HomeMy WebLinkAboutResolution - 2011-R0427 - Change Order To Contract - Archer Western Contractors Ltd. - 09_27_2011Resolution No. 2011—RO427 September 27, 2011 Item No. 6.4 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. I to that certain Contract No. 9413 by and between the City of Lubbock and Archer Western Contractors, Ltd., for Lake Alan Henry Water Supply Project Pump Stations, Contract D, and related documents. Said Change Order is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on September 27, 2011 TOM ARTIN, MAYOR ATTEST: N. APPROVED AS TO CONTENT: ma4jaiL T 0QVJ Marsha Reed, P.E., Chief Operations Officer APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vw:ccdocs/RES.ChgOrd#1Contract-Archer Contractors September 12, 2011 CITY OF LUBBOCK CHANGE ORDER Change Order #: 1 Contractor: Archer Western Contractors, LTD Date: I September 1, 2011 BID/ITB/RFP #: RFP #10-056-MA Contract #: I 9413 I Project Name: I Lake Alan Henry Water Supply Project Pump Stations, Contract D "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters the nature of the thine to be constructed or that is not an integral nart of the nroiect obiective must be let out for public bid. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary): (1)SCADA remote monitoring capability was requested to monitor the status and power quality of the new 7.5 WA Electrical Substation at Lake Alan Henry. A/W is requesting S48,363 to complete the work. (2)The power transformers and conduits necessary to operate the wall fans and roof dampers were omitted from the Lake and Post Booster Pumps Station building. Contractor is requesting S 18,410.70. (3)Portion of a screening wall at Post Booster Pump Station was deleted from the scope of work. A/W is offering S 10,000 credit. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: S'20,6219.6241 B. AMOUNT OF THIS CHANGE. ORDER: Council approval required #over S25, 000 S56,773.70 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): D. AMOUNT OF PREVIOUS CHANGE ORDERS: S0 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $56,773.70 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS /A : 25%Maximum u G. NEW CONTRACT AMOUNT (A+E): $20,686,393.70 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. This Chance Order is not valid without he following signatures (please sien in order and return 3 on i>lswith Contract Cover Sheet to _ Purchasine and Contract Management Department): (1)CO RACTO Date (2) PROJE0t ARCHITECT/ENGINEER c Date Aroved as to Co ent: Appro d as to p (,) Ow _ EPR SE, TATIVE Date (dE RNEY Date F--) Q1 (5) cAprrAL PROJECTS MANAGER Date (6) P CHAS NG CON"TRACT M kNAGER Date Change Orders over $25,000 requite a Contract Cover Sheet and the £allowing signatures: cIT`7 A"#- i 4 9/27/1_ T` 9/27/11 (7) MAYOR Date (8) ( `I Y SEC RETA Date Council Date: September 27, 2011 Agenda Item #:. 6.4 Resolution #: 2011-RO427 PWC-045 (Rev 01108) 4055 International Plaza, Suite 200 • Fort Worth, Texas 76109 * 917-735-7300 • fax 817-735-7491 Resolution No. 2011—RO427 City of Lubbock Lake Alan Henry Water Supply Project Pump Stations — Contract D Contract #9413 Capital Improvement Project #92069 Mr. L. Wood Franklin, P.E. City of Lubbock P.O. Box 2000 Lubbock, TX 79457 RE: Change Order No. 1 Mr. Franklin: Attached with this letter is documentation for Change Order No. 1. This change order involves the following items. 1. During design of the Lake Booster Pump Station, it was decided to not remotely monitor the status / power quality of the Electrical Substation secondary service output to the Lake Booster Pump Station. During coordination efforts between SGS, Archer Western and City personnel, the City requested a proposal from Archer Western to provide this remote monitoring through their sub -contractors. The additional work required to provide this monitoring includes SCADA configuration and installation of fiber optic and conduit. Archer Western is requesting $48,363.00 to complete the work. The following documents are attached to support this change. RFI-025 with response from Freese and Nichols, Inc. dated September 23, 2010. - CMR-011 submitted by Archer Western, with response from Freese and Nichols, Inc. dated June 29, 2011. CMR-011A submitted by Archer Western, with cost breakdown dated July 21, 2011. 2. During construction, it was discovered that power cable and conduit had not been shown in the plans to power the actuators on the roof dampers. In addition the actuators for the dampers for the wall fans did not have a power supply. In order to provide these power supplies, Archer Western is requesting $18,410.70 The following documents are attached to support this change. • RFI-049 with response from Freese and Nichols, Inc. dated February 28, 2011. • RFI-052 with response from Freese and Nichols, Inc. dated April 8, 2011. • CMR-012 submitted by Archer Western, with cost breakdown dated July 21, 2011. 3. During construction, it was decided to delete a portion of the screening wall at the Post Booster Pump Station, as it was not required by the Electric Power Provider. Archer Western offered a net credit for this deletion of $10,000.00 The following documents are attached to support this change. 0 CMR-009 submitted by Archer Western, with cost breakdown dated April 27, 2011. The change in contract price associated with these changes is detailed below. Original Contract Price: Net increase of this Change Order: Contract Price all approved Change Orders: Original Contract Time: Contract Time change with Change Orders: Net increase of time with this Change Order: Contract Time with all approved Change Orders: $20,629,620.00 $56,773.70 $20,686,393.70 600 days to Substantial Completion 0 days 0 days 600 days to Substantial Completion Please let me know if you have any questions regarding these changes. Sincerely, 4A -V4 Kelly . Wood, P.E. Freese and Nichols, Inc. Xc: Mr. John Kelly, Parkhill, Smith and Cooper Mr. Craig Robinson, Freese and Nichols, Inc. 1 ARCHER WESTERN CONTRACTORS A MEMBER OF THE WALSH GROUP ,tune 22, 2011 Kelly Wood, P.E. Freese & Nichols 4055 International Plaza Fort Worth, TX 76109 Ref; Lake Alan Henry Pump Stations Contract D City of Lubbock Project Dumber CIP 92069 Subject: CMR 11 — LBPS Pump Station Scada Dear Mr. Wood: During our original field coordination meeting with SGS, the owner said that they may want to monitor the status/ power quality of the Electrical Substation secondary service output to the LBPS via a fiber optic connection to the LBPS Scada system. This was also addressed in RFI-025. We have calculated the costs to do this work to be $ 48,363.00. Please note that on SGS`s portion of the work that their estimate is based on 5 days of commissioning. A detailed break down and back up of the work related to this change order is included for your review and approval. If you have any questions or require additional information, please do not hesitate to contact us. Sincerely, �, 7add .s"&"Ad J. Todd Swallows Archer Western Contractors, Ltd. Project Manager CC: File Jeff Polak Jay Vincent 2121 Avenue V Suite 103 Arlington, Texas 76006 817-640-3898 (fax) 817-640-8734 An Equal Opportunity Employer Contract D - CIVIR 11 - L8PS Scads DATE June 22, 2011 LAH PUMP STATIONS - CONTRACT D OWNER CITY OF LUBBOCK ENGINEER FREESE & NICHOLS CONTRACTOR ARCHER WESTERN CONTRACTORS, LTD WORK DESCRIPTION: Spa Dent Unit UniVP4ice I Labor I Matenal I Eqdvwt ISutxnr+ Totals 0.00 mh $0.00 so.00 0 Oo MH so.00 $0 oo "najW 400 MH $0.00 $200 00 000 MH Woo $0 o0 0.00 CY so 00 s0.00 0.00 Is 60 00 $0.00 000 ea so oo $0 00 000 is $0.00 $0.00 $0.00 000 hrs s0 o0 s 000 LS $0 00 3 TPC 100 Is 644,32100 $4.321.00 So 00 s0 00 _ so oo s0 o0 SUBTOTALS: $200.00 $0.00 $0.00 BN 321.00 644 521.00 Labor BurRen 55% 1 $110 00 $110 00 5% Comptwhon on Subcontrador $2,216 05 15% Cam bon on AW Work W 50 SUBTOTAL $01 $933J6 BONDS _ $667 82 INSURANCE soo1.38 M8 362.74 TOTAL AMOUNT THIS PROPOSAL — SCADA Points Available from LAH Pump Substation Included are many of the Information items available to the owner/operator via fiber SCADA connection to the substation, The Items below will be 'gathered ' Into a box that can speak several slave protocols (DNP3, modbus, etc.) to a master. These items reflect many, but not all available. Specific requests can be Included with sufficient lead time and cost considerations. SCADA points available from take Alan Henry Pump Substation equipment • Relay/meter analog and digital points in digital format from the following relays: o Schweitzer Engineering Labs (SEL} SEL-387E current differential relay protecting transformer 01 o SEL-397E current differential relay, protecting transformer 02 o SEL-351S overcurrent relay protecting transformer ill o SEL-351S overcurrent relay protecting transformer #2 o SEL-734 meter monitoring the total 4.16kV bus — not revenue class, only Informational • Transformer ill and transformer 02 alarms in digital format o Transformer main tank standard alarms, including but not limited to. • Oil, winding and nitrogen alarms/trips ■ Fan and cooling alarms • Pressure, temperature and level alarms o Transformer LTC standard alarms, Including but not limited to: • LTC local/remote, auto/manual status • LTC lockout status • Physical contact status in digital format o Lockout relay position o Circuit switcher position o Battery and charger alarms • Supervisory control of circuit switcher via digital channel • Other items by request or as necessary r- r r r� r r r� �r rp r� r� r r� r 7 r I i n r r r y r �' r � J �. r �� ► r r= r r f F / FIR 1 a 0� d Ix i r Or umsocx LAKE ALAN HENRY WATER SUPPLY PROJECT � � - �n co~ o :, LAKE 900STER PUMP STATION .� a'.s�.-w....* OVERALL LAYOUT AND SITE PLAN 1�7 ARCHER WESTERN CONTRACTORS A MEM$ER OF THE. WALSH GROUP March 28, 2011 Kelly Wood, P.E. Freese & Nichols 4055 Intemational Plaza Fort Worth, TX 76109 Ref: Lake Alan Henry Pump Stations Contract D City of Lubbock Project Number CIP 92069 Subject: CMR 9 — Delete Screen Wall/ Acid Transformer Pad revised Dear Mr. Wood. The total credit to delete the L shaped screen wall south of the Post Pump Station and add an additional transformer pad is $10,000,00. A detailed break down and back up of the work related to this change order is included for your review and approval. If you have any questions or require additional information, please do not hesitate to contact us, Sincerely, �, '7mW s"&a" J. Todd Swallows Archer Western Contractors, Ltd. Project Manager CC: File Jeff Polak Jay Vincent 2121 Avenue "Jo Suite 103 Arlington, Texas 76006 a17-640-3898 (fax) 817-640-8734 An Equal Opportunity Employer Contract D - CMR 9 - Screen Wall/ Transformer Pad DATE: Feb 23, 2011 LAH PUMP STATIONS - CONTRACT D OWNER: CITY OF LUBBOCK ENGINEER: FREESE & NICHOLS CONTRACTOR: ARCHER WESTERN CONTRACTORS, LTD. WORK DESCRIPTION: Screen W01 Transformer Pad Descai 'on CRY 0.00 itlPrice 21.00 Labor $0.00 Material Equipment Subwn Totals Delete misc metals at sown_ wall 24,00 JMHS40.01) 21.00 $504,00 _ Pro'ectManager 2.00 50.00 $100,00 S 2.00 0.04 cy $0.00 $80.04 $0.00 Delete misc metals at screen wall 1.00 Is $1,551.00 (51,551.001 0.00 ea $0.00 $0.00 0.00 Is $0.00 $0.00 $0.00 0.00 hrs $0.00 $ 0.00 LS $0.00 $ 7. _g. Delete Tilt Walls (Eagle Precast) (438.3D $11.00 S4 800.0 Delete grade beaml add transformer d 1.00 $3,240.00 $3,240.06 AddTranstormer pd 1,00 S1,050.00 $1050.00 _ SUBTOTALS: 324.00 $1 551.00 $0.00 $6 990.07 $B M.07 Labor Burden 55% $175.20 $178.20 5% Compensation on Subcontractor $349.50 15% Com nstion on AW Work $307.98 SUBTOTAL $9 700.75 BONDS S 132.98 INSURANCE 5159,57 TOTAL AMOUNT THIS PROPOSAL $9 993.30 Project No: 33D rM Project: Al: Lake Alan Henry Water Supply P5 Contract D Client: City of Lubbock Fregse and ,Nichols Contractor: Archer Western Contractor FN Mc5noge' Pro Request For Information #025 LBPS Substation Monitoring/ Revised Fiber Optic Routing SUBMITTAL INFORMATION SUBMITTAL SUBMITTAL #: CONTRACTOR REF #: SPEC SECTION: PLAN SHEET: SUBMITTAL STATUS: TYPE: Rf�qUest For �� RFW2S NA � Final Distribution Information _ SUBMITTAL [iJHPS 5ubatsdon Mmoodngl Revised Fibat Optic RoUtinq bESCRIPTION: UPLOAD SUPPORTING DOCUMENTS RFI-025 w attachmente.pdf 9i2312010 5:28 PM Jay Vincent CONTRACTOR CERTIFICATION CONTRACTOR COMMENTS: t See attached RFI-025 HOW WILL THE COPIES BE SUBMITTED: Electronic NUMBER OF COPIES SUBMITTED: 1 This shop drawing has been reviewed by the Contractor and certified to be in strict conformance with the Contract Documents as modified by addenda, field orders, and change orders. Deviations can only be approved by field order or change order. Approval is only for conformance with the design concept of the protect and compliance with the intent of the Information given in the Contract Documents. Contractor is responsible for dimensions to be confirmed and owmiated of the Job site; for information that pertains solely to the fabrication processes or to techniques of aonstrwillon; and for the work of all trades. SUBMITTED BY: Jay Vincent DATE: 9/2312010 5:29 PM REVIEWER COMMENTS REVIEWER NAME: REVIEWER EMAIL: COMPANY i ORGANIZATION DATE SENT: DATE COMPLETED: Jeff Hensley I jnh@freese.com 4A55Intel. lallonal Plaza �2412010 10i1312010 Approved as Noted. Provide In writing as a formal submittal to the Engineer responses to the questions below. Contractor shall coordinate with the Owner for Information to be read from the substation. After conversation with the Owner, Contractor shall provding In writing to the Engineer what all Informaton the Owner want to read from the substation. This Information shall be conveyed to the following: 1) to the pump station SCADA system Integrator, 2) substation Engineer ann 3) Water Treatment Plant SCADA System Integrator. Contractor shall provide all hradware, REVIEWER COMMENTS: software, and programming to Incorporate this Information. I Contractor shall coordinate with substation Engineer/Contractor on how the conduitiinnor duct will be Installed In the substation. Will the pump station contractor stop 5" outside the substation or will the condultllnner duct be Installed by the pump station contractor In the substation. Provide In writing to the Engineer how this will be done. Who will provide hardware at the substation? Pump Station Contractor shall coordinate with the substation Engineer/Contractor on who provides what. This informaion shall be conveyed In writing to the Engineer. REVIEWER NAME: REVIEWER EMAIL: COMPANY I ORGANIZATION DATE SENT: DATE tOMPLETED: Kelly Wood I kww[freese.com I FNI 9124/2010 10/1/2010 REVIEWER COMMENTS: NQ rxtmtttztt! REVIEWER NAME: REVIEWER EMAIL: COMPANY I ORGANIZATION DATE SENT: DATE COMPLETED: Wade Zemlock twzQfreese.com Freese and Nichols, Inc. 13/2412010 1 10I8120t0 Proposed re-route of ductbanks Is acceptable. REVIEWER COMMENTS: Coordinate with the City of Lubbock for approval to tie In to substation and to display the Information via SCADA. UPLOAD SUPPORTING REVIEW DOCUMENTS DISPLAY ROUTING SUP ■ (CHok on the Names above to Emad U"d FNiI Forma v1.04 Fm REQUEST FOR INFORMATION RFI-025 PROJECT: Lake and Post Booster Pump Stations PROJECT NUMBER: OWNER: City of Lubbock, Texas CONTRACTOR: Archer Westem Contractors, Ltd. Job #210051 ENGINEER: Freese & Nichols, Inc. PSC10133D REFERENCE DATA: Specification Section No. Page No. Paragraph No. Drawing No. E-2 Detail description: LBPS — Electrical Substation Monitoring/Revised Fiber Optic Routing 1) During the 09/13 field coordination meeting with SGS Engineering, the question was raised as to whether the Owner would want to monitor the status / power quality of the Electrical Substation secondary service output to the LBPS via a fiber optic connection to the LBPS SCADA System. Please see the attached listing of available data and advise what information, if any, is to be incorporated. 2) Also attached is a proposed revision to the fiber optic duct bank routing. Please advise if this is necessary / acceptable as soon as possible... site underground material procurement in progress and installation pending. REQUESTED BY: J. Vincent DATE: 9-23-10 ENGINEER'S RESPONSE: ;J Information ; Interpretation Clarification for the items described above or in the attached material referenced: RESPONSE BY: DATE: PSC10133D Lake Alan Henry Booster Pump Stations SCADA Points Available from LAH Pump Substation Included are many of the information items available to the owner/operator via fiber SCADA connection to the substation. The items below will be 'gathered ` into a box that can speak several slave protocols (DNP3, modbus, etc.) to a master. These items reflect many, but not all available. Specific requests can be included with sufficient lead time and cost considerations. SCADA points available from Lake Alan Henry Pump Substation equipment • Relay/meter analog and digital points in digital format from the following relays: o Schweitzer Engineering Labs (SEL) SEL-387E current differential relay protecting transformer #1 o SEL-387E current differential relay protecting transformer #2 o SEL-351S overcurrent relay protecting transformer #1 o SEL-351S overcurrent relay protecting transformer #2 o SEL-734 meter monitoring the total 4.16kV bus —not revenue class, only informational • Transformer #1 and transformer #2 alarms in digital format o Transformer main tank standard alarms, including but not limited to: ■ Oil, winding and nitrogen alarms/trips ■ Fan and cooling alarms ■ Pressure, temperature and level alarms o Transformer LTC standard alarms, including but not limited to: ■ LTC local/remote, auto/manual status ■ LTC lockout status • Physical contact status in digital format o Lockout relay position o Circuit switcher position o Battery and charger alarms • Supervisory control of circuit switcher via digital channel • Other items by request or as necessary I N` 1*4 SENERAL N=% 1. TM CORMA 011 MWA. W CSPO►E)W FOR PRwTBBo AM 2M wMaNd.<On- ftAL CBUD OB[. ARO A# CPM 10 U AS REXMD 1n T1t I4 5 3y SYI ODL "00 1. PROOCE TWO r COMXM EACH WTW A W BRIFRO{ m MR MM OPTIC CAPI 2 PRO"K A 3 MN1.rl4b PULL WX FOA FOU OPTIC CARE. I C: 1/9-1 FOR AWnWAAL WOR1MTOL {. VVM TM CX1Lf LOCAT AND Ct ALL S, CONIPACIOR. 11EL0 S. PROADE A S'A MWt PALL loft TOR MBEA OPTIC C KC C TS: E-lO FOR LLTEL TRAMSNRTER AT THE MAKE STRUCTURE Fl1S0 VERPY THE DACF IAGTIM OF TI[ ORAKE SANCTUM_ v t _ LACE BOOSTED PUMP STATION t OVERALL LAYOUT AND SITE PLAN T--w if gap �latt: �iI1:1! H U W C3 EK Z 0. O } a -t r CL a a aSID ga z o w M 2 w d W 1413 - — - _—IIIIIIIIIIIIIMIII� Y� Y Routing Slip: SUBMrrrAIS - RFI-025 -LOPS Substation Monitoring! Revised Fiber Optic Routing) Started By.• Jay Vincent Name/Comments Completed Status Noifiy AE Conatruotlon Han4ger James Johnson 9/2312010 529 PM Notified Mears Taylor 9/2312010 519 PM Notified Craig Robinson 9/23/2010 5:29 PM Notified DCS Review Mike Karadag 9/2412010 9:38 AM Completed EnginesrReview Kelly Wood 101112010 1129 AM vI Completed Wade Zemloa 10/812010 9:10 AM `/ Completed Jeff Hensley 1(VI 3/2010 6:50 PM `/ Completed DCS Review 2 Mks Karadag 10114/2010 1:04 AM `/ Completed rnProject No: PSCI O1330 Project: Lake Alan Henry Water Supply PS Contract D Client: City of Lubbock Freese and .Nichols Contractor: Archer Western Contractor Contract Modification Request #011 LBPS Substation Monitoring F-N Mclnage- Pro SUBMITTAL INFORMATION SUBMITTAL SUBMITTAL M CONTRACTOR REF M SPEC SECTION: PLAN SHEET: SUBMITTAL STATUS: TYPE. t`nntrari Morf�i Ott CMR-011 Not Approved, Final Distribution � SUBMITTAL LBPS Subatatlon Monitoring DESCRIPTION: - - - UPLOAD SUPPORTING DOCUMENTS CMR-11 Proposal - Substation MonRoring.pdt 6/29/2011 10:04 AM Jay Vincent CONTRACTOR CERTIFICATION CONTRACTOR COMMENTS: Sea attached proposal. HOW WILL THE COPIES BE SUBMITTED: Electronic NUMBER OF COPIES SUBMITTED: 1 This shop drawing has been reviewed by the Contractor and certified to be in strict conformance with the Contract Documents as modified by addenda, field orders, and change orders. Deviations can only be approved by field outer or change order. Approval Is only for conformance with the design concept of the project and compilance with the intent of the information given in the Contract Documents. Contractor is responsible for dimensions to be confirmed and correlated at the job site; for information that pertains solely to the fabricadon processes or to techniques of construction; and for the work of all trades. SUBMITTED BY: Jay Vincent DATE. 6/29/2011 10:08 AM NOTIFICATION BY CONTRACTOR The Contractor proposes to make the additions, modifications, or deletions to the Work described In the Contract Documents, as shown in Attachment A"end requests that you take the thliowing action: r Notify us that you concur that this change does not require a change In Contract time or amount and issue a Field Order. Issue a Work Change Directive to authorize us to proceed with the described change with payment at the Contract unit prices. r Issue a Work Change Directive to authorize us to proceed with the change under the time and materials provisions of the Contract Documents. f: Issue a Work Change Directive or Change Order for performing the described change. Proposed change in Contract amount is indicated in the attached detailed cost breakdown of tabor, materials, equipment and all other costs associated with this change. Impacts on Contract time are shown in the attached revised schedule. SUBMITTED BY: Jay Vincent DATE: 6/29/2011 10:08 AM REVIEWER COMMENTS REVIEWER NAME: REVIEWER EMAIL: COMPANY I ORGANIZATION DATE SENT: DATE COMPLETED: James jkj�rriase,egtn Freese and Nichols Inc. 6/29/20117 612912011 Johnson REVIEWER COMMENTS: no comments REVIEWER NAME: REVIEWER EMAIL: COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLETED: Kelly Wood Ik�wrwWreeae.com FNI 6/29/2011 7111l2011 RMWER COMMENTS: No comments. REVIEWER NAME: REVIEWER EMAIL: COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLETED: Jeff Hensley jnh@freese.com 4055International Plaza 6/29/2011 6130/2011 REVIEWER COMMENTS: Need a more Itemized breakout of the cost for revlew. Just listing a buch of hems and having a lump sum cost Is not acceptable. The cost needs to be broken down into Individual pieces. REVIEWER NAME: REVIEWER EMAIL: COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLETED: Wade Zemlock ' _ _ __ Freese and Nichols, Inc. 6/29/2 111 71101011 REVIEWER COMMENTS: See Comments from JNH. UPLOAD SUPPORTING REVIEW DOCUMENTS CONSTRUCTION MANAGER'S RESPONSE r We concur that this change does not require a change in Contract time or amount. A Field Order will be issued. r We concur that you plFiceed with the change with payment to be made at the Contract unit prices. A Work Change Directive will be issued. C We concur that you proceed with the change under the time and materials provisions of the Contract Documents. A Work Change Directive will be issued. [' A Change Order will be issued. to Additional Information is required to evaluate this request. Provide information as described in the attached comments and resubmit. r Contract Modification Request is not accepted. I SUBMITTED BY: I DATE: 7/11/2011 9:09 AM 1 DISPLAY ROUTING SLIP 17 Current Workflow Step: DCS Admin: Mike Karadag Wor"aw Initiator: Jay Vnoent (Click on UN3 Names above to Email User) FNI Fortes v1.04 ra CONTRACTOR'S MODIFICATION REQUEST PROJECT: Lake Alan Henry Booster Pump Stations OWNER: City of Lubbock, Texas CONTRACTOR: Archer Western Contractors, Ltd. ENGINEER: Freese & Nichols, Inc. 4.4L If PROJECT NUMBER: 210051 PSC10133D DESCRIPTION: LBPS Substation Monitoring NO. CMR-011 NOTIFICATION BY CONTRACTOR The Contractor proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown in Attachment "A" and requests that you take the following action: Notify us that you concur that this change does not require a change in Contract time or amount and issue a Field Order. X Issue a Change Order for performing the described change. Change in Contract amount is indicated in the attached detailed cost breakdown of labor, materials, equipment and all other costs associated with this change. Impacts on Contract Time are shown in the attached revised schedule. Authorize the Contractor to proceed with the described change. Payment will be requested at the unit price bid. ❑ Authorize the Contractor to proceed with the change under the time and materials provisions of the Contract. By: Jay Vincent Date: 6-29-10 CONSTRUCTION MANAGER'S RESPONSE We respond to your request as follows: We concur that this is a no cost or time change. See attached/forthcoming Field Order No. I comments. ❑ Your proposal is recommended to the Owner. See attached/forthcoming proposed Change Order. ❑ Proceed with the change at the unit price bid. ❑ Proceed with the change under the time and materials provisions of the Contract. ❑ Additional information is required to evaluate this request. Provide information as described in the attached comments and resubmit. ❑ Contractor's Modification Request is not accepted. By: Date: TGWO6131 C Eagle Mountain Conneclion Booster Pump Stations CONTRACTOR'S MODIFICATION REQUEST ATTACHMENT A TCW06131C Eagle Mountain Connection Booster Pump Stations ra PIJ -02z7 PROJECT: Lake and Post Booster Pump Stations PROJECT NUMBER: OWNER: City of Lubbock, Texas CONTRACTOR: Archer Western Contractors, Ltd. Job #210051 ENGINEER: Freese & Nichols, Inc. PSC10133D REFERENCE DATA: Specification Section No. Page No. Paragraph No. Drawing No. E-2 Detail description: LBPS — Electrical Substation Monitoring/Revised Fiber Optic Routing 1) During the 09/13 field coordination meeting with SGS Engineering, the question was raised as to whether the Owner would want to monitor the status / power quality of the Electrical Substation secondary service output to the LBPS via a fiber optic connection to the LBPS SCADA System. Please see the attached listing of available data and advise what information, if aaiy, isto he incorporated. 2) Also attached is a proposed revision to the fiber optic duct bank routing. Please advise if this is necessary / acceptable as soon as possihle... site underground material procurement in progress and installation pending. REQUESTED BY: J. Vincent DATE- 9-23-10 ENGINEER'S RESPONSE: information Interpretation _ _ Clarification for the items described above or in the attached material referenced: Jeff Hensley's Comments: Approved as Hared. Provide in writing as a formal submittal to the Engineer responses to the questions below. Contractor shall coordinate with the Owner for information to be read from the substation, After oonversation with the Owner, Contractor shall provding in writing to the Engineer whet all tnformaton the Owner want to react from the substation. This information shall be conveyed to thetoilcming:1) to the pump station SCADA system integrator, 2) substation Engineer mm 3) Water Treatment Plant SCADA. System tntagrater. Contractor shall provide all hradwars, software, and prugrarnadrig to iticorporate this information. Contractor shad coordinate with substation Engluser/Contractor on how the conduitrinner duct will be Installed in the substation. Will the pump station contractor stop V outside the substation or will the conduMnner duct be Installed by the pump station contractor in the substation. Provide in writing to the Engineer low this will be done. Who will provide hardware at the substation? Pump Station Contractor shall coordinate with the substation Engineer(Contractor on who provides what. This Informalon shall be conveyed In wrllfng to the Enginew. Wade ZerrlocWs Comments: Proposed re-route of ducibanks is acceptabie. Coordinate with the City of Lubbock for appraval to tie in to substation and to display the information via SCADA RESPONSE BY: Jeff HenSleV DATE: 10-14-10 PSC101330 Lake Alan Henry Dooster Pump Stations Frajact[[tx PSC10133D P►oject Lake Alan Henry Water Supply PS Contrad D WHIM Client City of LuNxxk Freese —d Nichols Contractor: Archer Western Contractor F-N Mf3nt3ger Pro Request For Information 9025 LBPS Substation Monitoring/ Revised Fiber Optic Routing SUBWTTAL INFORMATION WSMITTAL TYPE: SUBMRTAL is CONTRACTOR REF # SPEC SECTION; PLAN SHEET: SUBMITTAL STATUS: Info h0F, 025 RFI-025 N.A. E-2 Final DIStribution SUBpn'FAL DESCRIPTION: LaSPS Substation Monitoring) Revised Fiber Optic Routing 1. UPLOAD SUPPORTING DOCUMEWS Rl:1•026 w attachnwts.pdf 9Vt3MI0 6:26 PM Jay Vaster! CONTRACTOR CERTIFICATION CONTRACTOR COMMENTS: i See attached RFI-025 how WILL THE COPIES BE SOBMTTED: Electronic NUMBER OF COPIES SUBMITTED: i This Shoe efrawkV, has been mvkhvsd by the Caoftaclor and certified to be in strict conM rrArrce wiM the Contrad Dowft*nfs as rrrodrfTed by addenda, field orders, and flhenge orders. Devia[;ons Can ordy be aWruved by Aeid wdef or change order. Approval Is only farcortfdrnance with ft design concept of the ~and car, lance with Me Went of fie infonnafion ,givers In 8m Ca Wad 0acvmw(s. Conhact rrs fogauiWe tr dkrren dos to be cantlrmed end correlated at the jab sib idr a*rma6an that pha+taina solely tvllhe fabris:afi'Cn phr[htesses ar fo techhhigtn3s o1 carrshlvcliorr; and for tfhe hrbrit of atl tYadea SUB<; WMD BY: Jay Vir cent DATE: 9123J2010 $19 PM REVIEWER COMMENTS REV WER NAME REVIEWER EMAIL: COMPANY I ORGANIZATION DATE SENT: DATE COMPLETED: Jeff Hanley jnnh@fteeae.com 4055 Wornatlonal Plaza W42201Q 1GH=010 Approved as Noted Provide In wrWhg se a fo mal submitlat to the Engineer responses to the questions below, ConUBckw shall coordinate with the Owner for Informalton to be readfrom the substation, Attar cmmenaton with the Owner. Contractor shall proydrog In writing W the Engineer what all Indormaton the Owner want to read from the subahr9on. This Information shall be conveyed to Me following: 1) to the pump station SCADA system integrator, 2) substation Engineer ann 3) Water Treatment Plant SCADA System kWgrator, Contractor shall provide all hardware, REVIEWER COMMENTS: software, and programmkM to incorporate this hdormaton. Contractor shall Coordlnata with substation Enginewtcontractor on haw the corm uitfenner duct will be Installed in the substation. WIN the pump suitor corrimcior stop S" outside the substation cw will the canduitlinner duct be Installed by the pump sutfon contractor In the substafn. Provide in vaWng to the Engineer how this will be done_ Who will provide hardware at the substation? Pump Station Contractor shall coordinate with the substation LngineerlCDatractoe on who provides what. This informalon shall be conveyed In writing to the Engineer. REVIEWER NAME: REVIEWER EMAIL: COMPANY I ORGANIZATION DATE SENT; DATE COMPLETED: (telly Wood kww@rrsess.Com FNI 9f2412010 1 01112010 REVIEWER COMMENTS; No comment REVIEWER NAME: REVIEWER EMAIL COMPANY I ORGANIZATION DATE SENT: DATE COMPLETED: Wada Zernlock twzwmese.corn Freese and Nichafs, Inc. 9124MIll I 111W010 Proposed re-route of ductbanks fs acceptable. REVIEWER COMMENTS: Coordinate with the City of Lubbock for approval to tie in to substation and to display the information via SCADA- t)RLOA.0 SUPPORI-fNG REVIEW DOCUMENTS CIGP: A'i RCU-i!IJG SLIP F Currant Wo k%. Slop: oc-S Aelnin: Wffm Kstaeep wommx Intazior: Jay V6 nl (Cfck r» Mo hw m s ab— to En'w U40r) FNI Forms 0.04 P-VngUp: 40EtAtlTALS • RFA—1 -LEIP5 SUb. tabor- Meddorieg: nevood Ft±et C�Sh Rr inp� &.Wftd sy:.4y v„tcant Nema fedmmurta Completed States ModfyAE Canstrvcrion ttanager Jemee Jnhnsnn 912=010 529 PM Gl NohTied Mead Tny4rn W2=010 529 PM `t� Nobfiod Craig 5:29 PM 'a'1Nah16eU DCS )3mvlpen LWKamdeg W4=104:38 AAt .. Con.puiwd EF40ee! Ravin. K.Fy WV d i 0P72010111 L29 AM Completed Wade zemfoa 101tv2o109: 1 o AM C—plitea Jdf mjnAsy 101t3noto 6:50 PM C.mp Q d C: Revhm 2 UF3 bKzrae q 10It420101:04 AM ." CampHRed SCADA Points Available from LAH Pump Substation Included are many of the Information items available to the owner/operator via fiber SCADA connection to the substation. The items below will be'gathered ' into a box that can speak several slave protocols (DNP3, modbus, etc.) to a master. These items reflect many, but not all available_ Specific requests can be included with sufficient lead time and cost considerations. SCADA points available from Lake Alan Henry Pump Substation equipment • Relay/meter analog and digital points in digital format from the following relays: o Schweitzer Engineering Labs (SEL) SEL-387E current differential relay protecting transformer #1 o SEL-387E current differential relay protecting transformer #2 o SEL-351S overcurrent relay protecting transformer #1 o SEL-351S overcurrent relay protecting transformer #2 o SEL-734 meter monitoring the total 4.16kV bus — not revenue class, only informational • Transformer #1 and transformer #2 alarms in digital format o Transformer main tank standard alarms, including but not limited to: ■ Oil, winding and nitrogen alarms/trips Fan and cooling alarms Pressure, temperature and level alarms o Transformer LTC standard alarms, including but not limited to: ■ LTC local/remote, auto/manual status • LTC lockout status • Physical contact status in digital format o Lockout relay position o Circuit switcher position o Battery and charger alarms • Supervisory control of circuit switcher via digital channel • Other items by request or as necessary GENF�NOTES: �� i. me 9YWL Bi RCSPAk9G..[ FOR PRAMARtlG AMA 931kG ALL .Q `L1. AqA JUMEF%Ye BUK4 l.4 PEpWEA 61� �fMfi I. FROmE Two 3° caso m [1LM 1RTL A Ili ~-qV L;r iCM rgIEn OPnC ua$ 1. PADaX A .SAYhi %Y *-o P— Sox FBA nom APrx.' GBIL. 8 gg I M i/[-3 FOR A VWL WFORUATI Or a1G A. CQlIA'Fir Wo PLL{L Lax PRUM 9 RY THE WFOC COMNLIOR, FOE YUWY lilt DPJ:F L=T*" MA ALL ftEQLw9Dm S F1101YOE A WWWU.31R PULL sox R7R Fop APiIC cAgLr. r R. RE, y MR CT rT*4 OI5F AT THE S',RJ lT6�Cr11QC. FFAD �Rrr nrz oucr LacxnoN of THE mFuct srRuctuPE, r V 3 z a ° ag. -3 W w a�V, z W R (L it v� i o z r �m� z w¢ e, ge, Q 3S�E LAKE BOOSTER PUMP STATION OVERALL LAYOUT AND SITE PLAN _ s� / ` A Fc e yrp, +40 Convect D - CMR 11 - LBPS Scads DATE: June 22, 2011 LAH PUMP STATIONS - CONTRACT D FLUBSOCK :SE & NICHOLS 4RCHER WESTERN CONTRACTORS, LTD. WORK DESCRIPTION: Scads Desch ion oty Unit UnitlPrice Labor Material Equipment Subcontracto Totals 0.00 mh $0.00 $0.00 0.00 MH $0.00 $0.00 Project Manager 4.00 MH $50.00 $200,00 000 MH $0.00 $0.00 -F. ,n'+. vdf.`+n �-�'-,a,.. ram' .� t��.:: _.. __-rrTMT'X"?.•� ..-�.�'^' --�,5' ��.--=r4. �:3 0.00 Cy $0.00 $0.00 0.00 is $0.00 $0.00 0.00 ea $0.00 $0.00 0.00 Is 1 $0.00 $0.00 $0.00 0.00 hrs $0.00 0.00 LS $0.00 $ - TPC 1.00 . . w Is $44.321.00 $44,321.00 $0.00 $0.00 $0.00 $0.00 SUBTOTALS: $200.00 $0.00 $0.00 $44,321.00 $44,521.00 Labor Burden 55% $110.00 $110.00 5% Compensation on Subcontractor $2,216.05 15% Compenstion on AW Work $46,50 SUBTOTAL $0.893.56 BONDS $667.82 INSURANCE $801.38 TOTAL AMOUNT THIS PROPOSAL $48 3S2.T4 'PC CONTROLS, OLS, INC. P.O. Box 2247 Pottsboro, Texas 75076 Phone: 903-206-4248 / Fax: 903-732-6201 CONTRACT MODIFICATION REQUEST DATE: June 2, 2011 TO: Archer Western Contractors, Ltd. ATTN: Todd Swallows RE: CMR 115-04 LBPS Substation SCADA Gentlemen: Please accept this request for the following proposed changes per RFI-25: Electrical: Install Sin Sched. 80 PVC conduit with innerduct UiG from the Fiber Optic Pull Box to Substation with pull -line Instrumentation and Controls: Fiber optic network equipment 1 innerduct! cable i testing ! programming per the attached RLC and SGS scopes Control Panels: NONE Exclusions: Sales Tax Termination, Programming, Testing, Calibration, Commissioning of Packaged Equip Furnished by Others Clarifications: Contract time extension of (0) ZERO days requested / required CMR Summary Sheet attached RLC and SGS proposals attached Revised fiber optic routing per RFI-25 attached Proposal pricing valid for forty-five (45) days Pricing: CIVIR TOTAL $44,321.00 If you have any questions, please do not hesitate to call_ Regards, Jay Johnson Project Manager TPC Controls, Inc. Page 1 of 1 TPG CONTROLS, INC. P.O. Box 2247 Pottsboro, Texas 75076 Phone: 972-414.7028 / Fax: 903 327 8460 CMR #116-04 LSPS Substation SCADA Date: 6/212011 Description Material Labor Exposed Conduit Sub -total $139 1 Slab/ Udg Conduit Sub -total $1.191 28 Wire & Cable Sub -total $806 8 Switchgear Sub -total $0 - Fixtures & Devices Sub -total $0 - Special Systems Sub -total $0 - Demolition Sub -total $0 - Sub -Total Estimate $2,136 6°% 38 Switchgear None $0 - Generator None $0 - Light Fixtures None $0 - Handhole, Manholes None $17 - Lightning Protection None $0 - Grounding None $0 - SUBSTATION SGS $14,000 16 SCADA RLC $17,210 16 Control Panels None $0 - Instrumentation None $0 - Fire Alarm None $0 - X-ray I Scan None $0 - HV Cable None $0 - Hi -loot Testing None - $0 $0 - Cable Tray None $0 _ _ - Sub -Total Quotation $31,210 83% 32 Feld Exp. $5,000 Per Crew $1,010 - Fuel for Testing No.gal: - $0.00 per Gal $0 - Temp9ggy Power $0 - -32 Sub -Total dense $13010 3% Total Estimate 1 Quotation I Expense $34,366 92°% 70 Labor Supervision 1096 7 Total Labor Hours 77 Labor Dollars per MIH $28.00J $2,154 Payroll Burden 1 43.00% $926 Total Labor Co9t 8% $3,"1 Estimate I Quotation I Expense Cost 92% $34.356 Labor Cost 8°% $3,081 Total Project Cost 100% $37,437 Overhead 10.007o $3,744 Sub -total Project Cost I Overhead $41,181 Profit $2,059 Sub -total Project Cost I Overhead I Profit $43,240 Bond $1,081 Total Project Price $44 321 TPC Controls,lnc. - Confidential Page 1 of 1 Print Time: 1:25 PM, 6=011 Proposal Summary and Project Estimate — LAHPS Substation SGS Engineering Engineering Proposal for Substation SCADA Implementation and Testing SGS Engineering offers the following proposal for requested SCADA implementation change order at Lake Alan Henry Pump Station Substation. The scope of this proposal includes connection of all intelligent devices at the substation to the data concentrator (SEL-3530), programming of all devices to move requested data and controls, internal testing of all SCADA points and controls within the substation and coordination with Owner's representatives to verify information and control is present and operational at the Owner's control center. The data will be moved within the substation transparently and collected in the data concentrator and then made available to the Owner over Modbus TCP via a fiber optic connection provided by others. A 3" PVC conduit will be provided exclusively for fiber installation into the substation control building, terminating outside the substation fence. Others will provide the balance of the conduit to the Owner's interface point. Others will install fiber and make all Owner connections to substation equipment. The scope of the project with line item estimates of engineering costs. - Substation SCADA Testing and Checkout $10,000 Settings $ 2,000 Communications Facilities 2 000 TOTAL ENGINEERING ESTIMATE $14,000 The Engineering Estimate amount is based on five (5) days of onsite commissioning. Extra days will be billed at $2,000 a day up to the not -to -exceed amount. Attached is a sheet defining the Owner's requested values to be mapped to its SCADA system from the substation devices. Meterinq Quantities (SEL-734 Voltages VA, VB, VC Currents IA, IB, IC Frequency Power (M) per Phase and Total Reactive Power (WAR) Total Apparent Power (WA) Total Power (kVV) Peak Demand Reactive Power (WAR) Peak Demand Apparent Power (WA) Peak Demand Energy (kl+Vh), ImportlExport 3P Reactive Energy (kVARh) Import/ Export 3P Apparent Energy (kVAn) Import! Export 3P Power Factor i Harmonics (odd, up to the 13"') THE) K-Factor Distortion Power Relay Alarm Information (two each 5EL-387E. SEL-351S1 T rip indication Trip targets Fault current values Relay OK status Transformer Alarm Information (two each SEL-2515 and LIVR control High oil temperature High winding temperature High tank pressure Low oil level Cooling tan stage status Nitrogen tank low pressure Load tap changer (LTC) manuallautomatic LTC remote/local LTC problem Other Alarm Information Transformer lockout relay status (triplreset) 69 kV circuit switcher position (52a) Circuit switcher trip coil good Circuit switcher DC good Battery DC good Battery charger AC on Battery charger DC good Battery/charger status alarms Control Remote trip of the circuit switcher h. RICHBRU512n LUQIC cunTRUL, LLc. 8115 Hicks Hollow Office (972) 542-7375 McKinney, Texas 75071 Fax (214) 733-8254 Request for Information RLC RFl #: 3021-001 Project Name: Lubbock Contract D Pump Station Project Number: 3021 Engineer: Freese & Nichols Ref. Subject: Commutation to Substation Contractor requests: • RLC will provide and install multi mode fiber cable from the existing enclosure in the lake side pump station to an existing enclosure in the substation. • RLC will provide and install fiber termination boxes at each end to terminate the fiber. • RLC will break out the fiber using fiber break out kits. • RLC will terminate the fiber cable using ST Multi mode fiber connectors. • RLC will test the fiber cable with an OTDR at 850nm and 1300nm. • RLC will interface with the existing Black box system at the substation for I/O points. • RLC will build screens at the Lake Alan Henry WTP as required. • RLC will show up to 75 points. Total for the Change $17,209.84 Requested By: Michael Cunningham, President Date: 04-04-2011 Routing Slip: SUBMITTALS-CMR-011 - LSPS Substation WlonitoringF Started Sy. Jay Wrwent I Name I Comments Completed Statue Notify AE Construction Manager Craig Robinson &29J2011 10:08 AM 29 Nodfled James Johnson 6129/2011 10:08 AM 29 Notified Jimmy Sibert 6l29/2011 10:08 AM 29 Notified Mead Taylor 6l2912011 10:08 AM 29 Noffied DCS Review Debby Greer 612912011 1:52 PM Did Not Finish Mike Katedag W912011 1:52 PM Completed Enpinear Review Kelly Wood 7/1 i=11 9:09 AM Completed James Johnson WV2011 2.02 PM Completed Jeff Hanslay 6/3012011 8:14AM Completed Wade Zemlo& 711/2011 6:04 AM `/ Completed DCS Review 2 Debby Greer 7111/2011 10:46 AM Did Not Finish Mike Karsdag 7111/2011 10:46 AM Completed rM Project No; Project: Client: Freese end Nichols Contractor: PSCi0133D Lake Alan Henry Water Supply PS Contract D City of Lubbock Anther Wester Contractor F-N managerPro Contract Modification Request #011A LBPS Substation Monitoring - Including Additional Breakdown SUBMITTAL INFORMATION SUBMITTAL TYPE: SUBMITTAL #: CONTRACTOR REF #: SPEC SECTION: PLAN SHEET: SUBMITTAL STATUS: i�tract Cal[c-n 011A L CMR-011A NA Approved, Final Distribution Res SBMITTAL DEUSCRIPTION: LBPS substation Monitoring - Including Additional Breakdown - — _ _ _ _._ UPLOAD SUPPORTING DOCUMENTS CMR-011A Substation Monitoring.pdf 7/21/2011 6:20 PM Jay Vincent CONTRACTOR CERTIFICATION CONTRACTOR COMMENTS: See attached CMR-011A, for review and approval HOW WILL THE COPIES BE SUBMITTED: Electronic NUMBER OF COPIES SUBMITTED: L1 This shop dra►ving has been reviewed by the Contractor and certified to be in strict conformance with the Contract Documents as modified by addenda, field orders, and change orders. Deviations can only be approved by field order or change order. Approval is only for conformance with the design concept of tha prcod and compliance with the intent of the information given In the Contract Documents. Contractor is responsible for dimensions to be confirmed and correlated at the job slie; for information that pertains solely to the fabrication processes or to techniques of construction; and for the work of all trades. SUBMITTED BY: Jay Vincent DATE: 7/21/2011 6:22 PM NOTIFICATION BY CONTRACTOR The Contractor proposes to make the additions, modifications, or deletfons to the Work described in the Contract Documents, as shown in Attachment A`and requests that you take the following acfion: e Notify us that you concur that this change does not require a change in Contract time or amount and issue a Field Order. r Issue a Work Change Directive to authorize us to proceed with the described change with payment at the Contract unit prices. f Issue a Work Change Dimecflve to authorize us to proceed with the change under the time and materials provisions of the Contract Documents. l: Issue a Work Change Directive or Change Order for performing the described change. Proposed change in Contract amount is indicated In the attached detailed cost breakdown of labor, materials, equipment and all other costs associated with this change. impacts on Contract time are shown in the attached revised schedule. SUBMITTED BY: Jay Vincent DATE: 7/21/2011 6:22 PM REVIEWER COMMENTS REVIEWER NAME: REVIEWER EMAIL: COMPANY I ORGANIZATION DATE SENT: DATE COMPLETED: James Johnson Ike• Freese and Nichols Ins, 7125/20111 7/27/2011 REVIEWER COMMENTS: no comments _—� REVIEWER NAME: REVIEWER EMAIL: COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLETED: ,Iw" Hensley Inheireew,com 4055 Intsmetional PHtza 7125C2011 712t;t2011 REVIEWER COMMENTS: j REVIEWER NAME: REVIEWER EMAIL: COMPANY / ORGANIZATION DATE SENT: DATE COMPLETED: Kelly Wood kww@freese.com FNI 7/25/2011 7129/2011 REVIEWER COMMENTS: No comments REVIEWER NAME: REVIEWER EMAIL: COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLETED: Wade Zemlack f twz@k"se.com Freese and Nichols. Ir 7/25/2011 71=2011 REVIEWER COMMENTS: Approved. UPLOAD SUPPORTING REVIEW DOCUMENTS CONSTRUCTION MANAGER'S RESPONSE I We concur that this change does not require a change in Contract time or amount. A Field Order vi1111 be issued. r We concur that you proceed with the change with payment to be made at the Contract unit prices. A Work Change Directive will be issued. r We concur that you proceed with the change under the time and materials provisions of the Contract Documents. A Work Change Directive will be issued. A Change Order Will be issued. f Additional information Is required to evaluate this request Provide information as described in the attached comments and resubmit. r Contract Modification Request is not accepted, I SUBMITTED BY: I DATE: 7/29/2011 12:49 PM I DISPLAY ROUTING SLIP I- WoMew Step: DCS Admin: Mike Karadag Workflow Inftlattic Jay Vincent (Ctkk on the Names above to Email User) FNI Forms v1.04 ice,CONTRACTOR'S MODIFICATION REQUEST Freese and Nichols (4.421 j PROJECT: Lake Alan Henry Booster Pump Stations PROJECT NUMBER: OWNER: City of Lubbock, Texas CONTRACTOR: Archer Western Contractors, Ltd. 210051 ENGINEER: Freese & Nichols, Inc. PSC10133D DESCRIPTION: LBPS Substation Monitorina — With Additional Breakdown NO. CMR-011A NOTIFICATION BY CONTRACTOR The Contractor proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown in Attachment "A" and requests that you take the following action: Notify us that you concur that this change does not require a change in Contract time or amount and issue a Field Order. X Issue a Change Order for performing the described change. Change in Contract amount is indicated in the attached detailed cost breakdown of labor, materials, equipment and all other costs associated with this change. Impacts on Contract Time are shown in the attached revised schedule. Authorize the Contractor to proceed with the described change. Payment will be requested at the unit price bid. Authorize the Contractor to proceed with the change under the time and materials provisions of the Contract. By: Jay Vincent Date: 7-21-11 CONSTRUCTION MANAGER'S RESPONSE We respond to your request as follows: We concur that this is a no cost or time change. See attached/forthcoming Field Order No. / comments. Your proposal is recommended to the Owner. See attached/forthcoming proposed Change Order. Proceed with the change at the unit price bid. Proceed with the change under the time and materials provisions of the Contract. Additional information is required to evaluate this request. Provide information as described in the attached comments and resubmit. Contractor's Modification Request is not accepted. By: Date: TCW06131 C Eagle Mountain Connection Booster Pump Stations CONTRACTOR'S MODIFICATION REQUEST ATTACHMENT A 4.4Z / Archer Western requests review/approval of the attached proposal for the LBPS Substation Monitoring modifications, per the request of the City of Lubbock/ RFI-025 response. Please reference attached documents for scope of the work, monitored SCADA points, and cost breakdown for this proposal. Total Additional Cost: $48,363.00 Additional Time Requested: 0 Days Please advise if this proposal is acceptable at your earliest convenience. TCW06131C Eagle Mountain Connection Boaster Pump Stations ARCHER WESTERN CONTRACTORS A MEMBER OF THE WALSH GROUP July 21, 2011 Kelly Wood, P.E. Freese & Nichols 4055 International Plaza Fort Worth, TX 76109 Ref; Lake Alan Henry Pump Stations Contract D City of Lubbock Project Number CIP 92069 Subject: CMR 11A — LBPS Pump Station Scada (with addl breakdown) Dear Mr. Wood: During our original field coordination meeting with SGS, the owner said that they may want to monitor the status/ power quality of the Electrical Substation secondary service output to the LBPS via a fiber optic connection to the LBPS Scada system. This was also addressed in RFI-025. We have calculated the costs to do this work to be $ 48,363.00. Please note that on SGS's portion of the work that their estimate is based on 5 days of commissioning. Additional break down and back up of the work related to this change order is included for your review and approval. If you have any questions or require additional information. please do not hesitate to contact us. Sincerely, P. 704M s"&A&4 J Todd Swallows Archer Western Contractors, Ltd Project Manager CC: File Jeff Polak lac Vincent 2121 Avenue "J" Suite 103 Arlington, Texas 76006 817-640-3898 (fax) 817-640-8734 An Equal Opportunity Employer ra REQUEST FOR WFORMATION RFI-025 PROJECT: Lake and Post Booster Pump Stations PROJECT NUMBER: OWNER: City of Lubbock, Texas CONTRACTOR: Archer Western Contractors, Ltd. Jab #210051 , ENGINEER: Freese & Nichols, Inc. PSC10133D REFERENCE DATA; - Specification Section No. Page No. Paragraph No. Drawing No. E•2 Detail description: L9PS — Electrical SubsJUM Monitorina/Revisecf Fiber Ofnic Roudna 1) During the 09/13 field coordination meeting with SGS Engineering, the question was raised as to whether the Owner would want to monitor the status / power quality of the Electrical Substation secondary service output to the LBPS via a fiber optic connection to the LBPS SCADA System. Please see the attached listing of available data and advise what information, if any, is to be incorporated. 2) Also attached is a proposed revision to the fiber optic duct bank routing. Please advise if this is necessary / acceptable as soon as possible... site underground material procumment in progress and installation pending. REQUESTED BY: J. Vincent DATE: 9-23-10 ENGINEER'S MPONSE: _ Information Intmiretation Clarificatin_ n for ft Items described abov2 or in the attached material referenced: Jeff He!*IeYs Commence Appnweil ne NoftC Provide kn ookk se a ton" stibmbnat io the Engineer responses to the Contractor shd oaandkwf with 1ha tawinar for irdonnation to be reed from the substation. After conversation wsrr the Owner, contractor shell provdiny In watlnp to the Erginew what ell kdonasdow the Omew wart to read from the substation. This htcrmstion @W be conveyed to the folowbW 1) to Its purrs station SCADA rp tem Integr*W, 2) subcMion Eegiiew ann 3) Water Tr.Mmwrt Ptard SCADA System kftW*or. Contractor shall provide sl twadwars, Kftmw% and prunranarttty to Incorporate this Irdormstion. Contractor ehNl 000rdinots wMh substation ErginsedContredtor on how the nwndrrMrmw duct will ba ilntelled In tfrs substation. WW the pump station contractor atop S outside the substation or v M 1M conduMmer dud be k 6illed by the pump station contractor In the substation. Provide In writing to the Engimm how this will be done - Who wN provide hardwers at the wbetation? Romp Slstion Comidor shall twadlnate with the substsdon EnglnsedContractor on who provides what This kdotwilon shalt be oonveyed In we lltrop lotlro Eraineir. Wade Zemloi;Ws Comments: IIropoeed rtronle of ductbanks Is acceptable. CoardineW with 2M City of Lubbock for approval to tie In to snAbstation and to display the Intormabion via SCAM RESPONS9 Sr. Jeff Hensley DATE: 10-14-10 PWI0133D Lake Akan Henry Booster Pump Stations Prajlc!No: PBC101= rM P. Lam Afan henry Waler SUP* PS Contract O lid FN Manager Pro Freese sr bvtho4s CAr, hw*r,, Ardhsr ftWm Contractor SUBMITTAL INFORMATION SI SWrrAL SUBWTTAL t: TYPE R"F*wA:rr 226 InbrMlIfian Request For Information 9025 LBPS Substation Monitoring! Revised Fiber Optic Routing CONTMCTOR REF I: G SPEC SECTION: I PLAN SHM: I SUBMITTAL STATUS: RFIAW I NJL I E-2 R"I TAL I LSPS Swbslslion Mor►Horin�gi Revised Fiber Opfk R*Wtng DESCRIPTION UPLOAD SUPPORTING DOCUMENTS RR-M w aead:nsnu-0dl OrdMI0 6.2E PIA Jary VWmwt ------------- CONTRACTOR CERTIFICATION CONTRACTOR COMMENTS: See stlactred F49-M HONE MILL THE COPLES BE SUBMITTED: Elacbwlc NUMBER OF COPES SUBWTTED: 1 TIIIs *AP d4rnibr +dda+ds, RMt ordrs, and dWW orderr Deckle, ran anti' be SAwaved ed by SaW oRMr ar dung ordir Appr *W is onto lbr oorNbmww weft tto dsoo? comwo of M* pfood and oanpasrroe w1ft we bwwv d tote it mmoolb. BMen In** C&*W O+oaan ft Caiaraar br $arponabk br drnwulons so be cor*rW and corrababld M do lbb dnkw nW"WWn tMr pwgis =** b 1w 0 0de:ssar+poams or to bdenipm d coraftcIbm and Ibr Ir cork dot hsdes. Sueurrnm BY: ,lay Wcant DATE 9I23MI0 5211 PM REVIEWER COMMENTS REVIEWER MAYS REVWV ER EMAIL; COMPANY 1 ORGANIZATION DATE SBIT: DATE COMPLETED: Jeff "aftslgl 4M Mntarnasional Plaza 624W10 10HW2010 App ed as Mob & Prortda In rr kh as a formal euboW b the Lrnphaer responses to the qusMbre Iaslor. Contraciar atma coordbsaite wkh the Owner for Wannaban to be read from the subetstlon. Aftw wnrerssdion with tbs Owner, Contractor aW prow& lit rsAlflrtq to the Engineer what all nalo Worrn tine Owrror creel to rwd horn 1ha subslepan This InMrmalbn shall be conveyed to the foil xioing: 1) to ft pump aladw SCADA aya$= Inle9ndsor. 2) snbebdce Er4*w r scan i) Watar Treabnwrl Plant SCADA firellow bnlagralm Contractor shell provide all hredwere, REVIEVVER COMMENTS: sotbome. and proGnnrnMtg b Wearponft Oda IrntotmaKorn. Csnbacfar slnK eoardlnsle reran subsmltlon on horn IM conduhAnnw dud will ba kolalled in/new Mfl• the puM t lift ponb'aclor step S" suicide the subabtlon or 00 Kns caridwIl0innerdtrct be M+sla%d by Cn pump station contractor In the MfbatMkan Pr arlde N raMYq b tins ingiewr how this wlil ba done. VMno WE provbds hamildwo at Ow wont Pump Sladon Contractor shwK coanNnab wMh Kie aabobdWo on who prmfldss wbaR This h too iiabrt"be conraTed M ta11Mt� to Sla E3tgbwr. RE'VVW" NAME REVEWER fDMAL COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLEM: Ksfh wood kwwOhease.cae Flit 82412010 1 W rWI E REVEWER COMMEWM: lie comrnerM REVIEYYER NAME: EMAIL COMPANY ! ORGMIXATION GATE SENT: DATE coMPLETED: Wolfe Zemiock nrsOrn..._cae, Fraser and Nlehote, vim t1rd4=10 toltlrms REVIEMIER COMMENTS:woula 101 of ducdmffrb Is acceptable. C000dkMNe wttk the City of Lubbock for approval to IN In to substation and to display the IrA nation via SCADA UPLOAD SUPPORTING REVIEW DOCUMENTS 018PLAY ROUTING SLIP r I Ctrmtl vrwwbm ib/: 00 *.&MW Me Rae" Irmm1A Now.. }y Yfrowr Mlt* OR mr Nw" I a b Errr LAW,) M Fa 0 kM Ro I*V 04 SUBM"TA1l. Rit4ft- N'ASwC*UrWn M,,, —rg Nn4.d Fmn Ocia RwR"I Kfmr f C4mmMtY NOW Af Girt L - I X-ft- cwwKl.rO @bow Atsw , I I b2mie S2S PM am~ mmoTsfAr Y23=19 S2S PIA Heft~ oftftboww W23=1000PM Hmma 0 OCf me.Aw tar Kirdog W24)m1a •y AM i.Wbmr nwrbw r^wow tMomf01120AM , C4*n~ wwlr2woba 1D4Y2D10t10AM C. ,' AN "W"k, 1Dt11m010 k00 P'Y PCO AIwMpw 7 we Kwpbg 10M4=1 D 104 AM . Cwww1AA 1"PC CONTROLS, INC. P.O. Box 2247 Pottsbora, Texas 75076 Phone: 903-2064248 / Fax. 903-732-6201 CONTRACT MODIFICATION REQUEST DATE. July 13, 2011 TO: Archer Western Contractors, Ltd ATTN: Todd Swallows RE: CMR 115-04-R1 LBPS Substation SCADA Gentlemen Please accept this request for the fallowing proposed changes per RFI--25: Electrical: Install 3in Sched. 80 PVC conduit with innerduct UIG from the Finer Optic Pull Box to Substation with pull -line Instrumentation and Controls: Fiber optic network equipment / innerduct I cable I testing I programming per the attached RLC and SGS scopes Control Panels: NONE Exclusions: Sales Tax Termination, Programming, Testing, Calibration, Commissioning of Packaged Equip Fumlshed by Others Clarifications: Contract time extension of (0) ZERO days requested I required CMR Summary Sheet attached REVISED RLC proposal attached SGS proposal attached Revised fiber optic routing per RFI-25 attached Proposal priang valid for forty-five (45) days Pricing: CMR TOTAL If you have any questions, please do not hesitate to call. Regards, Jay Johnson Project Manager TPC Controls, Inc. Page 1 of 1 S",321.00 TPc CONTROLS. P.D. Box 2247 Pottsbom, Texas 75070 Phone. 972-04-7028 /Fax: 903-327.0 OO CMR #115.04-R1 LBPS Substation SCADA Date; 7/1312011 Descrltrtion Materiel Labor Exposed Conduit Subtotal $139 1 Slab/ Udg Conduit Subtotal $1,191 28 Wire & Cable Sub -total $806 8 Swttchgear Sub -total SO - Fixtures 8 Devices Sub -total $0 - Special Systems Sub -total $0 - Demolition Subtotal $0 - Sub -Total Estimate $2,136 6% 38 Switc hgear None $0 - Generator None $0 - Light Fixtures None $0 - Handhole, Manholes None $0 - Lightning Protection None $0 - Grounding None $0 - SUBSTATION SGS $14.000 16 - SCADA RLC $17,210 16 Control Panels None $0 - Instrumentation None $0 - Fire Alarm None $0 - X-ray/Scan None $0 = HV Cable None $0 - Hi -Pot Testing None - s0 $0 - Cable Tray None $0 Sub -Total QubtWort $31,210 83% 32 Field Exp $5,000 Per Crew $1,010 Fuel for Testing No.gal: -J $0.00 per Gal $0 - T► Pow $0 - Sub -TOW Esm" $1,010 3% 32 Total Estimate 1 Quotation/Expense $34,366 99 70 Labor Supervision 1096 7 Total Labor Hours 77 Labor Dollars per MIH $28.00 $2,154 Payroll Burden 43.00% $926 Total Labor Cost 8% $31081 Estimate / Quotation / Expense Cost 92% $34,356 Labor Cost 6% $3,081 Total Project Cost 100% $37,437 Overhead I FO-0% $3,744 Subtotal Project Cost 1 Overhead $41,181 Profit 5.0096 $2,069 Sub -total Project Cost I Overhead I ProM $43,240 Bond $1,081 Total Project Price U4,321 TPC Controls,lnc. - Confidential Page 1 of 1 Print Time: 9A0 AM, 711312011 Proposal Summary and Project Estimate — LAWS Substation SGS Engineering Engineering Proposal for Substation SCADA Implementation and Testing SGS Engineering offers the following proposal for requested SCADA Implementation change order at take Alan Henry Pump Station Substation_ The scope of this proposal Includes connection of all intelligent devices at the substation to the data concentrator (SEL-3530), programming of all devices to move requested data and controls, internal testing of all SCADA points and controls within the substation and coordination with Owner's representatives to verify information and control Is present and operational at the Owner's control center, The data will be moved within the substation transparently and collected in the data concentrator and then made available to the Owner over Modbus TCP via a fiber optic connection provided by others. A 3" PVC conduit will be provided exclusively for fiber installation Into the substation control building, terminating outside the substation fence. Others will provide the balance of the conduit to the Owner's interface point. Others will Install fiber and make all Owner connections to substation equipment. The scope of the project with line item estimates of engineering costs: Substation SCADA Testing and Checkout $10,000 Settings $ 2.000 Communications Facilities 2,00 TOTAL ENGINEERING ESTIMATE $14,000 The Engineering Estimate amount is based on five (5) days of onsite commissioning. Extra days will be billed at $2,000 a day up to the not -to -exceed amount. Attached is a sheet defining the Owner's requested values to be mapped to its SCADA system from the substation devices 11° ma0 .1"L Voltages VA, VS, VC Currents IA. IB, IC Frequency Power (kW) per Phase and Total Reactive Power (WAR) Total Apparent Power (kVA) Total Power (kW) Peak Demand Reactive Power (WAR) Peak Demand Apparent Power (WA) Peak Demand Energy (kWh), ImporttExport 3P Reactive Energy (kVARh) Import/ Export 3P Apparent Energy (kVAh) Import/ Export 3P Power Factor Harmonics (odd, up to the t 3") THD K-Factor Distortion Power Relay Alarm Informatlon (two each SEL-MM SEL-3511S) Trip indication Trip targets Fault current values Relay OK status ransfannerAlarm Information (two each SEL-2516 and t L/R control) High oil temperature Kigh winding temperature High tank pressure Low oil level Cooling fan stage status Nitrogen tank low pressure Load tap changer (LTC) manuallautornoc LTC remote/local LTC problem Other Alarm Information Transformer lockout relay status (tnplreset) fig kV dreult switcher position (52a) Circuit switcher trip coil good Circuit switcher DC good Battery DC good Battery charger AC on Battery charger DC good Battery/charger status alarms Contmi Remote trip of the circuit svMtcher RICHRRQBan LOGIC COnYRbL. LLC. 8115 Hicks Hollow Office (972) 542-7375 McKinney, Texas 75071 Fax (214) 733-8254 Request for Information RLC RFI #: 3021-001 Project Name: Lubbock Contract D Pump Station Project Number: 3021 Engineer: Freese & Nichols Ref. Subject: Commutation to Substation Contractor requests: • RLC will provide and install multi mode fiber cable from the existing enclosure in the lake side pump station to an existing enclosure in the substation. • RLC will provide and install fiber termination boxes at each end to terminate the fiber. • RLC will break out the fiber using fiber break out kits. • RLC will terminate the fiber cable using ST Multi mode fiber connectors. . RLC will test the fiber cable with an OTDR at 850nm and 1300nm. Total for items above work performed by RLC $7,475.44 • RLC will interface with the existing Black box system at the substation for I/O points. • RLC will build screens at the Lake Alan Henry WTP as required. • RLC will show up to 75 points. Total For items above subcontracted to BLTI $9,734.40 Total for the Change $17,209.84 Requested By: Michael Cunningham, President Date: 07-13-2011 uYA91� 6-„.,1Cn qIR 1 y �Y rr� r' r: , ,II 5I i rr t r r r • r / ` d of t m - «•1 CYrr Or L LAWC r .:, LAKE ALAN HENRY WATER SUPPLY PROJECT I'1 _ CONTWW I D li r°' °° LAKE 800STER PUMP STATION .� .:" �•=�. ~ OVERAL, LAYOUT AND SITE PLAN Routing Slip: SUBMITTALS • CMR-011A - LBPS Substation Monitoring - Including Additional Breakdown) a Started Br. Jay Vincent Rama P Commsnta Norly AE Construction Manager James Johnson Jimmy Sibert Mearl Taylor Craig Robinson DCS Review Debby Greer Mike Karadag Engineer Review Wade ZemlDck Jeff Hensley Keny Wood James Johnson DCS Review 2 Debby Greer Mike Karadag eernpletee 71V=11 6:22 PM 71212011 6:22 PM 712112W1622PM 712V2011 6:22 PM 7125C2011 10:17 AM 7/25/2011 10:17 AM 7/25/2011 10:21 AM 112012011 210 PM 712912011 12:49 PM 7127/2011 9:25 AM 7/2912011 1;30 PM 7/29=11 1:30 PM Status 29 Notified a Notifled 29 Notified 29 Notified D,d Not Finish Completed f Completed Completed yt' Completed Completed Mf Completed Did Not Finsh rnProject No: PSC10133D Protect: Lake Alan Henry Water Supply PS Contract D Client: City of Lubbock Freese and Nichols Contractor: Archer Western Contractor FN Manager Pro Request For Information #049 Relief Hood Dampers - Power and Interlocks SUBMITTAL INFORMATION SUBMITTAL SUBMITTAL #: CONTRACTOR REF #: SPEC SECTION: PLAN SHEET: SUBMITTAL STATUS: TYPE: Rcxlunst For Information RF! 049 M-4,E-4,E- Final Distribution B,E-21,E-25 SUBMITTAL DESCRIPTION: Relief Hood Dampers - Power and Interlocks UPLOAD SUPPORTING DOCUMENTS RFI.049,pdf 2128/2011 5:00 PM Jay Vincent CONTRACTOR CERTIFICATION CONTRACTOR COMMENTS: See attached RFI-049 HOW WILL T14E COPIES BE SUBMITTED: Electronic NUMBER OF COPIES SUBMITTED: 1 -I This shop drawing has been reviewed by the Contractor and certified to be in strict conformance with the Contract Documents as modified by addenda, field orders, and change orders. Deviations can only be approved by field order or change order. Approval is only for conformance with the design concept of the project and compliance with the Went of the information given in the Contract Documents. Contractor is responsible for dimensions to be confirmed and correlated at the job site; for information that pertains solely to the fabrication processes or to techniques of construction; and for the work of all trades. SUBMITTED BY: Jay Vincent DATE: 313D12011 5:20 PM REVIEWER COMMENTS REVIEWER NAME: REVIEWER EMAIL: COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLETED: James jkj@freese.com Freese end Nichols Inc. � 2128/2011 312/2011 Johnson REVIEWER COMMENTS: No comments REVIEWER NAME: REVIEWER EMAIL: COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLETED: Jeff Hammond Jsh reese.00m Freese and Nichols, Inc. 2l26f2011 31=011 REVIEWER COMMENTS: Contractor to field route #12 wire In 314" conduit. i Refer to sheet E-16, Detail 5 for the Lake site and sheet E-35, Detail 5 for the Post site. REVIEWER NAME: REVIEWER EMAIL: _ COMPANY I ORGANIZATION DATE SENT: DATE COMPLETED: Kelly Wood kwwaftesse.mn wemi 1 3/7tZ011 REVIEWER COMMENTS: — none UPLOAD SUPPORTING REVIEW DOCUMENTS DISPLAY RQUTtNG SUP ■ Cunene WotM ow atop: OCs Admin., Wks Keradog Workflowrk*lotor: Jay Vbcwt (COck on Ow Names above to Emed Used FNI Forma of .04 Flom �� sna Nrt�a.�la REQUEST FOR INFORMATION RFI-049 PROJECT: Lake and Post Booster Pump Stations OWNER: City of Lubbock, Texas CONTRACTOR: Archer Westem Contractors, Ltd. ENGINEER: Freese & Nichols Inc. PROJECT NUMBER: Job #210051 PSC10133D REFERENCE DATA: Specification Section No. Page No. Paragraph No. Drawings: M-4.E-4,E-8.E-21,E-25 Description: Relief Hood Dampers — Power and Interlocks See attached RFI from TPC Controls (TPC RFI 115-14). Please advise as soon as possible. i REQUESTED BY: J. Vincent DATE: 2-28-11 ENGINEER'S RESPONSE: Information Interpretation for the items described above or in the attached material referenced: Clarification RESPONSE BY: DATE: PSC10133D Lake Alain Henry Booster Pump stations TPC CD T S, INC. P.O. Box 2247 Telephone: (903) 206 4M Pottsboro, Texas 75076 Fax: (903) 732-6201 Request for Information TPC RFI M 115-14 Project Name: Lake Alan Henry Water Supply Project Pump Stations Contract — D Project Number: 9413 Engineer: Freese & Nichols, Inc. General Contractor: Archer Western Contractors, Ltd. Ref. Documents: Ref. Specifications: Ref. Plan Sheets: M4 HVAC Schedules / E-4 LBPS Power Plan / E-8 LBPS Cont. & Inst. Plan / E-21 PBPS Power Plan / E-25 PBPS Cont. & Inst. Plan Ref. Subject: hood Interlocks Contractor reauests: X Information Interpretation X Clarification Issue: 1. HVAC Hood schedule calls for motorized damper to be interlocked with associated Supply Fan but there are no provisions shown on the Electrical Power or Control plans. Request the conduit routing / wire requirements /(nd damper motor flkcr�,�R files eN 1144 PAOv)Ae moiog pvow ro Requested By: Jay Johnson — Project Manager Date:_ FebruwX28, 2011 Routing Slip : SUBMITTALS-RFI-049 - Relief Hood Dampers -Power and Interlocks Smrted By Jay Wncent Name 1 Comments FloW AE Construction Manager Craig Robinson James Johnson Jimmy Siberl Mead Taylor DCS Review Mike Karadag Engineer Review Jeff Hammond James Johnson Kelly Wood DCS Review 2 Mike Karsdag Mike Karadag Completed 2282011 5:01 PM 7128/2011 5:01 PM 212812011 5:01 PM 21282011 5:01 PM 2/28/2071 6:08 PM 302011 9:43 AM 3'P2011 12:11 PM 317/2011 1:17 PM 3)712011 3:49 PM 3/3012011 511 PM Status �9 Notified 29 Notified Notified Notified Completed Completed Completed Completed V Completed V Completed raProject No: PSC10133D Project: Lake Alan Henry Water Supply PS Contract D Client: City of Lubbock Freese and Nichols Contractor: Archer Westem Contractor Request For Information #052 Supply Fans wl Manual Gravity Dampers F-N Mancmer Pro SUBMITTAL INFORMATION SUBMITTAL SUBMITTAL #: CONTRACTOR REF 0: SPEC SECTION: PLAN SHEET: SUBMITTAL STATUS: TYPE: �u V 052 RFI-052 15838 6 SI��Y Final Distribution { SUBMITTAL Supply Fans wl Manual Gravity Dampers DESCRIPTION: — — UPLOAD SUPPORTING DOCUMENTS RFI-052.pdf 4IW2011 4:24 PM Jay Vincent CONTRACTOR CERTIFICATION CONTRACTOR COMMENTS: Please expedite response. HOW WILL THE COPIES BE SUBMITTED: Electronic NUMBER OF COPIES SUBMITTED: 1 This shop drawtng has been reviewed by the Contractor and certified to be in strict conformance with the Contract Documents as modified by addenda, Raid orders, and change orders, Deviations can only be approved by field order or change order. Approvals only for conformance with the design concept of the project and comp#ance with the intent of the information given in the Contract Documents. Contractor is responsible ror dimensions to be confirmed and correlated at the Job site; for information that pertains solely to the fabrication pmcasses or to techniques of construction, and for the work of all trades. SUBMITTED BY: Jay Vincent DATE: 4/812011 4:27 PM REVIEWER COMMENTS REVIEWER NAME: REVIEWER EMAIL: COMPANY l ORGANIZATION DATE SENT: DATE COMPLETED: James jkJ4V seae.com Freese and Nichols Inc. 14111/2011, i 411412011 Johnson _ REVIEWER COMMENTS: no comments REVIEWER NAME: REVIEWER EMAIL. COMPANY l ORGANIZATION DATE SENT: DATE COMPLETED: Jeff Hammond jshl]>jfnesa.com��- -� Free& and Nichols, Inc. 4i11 i2011 4/131R011 REVIEWER COMMENTS: Fan and motorized damper assemby with 24V actuator from manufacturer as recommended by Greenheck is acceptable. Additionally, fan and motorized damper assembly to coma with a single point electrical connection from factory. REVIEWER NAME: REVIEWER EMAIL: COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLETED: Kelly Wood kwMrajijtirseas.t�m FNI 4111J2011 411512011 REVIEWER COMMENTS: No t:omments UPLOAD SUPPORTING REVIEW DOCUMENTS DISPLAY ROUTING SLIP ■ CurMM Warldfow Oboe DCO AdmM: MNw Kw*daa Wrxkllow IrWi tnr: Jar Vkz"w t (CAck on the Names above to Email Used FNI Forme vl.M WMN Freese and Nichols SUBMITTAL TRANSMITTAL (4. / ) PROJECT: Lake and Post Booster Pump Stations PROJECT NUMBER: OWNER: City of Lubbock, Texas CONTRACTOR: Archer Western Contractors, Ltd. Job # 210051 ENGINEER: Freese & Nichols, Inc. PSCIO133D REFERENCE DATA: Project Submittal No, RFI-052 Specification Section: 15838 Plan Sheets: M-4, 5/E-16, 5/E-32 Description: Supply Fans w/ Manual Gravity Dampers CONTRACTOR'S CERTIFICATION: 1 hereby certify that this submittal has been reviewed by the Contractor and is in strict conformance with the Contract Documents as modified by Addenda, Change Orders and Field Orders. CERTIFIED BY: J. Vincent DATE: 4-8-11 TYPE # DESCRIPTION #SENT #RET'D STATUS CMR Contractor's Modification Request ❑ Approved ❑ Approved As Noted ❑ Not Approved ❑ Revise & Resubmit - ❑ Filed As Received ❑ Final Distribution ❑ Change Order Issued ❑ Field Order Issued C Recommended For Approval Returned WIO Review Addy Information Required Cancelled ❑ See Review Comments ❑ Pendi-I rt,e.,ye Order CTR Certified Test Report EIR Equipment Installation Report O&M Operation & Maintenance Manual NBC Notification By Contractor PCM Proposed Contract Modification PR Payment Request PP Project Photographs RD Record Data RFI 052 Request For Information FN Pro SAM Sample SCH Schedule Of Progress SD Shop Drawing FOR ARCHITECT I ENGINEER'S USE ONLY DATE RECEIVED BY DATE RETURNED BY COMMENTS: DISTRIBUTION REVIEW NO. SENT TO. NO. SENT TO. DEPT. 6Y DATE SENT DATE RET=D PSC10133D Lake and Post Booster Pump Stations ro REQUEST FOR INFORMATION RFI--052 PROJECT: Lake and Post Booster Pump Stations PROJECT NUMBER: OWNER: City of Lubbock, Texas CONTRACTOR: Archer Western Contractors, Ltd. Job #210051 ENGINEER: Freese & Nichols, Inc. PSC10133D REFERENCE DATA: Specification Section No. Page No. Paragraph No. Drawings: M4. 5/E-16. 5/E-32 Description: Supply Fans w/ Manual Gravity Dampers The "Fan Schedule" on Drawing M-4 specifies Greenheck/SBS supply fans with unit -mounted backdraft dampers. The "Power Ventilators" specification 15838-2.03F.1. states that the fans are to be furnished with "gravity shutters". In approved submittal SD057-15838-001, Greenheck submitted the specified SBS-3H42 fans with VCD- 20 dampers and 24VAC electric actuators. This was missed during Archer Western's review of the data prior to submitting to the Engineer. When Greenheck was questioned about the why motorized dampers were being proposed in lieu of the specified gravity dampers, they stated that they will not furnish, nor warrant, this model of supply fan with gravity dampers that are mounted on the outside (where the fans are forced to "pull" the shutters open instead of "push" them open). In order to furnish the specified supply fan model/ arrangement, the manufacturer is requiring the unit - mounted dampers to be installed with electric actuators (actuators are at no additional cost to the Owner). However, the "Damper Control Schematic(s)" that are shown in 5/E-16 and 5/E-32 will have to be revised to show the additional motorized dampers at the fans, and there will be additional costs associated with the electrical installation. Please revise schematics as shown in 51E-16 and 51E-32 to reflect the additional motorized dampers at the supply fans, or provide direction as how we are to proceed as soon as possible. REQUESTED BY: J. Vincent DATE: 4-8-11 ENGINEER'S RESPONSE: ❑ Information ❑ Interpretation ❑ Clarification for the items described above or in the attached material referenced: RESPONSE BY: DATE: PSC10133D Lake Alan Henry Booster Pump Stations Routing Slip: SUBMITTALS - RFI.052 - Supply Fans will Manual Started By: Jay Vincent Name i Comments No ft AE Construction Manager Craig Robinson James Johnson Jimmy Sibert Mead Taylor OC$ Review Debby Greer Mike Karsdeg EnglnearReview Jeff Hammond James Johnson Kelly Wood OCS Review 2 Debby Greer Mike Karadag Completed Status 419/2011 4:27 PM Notified 4113=11 427 PM Not fled 402011 4:27 PM Notified 415/2011 4:27 PM Notified 4/11/2011 7:17 AM 4111/2011 7:17 AM Did Not Finish ✓ Completed V1312011 3:40 PM 4114/2011 124 PM 41151201110:56AM 411512011 12:05 PM 4//512011 12--05 PM '/ Completed Completed I/ Completed Did Not Finish Completed rnProject No: PSC10133D Project: Lake Alan Henry Water Supply PS Contract D Client: City of Lubbock F-N Manager Pro Freese and Nichols Contractor: Archer Western Contractor Contract Modification Request #012 Relief Damper/Supply Fan Interlocks (RFI-049); Single -point Electrical Connections at Supply Fans (RFI-052) SUBMITTAL INFORMATION SUBMITTAL SUBMITTAL#: CONTRACTOR REF #: SPEC SECTION: PLAN SHEET: SUBMITTAL STATUS: TYPE: tetrad - diifcign —T 012 CMR-012 Not Approved, Final Distribution Fi eques j FSUBMITTAL Relief Damper/Supply Fan Interlocks (RFI 049); Single -point Electrical Connections at Supply Fans (RFI-052) DESCRIPTION: - _.- ---- -- - UPLOAD SUPPORTING DOCUMENTS CMR-012 Proposal.pdf 6/2912011 10:15 AM Jay Vincent CONTRACTOR CERTIFICATION CONTRACTOR COMMENTS: See attached proposal. HOW WILL THE COPIES BE SUBMITTED: Electronic NUMBER OF COPIES SUBMITTED: 1 This shop drawing has been reviewed by the Contractor and certified to be in strict conformance with the Contract Documents as modified by addenda, field orders, and change orders. Deviations can only be approved by field order or change order. Approval is only for conformance with the design concept of the project and compliance with the intent of the information given in the Contract Documents. Contractor Is responsible for dimensions to be confirmed and correlated at the job site; for information that pertains solely to the fabrication processes or to techniques of construction; and for the work of all trades. SUBMITTED BY: Jay Vincent DATE: 612912011 10:16 AM NOTIFICATION BY CONTRACTOR The Contractor proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown In Attachment A' and requests that you take the following action: r Notify us that you concur that this change does not require a change in Contract time or amount and issue a Field Order. cs Issue a Work Change Directive to authorize us to proceed with the described change with payment at the Contract unit prioes. Issue a Work Change Directive to authorize us to proceed with the change under the time and materials provisions of the Contract Documents. re Issue a Work Change Directive or Change Order for performing the described change. Proposed change in Contract amount is indicated in the attached detailed cost breakdown of labor, materials, equipment and all other costs associated with this change. Impacts on Contract time are shown in the attached revised schedule. SUBMITTED BY: Jay Vincent DATE: 6/292011 10:16 AM REVIEWER COMMENTS REVIEWER NAME: REVIEWER EMAIL: COMPANY I ORGANIZATION DATE SENT: DATE COMPLETED: James Johohnsonnson Freese and Nichols Inc 6/2912011 6=12011 � REVIEWER COMMENTS: no comments REVIEWER NAME: REVIEWER EMAIL: COMPANY I ORGANIZATION DATE SENT: DATE COMPLETED: JeH Hammond Ishl�Frease wm �Freeae and Nichols, tnc. 6/29/2011 711/2011 REVIEWER COMMENTS: REVIEWER NAME: REVIEWER EMAIL: COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLETED: „ jnh@freese.com 4055International Plaza I 612912011 613012011 REVIEWER COMMENTS: Per Wade Zemlock'a comments. —� REVIEWER NAME: REVIEWER EMAIL: COMPANY I ORGANIZATION DATE SENT: DATE COMPLETED: Kelly Wocd kww@fresse.com FNI 6/29/2011 7/11/2011 REVIEWER COMMENTS: No comments. REVIEWER NAME: REVIEWER EMAIL: COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLETED: Wade Zamlock twz@freese.com Freese and Nichols, Inc. 6/29/2011 7/1/2011 Cost appears excessive. Provide a detailed break down of material and labor. REVIEWER COMMENTS: The cost for a single point electrical connections should not be Included. This is a means and method issue that the Owner should not be held responsible for on cost The Contractor failed to order the equipment single point electrical connection which was the Intent of the drawings. UPLOAD SUPPORTING REVIEW DOCUMENTS f CONSTRUCTION MANAGER'S RESPONSE F We concur that this change does not require a change in Contract time or amount. A Field Order will be issued. C We concur that you proceed with the change with payment to be made at the Contract unit prices. A Work Change Directive will be issued. O We concur that you proceed with the change under the time and materials provisions of the Contract Documents. A Work Change Directive will be issued. ' A Change Order will be issued. O Additional information is required to evaluate this request. Provide information as described In the attached comments and resubmit. r Contract Modification Request is not accepted. I SUBMITTED BY: I DATE: 7/11/2011 9:08 AM I DISPLAY ROUTING SLIP 0 (Click on the Nerves abrnre to Email FNI Forme Loll CONTRACTOR'S MODIFICATION REQUEST Freese and Nichols (4.421 PROJECT: Lake Alan Henry Booster Pump Stations PROJECT NUMBER: OWNER: City of Lubbock, Texas CONTRACTOR: Archer Western Contractors, Ltd. 210051 ENGINEER: Freese & Nichols, Inc. PSCIO133D DESCRIPTION: - Relief Damper/Supply Fan Interlocks ( Per RFI-049) NO. CMR-012 -Single-point electrical connections for SF-LBPS-1,2,3,4 and SF-PBPS-1,2,3,4,5 (RFI-052) NOTIFICATION BY CONTRACTOR The Contractor proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown in Attachment "A" and requests that you take the following action: ❑ Notify us that you concur that this change does not require a change in Contract time or amount and issue a Field Order. X Issue a Change Order for performing the described change. Change in Contract amount is indicated in the attached detailed cost breakdown of labor, materials, equipment and all other costs associated with this change. Impacts on Contract Time are shown in the attached revised schedule. Ll Authorize the Contractor to proceed with the described change. Payment will be requested at the unit price bid. ❑ Authorize the Contractor to proceed with the change under the time and materials provisions of the Contract. By: Jay Vincent Date: 6-29-10 CONSTRUCTION MANAGER'S RESPONSE We respond to your request as follows: We concur that this is a no cost or time change. See attached/forthcoming Field Order No. J comments. ❑ Your proposal is recommended to the Owner. See attached/forthcoming proposed Change Order. ❑ Proceed with the change at the unit price bid. ❑ Proceed with the change under the time and materials provisions of the Contract. Additional information is required to evaluate this request. Provide information as described in the attached comments and resubmit. Contractor's Modification Request is not accepted. By: Date: TCW06131C Eagle Mountain Connection Booster Pump Stations CONTRACTOR'S MODIFICATION REQUEST ATTACHMENT A (4.421 ) Archer Western is requesting review and approval of the following proposals: - Reference RFI-049 Response: Additional conduit and wire required to interlock the supply fans and the dampers at the relief hoods (includes both LBPS and PBPS, all nine fans and relief hoods). Total add: $16,520.70 (See attached spreadsheet) - Reference RFI-052 Response: Additional cost to provide a single -point electrical connection on the supply fans, factory interlocking electric damper actuator to the supply fan (includes both LBPS and PBPS, all nine supply fans and associated supply dampers). Total Add: $1,890.00 (See attached spreadsheet) Total for this CMR-012 Proposal is $18,410.70 Please advise if this proposal is acceptable at your earliest convenience. TCW06131C Eagle Mountain Connection Booster Pump Stations CM R-012 Date: June 28, 2011 Lake Alan Henry Booster Pump Stations Freese and Nichols City of Lubbock, Texas CHANGE DESCRIPTION: Additional conduit and wire required to interlock the supply fans and the dampers at the relief hoods (LBPS and PBPS - RF1-049 Additional cost to provide a single -point electrical connection on the supply fans, factory interlocking each electric damper actuator to its associated supply fan (LBPS and Post) - RFI-052 DESCRIPTION QTY UIM UNIT PRICE LABOR MATERIAL EQUIPMENT SUB TOTALS Labor: 1 Admin. - Change Order preparation 0 MH $ 45.00 $ Materials: Equipment: Subcontract: TPC Controls, Inc. RFI-049 1 LS $15.734.00 Roche Newton RFI-052 1 LS $1,800.00 SUBTOTALS: PAYROLL BURDEN @ 55% OF LABOR SUBTOTALS: $ - $ - $ - $17,634.00 $17,534.00 $ $0.00 $ $ - $ - $17,534.00 $17,534.00 15% OHBP on A.W_ work 5% OHBP on subs BOND & INSURANCE $0.00 $876.70 TOTAL AMOUNT OF THIS PROPOSAL FOR CMR-012: $18,410.70 TI'C CONTROLS, INC. P.O. Box 2247 Pottsboro, Texas 75076 Phone: 903-206-4248 / Fax: 903-732-6201 CONTRACT MODIFICATION REQUEST DATE: March 31, 2011 TO: Archer Western Contractors, Ltd. ATTN: Todd Swallows RE: CMR 115-03 Fan -Damper Interconnect Gentlemen: Please accept this request for the follwing proposed changes per RFI-049 response: Electrical: Install (1) one 314in conduit trunk line with #12 wires to interconnect Supply Fans with the associated Roof Dampers at the LBPS and at the PBPS [total of (9) nine Fans and (9) nine Dampers] Instrumentation and Controls: NONE Control Panels: NONE Exclusions: Sales Tax Termination, Programming, Testing, Calibration, Commissioning of Packaged Equip Furnished by Others Clarifications: Contract time extension of (0) ZERO days requested / required CMR Summary Sheet attached E-8 and E-25 Proposed Layout / Routing attached Proposal pricing valid for forty-five (45) days Pricing: CMR TOTAL If you have any questions, please do not hesitate to call. Regards, Jay Johnson Project Manager TPC Controls, Inc. Page 1 of 1 $15,734.00 7'PC CONTROLS, INC. P.O. Box 2247 Pottsboro, Texas 75076 Phone. 972-414-7028 / Fax: 903-327-8480 CMR #115-03 Date: 3/31/2011 Description Material Labor Exposed Conduit Sub -total $2,259 84 Slab/ Udg Conduit Sub -total $0 - Wire & Cable Sub -total $3,018 53 SWtchgear Sub -total $0 - Fixtures & Devices Sub -total $0 - Special Systems Sub -total $0 - Demolition Sub -total $0 - Sub -Total Estimate $5,277 40% 137 Switchgear None $0 - Generator None $0 - Light Fixtures None $0 - Handhole, Manholes None $0 - Lightning Protection None $0 - Grounding None $0 - Fiber Cabling None $0 - SCADA None $0 - Control Panels None $0 - Instrumentation None $0 - Fire Alarm None $0 - X-ray / Scan None $0 - HV Cable None $0 - Hi-PotTesting None - $0 $0 - Cable Tray None $0 - Sub -Total Quotation $0 0% - Field Exp, $6,000 Per Crew $1,978 - Fuel for Testing No.gal: - $0.00 per Gal $0 - Temporary Power $0 - Sub -Total Expense $1,978 15% - Total Estimate I Quotation I Exnpense $7,255 56°% 137 Labor Supervision 10% 14 Total Labor Hours 151 Labor Dollars per M/H $26A0 $4,221 Payroll Burden 43.000 $1,815 Total Labor Cost 45°% $6,036 Estimate / Quotation / Expense Cost 55% $7,255 Labor Cost 45% $6,036 Total Project Cost 100°% $13,291 OverheadF1_0 0_0 -./-.l $1,329 Sub -total Project Cost / Overhead Profit F 6,00°% Subtotal Project Cost / Overhead / Profd Bond $14,620 $73i $15,351 $384 Total Project Price $15,734 TPC Controls,lnc. - Confidential Page 1 of 1 Print Time: 2:17 PM, 3131/2011 p 1. =COMIMCI NARK il£51CMAEt9 FOR IIIOM0616 " wom A L w110YMM�S. 2IC11.0o JUMCR0IA W 10a - RCOIWRED 6T THE S. SWARAIE 170V CONMCTM FROM TWWW SNOILEO PANS AND MAM WIN A STUL MARRCR M LOW VOL=NZ fML twT. 1 FM E-16 NO E-12 NTERCONKCT*N DUA:wY TOR ANAL DESMAMN OF ALL CAWIEL 4. THE CONTFAMOR SMALL MAWAN A YMMM Or IW SCrRM 41WV C49LE TRAY AND LOW VOLTAGE r.sF MY. 3, ALL EoUNNENT SMOIRI DAWR 4MLL WE Pwa3m UIOdt TIA COMRACT. ALL EWPMEMT SHOWN LM:M AND OASMW IS TUTM A$ INDICATED. a PVC CAUL Sams W sTu Am BELOW CRIME NULL ravuW IN SYMBOL 101 1. v,Lx caNTWa PA1A0. Z. ROUTE COMW ®FLOW CKW- 1 LM MICH SHALL ACMAT[ AT r AWK FUSE RDOR. 4. PROMDE E$ EMPTY OCAmIIITS WTM A PULLCORD, O. Exip0OR Loom cowACfm L CAP SPARE COMOUT AT F94DOW iLM. 7. MEAT DUMMA YOUNTO MOMONTYIY tO UAIWMO[ Or ROOF JvW. 6 9UYP PUMP C0VMDL PMM M A NEW 4X. 316 7TAU= STar EMCUMME. 9. UMW MWT SMKM TO ACMAR AT Y AWYE TIK MW SrAMN rtaDR. 10. TO DYR AT WWRK EOWMENT RACK M COMIIOL ROOK M.- 11. PWOWOE A Y COT w rAOr Den Rw CmnFmx NALW DCLDSM TO TN[ NPU CaNRaL Pm4KL. � ae Lm VOLTAGE M.1170.0a L-,/CC• TRAY Y � II 1 I 1 I I 15 1 LAKE BOOSTER PUMP STATION ® 1 CONTROLS & INSTRUMENTATION PLAN :- CABLE TRAY TO PUMP ROOM Vlw6 r-v MDT ro SC" J. pp CCF F- w z w za. a. O z 1CL 40 CL YN d 0 �w 'wait ;WLLJAN k} V)z bfY O_ z O zd w m V1 w J ,s O z w O U E=8 146 i I 1 - I I r--- t n� J l 1 - z y- - r -- - �- - ------ - - I y I I I ------ r------- L _ - r Ghl �I IYI 1 I I I, ' I �i —------1 i -•-- — I I — RE. i/E-26 FOR COM11MwmM AAA I,Y I,.11 � D m y . �.. • ' a� aTr OF Lc.IRRoCK rn ;tea LAKE ALAN HENRY WATER SUPPLY PROJECT ,� rat COMMACT D NIris Iol1 aar4r upon w Go/.$ 'a EL{Cp� wee ....�1� w ." 'Im" I. I'" ' 1I'° POST BOOSTER PUMP STATION - - 1 _ .. !'f1RlTC}!ll C A IiJCTDI I1iCRIT6T1l1AI 13i Aid Vincent, Jay From: JHKASAI@aol.com Sent: Wednesday, May 11, 2011 9:12 AM To: Vincent, Jay Subject: Fwd: FW: FW: RFI-52 Confirmation of single point electrical connections from ... Jay, Please see below. He was out sick Monday and Tuesday, I found out when I called to follow up the email yesterday. James From: matt@dghco.com To: JHKASAI@aoLcom Sent: 5/11/2011 8:43:52 A.M. Central Daylight Time Subj: FW: FW: RFI-52 Confirmation of single point electrical connections from Gree... Response 1.[ It will cost $200.00 per fan to have the single point wiring. uvers, From: JHKASAI@aol.com [mallto:JHKASAI@aoLcom] Sent: Tuesday, May 10, 2011 7:45 AM To: matt@dghco.com Subject: Fwd: FW: RFI-52 Confirmation of single point electrical connections from Gree... Matt, I need that email TODAY. James From: jvincent@walshgroup.com To: JHKASAI@aol.com Routing Slip: SUBMITTALS - CMR-012 - Relief Damper/Supply Fan Interlocks (RFI-049); Single-polnt Electrical Connections at Supply Fans (RFI-052)) Started By. Jay wheent GName 1 Comments Completed Status AbWy AE Construction Manager James Johnson 6/292011 10:16 AM 29 NuVied Jimmy Sibert 6129fP011 10:16 AM 29 Notified Mead Taylor 6129/2011 10:16 AM 29 Notified Craig Robinson 61292011 10:1 S AM 29 Notified DCS Review Debby Greer 6/29f2011 1:59 PM Did Not Fln,sh Mike Keradeg 6129/2011 1:59 PM �/' Completed Engineer Review Jeff Hensley 6130/2011 8:14 AM `/ Completed Wade Zemiock 7/12011 8:23 AM Completed James Johnson 5292011 2.01 PM Completed Jeff Hammond 7/12011 1:37 PM Completed Kelly Wood 7111/2011 9:08 AM Completed DCS Review 2 Debby Greer 71112011 10:47 AM Did Not Finish Mike Karsdeg 7111/2011 10:47 AM V Completed No: PSC10133D rnProject Protect: Lake Alan Henry Water Supply PS Contract b Client: City of Lubbock Freese and Nichols Contractor: Archer Western Contractor F-N Manager Pro Contract Modification Request #009 PBP S Transformer Relocation, Equipment Pad, Delete Transformer Screenwall SUBMIT"rAL 1NFORMATION SUBMITTAL TYPE: SUBMITTAL#: CONTRACTOR REF #: SPEC SECTION: PLAN SHEET: SUBMITTAL STATUS: n wa l CMR-009 Approved, Final Distribution UBMITTAL ESCRIPTION: FS PEPS Transformer Relocation, Equipment Pad, Delete Transformer Screenwall — - UPLOAD SUPPORTING DOCUMENTS CMR-009 Revised Screen Wall Gredli.PDF 4127/2011 9:58 AM Jay Vincent CONTRACTOR CERTIFICATION CONTRACTOR COMMENTS: See attached proposal HOW WILL THE COPIES BE SUBMITTED: Electronic NUMBER OF COPIES SUBMITTED: 1 This shop drawing has been reviewed by the Contractor and certified to be in strict conformance with the Contract Documents as modified by addenda, field orders, and change orders. Deviations can only be approved by field order or change order. Approval is only for conformance with the design concept of the project and compliance with the Intent of the information given in the Contract Documents. Contractor is responsible for dimensions to be confirmed and correlated at the Job site; for information that pertains solely to the fabrication processes or to techniques of construction; and for the work of all trades. SUBMITTED BY: Jay Vincent DATE: 4/2712011 10:02 AM NOTIFICATION BY CONTRACTOR The Contractor proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown In Attachment A' and requests that you take the following action. O Notify us that you concur that this change does not require a change in Contract time or amount and issue a Field Order. in Issue a Work Change Directive to authorize us to proceed with the described change with payment at the Contract unit prices. Issue a Work Change Directive to authorize us to proceed with the change under the time and materials provisions of the Contract Documents. t: Issue a Work Change Directive or Change Order for performing the described change. Proposed change in Contract amount is indicated In the attached detailed cost breakdown of labor, materials, equipment and all other costs associated with this change. Impacts on Contract time are shown in the attached revised Schedule. SUBMITTED BY: Jay Vincent DATE- 412712011 10:02 AM REVIEWER COMMENTS REVIEWER NAME: REVIEWER EMAIL: COMPANY I ORGANIZATION DATE SENT: DATE COMPLETED: James Johnson Freese and Nichols Inc. I 4/27/2011 6412812011] JitJ�fraesacom REVIEWER COMMENTS: no comments REVIEWER NAME: REVIEWER EMAIL: COMPANY I ORGANIZATION DATE SENT: DATE COMPLETED: Jeff Henslay Jnh@heesecom 405E Intennattonal Plaza i41271261 i 5/4/2011 REVIEWER COMMENTS: IL no sor>tir wpnts REVIEWER NAME: REVIEWER EMAIL: COMPANY 1 ORGANIZATION DATE SENT: DATE COMPLETED: Kelly Wood kWwQfreese.com FNI 4/2712011 ' 5/912011 REVIEWER COMMENTS: No comments REVIEWER NAME: REVIEWER EMAIL: COMPANY! ORGANIZATION DATE SENT: DATE COMPLETED: Wads Zemlack twsweese.com �Fnese and Nichols, Inc. ] 4/27/2011 I 5/5/2011 REVIEWER COMMENTS: No Comments UPLOAD SUPPORTING REVIEW DOCUMENTS CONSTRUCTION MANAGER'S RESPONSE r We concur that this Change does not require a change in Contract time or amount. A Field Order will be issued. r We concur that you proceed with the change with payment to be made at the Contract unit prices. A Work Change Directive will be issued. O We concur that you proceed with the change under the time and materials provisions of the Contract Documents. A Work Change Directive Will be issued. Ce A Change Order will be Issued. C Additional information Is required to evaluate this request Provide information as described in the attached comments and resubmit. r Contract Modification Request Is not accepted. SUBMITTED BY: DATE: 5/9/2011 10:00 AM DISPLAY ROUTING SLIP r Currant Workflow Step: DCS Admin: Mike Karadag Workflow Initiator: Jay Vincent (C)lak on the Mamas above !o Emad User) FNI Forma 0.04 rm REQUEST FOR INFORMA77ON RF1-039 Revised 1-19-11 PROJECT: Lake and Pump Statlor►s PROJECT 1t WBM, OWNER: City of Lubbock, Texas CONTRACTOR: Archer Western Contractors, Ltd. Job 0210061 l KUNIM . From & Nahols, Inc. PSCIO133D REPERE14CE DATA: 9peclllcalbn Secdon No. Paoe No. Paragraph No. Drawings: 0-20. E-20 sae adad*d AM from TPC Controls. "'"Please rate on page 1. of the attached RFi from TPC,*"' TPC will make the proposed changeMebcatbn at no oost io the Owner. However, if there arse rnodifk ewft to the axtattnp tranalmner screenwati, or an addltlomi soreenwall is to be added &M ON do VmpoW trm*ortrter lomdon, there will be aM bonal oosts aseoc kled with this aloe and a c move order would be required to Cover addttbnaf oosta to Archer Western. DATE1 t,NMEMS RESPONSE: Infomtatlon Interpretation cmirmosom for ttte items described above or in the attached nmft al referenced: RESPONSE - a,=i 1 W.2a ► d.= 0 .►.pia - iisyl:.-1, "ciol m Lam Awn NOW Hoeaw Pump 9ras" MARCH CONSTRUCTION INC. 18833 REDLAND ROAD SAN ANTONIO, TEXAS 78259 (210 490-8198 Fax (210) 490-2201 March 24, 2011 Proposal submitted to: Archer Western Re: Credit for screen wall footing Add for Transformer pad March Construction, Inc. proposes to furnish the following INCLUSION: 1. To include 2. Concrete 13 cy aQ 105 S 1,365.00 3. Labor to form 4 men @ $ 25 9 hrs. $ 900.00 4. Labor to tie 3 men @ S 25 9 hrs. $ 675.00 5. Labor to pour 3 men @ $ 25 4 hrs. 3$ 00.00 Total credit $ 3,240.00 1. Add transformer pad 3 cy @ 350.00 $1,050.00 Total Credit $ 3,240.00 Total ADD S 1,050.00 Respectfully submitted, Butch Murray Butch@marchconstruction.com PO Box 1883 Decatur, TX 76234 TO: ATTN. JOB NAME: EAGLE PRECAST CORPORATION REVISED QUOTE Deduct site wall Archer Western Contractors Jay Vincent Lake Allen Henry Pump stations (2 bldgs) DATE: 2/7/11 FAX# 940-626-8020 Fax# 940-626-8021 Cell# 940-368-0914 We appreciate the opportunity to bid on this project and hope you will consider us for your future projects as well. Should you have any questions or need further assistance, please contact us at the address and phone numbers listed above. DESCRIPTION ADD(+) OR DEDUCT (-) TOTAi. 1 Deduct site wall on2/7/11 ($4800.00) NOTES; 1. All work on site, is based on working five days a week at eight hours per day, on a straight time basis. 2. Clear and reasonable access must be provided throughout the erection timeline, for hoisting materials and shuttling trucks, Clear access must be maintained for the crane to advance freely. 3. All work shall conform to the AISC code of standard practice, latest revision, and the PCI Code. No standards stricter than PCI will apply. 4. Accurate Initial lines and grades must be established and maintained by others. Erection crew will lay out from established bench marks and column lines. 5. This bid is based on bearing on the slab with tie back connections to the structural steel. 6. One mobilization to the jobsite for personnel and equipment is included in this Quote. Additional mobilizations will be billed at cost plus overhead to the GC. 7. A sequence and schedule of erection must be signed off prior to production of materials. Any changes in this schedule may be cause for additional charges. S. Our production schedule is based on 6 weeks casting and 10 days erection, total for 2 buildings. We would like to have all submittals approved within 10 weeks of signed contract. 9. We exclude full time, non -working site safety, fire watch and superintendent personnel from this quote. These positions can be added at a cost plus basis. 10. We exclude Post installation testing or inspection. 11. OSHA required safety protection will be supplied for our trade only. 12. Cleaning w111 be done at the completion of an area. Cleaning will be limited to erection smudges and debris. 13. Cleaning or repair, due to the negligence of other trades will be considered an add and will be billed on a cost plus basis. 14. This quote excludes stone and/or drainage necessary to establish or maintain access throughout the site_ 15. All barricades, street closures, traffic control etc. will be by others. 16. Is per plans and PRECAST CONCRETE specifications provided as of this date. Any exceptions will be noted. 17. Bonding fees, if required, will be added to this quoted price. Included Excluded Qualification Items x Pre -approval per meeting with performance architect x Patching of panels x loose erection hardware x Delivery, (All materials are quoted FOB site) x Taking field dimensions x Engineering costs of stone x Site Work mechanical building and dum ster enclosure only) x Installation (per acceptance) 3% Retainage x Sales Tax x Shop drawings and setCng plans x Dropping trailers x Imported aggregates and pigments with sandblast finish x sealing, flashing, and related ----+Caulkin 2 Sets of Arch & Structural Drawings Required. Setting contractor Is responsible for unloading In a timely manner, storing and protecting precast concrete upon receipt. Goods damaged during delivery must be noted upon receipt. Use of precast concrete by setting contractor constitutes acceptance. EAGLE PRECAST CORP. must have signed purchase order, notice of furnishings and notice of cornmencernent In our file and two sets of necessary drawings and spas prior to any drafting or manufacturing. By signing this quotation you are contracting with us for specially fabricated precast concrete products to be used In the above referenced project for the above referenced contract price excluding applicable sales tax. A construction schedule is required as soon as possible. After reviewing the schedule a mutual agreed upon production slot will be set. Drafting and Engineering cost will be Invoiced on monthly bases. If job is delayed for any reason EAGLE PRECAST reserves the right to proceed with Drafting, Engineering, & Production of stone and will Invoice for these services on the ZIP of each month with a Net of 30 days. BO I.EMMON, President Company. Date: Acceptance Signature: 11 MiM ZDM1 liMr j f'0llos 77M { 1 EM1A�gMe, Tnw 7e I d26A110A7D1 phyr S MANA 80 40 INDUSTRIES Ja %wY 27, 2D11 w aura► Ards -Western QnOwtor+s LTD 2121 Ave. J, St#e 103 Arlington, Texas 76006 AtUentfim, W. by 11fncent Re: t.ahe Alan Henry Pump Statfons - Contrad D Amuceburg, Texas M Job #t21-213 &*)a t HI Doa~ Change Notice #t4 Daar W. Miler t: uxkxled lock is our prtdng far Ow scope changes as tracked under our DCN 04. This Worn pa tak m to the deletion of the Past Pump SUdon Trarofomw Sam Wall from our scope d work. For funlldfing the subject charges, we request a dedudtm change order to our cantrad In the amount of (3.'ll -001. Pkase canted me shook! you have arty qua concerning dtis iswe. show*, HWSQ•I W INDUSTRIES L We� — Businoms Manager cc: SIT m Durham (Walsh / Ardw Westam) MMV Adak (Walsh / Archer-Westem) Daniel t.fendo (HI) GLS.-dwg Routing Sllp : SUBMITTALS • CMR-009 - PBP$ Transformer Relocation, Equipment Pad, Delete Transformer Screenwalq I Started By' Jay Wnceof Name 1 Comments Completed Status AlofAy AE Conatructlon Manager Craig Robinson 4/27/2011 10:02 AM 29 NoMed James Johnsen 4127=11 10:02 AM N Notified Jimmy Sibert 4127/2011 10:02 AM NoV*d Mead Taylor 4/27/2011 10:02 AM N Nodfied DCS Review Debby Greer 4127=11 11:58 AM Did Not Finish Mike Karadag 4127/2011 11:58 AM Completed Engineer Review Jeff Hensley 51412011 1Z27 AM Completed James Johnson 4/28=11 523 PM Completed Wade Zantlock 51512011 4:17 PM ✓ Completed Kelly Wood 5MM11 10:00 AM Completed DCS Review 2 Debby Greer 5116/2011 11:17 AM Did Not Finish Mika Karadag 5/1612011 11:17 AM b/ Completed