HomeMy WebLinkAboutResolution - 2012-R0016 - Change Order - Duininck Inc.- Runway 08_26 Taxiway Improvements - 01_12_2012Resolution No. 2012-R0016 January 12, 2012 Item No. 5.18 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK. THAT the Mayor of the City of Lubbock is hereby authorized and directed to cecute for and on behalf of the City of Lubbock, Change Order No. 3 to that certain ontract No. 9593 by and between the City of Lubbock and Duininck, Inc., for Runway 3/26 Taxiway Improvements -Phase II, and related documents. Said Change Order No. 3 attached hereto and incorporated in this resolution as if fully set forth herein and shall included in the minutes of the City Council. by the City Council on January 12, 2012 Zo)� '0� TOM MARTIN, MAYOR TTEST: Garza, City P VIED AS TO CL`:1L zv' Loomis, Director of Aviation APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vw:ccdocs/RES.ChgOrd#3Contract-Duininck, Inc. December 27, 2011 CITY OF LUBBOCK Resolution No. 2012—R0016 CHANGE ORDER Change Order #: 3 Contractor: Duininck, Inc. Date: November 21, 2011 B1D/ITB/RFP #: ITB # 10-099-DD Contract #; 9593 Project Name: Lubbock Preston Smith International Airport Runway 08/26 Taxiway Improvements — Phase II "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters the nature of the thing to be constructed or that is not an integral part of the project objective must be let out for public bid. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additiona'1 pages if necessary): Change Order #3: Refer to drawings attachments for supplemental information. 1. Quantity Adjustments (See Attachment A) ($ 1,036,206,68) 2. Liquidated Damages (October 25, 2011 completion) {$ 43,500.00) NTP — October 5, 2010 Final Completion — 340 days Weather Days — 3 days Total Days — 343 days Scheduled Final Completion — September 13, 2011 Actual Final Completion — October 25, 2011 Days Overran — 30 (weekdays only) @ S1,450/day 3. Removal of 75' of existing duct bank, hauling off debris, backfilling to 95% density $ 18,400.00 4. Install 8 non -coated grates on existing headwall $ 13,800.00 5. Hot Pour Joint Seal at Blast Pad and New Runway $ 325.24 6. Silt Fence Removal $ 5,280.00 TOTAL ($ 1,041,901.44) Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $ 13,292,395.29 B. AMOUNT OF THIS CHANGE ORDER: Council approval required !)over $25,000 (S 1,041,901.44) C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): -7.84% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 187,367.74 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): ($ 854,533.70) F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25%Maximum -6.43% G. NEW CONTRACT AMOUNT (A+E): $ 12,437,961.59 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. IlDatalIProjects1201012709.10\Construction PhasOChange OrderslChange Order 3\LBB PH2—CO 3.doe PWC-045 (Rev 01/08) This Change Order is not valid without the following signatures (please sign in order and return 3 on%tx nals 11�5'�t Date Approld as to Contet . ( ) OWNER'S REPRESEN AIWE D e (5) CAPITAL PROJFCTS MANAGER Date Z-�� / ?-/5 //r (2) PIS JECT ARCHITECT/ENGINFER Date Approved o Fo (4) CITY ATTORN k&)&� )A MJ 04, Date (6) PUICHASING AND CON►FRACT MANAGER Date Change Orders over $25,000 require a Contract Cover Sheet and the following signatures: CITY OF LUBBOCK (7) MAYOR 1/12/12 Date Council Date: January 12, 2012 Agenda lteni t ATTEST: 1/12/12 (8) IT ECRETARY Date 5.18 Resolution 9: —R0016 \\Data)\Projects\2010\2109.10\Construction Phase\Cliange Orders\Change Order 3\LBB PH2_CO 3.doc PWC-045 (Rev 01/08) ATTACHMENT A LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT RUNWAY 98/26 IMPROVEMENTS - PHASE 2 SUMMARY OF CHANGE ORDER NO. 3 I(3UANTrrY ADJUSTMENTS) BASE BID Original Quantity Final Quantity Quantity Adjustment Unit Price Total Aclustmard Amount 2 Item P-101, Remove and Salvage of 2" P401, 6" TxDOT Item 345, 6" P-165 15,586 15,104.28 481.72) SY $3.75 $1,805.45 3 Item P-101, Remove and Dispose of 14" P-501, B" P301, 6" P-155 17,304 20.337,74 3033.74 SY 512.00 $ W;404.88 4 Item P-101, Remove and Dispose of 28" P-501, e" P-304, 6" PAN 3,816 3,701.00(115.00)1SY $23.50 $2,702.5ti 5 Item P-101, Remove and Dispose of 14" P-501, 16" P-201, 6" P-155 1,046 659.29 386.71 SY $17.50 36.767.43 6 Item P-101, Remove and Swage of 5" P401, 11" Base 6,347 9,982.44 3635,441 SY $4.30 $15,832.39 7 [tern P-101, Re-m-me-and Dispose o , 1 , e 1 Re Base 2,05 2,841.25 (113.75 SY $18.00 $2,047.50 8 item P-101, Remove and Salvage of 4" HMAC, 8" Base 9,712 9,821.52 109.52 SY $3.20 $350.46 9 Item P-101, Remova and Salvage of 4" P-401, 12" P-209 1,232 1,195.99 36.01) SY $4.60 ($165.65 10 Item P-101, Remove slid Dispose of 6" P501, 8" P-209 2,956 2,640.00 (116.00) SY $6.65 $771.40 12 Item P-152, Embankment 106,255 102,135.00 (3120.00) CY $7.50 $23,400.00 13 Item P-152, Excavation 145,406 141,601.00 (3804.00)1 CY S7.00 $26628.00 14 Item P-152, Grading and Subgrade Preparation (One 6" Lift) 14.477 14,044.00 433.00 SY $2.00 IIIII66100 15 Item P-152, Gmdft and Subgrads Preparation under Runway and TaxhNay excluding shoulders (Two 6" Lifts) 63,515 61,510.00 1905.00 SY $3,80 ($7,239.00 16 Item P-152 Grading In Unpaved Areas 639,421 620,238.37 19162,63) SY 50.80 $11,509.68 17 Item P-155, Lima Treated Subgrade, excluding time (6" Thickmess) 72,403 86,050.90 6352.10 SY $2.30 $14,W9.83 18 Item P-155, Lime used In LTSG (® 6%) 1,2221 563.47 658.63) Tan $180.00 $118,535.04) 20 Item P-209, Crushed Aggregate Base Course, 6" Thickness 63,5151 60,725,04 (2739.96) SY $13.15 $38,687.97 21 Item P-209, Crushed Aggregate Base Course, VY' Thictness EIAW 4,445.00 4443.00 SY $23.25 ($103,299.75) 23 Rem P401, Plant Mix Bituminous Pavements (2.2" lifts) 15,230 13,445.29 (1794.71) TON MOO $164,193.32 24 Item P-401, Plant Mix Bituminous Pavements (2-7 lifts) 2.864 2,801.82 62.18 TON $100.00 $6,218.00 25 Item P-401, Plant Mix Bituminous Pavements (1 1/2" thickness) 35 34.00 1,00) TON $160.o0 $1130.00 26 Item P-401, Plant Mix Bituminous Pavements (3% Bonus) 1 0.44 0,56 LS $50,794.80 ($28.507.4 27 ItemCement on a Pavement,Thickness n ing 0hamhesh) 1,488 1,499.OD 11.00 SY $59,50 $654.50 28 Item P501, Portland Cement Concrete Pavement, 16" Thickness 38,352 37,250.80 (1101.20)1 SY $59.00 $64,970.60) 29 Item 15401, Portlandam n Pavement, onus IncluaR for concrete shoulders In AIL 3) 1 1.23 0.23 LS $141,076.24 $31,847.86 30 Item P-SM, Bituminous Prime Coat, Including herbicidal treatment (0.3 gallay) 21,719 17,764.65 (3934,35) Gallon $4.10 (516,130.84 31 Item P520, Remove Existing Runway and Taxiway Painting 47,902 38,108.00 9794.00) SF $0.40 $3,917.60 33 Item P-620, Rummy and Taxiway Painting 87,642 49,137.00 (38505.00) SF $0.50 $19,252.50 34 Item P521, Saw -cut Grooving 4,725 4,584,00 141,00 SY $2.90 $408.90 35 Item D-701, Double 24" RCP, (installed In trench, including excavation and badd(il) 294 285.00 9.00) LF $165,00 ($1,485.00 36 Item MC, Rock Riprep (including filler fabric) 513 497.61 15.39 CY $85.00 $1,308.15 37 Item D-705, Perforated urldefdrain system (Including deanouts) 6,797 6,768.24 (381G)l LF S33.00 S1,279.08 39 Item T-901, Soil Preparation, Seeding and Fertllizing 157 0.00 157.00 AC S1,0W.0D $298,300.00 44 Item , onsNew ML9 Station 20D vAffi FAA SuppliedSemi-Flush, fixtures 1 0,00 (1.00) LS $10,000,00 $10,000.00 45 Item ALS, Provide new reinforced concrete EMT MALS Station 1 2.00 1.00 EA $6,7D0.00 $6.700.00 48 Item L-108, #1/0 AWG Bare Cu Guard Wire in Trench 5,561 4,042.00 1539.00 LF $5.00 37,695.00 49 Item L-108, 04 AWG, 600V, RHH-RHW cable In dud 14,767 9,680.00 5087.00 LF $1A0 $7,121.80 50 Item L-108, 06 AWG Bare Cu Guard Wire in Trench 9,201 10,034.00 833.00 LF $1,00 $833.00 51 Item L-108, #8 AWG, SWV, RHH-RHW cable In trench 2,643 1,088.00 1555.00 LF $1.00 31,555.00 52 Item L-108, 08AWG, 5KV L-824C Cable, in trench 8,98a 20,290.00 11322,00 LF $1.00 $11 322.00 64 Item L-10a, 6" Cebu Trench, Backlifi and Compaction 10,064 9,162.01 901.99 LF $3.00 $2,705.97 fib item L-108, Install New #110 AWG, 6MV, RHH-RHW cable 1,298 1298.00 LF $5.00 SB 490.00 56 Item L-108, Install New #10 AWG, 600V, RHH-RHW cable 2,559 _ 540.00 2019.00 LF S0-90 31,817.10 57 Item L-108, Install New 1112 AWG, 600V, RHH-RHW cable 328 909.00 581.00 LF $2.00 $1.162,00 58 Item L-108, Install New #2 AWG, 6GOV, RHH-RHW cable 2,864 5,264.D0 2400.DO LF $2.70 $6,480.00 59 Item L-108, Install New #6 AWG, 500V, RHH-RHW cable 1,416 3,360-00 1944.00 LF $1-80 $3.499.20 60 Item L-108, Install New 12 Pr. 1g ga., Shielded. Gel Filled, REA underground TELCO cable installed In Wench or dud 1,710 1 2,1%00 440.00 LF 53.20 $1,408.00 62 Item L-108, Trench, BacAN, and Compact 6" wide x 48" deep 721 1 516,00 206.00 LF S5.00 ($11030,00) 63 Rem L-108, Trends, Backlill, and Compact 10" wile x 24" deep 1,646 2.631.00 985.00 I LF $5.00 $4,925.00 64 Item L-110, 2" SCH 40 PCV cmndurl in Trench 12,672 16,%ZD0 4190.00 LF $1.60 $6,704.00 66 Item L-110, 3" SCH 40 PCV conduct in Trench 721 995.00 274.00 LF S2.D0 S548.00 66 Item L-110. 4' SCH 80 HOPE Conduit Bared under existing paving 454 W5.00 (349.00) LF S55.00 $1%195.00 68 Item L-110, New 2 X 2" PVC dud, concrete anrened 220 252.00 32. DO LF $32.00 $1,024.00 70 Item L-110, New 4 X 4" PVC duct, concrete encased 594 546.00 48.00 $50.00 $2,400,00 72 Item L-110, New dud marker 31 10,00 21.00 EA $70.00 31,47MOD 75 Item - Light ass In Compacted Earthder LED 60 7&D0(2.00)1EA $900.00 S1,B00.o0 77 Item L-117 SW, New panel for Size 2 Guldanca Sign in place 2 0.00 2.00 EA $SQ0.00 $1,600.00) 79 Item PLANS, Install New 36" x 24" concrete pull box 4 3.00 1.00) EA $3,000.00 (S3,000.00) 91 Item NSS. Remove & Selvage Existing Lighted Signs 16 15.00 1.D0 EA $200.00 $200.00) 94 Item MC, ES 448, Refined Coal Tar Emulsion without Additives 4,991 10,547.27 5551.27 SY $2.40 $13,323.05 95 Item MC, Dud Bank Installation (1-12" steel, 1-20" steel, 2-6" PVC) 1,516 1,471.00(45,00)LF $130.DD $5,850.DD ATTACHMENTA LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT RUNWAY 08/26IMPROVEMENTS • PHASE 2 SUMMARY OF CHANGE ORDER NO. 3 IOUANTITY ADIUSTMENTSI BASE DID Original Quantity Final Quantity Quantity Adjustment Unit Price Totai Adjustment Amount 100 Item MC, Demolition of Existing Atmos Gas Line (including dansdad backfill) 1,767 1,714,00(53.00)1LF $42.00 $2,226,00) 101 Item MC, Demolition of Exlating Oneok Gas Line (Including denslfiad backfiill) 1,764 1,731,00 53.00 LF $27.00 ($1,431.00) 102 Item MG, Demoiltion of Eyisting me and rala e vault "ure (Including densified backnf) 1,197 1,097.00 LF $155.00 $15,500,00 103 Item MC, Demolition of Existing LPBL Dud Bank and Manholes 1.482 1,816.00 LF $27,00 $9,018.00 104 Item MC, Nonwaven Geotextile Intedayer (including anchors) 41,818 39,446.17 d334.00 SY $2.35 $5,573.80106 Item MC, Pavement PatchlPothole Repair 100 MOD SY $70.00 ($7,000.00106 Item MC, OemoBkion of 16-Inch C303 for Waste Retum Line 279 271.00 LF $27.00 ($216.00107 Item MC, Demolition of 6-Inch Sch. 80 PVC Chtonne Line 279 271.00 LF $22.00 ($176.00 198 Item IVIC, 15emolUon of Prich Sch. 80Raw Water and Potassium Permanganate linen 557 541.00 (lf5.00)j LF $22.00 $352.00 109 item MC, 16-Inch C303 for Waste Return Line 279 305.50 29.50 LF $200.00 $5,9W.00 110 Item MC, 6-Inch Sdh. 80 PVC Chlorine Line 279.O 271.00 8,00) LF $47.00 $376.00) ill Item MC, 3-Inch Sch, 80 PVC Raw Water and Potassium Permanganate Linea 657 541.00 (16.00) LF $42,00 $672.00) ALTERNATE THREE A3.2 Rem P-156, Lfine Treated Subgrade, excluding time (5" Thickness) 16,354 16,018.93 345.07 SY $3.05 ($1,052.45 A3-3 Item P-155, Lime used In LTSG (C 6%) 277 100.31 176.69 Ton $180.DD $31,804.20 A3-4 Item P-209, Crushed Aggregate Base Course, 6" Thickness 16.364 15,834.67 (529.33) SY $13.15 $6,960.59) A3-5 Item Pa01, Portland Cement Concrete Pavement, T Triic} ness 15,711 15,2%33 (451.67) SY $39,00 ($17,615.05) AM Item P-602, Bkumimus Prime Coat, including herbicidal treatment (0.3 gaVsy) 4,910 4,352.00 558.00) Gallon $4,10 $2,287.80) 0.00 ALTERNATE FIVE m.00 A5-1 Item P-101, Contractor to Salvage and Retain spa Surface Course an Asphalt Base Material 2,444 7.957.24 5613.24 CY Lim0 $55,132.40 CHANGE ORDER 2 CO-2 Modifications at 4w1way edge light trench 9,794 5,584.00 12%D0) LF $T00 ($8,470.00 TOTAL ADJUSTMENT (S1,D36,2t16.66) r DuIIIINCK TEXAS November 14, 2011 Mark D. Haberer, P.E. Parkhill, Smith and Cooper 4222 85" Street Lubbock, TX 79423 Re: ITB NO. 10-099-DD R/W 08/26 and Taxiway Improvements Additional Work for Duct Bank Removal and Grates Dear Mr. Haberer, DTX —015 Duininck Texas is requesting the following amount for the three items of work requested by the Owner. Please see the pricing below. 1) Hot Pour Joint Seal at Blast Pad and New Concrete Runway $1.73 LF (Primate Pricing $1.50 LF x 1.15 = $1.73 LF). The total installed LF is 188 so 188 x $1.73 = $325.24. 2) Duct Bank Removal $18,400 (UCA pricing is $16,000 x 1.15 = $18,400) 3) Grates $13,900 (UCA pricing is $12,000 x 1.15 = $13,800) UCA breakdown is below. It is copied from the email originally sent for review. "Revised price deleting manhole removal Removal of 75' existing duct bank, hauling off debris, backfilling to 95% standard density. (testing by others) 16,000.00 Installing eight (8) Non -coated grates on existing headwalls. Materials 8 @ $750.00 each = $6,000.00 Labor 8 @ $ 750.00 each = $6,000.00. Total $12,000.00" 4) Silt Fence Removal 5280 LF at $1.00 LF = $5280.00 If there are any questions or concerns please do not hesitate to ask. I can be reached at 817-564-3135 or email at jeshelburneAduininck.com. incerely, n ES Project Manager Cc: File Tony Hermen 4701 North Highway 377 Roanoke, TX 76262 1917) 491-0946 A DIVISION OF DUININCK INCORPORATED