water Pipelines S. ANSI/AWWA C-218 Standard for Coating the Exterior of Aboveground Steel Water Pipelines and Fittings T. ANSIIAWWA C-219 Standard for Bolted Sleeve -Type Couplings for Plain -End Pipe U. ANSI/AWWA. C-222 Standard for Polyurethane Coatings for the Interior and Exterior of Steel Water Pipelines and Fittings V. AWWA. M-I I Steel Pipe - A guide for Design and Installation W. ASTM A 106 Standard Specification for Seamless Carbon Steel Pipe for High -Temperature Service. X. ASTM A 53 Standard Specification for Pipe, Steel, Black and Hot -Dipped, Zinc Coated Welded and Seamless Y. ASTM E 165 Method for Liquid Penetrant Examination Z. ASTM E 709 Guide for Magnetic Particle Examination AA. ASME Section V Nondestructive Testing Examination BB.ASME Section IX Welding and Brazing Qualification. CC. AWS B2.1 Standard for Welding Procedure and Welding Qualifications. PART 2 PRODUCTS 2.1 MATERIALS A. All pipe, fittings, and valves shall be new and of the best quality in material and workmanship. B. All pipe, fittings, and valves shall conform to American National Standards Institute/National Sanitation Foundation (ANSIINSF) Standard 61. C. In areas where natural gas lines exist, and are cathodically protected by means of impressed current, only electrically non-conductive pipe shall be allowed. 2.2 POLYVINYL CHLORIDE (PVC) PIPE A. PVC pipe 12 inches and smaller shall be AWWA C-900, DR-18. B. PVC pipe 14 inches and larger shall be AWWA C-905, DR-21. The outside diameter of the PVC pipe shall be cast iron equivalent. C. PVC pipe shall be formed with an integral bell and shall be joined using a gasketed bell and spigot joint. Spigot ends shall be beveled and reference marked to facilitate joining and insure proper seating depth. Gaskets shall conform to ASTM F 477. The nominal joint length shall be twenty (20) feet. D. AWWA C-900 and C-905 pipe shall be marked as prescribed by AWWA standards including nominal size, dimension, ratio, AWWA pressure class, manufacturer's name and code, and seal of testing agency that verified the suitability of the pipe material for potable water. SEWRP 2 Feed Water Line 02665-3 December 2012 t E. Pipe shall meet all additional test requirements as described in AWWA C-900 or C-905, as applicable. F. All PVC pipe shall be approved by the National Sanitation Foundation (NSF) for use in the transportation of potable water and shall bear the NSF seal of approval. 2.3 DUCTILE IRON PIPE A. Ductile Iron pipe 12" shall be Class 200. B. Ductile iron pipe to be furnished shall conform to the following standard specifications or latest revisions: (1) ANSI/AWWA C150/A21.50-81 (2) ANSUAWWA C104/A21.4-80 (3) ANSI/AWWA C151/A21.4-80 C. All ductile iron pipe shall be cement lined in accordance with AWWA C104-80 (ANSI A21.4) specifications. The external surface shall be coated with an asphalt base paint. Ell D. All joint for ductile iron pipe shall be of the rubber gasket bell and spigot type, except where connecting flanged fittings, and shall otherwise conform to the base specifications to which the pipe is manufactured. E. The joint shall be latest approved type of rubber gasket joint for ductile iron pipe. F. All joints of ductile iron pipe and fittings shall be sealed with a continuous ring rubber gasket meeting standards specified by AWWA CI 1-72 (ANSI A21.11) or its latest revision. 2.4 CONCRETE CYLINDER PIPE A. Prestressed Concrete Embedded Cylinder pipe shall be manufactured in accordance with the latest revision of AWWA C-301. B. Pretensioned Concrete Cylinder Pipe (PCCP) shall be manufactured in accordance with the latest revision of AWWAS C303-78 C. Concrete Cylinder Pipe shall withstand a minimum pressure of 150 p.s.i. longitudinally and helically. D. The joints of the pretensioned concrete cylinder pipe and fittings shall be sealed with a continuous ring rubber gasket meeting standards specified in AWWA C303-78. E. A Portland cement mortar shall be used to fill the annular space both inside and outside of joints in the pretensioned concrete cylinder pipe. (1) Portland cement used in the mortar shall conform to "Standard Specifications and Test for Portland Cement" A.S.T.M. serial designations C150 and C77. (2) Sand for the mortar shall conform to A.S.T.M. designation C-33-52T for fine aggregate. (3) The exterior joints on pretensioned concrete cylinder pipe shall be poured with a heavy duty diaper. (a) The width of the diaper shall be nine inches. (b) The band shall be provided with 3/8 inch x 0.20 steel straps on each side. 2.5 PIPE FITTINGS A. General: Pipe fittings shall be of a type and design especially suitable for use with the type of piping with which they are installed. Pressure rating of fittings shall not be less than that of - the pipe. J B. All ductile iron fittings shall have an external bituminous coating and shall be cement lined in accordance with AWWA C 104. t-' SEWRP 2d Feed Water Line 02665-4 December 2012 t", C. Fittings shall be ductile iron and shall be mechanical joint or push -on joint unless otherwise specified or shown on the Drawings. D. Ductile Iron Fittings — Ductile iron fittings shall conform to AWWA C153 110. Fittings shall be mechanical joint or push -on joint unless otherwise specified or shown on the Drawings. E. All fittings shall have a pressure rating equal to that of the pipe with which they are used but in no case less than 150 psi. F. Unless otherwise indicated, all ductile iron fittings shall have an external bituminous coating and shall be cement -lined in accordance with the specifications for coating and lining the pipe. G. All ductile iron fittings shall be cast from the same quality of metal used in casting ductile iron pipe and shall be subjected to the same test requirements. Marking and weighing shall be as required for ductile iron pipe. H. Where flanged fittings are used, the flanges shall be of the same material as the fitting. Where bell or mechanical joint fittings are used, the bells shall be cast integrally with the fitting. Screwed -on bells will not be acceptable. 2.6 FLEXIBLE COUPLINGS AND FLANGED COUPLING ADAPTERS A. Flanged coupling adapters and flexible couplings shall be provided at the locations shown on the Drawings and at other locations required for installation of the piping system. B. Flanged coupling adapters will be provided with anchoring studs to provide thrust restraint. Epoxy coated sheet construction shall be used for all couplings. All bolts, nuts, and washers shall be stainless steel. 2.7 PIPE JOINTS A. Push -on Joints — Push -on joints shall be as specified in AWWA Standard Cl 11. B. Mechanical Joints —Mechanical joints shall be as specified in AWWA Standard C111. 2.8 STEEL CASING A. Steel casing shall be new welded steel pipe with minimum yield strength of 35,000 psi meeting ASTM A36. The exterior of the casing pipe shall have a bituminous coating. B. Casing wall thickness for installation shall be in accordance with the City of Lubbock Design Standards and Specifications. C. Casing spacers shall be used to install carrier pipe inside the encasement pipe and to provide support around the periphery of the pipe should the pipe twist as it is pushed through the casing. D. The spacers shall be of a projection type that has a minimum number of projections around the circumference totaling the number of diameter inches. For example, eight (8) inch pipe shall have a minimum of eight (8) projections and eighteen (18) inch pipe shall have a minimum of eighteen (18) projections. E. Casing spacers shall use double backed tape, provided with the spacers, to fasten tightly onto the carrier pipe so that the spacers do not move during installation. Installation instructions shall be provided with each shipment. F. Casing spacers shall have a span of ten (10) feet to six (6) feet dependent on the total load anticipated with the pipe full of liquid. The maximum load shall not exceed the load limits per spacer listed in the brochure. G. These values in the brochure include conservative safety factors for class spacer used. Spacers shall have minimum height that clears the pipe bell or as otherwise indicated on plans. SEWRP 2" Feed Water Line 02665-5 December 2012 H. Casing spacers shall be projection type totally non-metallic spacers constructed of preformed sections of high -density polyethylene. Spacers shall be ISO 9002 certified for strength and quality. I. Manufacturer: Projection type spacers shall be Raci type spacers, or equal approved by the Engineer, along with wrap around end seal made of 1/8" think rubber with stainless steel bands. 2.9 VALVES A. Valves that are twelve (12) inches and smaller shall be gate valves unless otherwise noted on 1-- the plans or specified herein. All valves shall be designed for a working pressure of at least 150 psi unless otherwise noted. B. Gate Valves: (1) All gate valves shall be resilient seat or double disk parallel seat, iron body; bronze mounted throughout and shall meet all requirements of AWWA C 509. (2) The valves shall be of the type of joint used in the piping. (3) All valves shall open by turning to the leis, and unless otherwise specified, shall have non -rising stem when buried and outside screw and yoke when exposed, and be furnished with a two (2) inch operating nut when valves are buried and shall be furnished with hand wheels when exposed. (4) Gate valves shall be furnished with O-ring stem packing. (5) All gate valves shall be designed to withstand a working pressure of 200 psi unless otherwise noted. (6) Gate valves shall be meet the City of Lubbock Design Standards and Specifications. (7) All ductile iron shall conform to A536 Grade 65-45-12. Castings shall be clean and _< sound without defects that will impair their service. No plugging or welding of such defects will be allowed. (8) Bolts shall be electro-zinc plated steel with hex heads and hex nuts in accordance with ASTM 307 and A563, respectively. (9) All parts for valves furnished must be standard and completely interchangeable with valves of the same brand. Successful bidder to furnish to the Owner, upon request, a 1 letter stating the type of valves to be installed and a letter from the manufacturer stating that the parts are standard and interchangeable. C. Valve Boxes and Extension Stems: (1) Extension stems shall be furnished on buried valves where the top of the operating nut is more than ninety (60) inches below finished grade. Top of the extension stem shall not be more than thirty-six (36) inches below the top of the valve box.- (2) Buried valves shall be provided with cast iron valve boxes. (3) The boxes shall be designed to fit over a section of six (6) inch C 900 PVC riser pipe, which will be used, as an extension from the top of the valve to within six (6) inches of the ground surface. (4) The box shall have a heavy cast iron cover marked "Water". (5) The box shall have a flange type base, with the base being approximately four (4) inches larger in diameter than the outside diameter of the barrel of the box. (6) The necessary length of the six (6) inch C 900 PVC riser pipe required for the extension shall be considered as a part of the box. (7) Valve boxes shall be East Jordan Iron Works No. 8453, or approved equal. 7 SEWRP 2d Feed Water Line 02665-6 December 2012 1, i= �s (1) Hydrants shall meet the City of Lubbock Design Standards and Specifications (2) Hydrants shall meet AWWA C-502 (3) Hydrants shall have an iron body, bronze mounted throughout and be designed for working pressure of 150 psi. (4) Hydrants shall be traffic model type with a 5-1/4-inch valve opening, two (2) 2-1/2-inch hose nozzles, and one (1) 4-inch steamer nozzle. (5) The hydrant shall be for a 6-inch main. 2.10 POLYETHYLENE WRAP A. All buried valves and fittings shall be thoroughly wrapped prior to installation with a polyethylene material meeting the requirements of ASTM D 1248. B. The polyethylene material shall have a minimum thickness of eight (8) mils. C. The wrap shall be secured by two (2) inch duct tape. 2.11 JOINT RESTRAINTS A. Uniflange series 1500 joint restraint for PVC pipelines or approved equal. B. Must meet all pressure testing requirements of ASTM F-1674. C. Materials must meet requirements of ASTM A-536. D. Install per manufacturer's recommendations. 2.12 CONCRETE A. Concrete may be used for blocking the pipe and fittings and shall conform to the concrete specifications, as set forth in the Section 03300 Cast -in -Place Concrete, except a minimum compressive strength of 2,800 psi will be acceptable. PART 3 EXECUTION 3.1 GENERAL A. All pipe and accessories shall be unloaded, handled, laid, jointed, tested for defects and for leakage, and disinfected in the manner herein specified. 3.2 INSPECTION A. The pipe, fittings, and accessories shall be inspected upon delivery and during the progress of the Work and any material found to be defective will be rejected by the Engineer, and the Contractor shall remove such defective material from the site of the Work. 3.3 RESPONSIBILITY FOR MATERIALS A. The Contractor shall be responsible for all material furnished and shall replace, at the Contractor's expense, all such material that is found to be defective in manufacture or has become damaged in handling after delivery. 3.4 HANDLING PIPE AND ACCESSORIES A. All pipe, fittings, and other accessories shall, unless otherwise directed, be unloaded at the point of delivery, hauled to and distributed at the site of the Work by the Contractor. L", SEWRP 2"d Feed Water Line 02665-7 December 2012 B. In loading and unloading, they shall be lifted by hoists or slid, or rolled on skidways in such a manner as to avoid shock or damage to the materials. Under no circumstances shall they be dropped. Pipe handled on skyways must not be skidded or rolled against pipe already on the ground. C. The pipe, fittings, and accessories shall be placed along the site in such a manner as to be kept as free as possible from dirt, sand, mud, and other foreign matter. 3.5 ALIGNMENT AND GRADE A. All pipe shall be laid and maintained to the lines and grades shown on the plans or as established on the ground by the Engineer. B. The Contractor shall verify horizontal and vertical locations of items critical to the alignment and grade of the proposed water line. C. Confirm compliance with the Drawings and Specifications. D. Wherever it is necessary to deflect pipe from a straight line either in a vertical or horizontal plane to avoid obstructions, to plumb valves, or where vertical or horizontal curves are shown or permitted, the degree of deflection at each joint shall not exceed the maximum deflection noted on the Drawings. 3.6 MANNER OF HANDLING PIPE AND ACCESSORIES IN TRENCH A. After the trench grade has been completed, all bell holes dug and the grade inspected, the pipes and accessories may be placed in the trench. B. All pipe and fittings shall be carefully lowered into the trench piece by piece by means of derricks, ropes, or other suitable tools or equipment, in such a manner so as to prevent damage to the material in any way. Under no circumstances shall pipe or accessories be dropped or dumped into the trench. k1yKNOM11 r0 9�Z �Le3 A. Before lowering into the trench, the pipe shall be again inspected for defects and the pipe, while suspended, shall be lightly hammered to detect cracks. Any defective, damaged, or unsound pipe and materials shall be rejected. B. All foreign matter or dirt shall be removed from the inside of the pipe and from all bells, spigots, or parts of the pipe used in forming the joint, before the pipe is lowered into the trench, and it shall be kept clean by approved means during and after laying. C._ At a time when pipe laying is not in progress, the open ends of the pipe shall be closed by approved means, and no trench water shall be allowed to enter the pipe. 3.8 LAYING AND JOINTING PVC PIPE A. General: Unless otherwise directed, pipe shall be laid with bells facing in direction of laying; and for lines on appreciable slopes, bells shall, at the discretion of the Engineer, face up grade. B. Cutting of pipe for inserting fittings or closure pieces shall be done in a neat and workmanlike manner without damage to the pipe or the cement lining. C. The jointing shall be completed for all pipe laid each day, in order not to leave open joints in the trench overnight. At times when pipe laying is not in progress, the open ends of the pipe shall be closed by approved means, and not trench water shall be permitted to enter the pipe. D. No pipe shall be laid in water, or when the trench conditions or weather are unsuitable for such work, except by permission of the Engineer. SEWRP 2°a Feed Water Line 02665-8 December 2012 1 E. Before laying the pipes, all lumps, blisters, and excess coating shall be removed from the bell and spigot ends of each pipe; the outside of the spigot and the inside of the bell shall be wire brushed and wiped clean and dry. Pipe ends shall be kept clean until joints are made. F. Defective joints shall be repaired as directed by the Engineer. G. Mechanical Joint Piping: (1) The last eight (8) inches outside of the spigot and inside of the bell of mechanical joint pipe shall be thoroughly cleaned to remove oil, grit, excess coating, and other foreign matter from the joint, and then painted with lubricant recommended by the pipe manufacturer. (2) The cast iron gland shall then be slipped on the spigot end of the pipe with the lip extension of the gland toward the socket or bell end. (3) The rubber gasket shall be painted with lubricant recommended by the pipe manufacturer and placed on the spigot end with the thick edge toward the gland. (4) The entire section of the pipe shall be pushed forward to seat the spigot end in the bell. (5) The gasket shall then be pressed into place within the bell; care shall be taken to locate the gasket evenly around the entire joint. (6) The gland shall be moved along the pipe into position for bolting, all of the bolts inserted, and the nuts screwed up tightly with the fingers. (7) All nuts shall be tightened withra suitable torque limiting wrench. (8) Nuts spaced 180 degrees apart shall be tightened alternately in order to produce an equal pressure on all parts of the gland. H. If water gets in the trench before the joint is completed, or if the pipe is disturbed from line and grade after being laid, the pipe shall be taken up, the joints cleaned and the pipe re-laid. I. Immediately after completion of the jointing, sufficient bedding and backfill material shall be placed around and over the pipe to hold the pipe to line and grade. J. Pre -molded joints shall be made in accordance with the recommendations of the manufacturer of the pipe. K. The surfaces of the jointing material on both the bell and spigot at each joint shall be wiped with the solvent recommended by the pipe manufacturer. L. The spigot shall then be firmly forced into the bell using a bar or other similar lever and a block of wood to prevent damage to the pipe. 3.9 PLUGGING DEAD ENDS A. Standard plugs shall be inserted into the bells of all dead ends and pipes, tees, or crosses and spigot ends shall be capped. B. Plugs or caps shall be jointed to the pipe or fittings in the same manner used in jointing the pipe. C. All plugs and caps shall have horizontal thrust blocks. 3.10 FITTINGS A. Fittings shall be set at the locations shown on the plans or at locations as established by the Engineer, and shall be set and jointed to the pipe in the manner heretofore specified for pipe installations. Concrete blocking shall be provided for all buried fittings. 3.11 SETTING VALVES, VALVE BOXES, FIRE HYDRANTS AND FITTINGS A. Valves and fittings shall be set at the locations shown on the Drawings and shall be set and jointed to the pipe in the manner heretofore specified for pipe installations. Feed Water Line 02665-9 December 2012 B. All valves shall be hub end as required and all valves buried in the ground shall have a cast iron or precast concrete valve box set over the valve. C. All valves shall be set vertical, unless otherwise specified, and shall be thoroughly checked for operation prior to installation. D. After pressure has been applied to the line, stung boxes shall be checked for operation prior to installation. E. After pressure has been applied to the line, stuffing boxes shall be checked and tightened if necessary. F. Valve Boxes: (1) Valve boxes shall be firmly supported and maintained centered and plumb over the wrench nut of the valve, with the box cover flush with the surface of the ground or at such a level as directed by the Engineer. (2) All valve boxes under pavement shall be adjusted to finished pavement grades. G. Fire Hydrants: (1) Fire hydrants shall be located at the points shown on the Drawings. (2) All fire hydrants shall be set plumb, to the grade established on the Drawing, and with the steamer nozzle at right angles to the street. (3) Hydrants shall be supported in such a manner as not to cause a strain on the fire hydrant lead or branch. (4) The bowl of the hydrant shall be well braced against unexcavated earth at the end of the trench with concrete blocking. (5) The concrete blocking shall be placed so as not to interfere with the hydrant drains and so that the joints of the flanges are accessible. (6) Blocking of gate valves on fire hydrants leads shall be with concrete as shown on the Drawings. (7) The hydrants shall be thoroughly cleaned of dirt or foreign matter and checked for operation prior to installation. Drain holes shall not be blocked or sealed. (8) Fire hydrants shall be installed and maintained so that the center of the lowest water outlet shall be eighteen (18) inches from the ground. (9) Fire hydrants shall be installed with the four (4) inch nozzle facing the required access way. 3.12 THRUST RESTRAINT A. All fittings, valves and fire hydrants, unless otherwise specified, shall be provided with suitably restrained joints per the manufacturer's recommendation. B. Restrained push -on or mechanical joints, mechanical joint anchoring fittings, and mechanical joints utilizing setscrew ductile iron retainer glands shall be used in lieu of concrete thrust blocking. Thrust blocking will be allowed under only under special circumstances as approved by the Engineer. 3.13 EXCAVATION, TRENCHING AND BACKFILLING. A. Backfill and compaction shall be performed in accordance of COL Ordinance 2007-00122. B. Backfill around pipe with specified granular bedding material that is free of large rocks, topsoil, debris or other unacceptable material. C. The backfill around the pipe shall be shovel sliced around the haunch of the pipe and mechanically compacted or hand tamped to a point 12 inches above the top of the pipe. SEWRP 2"d Feed Water Line 02665-10 December 2012 D. Backfill from 12 inches above the pipe to the finished grade will be as follows: (1) For unpaved areas: (a) Use excavated material that is free of large rocks, debris or other material determined unsuitable by the Owner's Representative. Backfill shall be placed in maximum six ` (6) inch lifts and compacted to 95% Standard Proctor Density at +/- 2% optimum moisture content. (b) Each lift shall be tested at a maximum of 500 feet intervals according to ASTM designation D-698. (c) These tests shall be performed by a reputable contractor specializing in geotechnical work and will be at the successful bidder's expense. (d) Copies of these tests shall be provided to the Owners Representative. (2) For paved areas: (a) Place Cement Stabilized Backfill (CSB) meeting City of Lubbock Standards under the bottom of the pavement in a minimum of thickness of 12". (b) The backfill from 12-inches above the top of pipe to the CSB shall be in placed in maximum 6 inch lifts and compacted to 95% Standard Proctor Density. (c) Each lift shall be tested at a maximum of 500 feet intervals according to ASTM designation D-698. (d) These tests shall be performed by a reputable contractor specializing in geotechnical work and will be at the successful bidders expense. (e) Copies of these tests shall be provided to the Owners Representative. (3) The City of Lubbock will perform random spot testing at no expense to the contractor. 3.14 LINE TESTING A. After the pipe is laid and the joints completed, each section or run of piping, shall be tested as specified herein. The Contractor shall bear all costs of providing all equipment, materials, labor, and other incidentals required to test pipe lines as specified herein. B. The Contractor shall provide suitable means for filling the lines and developing the required pressure in the lines. C. Testing procedure shall be as follows: (1) Duration — The duration of the hydrostatic test shall be a minimum of four (4) hours. (2) Pressure — The pipeline shall be tested so that the pressure at the lowest point in the test section is at least 100 percent, but not greater than 120 percent of the pressure class of the pipe, and the minimum pressure at the highest point in the test section is not less E than 85 percent of the pressure class of the pipe. -' D. Allowable Leakage — The maximum allowable leakage for push -on joints is the number of gallons per hour as determined by the following formula(s): E. PVC: Ductile Iron: ,z (1) L = ND(P)'h L = SD(P)'h (2) 7,400 133,200 (3) where: (a) L = allowable leakage in gallons per hour (b) N = number of joints in length of pipe tested l_. (c) S = length of pipe (d) D = nominal diameter of the pipe in inches (e) P = average of the maximum and minimum pressures within the test section in psi SEWRP 2 Id Feed Water Line 02665-11 December 2012 1_. F. Any leakage which becomes evident prior to final acceptance of the project shall be found and repaired to the satisfaction of the Engineer even though the particular line has been previously accepted and tested. 3.15 DISINFECTION OF PIPELINES A. The Contractor shall furnish all labor, equipment, and materials necessary for the disinfection of all pipe lines, which shall be disinfected before being placed in service. B. The lines shall be disinfected by the application of a chlorinating agent in accordance with the requirements of AWWA C 651, include the placement of hypochlorite granules in the pipe during construction. C. The Contractor shall notify the Engineer 48 hours in advance of disinfection so that the Engineer or Owner's Representative may witness the disinfection activities. D. Quality Assurance: (1) Bacteriological sampling and test will be performed in accordance with the latest requirements of Standard Methods for the Examination of Water and Wastewater. (2) The`City of Lubbock laboratory will be used for bacteriological testing. E. Chemicals: (1) Acceptable disinfectants are liquid and solid forms of hypochlorites. Liquid chlorine gas is not acceptable. (2) Acceptable chemicals for neutralizing chlorinated water are liquid and solid forms of sodium bisulfate, sodium sulfite, and sodium thiosulfate. (3) The water being used to fill the line shall be controlled to flow into the section to be sterilized very slowly, and the rate of application of the chlorinating agent shall be proportioned at least fifty (50) parts per million in the water entering the pipe. F. Temporary Facilities: (1) Provide temporary taps or blowoffs as required. As a minimum, use a two (2) inch diameter steel pipe and fittings with isolation valves and sampling taps. (2) Water used for the initial flushing as well as the final chlorination shall be introduced into the pipeline through a corporation stop or other approved connection inserted in the horizontal axis of the newly laid pipe. (3) No connection to the existing distribution system is allowed until the pipeline has passed all bacteriological testing. G. Final Flushing: (1) Flush the water system of the highly chlorinated water within twenty-four (24) hours of initial chlorination. (2) Flush water in a location and manner approved by the Engineer. (3) Neutralize the highly chlorinated water to a maximum free chlorine residual of 1.0 mg/L. H. Sampling and Analysis: (1) Collect bacteriological samples at intervals no more than 1000 feet and one (1) sample from each end of the pipeline in the presence of the Engineer or Owner's representative. (2) The Owner's representative or the Engineer shall deliver the samples to the City of Lubbock Health Department or the City of Lubbock Water Treatment Laboratory for analysis. (3) Collect samples after the initial disinfection and after the facilities have been filled with chlorinated water and a free chlorine residual of at least 0.5 mg/L has-been detected. I. Acceptance: 3 SEWRP 251Feed Water Line 02665-12 December 2012 1 (1) Facilities will be considered properly disinfected when two (2) consecutive sets of acceptable bacteriological samples, taken at least twenty-four (24) hours apart, have indicated the absence of coliform organisms. J. After acceptance by the Engineer, remove all temporary facilities and properly plug test taps. The pipeline may then be connected to the City of Lubbock water distribution system. 3.16 INSTALLATION OF STEEL PIPE CASING AND PIPE IN CASING A. Installation of the casing pipe sleeves shall be accomplished by boring as specified herein. B. Equipment used shall be such size and capacity as to allow the placement of the casing to proceed in a safe and expeditious manner. Installation of the casing and the excavation and removal of the materials within the casing shall proceed simultaneously. C. The boring shall proceed from a pit provided for the boring equipment and workers. D. Excavation and location of the pit shall be approved by the Engineer and County as appropriate. E. Boring without the concurrent installation of the casing pipe will not be permitted. F. The use of water or other fluids in connection with the boring operation will be permitted only to the extent of lubricating cuttings. G. Jetting will not be permitted. H. Overcutting in excess of one (1) inch shall be remedied by concrete pressure grouting the entire length of the installation. I. All casing pipe joints shall be welded. J. Care shall be taken to keep the pipe sleeve on the proper line and grade. K. After the casing pipe has been jacked and bored and is accepted by the Engineer, the pipe shall be shoved through the casing. L. The pipe shall be pushed or pulled through the casing by exerting pressure on the barrel of the pipe and not on the bell, and shall be done in such a manner that the joint is always in compression during the shoving operation. 3.17 PIPE IDENTIFIERS A. Marking Tape: (1) All pipes installed in an open trench will be identified with the appropriate color and description of three (3) inch wide pipe identification tape. (2) Install the tape parallel to the pipe it identifies at a distance above the pipe of twelve (12) to eighteen (18) inches. (3) Above non-metallic (PVC) pipe material, install a tape detectable with a metal detector from the top of finished grade. (4) Install detectable tape as deep as it can be detected but no closer to the non-metallic pipe than twelve (12) inches. B. Locator Wire: (1) On non-metallic (PVC) pipe material, install twelve (12) gauge minimum solid copper with 30 mil HDPE thermoplastic insulation directly above piping. A. The backfill shall be rounded up over the trench sufficiently to allow for future settlement and any excess dirt shall be removed from the site. SEWRP 2" Feed Water Line 02665-13 December 2012 i B. Cement Binder: ASTM C 150, Portland Cement or hydraulic or blended hydraulic cement as defined in ASTM C 219. C. Primer: Product of underlayment manufacturer recommended for substrate, conditions, and application. D. Aggregate: Well -graded, washed gravel, 1/8 to 1/4 inch, or coarse sand as recommended by underlayment manufacturer. E. Compressive Strength: Not less than 4100 psi at 28 days when tested according to ASTM C 109. 2.8 CONCRETE MIXES A. Prepare design mixes for each type and strength of concrete determined by either laboratory trial mix or field data bases, as follows: (1) Proportion normal -weight concrete according to ACI 211.1 and ACI 301. (2) Standard design mix to be used unless noted otherwise, provide normal weight concrete with the following properties: (3) Compressive Strength (28 days): 3000 psi (4) Type I cement (5) Fly Ash: Allow up to 25% of cementitious material (6) Minimum Slump: 4 inches (7) Maximum Slump: 6 inches (8) Maximum Slump for Concrete Containing High -Range Water -Reducing Admixture: 8 inches after admixture is added to concrete with 2 to 4 inch slump. (9) Maximum Water/Cementitious Materials Ratio: 0.55 (10) Add air -entraining admixture at manufacturer's prescribed rate to result in concrete at point of placement having an air content of five (5) to seven (7) percent, unless otherwise indicated. B. Cementitious Materials: (1) For concrete exposed to deicers, limit percentage, by weight, of cementitious materials other than Portland cement according to ACI 301 requirements. (2) Limit percentage, by weight, of cementitious materials other than Portland cement in concrete as follows: (a) Fly Ash: 20 percent (b) Do not air entrain concrete to trowel -finished interior floors and suspended slabs. Do not allow entrapped air content to exceed 3 percent. (c) Admixtures with chloride ions are prohibited. C. Admixtures: (1) Use admixtures according to manufacturer's written instructions. (2) Use water -reducing admixture or high -range water -reducing admixture (superplasticizer) in concrete, as required, for placement and workability. (3) Use water -reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions. (4) Use water -reducing admixture in pumped concrete, concrete for heavy -use industrial slabs and parking structure slabs, concrete required to be watertight, and concrete with a water/cementitious materials ratio below 0.50. SEWRP 2— Feed Water Line 03300-4 December 2012 ,- C. Place joints perpendicular to main reinforcement. Continue reinforcement across construction joints, unless otherwise indicated. Do not continue reinforcement through sides - of strip placements of floors and slabs. D. Form from preformed galvanized steel, plastic keyway -section forms, or bulkhead forms with keys, unless otherwise indicated. Embed keys at least 1-1/2 inches into concrete. E. Locate joints for beams, slabs, joists, and girders in the middle third of spans. Offset joints in girders a minimum distance of twice the beam width from a beam -girder intersection. F. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs. G. Space vertical joints in walls as indicated. Locate joints beside piers integral with walls, near corners, and in concealed locations where possible. H. Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces. 1. Contraction Joints in Slabs -on -Grade: Form weakened -plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one- fourth of concrete thickness, as follows: (1) Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond -rimmed blades. Cut 1/8 inch wide joints into concrete when cutting action will not tear, abrade, or otherwise damage surface and before concrete develops random contraction cracks. (2) Curb and Gutter Joints: Curbs and gutter shall be constructed with an expansion joint at the tangent point on each return at intersections and at the end of each day's concrete pour. (a) A construction or contraction joint shall be located at intervals corresponding to the joint interval of the adjacent concrete pavement or as directed by the Owner's Representative. (b) Joints in the new concrete pavement shall extend through the new curb and gutter unless otherwise directed by the Owner's Representative. (c) All joints shall be perpendicular to the surface of the concrete and to the axis of the section. (d) The contraction joints shall be made by cutting into the curb and gutter sections with a trowel a depth of 22 inches; these joints shall be fmished as specified under finishing. (e) Expansion joint material shall be an approved preformed bituminous impregnated non -extruding type jointing material, meeting the requirements of AASHTO M 213. The joint material shall be 1/2 inch thick, and shaped to the section of the curb and gutter or other work. (3) Sidewalk Joints: Space contraction joints at 4 feet and expansion joints every 20 feet. Expansion joints shall be placed between existing and new setting of concrete. (4) Dowel Joints: Install dowel sleeves and dowels or dowel bar and support assemblies at joints where indicated. (a) Use dowel sleeves or lubricate or asphalt -coat one-half of dowel length to prevent concrete bonding to one side of joint. 3.7 CONCRETE PLACEMENT A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections have been performed. SEWRP 2" Feed Water Line 03300-7 December 2012 B. Do not add water to concrete during delivery, at Project site, or during placement, unless approved by the Engineer. C. Before placing concrete, water may be added at Project site, subject to limitations of ACI 301. D. Do not add water to concrete after adding high -range water -reducing admixtures to the mix. E. Water may not be added beyond the limit of water withheld from the plant. F. Deposit concrete continuously or in layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. G. If a section cannot be placed continuously, provide construction joints as specified. H. Deposit concrete to avoid segregation. 1. Deposit concrete in forms in horizontal layers no deeper than 24 inches and in a manner to avoid inclined construction joints. Place each layer while preceding layer is still plastic, to avoid cold joints. J. Consolidate placed concrete with mechanical vibrating equipment. Use equipment and procedures for consolidating concrete recommended by ACI 309R. (1) Do not use vibrators to transport concrete inside forms. Inset and withdraw vibrators vertically at uniformly spaced locations no farther than the visible effectiveness of the vibrator. (2) Place vibrators to rapidly penetrate placed layer and at least 6 inches into preceding layer. (3) Do not insert vibrators into lower layers of concrete that have begun to lose plasticity. (4) At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mix constituents to segregate. K. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits L. of construction joints, until placement of a panel or section is complete. Consolidate concrete during placement operations so concrete is thoroughly worked around reinforcement and other embedded items and into corners. M. Maintain reinforcement in position on chairs during concrete placement. N. Screed slab surfaces with a straightedge and strike off to correct elevations. O. Slope surfaces uniformly to drains where required. P. Begin initial floating using bull floats or darbies to form a uniform and open -textured surface plane, free of humps or hollows, before excess moisture or bleedwater appears on the surface. Do not further disturb slab surfaces before starting finishing operations. Q. Cold Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures. (1) When air temperature has fallen to or is expected to fall below 40 degree Fahrenheit, uniformly heat water and aggregates before mixing to obtain a concrete mix temperature of not less than 50 degrees Fahrenheit and not more than 80 degrees Fahrenheit at point of placement. (2) Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials. (3) Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators, unless otherwise specified and approved in mix designs. SEWRP 2nd Feed Water Line 03300-8 December 2012 1 t__1 R. Hot Weather Placement: Place concrete according to recommendations in ACI 350R and as follows, when hot weather conditions exist: S. Cool ingredients before mixing to maintain concrete temperature below 90 degrees Fahrenheit at time of placement. T. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. U. Using liquid nitrogen to cool concrete is Contractor's option. V. Cover steel reinforcement with water -soaked burlap so steel temperature will not exceed ambient air temperature immediately before embedding in concrete. W. Fog -spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade moisture uniform without standing water, soft spots, or dry areas. 3.8 MISCELLANEOUS CONCRETE ITEMS A. Filling In: Fill in holes and openings left in concrete structures, unless otherwise indicated, after work of other trades is in place. B. Mix, place, and cure concrete, as specified, to blend with in -place construction. Provide other miscellaneous concrete filling indicated or required to complete Work. 3.9 CONCRETE PROTECTION AND CURING A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold -weather protection and with recommendations in ACI 305R for hot -weather protection during curing. B. Formed Surfaces: Cured formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces. (1) Leave forms in place for a minim of 3 days. (2) Upon removal of forms, apply approved curing compound. C. Unformed Surfaces: Begin curing immediately after finishing concrete. (1) Cure unformed surfaces, including floors and slabs, concrete floor toppings, and other surfaces, by the following method: D. Concrete shall be wet cured for 3 days after concrete placement. Wet curing shall begin immediately after final finishing of slab surface and shall consist of continuous misting by sprinkler or wet burlap. (1) No work will be permitted on the slab during wet curing. E. Immediately after removal of sprinkler or burlap, Contractor shall apply approved curing compound. F. During cold weather concrete placement, in lieu of wet curing, the Contractor shall place plastic sheets over the concrete surface with blankets over the plastic. Plastic shall remain in place for 3 days. G. Sealing Coat: Uniformly apply a continuous sealing coat of curing and sealing compound to hardened concrete by power spry or roller according to manufacturer's written instructions. 3.10 FIELD QUALITY CONTROL A. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device will be permitted by the Engineer. END OF SECTION SEWRP 2d Feed Water Line 03300-9 December 2012 �,.,��_ .._..,,.. ...�,,., .��,�. �... ,� �.m, �, �... _ .�__� �..____-, µ...., .... �, ,,,..,. _ �.�..�,..,.�+ ,� .�..� � �..�...,..,� �..�..� W...,. 77-7 77 i7 77-7-11 77 F77 PUBLIC WORKS ENGINEERING S.E.W.R.P. 2nd FEED WATER LINE TION:,- MAYOR GLEN C. ROBERTSON CITY COUNCIL VICTOR HERNANDEZ, FLOYD PRICE, TODD KLEIN, JIM GERLT, KAREN GIBSON, LATRELLE JOY CITY MANAGER LEE ANN DUMBAULD VICINITY MAP lu`bliock DECEMBER, 2012 CHIEF OPERATIONS OFFICER MARSHA REED, P.E. CITY ENGINEER WOOD FRANKLIN, P.E. CHIEF WATER UTILITIES ENGINEER 3OHN TURPIN, P.E. M'G,,,� 17 Z a l p c7di?i �i`=,;f 'i 1lPY ty mmW m ZW foil saes fz W qq 33�s33a j J ooU7o` e L L w I T 0 j'M oi!o- 6 n"o iIS. .4 A i tA iE L4 PAGE INTENTIONALLY LEFT BLANK