HomeMy WebLinkAboutResolution - 2003-R0125 - Amendment To Engineering Agreement - Parkhill, Smith And Cooper - 03_27_2003Resolution No. 2003-RO125
March 27, 2003
Item No. 23
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, Amendment No. 7 to the
Engineering Agreement between Parkhill, Smith and Cooper and the City of Lubbock, for
Preliminary and Final Engineering Design Services and related survey and testing for a
Parking Structure with Blast Protection. Said Amendment is attached hereto and
incorporated in this Resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this 27th day of March 2003.
M
ATTEST:
Re ecca Garza
City Secretary
APPROVED AS TO CONTENT:
Mark a
Dire for of Aviation
APPROVED AS TO FORM:
William de Haas
Contract Manager/Attorney
CCdocs/kb/PSC Amendment 7 Parking Structure res.
March 17, 2003
A
Resolution No. 2003—RO125
March 27, 2003
Item No. 23
so
6-11=iiiiiiiii::
March 10, 2003
Mr. Mark N. Earle
Director of Aviation
Lubbock International Airport
Route 3 Box 389
Lubbock, Texas 79401
Re: Amendment Nei. ? to .Agreement for Professional Services,
Design and Construction Phase Services for:
Reconfigure and Overlay the Public Parking Lot, Project 2 - Overlay
Dear Mr. Earle:
After the events of September 11, 2001, regulation changes made portions of the scope of services for contract
Amendment Number 4, Attachment A..1 obsolete. The purpose of Amendment 7 is to renegotiate the scope. of
Amendment 4.A.1 by incor-poratnig the scope of Amendment 4.A.1 and adding blast protecticn measures to the
project. We have met with youx staff, reviewed the project and prepared an Engineers Opinion of Probable Cost
(EOPC) for the above referenced project, Our understanding of the scope and a fee proposal for the three tasks
(,design, construction and surve3,ing,/testing) associated with this project follows.
Reconf gi re and Overlay the Pablic Parking Lot, Project 2 -- Overlay
Task 1 - Fee for Professional Services (Study and Report, Preliminary Design,
Final Design and Bidding/Negotiation, lump sum). $466,150
Task 2 - Construcfion Phase Services (Paragraph A1.05 of contract, which includes RPR
and construction related Engineering Services, lump sum). $332,500
Task 3 - Surveying and Testing `iei ices, (hourly rate w/ max). $ 9 9 ,17 7
TOTAL $897,827
A more detailed breakdow7of each, task as well as the anticipated time associated withthem is included. as
Attachment A (Reconfigure and Overlay the Public Parking Lot, Project 2 — Overlay). This a.:Lachment is
intended. -to supplement this summary and is a part of this agreement.
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, hic. dated
June 12, 1997 and to provide the task 1 and task 2 services on a Tamp sum basis under the provisions of
EXHIBIT A. — PART 1, and EXHIBIT B PAYMENTS TO THE ENGINEER LUMP SUM MFTHOD,
Paragraph B4.01. We proposed to provide the task 3 services on an hourly rate basis with a maximum amount
under the provisions of EXH7I3IT' A -- PART 1, ENGINEERS SERVICES and EXHIBIT B PAYMENTS TO
THE ENGINEER LUMP SUM METHOD, Paragraph B4.02.
Parkhill, Smith & Cooper, Inc.
Engineers ■ Architects ■ Planners
4222 85th Street, Lubbock, Texas 79423
(806) 473-2200 FAX (806) 473-3500
Lubbock
El Paso
Midland
Amarillo
Odessa
Iof
Mr. Mark N. Earle
Page 2
March 10, 2003
If this meets with your approval, please execute and return one copy of this letter to our office. We will take
receipt of this signed letter as our notice to proceed with these services. We look forward to working with you
in completing this project. If you have any questions please call either John Hamilton or myself.
Sincerely,
PARXdwin
By
EED/wmb
Enclosures
IN DUPLICATE
P.E.
\\I.UBI data\pmjeas\2002\2727.02\CORRFSP\L1Rhre030703-mvid7.DOC
Accepted by:
In
Attest:
By
ebecca Garza.
City Secretary
Approved as to Content:
By
le
el irector of Aviation
Approved as to Form:
By JG ,yI OL Ar-�
William de Haas
Contract Manager/Attorney
ATTACHMENT A Resolution No. 2003-RO125
City of Lubbock, texas
LUBBOCK INTERNATIONAL AIRPORT
RECONFIGURE AND OVERLAY PUBLIC PARKING LOT, PROJECT 2 - OVERLAY
.Item ;•i•' D�Gfi tltXfi t h:}'' ,ti.
AiMoUi Rn
PARKING LOT
1
Contractor mobilization (4% of construction)
1
LS
$254,811
$254,810
2
Traffic control and barricading
10
Month
$8,500.00
$85,000
3
Remove and dispose of existing curb and gutter
305
LF
$4.00
$1,220
4
Bomag existing surface into existing base and reconstruct
minimum 8 inch thickness
37,100
SY
$5.50
$204,050
5
Excavation, grading and subgrade preparation
37,100
SY
$4.00
$148,400
6
Flexible base course, 8-inch thickness
770
SY
$9.50
$7,320
7
Hot mix asphaltic concrete pavement, type C, 2-inch thickness
3,570
Ton
$55.00
$196,350
8
Bituminous prime coat (0.3 gal/SY)
9,520
Gallon
$1.75
$16,660
9
Bituminous tack coat (0.1 gaUSY)
3,175
Gallon
$2.00
$6,350
10
6-inch portland cement concrete paving
5,380
SY
$50.00
$269,000
11
Traffic marking, 4-inch wide lanes
35,000
LF
$0.75
$26,250
12
Traffic marking, 8-inch wide lanes
500
LF
$1.00
$500
13
Traffic marking, painted handicap symbol
33
Each
$100.00
$3,300
14
Remove and relocate existing signs
9
Each
$750.00
$6,750
15
Miscellaneous signage
1
LS
$13,750.00
$13,750
16
Sprinkler system modifications
1
LS
$15,000.00
$15,000
17
Utility adjustment (water, sewer and gas)
1
LS
$25,000.00
$25,000
18
Temporary soil erosion and siltation control
1
LS
$10,000.00
$10,000
FORCE PROTECTION STRUCTURE
1
Remove Asphalt Paving
9,151
SY
$3.01
$27,570
2
Remove Medians
3,600
SF
$4.22
$15,180
3
Excavation
6,247
CY
$4.82
$30,110
4
Drilled piers
1,470
LF
$54.20
$79,670
5
Drainage
1
LS
$102,000.00
$102,000
6
Berm Construction
6,918
CY
$13.30
$92,010
7
Landscaping
1
LS
$241,000.00
$241,000
8
Wall Footing
570
CY
$223.00
$127,190
9
Retaining / Blast Walls
1,497
CY
$362.00
$541,910
10
Sidewalks
7,200
SF
$2.53
$18,220
11
Concrete Planters
700
EA
$44.60
$31,220
12
Concrete Column (Add for Blast Resistance)
479
SY
$181.00
$86,700
13
Conventional Parking Garage Structure (approximate size)
320
SPC
$4,100.00
$1,312,000
14
Concrete Formwok and Placement for Roof
64,000
SF
$14.50
$928,000
15
Precast Wall Panels
7,200
SF
$30.10
$216,720
16
Stairs i£ Handrails
175
RISER
$181.00
$31,680
17
Sealants, Expansion Joints, Waterproofing
148,000
SF
$0.90
$133,760
18
Blast Doors
12
EA
$3,010.00
$36,120
19
Elevators
4
EA
$90,400.00
$361,600
20
Lighting in Parking Garage
300
EA
$844.00
$253,200
21
Site Electrical
1
LS
$90,400.00
$90,400
MISCELLANEOUS CONSTRUCTION (100%)
$604,597
TOTAL - CONSTRUCTION
$6,650,567
Administration
$5,000
Basic Engineering Services includes Phase 11 Blast Analysis, Preliminary & Final Design and Bidding/Negotiation)
$466,150
Construction Phase Services (Paragraph A1.05 of contract includes RPR and Construction Related Engineering
Services
$332,500
Surveying and Testing Services
$99,177
ENGINEERS OPINION OF PROBABLE PROJECT COSTS
$7,553,394
" Deduct to allow Collapse of Structure
$561,000
R. pro/ects120o112721.011C1V1LIEOPCITerminal lot sopc -force proledbr; recon.xls
r
City of Lubbock, Texas
LUBBOCK INTERNATIONAL AIRPORT
RECONFIGURE AND OVERLAY PUBLIC PARKING LOT, PROJECT 2 - OVERLAY
03104103
Itertt
an
N* trafi ° 'u s s 5 . , ,, , Glu .`
Unif ;;. ` �
Unit Pr 1 k ..
C� Amotxt�
PARKING LOT
1
Contractor mobilization (4% of construction)
1
LS
$101,375
$101,370
2
Traffic control and barricading
0
Month
$8,500.00
$0
3
Remove and dispose of existing curb and gutter
0
LF
$4.00
$0
4
Bomag existing surface into existing base and reconstruct
minimum 8 inch thickness
0
SY
$5.50
$0
5
Excavation, grading and subgrade preparation
0
SY
$4.00
$0
6
Flexible base course, 8-inch thickness
0
SY
$9.50
$0
7
Hot mix asphaltic concrete pavement, type C, 2-inch thickness
0
Ton
$55.00
$0
8
Bituminous prime coat (0.3 gal/SY)
0
Gallon
$1.75
$0
9
Bituminous tack coat (0.1 gal/SY)
0
Gallon
$2.00
$0
10
6-inch portland cement concrete paving
0
SY
$50.00
$0
11
Traffic marking, 4-inch wide lanes
0
LF
$0.75
$0
12
Traffic marking, 8-inch wide lanes
0
LF
$1.00
$0
13
Traffic marking, painted handicap symbol
0
Each
$100.00
$0
14
Remove and relocate existing signs
7
Each
$750.00
$5,250
15
Miscellaneous signage
0
LS
$13,750.00
$0
16
Sprinkler system modifications
0
LS
$15,000.00
$0
17
Utility adjustment (water, sewer and gas)
1
LS
$25,000.00
$25,000
18
Temporary soil erosion and siltation control
0
LS
$10,000.00
$0
FORCE PROTECTION STRUCTURE
1
Remove Asphalt Paving
9,151
SY
$3.01
$27,570
2
Remove Medians
3,600
SF
$4.22
$15,180
3
Excavation
6,247
CY
$4.82
$30,110
4
Drilled piers
1,470
LF
$54.20
$79,670
5
Drainage
1
LS
$102,000.00
$102,000
6
Berm Construction
0
CY
$13.30
$0
7
Landscaping
0
LS
$241,000.00
$0
8
Wall Footing
570
CY
$223.00
$127,190
9
Retaining I Blast Walls
1,497
CY
$362.00
$541,910
10
Sidewalks
0
SF
$2.53
$0
11
Concrete Planters
0
EA
$44.60
$0
12
Concrete Column (Add for Blast Resistance)
479
SY
$181.00
$86,700
13
Conventional Parking Garage Structure (approximate size)
0
SPC
$4,100.00
$0
14
Concrete Formwork and Placement for Roof
64,000
SF
$14.50
$928,000
15
Precast Wall Panels
0
SF
$30.10
$0
16
Stairs & Handrails
85
RISER
$181.00
$15,390
17
Sealants, Expansion Joints, Waterproofing
74,000
SF
$0.90
$66,880
18
Blast Doors
12
EA
$3,010.00
$36,120
19
Elevators
0
EA
$90,400.00
$0
20
Lighting in Parking Garage
150
EA
$844.00
$126,600
21
Site Electrical
1
LS
$90,400.00
$90,400
MISCELLANEOUS
CONSTRUCTION (10%)
$240,534
T A'r Ct�N.,U.' ., n, r<� „,z / x •; J ., .. ,>1; . " .i`,z X ` . ,
UY7fQ/
Administration
$5,000
Basic Engineering Services Includes Phase II Blast Analysis, Preliminary & Final Design and Bidding/Negotiation)
$185,454
Construction Phase Services (Paragraph A1.05 of contract includes RPR and Construction Related Engineering Services
$132,282
Surve in and Testing Services
$39,457
TOTAL ENGINEERS OPINION OF PROBABLE PROJECT COSTS
$3,008,067
R:Ipro/ecfs1200112721.011CIVILIEOPWarminal lot eopc -force protection recon.xls
City of Lubbock, Texas
LUBBOCK INTERNATIONAL AIRPORT
RECONFIGURE AND OVERLAY PUBLIC PARKING LOT, PROJECT 2 - OVERLAY
Terminal Parking Lot and Parking Garage
LIA PORTION
ENGINEER'S OPINION OF PROBABLE COSTS
03104103
ti..
item, tkX1 3 '7777.7
Quan , .
Untt . Un PnC "-k Arnourtf . :
PARKING
LOT
1
Contractor mobilization (4% of construction)
1
LS
$153,436
$153,440
2
Traffic control and barricading
10
Month
$8,500.00
$85,000
3
Remove and dispose of existing curb and gutter
305
LF
$4.00
$1,220
4
Bomag existing surface into existing base and reconstruct
minimum 8 inch thickness
37,100
SY
$5.50
$204,050
5
Excavation, grading and subgrade preparation
37,100
SY
$4.00
$148,400
6
Flexible base course, 8-inch thickness
770
SY
$9.50
$7,320
7
Hot mix asphaltic concrete pavement, type C, 2-inch thickness
3,570
Ton
$55.00
$196,350
8
Bituminous prime coat (0.3 gaVSY)
9,520
Gallon
$1.75
$16,660
9
Bituminous tack coat (0.1 gal/SY)
3,175
Gallon
$2.00
$6,350
10
6-inch portland cement concrete paving
5,380
SY
$50.00
$269,000
11
Traffic marking, 4-inch wide lanes
35,000
LF
$0.75
$26,250
12
Traffic marking, 8-inch wide lanes
500
LF
$1.00
$500
13
Traffic marking, painted handicap symbol
33
Each
$100.00
$3,300
14
Remove and relocate existing signs
2
Each
$750.00
$1,500
15
Miscellaneous signage
1
LS
$13,750.00
$13,750
16
Sprinkler system modifications
1
LS
$15,000.00
$15,000
17
Utility adjustment (water, sewer and gas)
0
LS
$25,000.00
$0
18
Temporary soil erosion and siltation control
1
LS
$10,000.00
$10,000
FORCE
PROTECTION STRUCTURE
1
Remove Asphalt Paving
0
SY
$3.01
$0
2
Remove Medians
0
SF
$4.22
$0
3
Excavation
0
CY
$4.82
$0
4
Drilled piers
0
LF
$54.20
$0
5
Drainage
0
LS
$102,000.00
$0
6
Berm Construction
6,918
CY
$13.30
$92,010
7
Landscaping
1
LS
$241,000.00
$241,000
8
Wall Footing
0
CY
$223.00
$0
9
Retaining / Blast Walls
0
CY
$362.00
$0
10
Sidewalks
7,200
SF
$2.53
$18,220
11
Concrete Planters
700
EA
$44.60
$31,220
12
Concrete Column (Add for Blast Resistance)
0
SY
$181.00
$0
13
Conventional Parking Garage Structure (approximate size)
320
SPC
$4,100.00
$1,312,000
14
Concrete Formwok and Placement for Roof
0
SF
$14.50
$0
15
Precast Wall Panels
7,200
SF
$30.10
$216,720
16
Stairs & Handrails
90
RISER
$181.00
$16,290
17
Sealants, Expansion Joints, Waterproofing
74,000
SF
$0.90
$66,880
18
Blast Doors
0
EA
$3,010.00
$0
19
Elevators
4
EA
$90,400.00
$361,600
20
Lighting in Parking Garage
150
EA
$844.00
$126,600
21
Site Electrical
0
LS
$90,400.00
$0
MISCELLANEOUS
CONSTRUCTION (10%)
$364,063
TOAL.: CdN`fr1UC'lit5
Administration
$0
Basic
Engineering Services Includes Phase II Blast Analysis, Preliminary &
Final Design and Bidding/Negotiation)
$280,696
Construction Phase Services (Paragraph A1.05 of contract includes RPR and Construction Related Engineering Services
$200,218
Surveying
and Testing Services
$59,720
ENGINEERS OPINION OF PROBABLE PROJECT COSTS
$4,545,327
Deduct to allow Collapse of Structure
$561,000
R.Wrgects12A0IL2721.OIIC/VIVEOPCITerminal lot eopc - force protectbn recon.mis
PARKHILL, SMITH & COOPER, INC. -
LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LIA Terminal Lot
JOB NO.:
01-2727-02
TASK:
1DSN
DATE:
03/03/03
FEE TYPE:
Lump Sum
PREPARED BY:
JTH
PRINCIPAL:
EED
PROJ. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$446ji,-1�
LABOR:
$358,915
OVERHEAD:
REIMB. CONSULTANTS:
REIMB. EXPENSES:
DIRECT CONSULTANTS:
$65,000
DIRECT EXPENSES:
$28,259
LABOR BUDGETS:
CODE
DESCRIPTION
HOURS
COSTS
01
Firm Principal
155
$21,545
02
Architect
330
$28,050
03
Engineer
1,146
$112,308
09
Engineering Technician
502
$34,136
07
Engineer -in -Training
999
$75,924
14
CADD Operator
1,290
$78,690
18
Clerical
162
$8,262
Page 1 of 3
FEE ESTIMATING SHEET PROJECT:
LIA Tor,m.l Lot
JOB NO.:
01-2727-02
TASK:
IDSN
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP
ARCH
ENO
ENO TECH
ER
CARD OPT CLERICAL
TASK
01
02
03
09
07
14
18
T
$139.00
$85.D0
$98.00
$68.00
$76.00
$61.00
$51.00
TOTAL
STUDY AND REPORT PHASE
Predesign Conference (LIA & PSG)
1
4
4
1
9
Kickoff Meeting with PSC, FAA, Hinman, & LIA
2
8
10
Site Ysits, Gather Data, Council/Board
2
a
24
32
Coordinate and Scope Hinman's Phase If
2
6
2
10
Review FAA Security and Structural Criteria
1
12
13
Develop/analyze project scope
Determination of Parking Garage Proportions
2
1
to
16
16
2
51
Assist in Site Location and Layout
1
4
16
16
37
Generate Prelim Floor Plan, Framing Plan
2
2
2
16
44
56
122
Site Plan, Plumbing Plan, Elect Plan and
Traffic Flow (14 sheets)
Generate Opinion of Probable Cost
1
4
12
17
Summary Latter for Prelim Design to FAA
1
4
12
4
4
25
(Coord. With FAA & LIA)
Coordinate soils investigation
1
4
8
12
Coordinate topographic surveys
1
4
8
12
Preliminary Engineering Report
develop design criteria
4
4
aftemate solutions
4
4
- 8
16
erwionmenfalconcems
8
4
4
16
narrative
1
20
18
2
41
opinion of costs
2
2
16
6
28
review with FAA, Owner
1
4
4
revise and resubmit
2
10
24
1
37
PRELIMINARY D SIGN PHASE
Refinescope, coord. with FAA, Owner
4
a
12
Meetings and Conferences
5
4
25
10
20
59
Review Hinrnan's Blast Presaure Data
2
4
8
14
Deternnlne Design Sizes of Structural Elements
a
40
48
Examine Bay Study for Economical Design
16
16
Scope and arrange for special surveys
1
4
16
20
Preliminary design documents
design basis, project descrip, criteria
4
4
Prepare Prelhn Civil Drawings
1
10
40
20
71
Prepare Preliminary Structural Drawings
1
10
24
40
75
Prepare Preliminary Architectural Drawings
1
10
24
40
75
Prepare Prelim Plumbg Dwgs
1
6
24
20
51
Prepare Prelim Elect Dwgs.
1
6
24
40
71
Landscape Dwgs
10
12
12
24
58
Prepare Outline Specifications
1
8
16
18
12
53
Coordination with Hinman on Dwgs. & Specs
1
2
8
3
14
review vd FAA, Owner
1
4
4
1
9
Revive opinion of Coate
8
2
6
16
32
Meeting with ClIem to review costs & design
1
8
9
Review Preliminary Drawings with FAA
4
8
4
16
Coordinate with Hinman on Prelim Dwgs.
8
a
a
3
27
FINAL DESIGN PHASE
Final drawings
Prepare Construction Drawings (Cl
20
140
200
ISO
200
710
Prepare Construction Drawings (Smhco
30
240
200
300
770
Prepare Construction Drawings (Arch)
15
ISO
160
250
675
Prepare Construction Drawings (MP)
5
40
so
100
225
Prepare Construction Drawings (Elect)
5
40
80
100
225
ADA Code Study & In -House Review
24
24
Prepare Technical Speclficatbrro
12
40
80
10
10
40
192
Coordinate with FAA standards
4
a
12
AssmVoonsuh with gait autihorities
4
8
12
Final design basis
4
1
5
Review CD's with Hinman
8
a
3
19
Review CD's with Owner
1
4
a
3
15
Issue Caa
2
4
12
24
42
Final opinion of Costs
4
1s
Is
38
Review with FAA, Owner
1
8
8
Revisions
4
a
1a
40
2
70
Prepare CMP
2
10
1
13
Mies meetings and conferences
6
4
24
11
6
45
Finalize pretimiary engineering report
2
20
18
a
48
Rpt of revlsions to FAA AC15N5300-10A
4
1
5
FAA Forms 7460-1 and 7480-1
4
2
6
SIDDING PHASE
Assist in advertisement
4
2
6
Plan dlatrbnAbn - issualrecordide"iss
19
16
Conduct Pre -Sid Conference, minutes
1
8
4
2
14
Miscellaneous addenda
4
4
2
10
Attend Bid Opening
1
3
3
Evaluate bids, bid tabulation, award
2
8
4
2
16
Prepare contract documents
2
4
4
8
16
Check out Conti, subcontractors, etc.
8
6
Review shbsulvle materials/equipment
6
6
6
19
MISCFLLANFO1 IS ITEMS
WPM (6 mos. O 2 hrslmo.)
4
12
16
Prepare stints. ($ O 1 hr.)
8
6
Monthly Progress Reports (0.5 hr. each)
4
4
Coordination with FAA, Owner
26
156
158
UDGET SUBTOTALS: HOURS! Trips-
51
155
330
1146
502
9"
1290
162
a
SALARY
S21 545 $28 050
$112 308 S34 136
$75 924 S78 890
$8 262
$358 915
EE ESTIMATING SHEET PROJECT:
IRECTS
LIA Terminal Lot JOB NO.: 01.2727-02 TASK:
10SN
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
$50,000
612 MECH/ELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS Parkin Equipment Sub
$15,000
TOTAL DIRECT CONSULTANTS
$65,000
DIRECT EXPENSES
621 TRAVEL/LODGING
MOTEL 8 DAYS A
AIR TRAVEL 3 AIR FARE a
PARKING 16 DAYS A
CAR RENTAL 10 DAYS a
MILEAGE 30 MILES A
2 MEN A $80.00 /MANDAY
2 MEN a $800.00 /MAN =
$10.00 /DAY =
$60.00 /DAY =
$0.345 a 51 TRIPS =
SUBTOTAL
$1,280.00
$4,B00.00
$160.00
$800,00
$527.85
$7,368
622 REPRODUCTIONS
BLUELINE PRINTS 60 SHTS a $2.55 a 50 SETS -
SEPIA PRINTS SHTS A $8.51 a SETS =
PRINTING:
ORIGINAL SET-UP COST 400 ORIGINALS a $0,15 lORI. _
COST PER SHEET 55 SETS a $0.08 /SHT a 225 SHEETS =
BINDING COST 55 SETS a $2.00 /SET =
XEROX 55 SHTS a $0.08 /BHT —
SUBTOTAL
$7,650.00
$60.00
$990.00
$110.00
$4.40
$8,814
623 MODEURENDERINGS/PHOTOS
600 Shots a $1.00 /Shot
$600
624 TELEPHONE 45 Calls a
$5.00 /Call
$225
625 MEALS DAYS a
MEN a /MANDAY
626 FIELD SUPPLIES
626 POSTAGE 40 Mailings a
$2.50 [Mailing
$100
629 PUBLICATIONS & SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 400 Pa s a
$1.00
$400
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD 1792 HOURS a
$6.00 /HOUR
$10,752
636 FIELD EQUIP RENTAL
646 SOFTWARE
TOTAL DIRECT EXPENSES
$28,259
Page 3of3
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LIA Terminal Lot
JOB NO.:
01-2727-02
TASK:
2CST
DATE:
03/04/03
FEE TYPE:
Lump Sum
PREPARED BY:
JTH
PRINCIPAL:
EED
PROD. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
_$aU-;51r U ,e- 3 301
500
LABOR:
$318,389
OVERHEAD:
REIMB. CONSULTANTS:
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$12,279
LABOR BUDGETS:
CODE
DESCRIPTION
HOURS
COSTS
01
Firm Principal
109
$15,151
02
Architect
94
$7,990
03
Engineer
525
$51,450
11
Resident Project Representak
2,657
$180,676
07
Engineer -in -Training
638
$48,488
14
CADD Operator
168
$10,248
18
Clerical
86
$4,386
Page 1 of 3
FEE ESTIMATING SHEET PROJECT:
LIA Terminal La
JOB NO.:
01-2727.02
TASK:
2CST
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP
ARCH
ENG
RPR
EIT
CADD OPT
CLERICAL
TASK
01
02
03
11
07
14
18
Trips
$139.00
$85.00
$98.00
$68.00
$76.00
$61.00
$51.00
TOTAL
RPR (12-month construction pedQM
Preconstruction Conference
1
6
6
260 Work Days at 8.5 Hrs/Calendar Day
260
2210
2,210
45 Pre/Post Days at 6 Hrs/ Calendar Day
45
270
270
CONSTRUCTION PHASE
Conduct Preconstr Conference, minutes
1
4
4
8
4
1
21
Coord baseline surveys, benchmark
8
4
12
Site visits, notes
104
13
26
156
260
28
483
Coord. with RPR, Contractor, Owner, FAA
20
30
10
8
68
Routine change orders
12
24
8
8
4
56
Review submittals
12
20
65
120
2
219
Pay estimates including final
14
14
21
56
91
Certifications, guarantees & warranties
2
4
1
7
Initial operation/startup, Perf tests
1
4
4
4
1
13
Final inspection and notes/findings
2
8
17
6
6
1
38
QC/PM (12 mos. 0 2 hrs./mo.)
24
12
36
Prepare stints. (12 @ 1 hr.)
12
12
Monthly Progress Reports (0.5 hr. each)
6
6
12
Coordination with FAA, Owner
20
40
24
84
CLOSEOUT PHASE
Record drawings
24
40
56
160
280
O&M manuals
4
2
1
7
Warranty insp.
1
4
4
4
4
1
17
Addnl. compliance insps.
6
16
32
16
2
66
Final test and QC rpt.
80
105
60
24
269
BUDGET SUBTOTALS: HOURS/ Trips -
435
109
94
525
2657
638
168
86
4271
SALARY
$15,151
$7,990
$51,450
$180,676
$48,488
$10,248
$4,386
$318,389
Page 2of3
E ESTIMATING SHEET PROJECT:
R11R
LIA Terminal Lot JOB NO.:
01.2727-02 TASK:
2CST
EECTS
CT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECH/ELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 TRAVEULODGING
MOTEL DAYS 0
AIR TRAVEL AIR FARE ®
PARKING DAYS ®
CAR RENTAL DAYS ®
MILEAGE 60 MILES ®
MEN ® IMANDAY =
MEN ® /MAN =
/DAY =
/DAY =
$0.360 ® 435 TRIPS = $9,396.00
SUBTOTAL
$9,396
622 REPRODUCTIONS
BLUELINE PRINTS SHTS Q $2.55 0 5 SETS -
SEPIA PRINTS SHTS Q $8.51 @ SETS -
PRINTING:
ORIGINAL SET-UP COST 1500 ORIGINALS Q $0.15 /ORL _ $225.00
COST PER SHEET SETS ® $0.08 /BHT ® 225 SHEETS =
BINDING COST SETS ® $2.00 /SET =
XEROX SHTS ® $0.08 /BHT =
SUBTOTAL
$225
623 MODEURENDERINGS/PHOTOS
Shots 0
/Shot
$200
624 TELEPHONE 150 Calls ®
$5.00 /Call
$750
625 MEALS DAYS ®
MEN ®
/MANDAY
626 FIELD SUPPLIES
$400
628 POSTAGE 40 Mailings 4
$2.50 /Mailin
$100
629 PUBLICATIONS & SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 200 Pages ®
$1.00
$200
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD 168 HOURS 0
$6.00 /HOUR
$1,008
636 FIELD EQUIP RENTAL
646 SOFTWARE
TOTAL DIRECT EXPENSES
$12,279
Page 3 of 3
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LIA Terminal Lot
JOB NO.:
01-2727-02
TASK:
3S&T
DATE:
03/03/03
FEE TYPE:
Hourly Rate w/Max
PREPARED BY:
JTH
PRINCIPAL:
EED
PROJ. MANAGER:
JTH
OVERHEAD RATE:
170.00%
PROFIT ON LABOR:
15.00%
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$99,177
LABOR:
OVERHEAD:
REIMB. CONSULTANTS:
$86,241
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
LABOR BUDGETS:
CODE
DESCRIPTION HOURS COSTS
01
Firm Principal
#N/A
#N/A
03
Engineer
09
Engineering Technician
07
Engineer -in -Training
14
CADD Operator
18
Clerical
Page 1 of 2
EE ESTIMATING SHEET PROJECT:
EIMBURSABLES
LIA Terminal Lot JOB NO.: 01-2727-02 TASK:
3S&T
REIMBURSABLE CONSULTANT COSTS
SUBTOTAL
511 STRUCTURAL CONSULTANTS
512 MECH/ELEC CONSULTANTS
513 ENV & CIVIL CONSULTANTS
514 LANDSCAPE CONSULTANTS
515 TESTING CONSULTANTS
$75,000
516 SURVEYING CONSULTANTS
$9,900
517 INTERIOR DESIGN CONSULTANTS
518 OTHER CONSULTANTS(Accessibility)$1,341
TOTAL REIMBURSABLE CONSULTANTS
$88,241
REIMBURSABLE EXPENSES
521 TRAVEL/LODGING
MOTEL DAYS O
AIR TRAVEL AIR FARE O
PARKING DAYS O
CAR RENTAL DAYS O
MILEAGE MILES O
MEN O /MANDAY =
MEN O /MAN =
/DAY =
/DAY =
$0.345 O TRIPS =
SUBTOTAL
522 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING:
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX
SHTS O $2.55 O 8 SETS =
SHTS O $8.51 O SETS =
ORIGINALS O $0.15 /ORI.
SETS O $0.08 /BHT O 250 SHEETS =
SETS O $2.00 /SET =
SHTS O $0.06 /BHT _
SUBTOTAL
523 MODEURENDERINGS/PHOTOS
Shots O /Shot
524 TELEPHONE Calls O
$2.00 /Call
525 MEALS DAYS O
MEN O /MANDAY
526 FIELD SUPPLIES
528 POSTAGE Mailings O
$2.00 /Mailin
529 PUBLICATIONS & SUBSCRIPTIONS
530 MISC REIMBURSABLE EXP
531 FAX Pages O
$1.00
532 TEMPORARY PERSONNEL
533 DRAFTING SUPPLIES
534 OFFICE SUPPLIES
535 CADD HOURS O
$6.00 /HOUR
536 FIELD EQUIP RENTAL
546 SOFTWARE
TOTAL REIMBURSABLE EXPENSES
Page 2 of 2
luxxocx IntePI1n110n84 AIPn�Pt
i.r
A. 21'�a�.
Project Name: LUBBOCK INTERNATIONAL AIRPORT Sheet: PROP_ 1
PROPOSED PARKING Issue Date: 4 APRIL 2002
Project Address: LUBBOCK, TEXAS Revisions:
PSC Project #:08.4620.01
)NO TERM
URKING
PRELIMINARY PARKING SECTION ® SHORT TERM LOT
NOT TO SCALE
maiAei
IUCTURE
LL
ED
WALK
CURB
)RNE
mu .H.Mm
0000ruu.r.0
:C01.111.11."■■u■■""
oum
uuunm.rur..
Project Name: LUBBOCK INTERNATIONAL AIRPORT
Sheet: PROP2
_
:I :)
PROPOSED PARKING
Project Address: LUBBOCK, TEXAS
Issue Dote: 4 APRIL 2002
Revisions:
�O
ncr e._:__t L. no aeon n,
+i
18'-6'
17'-6'
PARTIAL PRELIMINARY PARKING STALL PLAN
NOT TO SCALE
■■...■..... ..■■...
............■.....
:.............0..1. 0001,
•ii,ti, F S!1
18'-cr 18'-0'
17'-0"
18'-6'
Project Name: WBBOCK `INTERNATIONAL AIRPORT Sheet: PROP-3
PROPOSED PARKING Issue Dote: 4 APRIL 2002
Project Address: LUBBOCK, TEXAS Revisions: .