HomeMy WebLinkAboutResolution - 2003-R0162 - Contract For The Civic Center Portable Seating Renovations - Specialty Supply - 04_24_2003Resolution No. 2003—R0162 April 24, 2003 Item No. 31 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, a Contract for the Civic Center portable seating renovations, by and between the City of Lubbock and Specialty Supply & Installation Company of Conroe, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 24th day of Aril , 2003. MARL VDOUGAL, MAYOR ATTEST: Rebecca Garza, City Secretary APPROVED AS TO CONTENT: V` Victor Kilma , Purchasing Manager APPROVED AS TO FORM: William de Haas Contract Manager/Attorney gs:/ccdocs/Contract-Civic Ctr Bid 035-03-RS.res April 11, 2003 Resolution No. 2003—RO162 AIA Document AIN Standard Form of Agreement Between Owner and Contractor for FURNITURE, FURNISHINGS AND EQUIPMENT where the basis of payment is a STIPULATED SUM 1990 EDITION THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. The 1990 Edition of AIA Document A271, General Conditions of the Contract for Furniture, Furnishings and Equipment, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AGREEMENT made as of the 25 th. (In words, indicate day, month and year) BETWEEN the Owner: (Name and address) City of Lubbock / Memorial Civic Center 1501 6th. Street Lubbock, Texas 79401 and the Contractor: (Name and address) Specialty Supply & Installation Co. P. 0. Box 1047 Conroe, Texas 77305 the Project is: (Name and location) Lubbock Memorial Civic Center 1501 6th. Street Lubbock, Texas 79401 The Architect is: (Name and address) N / A day of March The Owner and Contractor agree as set forth below. in the year of 2003 Portions of this document are derived from AIA Document A101, Standard Form of Agreement Between Owner and Contractor Where the Basis of Payment Is a Stipulated Sum, copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, ©1987 by The American Insti- tute of Architects, 1735 New York Avenue, N.W., Washington, D.C. 20006-5209. Material in AIA Document A171 differing from. that found in AIA Document A101 is copyrighted 1979, ©1990 by The American Institute of Architects and The American Society of Interior Designers. Reproduc- tion of the material herein or substantial quotation of its provisions without written permission of AIA and ASID violates the copyright laws of the United States and will be subject to legal prosecution. AIA DOCUMENT A171 • OWNER -INTERIORS CONTRACTOR AGREEMENT • 1990 EDITION • AIA® • ©1990 • THE Y1' AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006-5209 • AS1Dm ©1990 • THE AMERICAN SOCIETY OF INTERIOR DESIGNERS, 608 MASSACHUSETTS AVENUE, N.E., WASHINGTON, ' D.C. 20002 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A171-1990 1 ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Condi- tions), Drawings, Specifications, addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others, or as follows: Furnish all material and labor to repair each Platform Seating as per scope of work attached 20 ) platform sections,of Portable for each section. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement, if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.) To be coordinated with Owner. Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractor shall notify the Owner in writing not less than five days before commencing the Work to permit the timely filing of mortgages, mechanic's liens and other security interests. 3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than (Insert the calendar date or number of calendar days after the date of commencement, Also insert any requirements for earlier substantial Completion of certain portions of the Work, if not stated elsewhere in the Contract Documents.) To be coordinated with Owner. , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to complete on time) NIA AIA DOCUMENT AM - OWNER -INTERIORS CONTRACTOR AGREEMENT - 19W EDITION - AIA'b - ©1990 - THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVENUE, NW, WASHINGTON, D.C. 20006-5209 - ASID® ©1990 - THE AMERICAN SOCIETY OF INTERIOR DESIGNERS, 608 MASSACHUSETTS AVENUE, N.E., WASHINGTON, D.C. 20062 - WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. A171-1990 2 ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of Seventy Two Thousand One Hundred Fifteen and no/100---------------------- Dollars (S 72, 115. 00 ), subject to additions and deductions as provided in the Contract Documents. 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (state the numbers or other identification of accepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date until which that amount is valid.) N/A 4.3 Unit prices, if any, are as follows: N/A AIA DOCUMENT A171 - OWNER -INTERIORS CONTRACTOR AGREEMENT - 1990 EDITION - AIAO - ©1990 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 2o006-5209 - ASID® ©1990 - THE AMERICAN SOCIETY OF INTERIOR DESIGNERS, 608 MASSACHUSETTS AVENUE, N.E., WASHINGTON, D.C. 20002 - WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A171-1990 3 ARTICLE 5 PROGRESS PAYMENTS 5.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided in the Contract Documents. 5.2 The period covered by each Application for Payment shall be one calendar month: ending. on the last. day QEthe month, or as follows: Total contract sum due and payable upon completion and acceptance. 5.3 Provided an Application for Payment is received by the Architect not later than the day of a month, the Owner shall make payment to the, Contractor not later than the day of the month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than days after the Architect receives the Application for Payment. 5.4 Each Application for Payment shall be based upon the schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. 5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: 5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion, of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of percent ( %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Subparagraph 8.3.7 of the General Conditions even though the Contract Sum has not yet been adjusted by Change Order; 5.6.2 Add that portion of the Contract Sum properly allocable to materials, furniture, furnishings and equipment delivered and suitably stored at the Project premises for subsequent incorporation in the completedWork (or, if approved in advance by the Owner, suitably stored off the Project premises at a location agreed upon in writing), less retainage of percent ( %); 5.6.3 Subtract the aggregate of previous payments made by the Owner; and 5.6.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as- provided in Paragraph 10.5 of the General Conditions. 5.7 The progress payment amount determined in accordance with Paragraph 5.6 shall be further modified under the following circumstances: 5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total" payments to percent( %) of the Contract Sum, less such amounts as the Archi- tect shall determine for incomplete Work and unsettled claims; and. 5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Subparagraph 10.10.3 of the General Conditions. 5.8 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Subparagraphs 5.6.1 and 5.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) AIA DOCUMENT AM - OWNER -INTERIORS CONTRACTOR AGREEMENT - 1990 EDITION - AIA® - ©1990 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006-5209 - ASIDS ©1990 - THE AMERICAN SOCIETY OF INTERIOR DESIGNERS, 608 MASSACHUSETTS AVENUE, N.E., WASHINGTON, D.C. 20002 - WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A171-1990 4 ARTICLE 6 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconform- ing Work as provided in Subparagraph 13.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarily survive final payment; and (2) a final Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the Architect's .final Certificate for Payment, or as follows: Total contract sum due upon completion and acceptance. ARTICLE 7 MISCELLANEOUS PROVISIONS 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the reference refers to that provision as amended or supplemented by :other provisions of the °Contract Documents. 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located_ (Insert rate of interest agreed upon, if any.) (Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's and Contractor's principal places of business, the location of the Project and elsewhere may affect the validity of this provision. Legal advice should :be obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.) 7.3 Other Provisions: ARTICLE 8 TERMINATION 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 15 of the General Conditions. AIA DOCUMENT A171 - OWNER -INTERIORS CONTRACTOR AGREEMENT - 1990 EDITION - AIAS - ©1990 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W, WASHINGTON, D.C. 20006-5209 - ASIDS ©1990 - THE AMERICAN SOCIETY OF INTERIOR DESIGNERS, 608 MASSACHUSETTS AVENUE, N.E., WASHINGTON, D.C. 20002 - WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. A171-19.90 5 ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, ALA Document A171, 1990 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract for Furniture, Furnishings and. Equipment, ALA Docu- ment A271, 1990 Edition. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated , and are as follows: Document N/A Title Pages 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Section Title Pages NIA AIA DOCUMENT A171 - OWNER -INTERIORS CONTRACTOR AGREEMENT - 1990 EDITION - AIAM - ©1990 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20oo6-5209 - ASID° ©1990 - THE AMERICAN SOCIETY OF INTERIOR DESIGNERS, 6o8 MASSACHUSETTS AVENUE, N.E., WASHINGTON, D.C. 20002 - WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A171-1990 6 9.1.5 The Drawings are as follows, and are dated unless a different date is shown below: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Number Title Date N/A 9.1.6 The addenda, if any, are as follows: Number Title Pages N/A Portions of addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. AIA DOCUMENT A171 - OWNER -INTERIORS CONTRACTOR AGREEMENT - 1990 EDITION - AIAO - ©1990 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20oo6-52o9 - ASID® ©1990 - THE AMERICAN SOCIETY OF INTERIOR DESIGNERS, 608 MASSACHUSETTS AVENUE, N.E., WASHINGTON, D.C. 20002 - WARNING: Unlicensed photocopying violates U.S, copyright laws and is subject to legal prosecution. A171-1990 7 tar 25 03 09:27a Civic Center (806)775-3240 p.2 ATTEST: Cit Secretary r OVED AS TO C NTENT: Owner's Relfesentative APPROVED AS TO FORM: City Attorney CITY OF LIJBBOCK, TE (OWNER) By: MAYOR CONTRACTOR: .r- PRINTED NAMES��11,K &d E&eW TITLE: ( 9W , Md k SPECIALTY SUPPLY & INSTALLATION CO. P.O. Box 1047 Conroe, TX 77305-1047 — (936) 890-8997 Fax (936) 890-6845 — mo RL-EZE POWER a�K Resolution No. 2003-RO162 TM �� s ecz�r;M � s L & INSTALLATION CO. Aw RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION A.1 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. 3. Check all welds and if any broken reweld and add bracing. 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices, 6. Check all upright columns , straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros 'fie, TX 77305 - (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com a ROL-EZE POWER Specialty 'u� ply & INSTALLATION (;O. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION A.2 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. 3. Check all welds and if any broken reweld and add bracing. 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns, straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 - Conroe, TX 77305 • (936) 890-8997 • Fax (936) 890-6845 www.theseatingpros.com ROL-EZEnr POWER specialty su� ply`" & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION A.3 :F�V.rxrNCE 1J35 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. 3. Check all welds and if any broken reweld and add bracing. 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty. The Seating Pros '.Q047 Conroe, TX 77305 • (936) 890-8997 • Fax (936) 890-6845 www.theseatingpros.com IM ROL-EZE POWER RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION A.4 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. 3. Check all welds and if any broken reweld and add bracing. 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns , straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal, and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 • Conroe, TX 77305 • (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com Tm ROL-EZE POWER Specially Sztp�ly " & INSTALILATtorr CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION A.5 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. asMrA SINCE 1835 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns, straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty. The Seating Pros P.O. Box 1047 • Conroe, TX 77305 - (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com 7M ROL-EZE POWER Specialfy Slvppiy TM & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION B.1 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. F51ssECE 7835 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns, straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal. and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 - Conroe, TX 77305 • (936) 890-8997 Fax (936) 890-6845 www.theseatingpros.com TM ROL-EZE POWER SpecfiMtY SMPPIYTm y &� TTrr oco. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION B.2 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. .----3-. Check all welds and if any broken reweld and add 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns , straighten, align and reinforce as necessary. 7. At. every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty. The Seating Pros P.O. Box 1047 - Conroe, TX 77305 - (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com nr ROL-EZE POWER Spea alty Su ply" & � INSTALLATION RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION B.3 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. Check all welds and if any broken reweld and 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns , straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. 'Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 • Conroe, TX 77305 • (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com 7M ROL-EZE POWER Specialty SmpplyTm & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION BA 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. 3 cheek al n-reweld-and add bracing 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns , straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty The Seating Pros P.O. Box 1047 - Conroe, TX 77305 - (936) 890-8997 • Fax (936) 890-6845 www.theseatingpros.com TM ROL-EZE POWER Spea'altv SM-�ply�' & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION B.5 :r4lf 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. -3: -- f-anyreweld and$dd braeing. - 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns, straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. rear diagonal and horizontal bracing. straighten and reinforce as 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 - Conroe, TX 77305 - (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com TM ROL-EZE POWER SPeciatS1-1p-y ply`" & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION C. 1 r4911fZ 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. --�- check all -welds -dnd-i€any-brek-en reweld and 4. Replace or repair all upper row inter -locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns, straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 • Conroe, TX 77305 • (936) 890-8997 • Fax (936) 890-6845 www.theseatingpros.com T ROL-EZETM POWER Specialty SZP P VT11 & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION C.2 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns , straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional- support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understrueture to include a two year warranty . The Seating Pros P.O. Box 1047 - Conroe, TX 77305 (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com TM ROL-EZE POWER Specialty 6Z_tP_P_11VTM & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION C. 3 asE CE 1835 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. 3.­Cheek all -welds -and4fany broken acing:.. 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns, straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. J. t:necx all rear aiagonat ana nonzontat uracing, straighten ana reinrorce as neeaea 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 - Conroe, TX 77305 - (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com n ROL-EZE POWER Sperm SupplyTN & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION C.4 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. 3. Check all welds and if any broken reweld and add braeing. 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns, straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each per column. 9. Check all rear diagonal. and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of forklift 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 - Conroe, TX 77305 - (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com TM ROL-EZE POWER SpoccialtySupply' & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION C. 5 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. ('hunlr all cvolrlo and ' 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns , straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 • Conroe, TX 77305 • (936) 890-8997 • Fax (936) 890-6845 www.theseatingpros.com TM ROL-EZE POWER Specialty Sgpply' & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION D. 1 ussE SINCE 1835 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. 3. - Check all -broken-reweid--and add b ' raernrg, ... 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns, straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. rear maaonat ana nonzonuu oracine. straighten ana reinforce as 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 - Conroe, TX 77305 • (936) 890-8997 • Fax (936) 890-6845 www.theseatingpros.com IM ROL-EZE POWER Specialty Sgpp i4yTM & I SN�TAI,LATION Co. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION D. 2 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. Check all welds and if any broken feweld and add-bracin&- 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns , straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. rear as 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 - Conroe, TX 77305 - (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com TM ROL-EZE POWER Specialty Suply'" & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION D. 3 EllssEE ifi35 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. 3-. Cheek all welds and if Feweld and add-bracing,.---- 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns , straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. rear aiat;onat ana nonzontat oracine. strawiten ana reinforce as 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift_ 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 • Conroe, TX 77305 • (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com nm ROL-EZE POWER Specialty Supply`" & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION D.4 FS,CE 1 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. add 4. Replace or repair all upper row inter- locking clips at each occurrence_ 5. Replace or repair all front row locking devices. 6. Check all upright columns , straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. Check all rear diagonal and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation_ 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17. Repaired understructure to include a two year warranty The Seating Pros P.O. Box 1047 • Conroe, TX 77305 - (936) 890-8997 • Fax (936) 890-6845 www.theseatingpros.com 7 ROL-EZE POWER Specialty �S'u�ply� & INSTALLATION CO. RECOMMENDED SCOPE OF WORK -- for Lubbock Civic Center SECTION D. 5 1. Inspect and replace damaged or missing casters. 2. Replace or repair all damaged or missing row lock catches and auto stop bars. __�.—C—},o,njriwn all_we and4Uany_4oken _i G�Ve1LIU Clnd-ad� {,, itt�Y •.�+ 'a a+i,y Cr Uraii nb — 4. Replace or repair all upper row inter- locking clips at each occurrence. 5. Replace or repair all front row locking devices. 6. Check all upright columns, straighten, align and reinforce as necessary. 7. At every location where the vertical upright column attaches to wheel channel, the angle is to squared and reinforced by means of welding additional gusset bracing. 8. Hydraulically raise and weld additional support bracing to provide proper operating tolerance between the upper inter -locking clip and the adjoining upright at each vertical column. 9. heck all rear diagonal, and horizontal bracing, straighten and reinforce as needed. 10. Fabricate and install fork lift pocket structure so units can be moved about by use of fork lift. 11. Inspect for loose or missing bolts & nuts, replace and/ or tighten as necessary. 12. Grease all upper and lower track assemblies using a white lithium grease. 13. Adjust and check out for smooth and proper operation. 14. All replacement parts to be factory authorized replacement parts. 15. All work to be preformed by factory trained and authorized repair technicians. 16. Demonstrate operation and procedures with owner. 17_ Repaired understructure to include a two year warranty . The Seating Pros P.O. Box 1047 - Conroe, TX 77305 - (936) 890-8997 - Fax (936) 890-6845 www.theseatingpros.com