HomeMy WebLinkAboutResolution - 2004-R0344 - Change Order To Increase Quantity Of Curb Ramp Construction - JG Group, LLC - 07_15_2004Resolution No. 2004-R 0344 July 15, 2004 Item No. 29 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, a Change Order between the City of Lubbock and JG Group, LLC, to increase the quantity of curb ramps to be constructed under the current contract. A copy of the Change Order is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 15th day of ATTEST: eLLC-=:C I ��� -- Rebec a Garza, City Secretary 4PPROVED AS TO CONTENT: Larry Hert6l, PE, City Engineer APPROVED AS TO FORM: ohn M. Knight, Aeristant C*y Attorney gs/ccdocs/res-Res-JG Group LLC.res June 25, 2004 .ouoi oaa-o'Ftl't p.4 Resolution No. 2004-RO344 CITY OF LUBBOCK CHANGE ORDER CHANGE ORDER #: 1 CONTRACTOR: JG Group LLC DATE: June 24, 2004 CITY OF LUBBOCK BID#: 053-03/RS PROJECT NAME: ADA Curb Ramps Phase Seven At Various Locations Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT SS AN INTEGRAL PART OF THE PROJECT OBJECTIVE After performance of a construction contract begins, Change Orders may be approved N necessary to i) make changes in plans or specifications, or 2) decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This does not mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an integral Part of the oroiect obiecdve must be let out for public bid by the Purchasing Department. Description of change (alteration, deviation, addition. or deletion) caused by conditions encountered during oonstruction not covered by the specifications and drawings of the project (attach additionci pages if necessary): Thirty sic hundred (3,600) square feet of additional curb ramps are being added to this contract to use a surolus of funds desienated for curb ramps. One hundred and four (104) workine days will be added to the total contract for the additional work. Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are.contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THiS FORM. ITEM DESCRIPTION A. ORIGINAL CONTRACT VALUE: B. AMOUNT OF THIS CHANGE ORDER: cowrdl gw ovai requtred if over $z5,000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): D. AMOUNT OF PREVIOUS CHANGE ORDERS: E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (EJA): 25Xmadmwn G. NEW CONTRACT AMOUNT (A+E): $ 411;072.50 5 60,275.00 $ 0.00 $ 60,275.00 t5% $ 471,347.50 - PUR-045 (Rev 03104) .;Uri c? u-t u-t: joa ju croup LLG (806) 698-8404 p.5 6 ,t-1 zgj� 4 (1) N R Date (2) PROJECT H)TF Appr rstoCoItent: / /% Approved as to Form: �Z 9104 Date (3 OWNE RPREWTATIVE te Date 61 -3 G! (5) Victor Kilm n, Purchasing Manager Date (6) Lou Fox, ity Manager Date Change Orders over .000 require fallowing signatures: CRY OF k ATTEST: 7/15/04 ��- VGwza, 7/15/04 Mar McDougal. Date (M ReWcca City Secretary Date PUR-045 (Rev D3M4) Resolution No. 2004-RO344 ITEM ADA Curb Ramps Phase Seven At Various Locations June 24, 2004 Change Order No. 1 DESCRIPTION QUANTITY UNIT PRICE TOTAL ADD ITEM QUANTITY: 1. Concrete curb removal, including saw cutting 928 lin. ft. $4.00/lin. ft. $3,712.00 and disposal, complete per lin. ft. ADD ITEM QUANTITY: 2. Concrete curb installation to match existing 928 lin. ft. $8.00/lin. ft. $7,424.00 curb, including jointing, complete per lin. ft. DEDUCT ITEM QUANTITY: 3. Concrete slab removal and disposal, including 26,000 sq. ft. $1.00/sq. ft. $26,000;00 walks, fillets, drainage slabs, valley gutters, etc., complete per sq. & ADD ITEM QUANTITY: 4. Concrete and truncated dome brick handicapped 15,500 sq. ft. $9.15/sq. ft- $141,825.00 ramp, as detailed, reinforced with three -eighths inch diameter (3/8"0) reinforcing steel, including truncated dome bricks, including three -fourths inch (%") bituminous expansion joint material, including all necessary earthwork and subgrade preparation and removal of all obstacles, installed complete per sq. fL .►u uroup LLL (8061 698-8484 p.7 DEDUCT ITEM QUANTITY: Four inch (4") concrete flatwork reinforced with 18,600 sq. ft. $3.66Isq. ft. $68,076.00 6"X6"W 1.4XW 1.4 (10 gauge) welded wire mesh, including sawing of contraction and longitudinal joints, including sealing joints with W.R. Meadows "Sof-Seal", including all necessary earthwork and subgrade preparation and removal of all obstacles, installed complete per sq. ft. DEDUCT ITEM QUANTITY: 13. Six inch (6'� thick concrete retaining wall with 300 lin. ft. $6.50/lin. ft. $1,950.00 vertical face, varying in height, not to exceed twelve inches (12") but more than zero inches (0') above finished flatwork grade, reinforced with 6"X6"W 1.4XW 1.4 (10 gauge) welded wire mesh, including all necessary earthwork and subgrade preparation, installed complete per lin. ft. ADD ITEM QUANTITY: 18. Removal and salvage of existing sprinkler 88 each $30.00 each. $2,640.00 head unit, including removal of existing fittings and irrigation piping as needed for ramp construction, including trenching, plugging of line, complete per each. ADD ITEM QUANTITY: 19. Installation of new PVC (poly vinyl chloride) 400 lin.. ft. $1.75/lin. ft $700.00 irrigation piping for sprinkler unit, by licensed irrigator, including salvaged sprinkler head unit, trenching, backfilling and restoration of disturbed area, fittings and connections to existing irrigation system(s) complete in place per lin. ft. $60,275.00 ADDITIONAL STREET RAMP LOCATIONS SUPPLEMENTARY PROJECTS SUPPLEMENTARY PROJECTS LOCATION LOCATION NUMBER LOC PRIMARY STREET SECONDARY STREET CORNER -IMPROVEMENT NORTHEAST NORTHWEST SOUTHEAST SOUTHWEST REMARKS I ADDED SALEM AVE. FORDHAM ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP 2 ADDED SALEM AVE. GRINNELL ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP 3 ADDED SALEM AVE. HARVARD ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP 4 ADDED SALEM AVE. ITASCA ST, CONSTRUCT RAMP CONSTRUCT RAMP CONSTRUCT RAMP CONSTRUCT RAMP 5 ADDED SALEM AVE. JARVIS ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP 6 ADDED SALEM AVE. KEMPER ST. CONSTRUCT RAMP CONSTRUCT RAMP N/A CONSTRUCT RAMP 7 ADDED SALEM AVE. LEHIGH ST. SEE REMARKS SEE REMARKS CONSTRUCT RAMP CONSTRUCT RAMP i ON NORTH BETWEEN 4522 AND 4602 8 ADDED UTICA AVE. LEHIGH ST. CONSTRUCT RAMP N/A CONSTRUCT RAMP N/A 9 ADDED UTICA AVE. MARS14ALL ST. CONSTRUCT RAMP N/A CONSTRUCT RAMP N/A WADDED QUAKER AVE. 26TH ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP H ADDED QUAKERAVE. 27TH ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP 12 ADDED QUAKERAVE. 28TH ST. CONSTRUCT RAMP CONSTRUCT RAMP N/A CONSTRUCT RAMP 13 ADDED QUAKERAVE, 29TH ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP 14 ADDED QUAKERAVE. 30TH ST. CONSTRUCT RAMP N/A CONSTRUCT RAMP N/A 15 ADDED QUAKERAVE. 31 ST ST. CONSTRUCT RAMP N/A N/A CONSTRUCT RAMP 16 ADDED QUAKERAVE. 32ND ST. CONSTRUCT RAMP CONSTRUCT RAMP N/A CONSTRUCT RAMP 17 ADDED QUAKER AVE. 33RD ST. CONSTRUCT RAMP CONSTRUCT RAMP CONSTRUCT RAMP N/A 18 ADDED QUAKER AVE. 35TH ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP 19 ADDED QUAKERAVE. 36TH ST. CONSTRUCT RAMP CONSTRUCT RAMP CONSTRUCT RAMP N/A 20 ADDED ORLANDO AVE. 36TH ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP 21 ADDED ORLANDO AVE. 37TH ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP 22 ADDED ORLANDO AVE. 38TH ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP 23 ADDED ORLANDO AVE. 39TH ST. N/A CONSTRUCT RAMP N/A CONSTRUCT RAMP 24 ADDED ORLANDO AVE. 40TH ST. N/A CONSTRUCT RAMP CONSTRUCT RAMP CONS RUCT RAMP 25 ADDED KNOXVILLE AVE. 38TH ST. N/A CONSTRUCT RAMP N/A N/A 26 ADDED LOUISVILLE AVE. 38TH ST. CONSTRUCT RAMP N/A N/A N/A ADDITIONAL ALLEY RAMP LOCATIONS SUPPLEMENTARY PROJECTS SUPPLEMENTARY PROJECTS LOCATION NUMBER LO STREET LOC N-S STREET ALLEY -IMPROVEMENT ALLEY LO EAST SIDE OF STREET WEST SIDE OF STREET REMARKS NORTH END SOUTH END NORTH END SOUTH END 1 ADDED SALEM AVE. FORDHAM-GRINELL N/A N/A CONSTRUCT RAMP CONSTRUCT RAMP 2 ADDED SALEM AVE. GRINELL-HARVARD N/A NIA CONSTRUCT RAMP CONSTRUCT RAMP 3 ADDED SALEM AVE. HARVARD-ITASCA N/A NIA CONSTRUCT RAMP CONSTRUCT RAMP 4 ADDED SALEM AVE. ITASCA-JARVIS N/A N/A CONSTRUCT RAMP CONSTRUCT RAMP 5 ADDED SALEM AVE. JARVIS-KEMPER N/A N/A CONSTRUCT RAMP CONSTRUCT RAMP 6 ADDED SALEM AVE. KEMPER-LEHIGH NIA N/A CONSTRUCT RAMP CONSTRUCT RAMP 7 ADDED ORLANDO AVE. 36TH-37TH N/A NIA CONSTRUCT RAMP CONSTRUCT RAMP 8 ADDED ORLANDO AVE. 38TH-39TH N/A N/A CONSTRUCT RAMP CONSTRUCT RAMP 9 ADDED ORLANDO AVE. 39TH-40TH N/A NIA CONSTRUCT RAMP CONSTRUCT RAMP