HomeMy WebLinkAboutResolution - 2019-R0214 - Market Lubbock Expenditure - Hump Investments (Facade) - 06/11/2019 Resolution No. 2019-RO214
Item No. 6.12
June 11, 2019
RESOLUTION
WHEREAS, pursuant to Article IV, Section 5 of the Amended and Restated Bylaws of the
Market Lubbock Economic Development Corporation (the "Corporation"), the City Council
of the City of Lubbock (the "City Council"), as the Corporation's authorizing unit, has the
authority to approve all prograins and expenditures of the Corporation; and
WHEREAS, the City Council finds that it is in the best interest of the public to approve the
program or expenditure, as proposed to the City Council by the Corporation, as set forth in
Exhibit"A" attached hereto and incorporated herein by reference; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the East Side Facade Grant program or expenditure of the Corporation, in the
amount set forth in Exhibit "A" attached hereto and incorporated herein by reference, to be
provided to Hump Investments, is hereby approved pursuant to Section 5 of the Amended
and Restated Bylaws of the Corporation.
Passed by the City Council on .lune 11, 2019
DANIEL M. POPE, MAYOR
ATTEST:
ebec a Garza, City Secre Ey
APPROVED AS TO CONTENT:
Scott Snider, Business Development Director
APPROVED AS TO FORM:
r r
Kelli Leisure, Assistant City Attorney
ecdocs/RES.Market Lubbock ES Eixpenditure- ]-lump Investments
05.28.19
M A R K E T
LtMB*CK,.
East Side Grant Program
June 11, 2019
Total Capital - $72,000
Total Grants - $27,100
• Hump Investments — 1708 E. 4th
o Grant Type — Fagade (50% up to $25,000)
o Expense Total = $51,000
o Grant Total = $25,000
o Board Approval — May 22, 2019
• Hump Investments — 1708 E. 4th
o Grant Type — Permittable (10% up to $50,000)
o Expense Total = $21,000
o Grant Total = $2,100
o Board Approval — May 22, 2019
1500 Broadway, 6th Floor, Lubbock, Texas 79401 Phone (806) 749-4500
MARKET LUBBOCK, INC. EAST-SIDE GRANT PROGRAM
1708 E. 4t"
(Hump Investments)
TOTAL SCOPE OF WORK = $51,000
FAPADE GRANT = $25,000
M A R K E T
LUBB11*r"WICK..
East-Side Grant Program
Presented to MLI Board
May 22, 2019
Project 1708 E.4th (Hump Investments) Facade
Hump Investments, led by Mr.Terry Humphrey, is renovating the property at 1708 E. 4111, located within
the East Lubbock Neighborhood Empowerment Zone as designated by the City of Lubbock.The scope of
work will include a new parking lot and new surface to the fagade wall totaling$51,000 in expenses.
The MLI Board is being asked to consider an East-Side Fagade Grant for Hump Investments totaling
$25,000 at 1708 E.4th.
M A R K E T
LUBB(*CK-
East-Side Grant Application
The information requested on this form will be used by Market Lubbock, Inc. for analysis of yourproject.
MLI CONTACT INFORMATION
Jorge Quirino-Special Projects Phone: 806.749.4500
Market Lubbock, Inc.
1500 Broadway, Sixth Floor, Lubbock,TX 79401 Email: jorge.quidno@lubbockeda.org
*Applications must be received by MLI prior to pulling a City permit or starting construction
*Scope of work must be approved by the City of Lubbock(more detail on page 3)
Project Property Address 1 ) -)q4o
GENERAL INFORMATION ABOUT THE COMPANY
Company Name
Street Address (DI t
City, State, Zip X
Federal Tax ID#V
GENERAL INFORMATION ABOUT THE COMPANY CONTACT
Name -
Title
Phone Number
Email v , l
Date Submitted
COMPANY BACKGROUND
List any person or entity that has at least 5%ownership in the Applicant Company:
Name Percent Name Percent
Is the firm registered with the Secretary of State's Office to do business in Texas? Yes f
Are you in good standing with the State of Texas? Yes
If you answered "No" to either of the above two questions, please explain
Is the firm and/or principals delinquent on any federal,state or local tax obligations? No f
Has the company or principals of the company had prior bankruptcies or lawsuits? No
If you answered "Yes"to either of the above two questions, please explain
1/4!19
1 MLI
INFORMATION ABOUT THE PROJECT
Project Name (MLI Use)
Property LCAD R#
Property Ownership: Own D Lease
Owner Approved i_
Grant Type(Check One): Permittable ❑ Fagade
Detailed Project Summary and Description of Work:
t1tua Po- ,nS ( D+, No4Y-1 rao �IY-dows, \`kem 6015
Project's NAICS Code(North American Industry Classification System)
NAICS Description
City Permit Total Amount(if applicable)
Summary of Itemized Expenses, Projected MLI Approved Reimbursement
MLI USE
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
TOTAL $0 1 $0
Final bids will be used to calculate the project cost and grant amount
1/4/19
MLI
Scope of work must be approved by the City of Lubbock.
The property owner or leasee is responsible for communicating directly with the City of Lubbock to
determine if any aspects of the scope of work require permits.
CITY CONTACT
Director of Business Development
Office 808.775.3082
DOCUMENTS REQUIRED FROM THE APPLICANT
At the time of application:
Application (must be received prior to construction started or permits pulled)
Written City Approval of:
Permit Needs
Public Improvement Needs
Detailed/Itemized Construction Bids or Schedule of Values
Before Picture (prior to construction beginning)
Architectural Plans(if applicable)
Architectural Renderings (if applicable)
After completion of construction:
Certificate of Occupancy or Similar City Document(Permit)
City Written Verification of Guideline Compliance (Non-Permit)
Proof of Payment:
PAID Invoices
Processed Checks, Bank or Credit Card Statements matching PAID invoices
Applicant Signature:
Date: ( 1
1/4/19
3 MLI
Daley's
Superior Asphalt
Manufactudng, Inc. P: (806)7442592/ F:(806)702-
8981
Serving the Texas Panhandle, Permian Basin
And Eastern New Mexico
Office and Plant 420 E. Lehigh St. Lubbock,Texas 79403
INVOICE DATE: March 7, 2019
Attn: Terry Humphrey
Phone: 806-543-8855
Project: MLK-Lubbock Texas
Email: terryhumphrey50@gmail.com
INVOICE DETAIL
• Clean and prep area to begin project
• Tack area
• Grade area/Base-roll to compaction
• Lay Type D HMAC on parking lot
• Roll to compaction
• Striped area accordingly
• Complete cleanup of project area
INVOICE TOTAL AMOUNT DUE$29,500.00
Should you have any questions, please feel free to contact me and thank you for your business.
Sincerely,
Sean Daley
806-7442592
Daley Superior Asphalt Manufacturing, Inc.
�K Customer Order Form �
Sales Office 127400 Urdct Typo: So SA Emplayee Namc:
Sold to: (Customer#1 4056039 Order Date: 31112019 Order#.
Customer Name: Terry Humphrey Ship To: 1708 E 4t.h
Customer Address: City,State,Zip; Lubbock, TX
City,State,Zip: Subdivisons:
Contact Person: Customer PO:
Contact Phone#-.
- 0 Requested Delivery Dale:
Name: Robin Cole Construction Code: Ship From: ST SF OP
Commission#: 3339169 07 of-
Header AttachmentslDlrections:
d:d
C� Country Ledge Aspen I7lats $3.500 S2.450.00
I $0.00
40 Country Ledge Aspen Goners $6.000 $240.00
40 Ar lerimix White S7.150 $286.00
138 Watertable/Sill S6.000 $828.00
$0.00
$0.00
-- $0.00
_ - $0.00
$0.00
$0.00
$0.00
—. .�. — $0.00
$0.00
- - $0.00
Shipmont Record: $3,804.00
$76.08
$320.11
50.00
$4,2.00.19
---------------
I
T
i
f i .�. 1b7'm � r � `•i
I +
�r
1 _
r -
t
RE 19-28
RESOLUTION APPROVING HUMP INVESTMENTS
AT 1708 E.4'h STREET FOR A
EAST-SIDE GRANT PROGRAM PERMITTABLE & FACADE GRANT
THE STATE OF TEXAS
COUNTY OF LUBBOCK
At a regular meeting of the Board of Directors of MARKET LUBBOCK ECONOMIC
DEVELOPMENT CORPORATION, INC., a Texas nonprofit corporation (MLI), on Wednesday, May 22,
2019, held in conformity with the bylaws, after due notice as therein provided, a quorum being present and
acting, the following resolution was unanimously adopted:
WHEREAS, MLI presented to members of the Board the proposal of a possible Economic
Development Grant and Contract to Hump Investments at 1708 E. 4'h Street. The terms and conditions of
such Economic Development Grant and Contract, other than the normal terms and conditions applicable to
all such Economic Development Grant and Contracts by the Corporation,are described generally as follows,
to wit:
Grant Hump Investments a Permittable Grant in the amount of$2,100 for renovations at the building
at 1708 E. 4'h Street, which is located in the East Lubbock Neighborhood Empowerment Zone as designed
by the City of Lubbock with scope of work including new spray foam on the roof totaling$21,000 in expenses
and a Fagade Grant in the amount of$25,000 with scope of work including new parking lot and new surface
to the facade wall $51,000 in expenses, once proof of payment has been submitted.
WHEREAS, The Board of Directors of MLI finds that an Economic Development Grants and
Contracts offering the incentive for providing assistance to renovate their facility meet and comply with the
qualifications and purposes of the Corporation for the granting of such Economic Development Grants and
Contracts.
Upon Motion by Director, Mr. Calvin Davis, and Seconded by Director,Ms. SuzAnn Kirby,
IT WAS RESOLVED that MLI offer and, if accepted by Recipient, enter into an Economic Grant
and Contract with Hump Investments at 1708 E. 4'h Street, Lubbock, Texas. The Economic Development
Grants and Contracts will be on the normal terms and conditions of such East-Side Grant Program and
Contract offered by MLI to existing businesses and business prospects and authorize the CEO to enter into
and execute all documents related to the Economic Grant and Contract.
O�L&bt�
John Osborne, President &CEO
Linda Davis, Secretary