HomeMy WebLinkAboutResolution - 2009-R0345 - Contract - Parkhill, Smith, & Cooper Inc.- Engineering Services - 08_27_2009RESOLUTION No. 2009--RO345 August 27, 2009 Item No. 5.15 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute Amendment No. 1 to a Professional Services Contract executed on October 23, 2008, by and between the City of Lubbock and Parkhill, Smith & Cooper, Inc., of Lubbock, Texas, for engineering services for Project #92158, Frankford Avenue from 98`h Street to 114th Street; 981h Street from Frankford Avenue to Milwaukee Avenue; and Milwaukee Avenue from 94' Street to 100`h Street, and related documents. Said Amendment No 1 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 27th ATTEST. Rebe ° Garza, City Secretary APPROVED AS I O CONTENT: Larry Hertel', l City Engineer APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vw/ccdocslRES.PSC-Amendment #1-Project92158 August 10, 2009 day of August '2009. TOM MARTIN, MAYOR Resolution No- 2009—R0345 AMENDMENT NO, 1 TO AGREEMENT CITY OF LUBBOCK, TEXAS AND PARKHILL, SMITH & COOPER, INC. FOR ENGINEERING SERVICES ENGINEERING SERVICES FOR: Frankford Avenue From 98'h Street to 114`h Street, 98'h Street from Frankford Avenue to Milwaukee Avenue, and Milwaukee Avenue from 94'h Street to 100'h Strect. Project No. 92158. (Hereinafter referred to as the project). THIS IS AN AMENDMENT TO THE AGREEMENT dated October 23, 2008 and entered into by and between CITY OF LUBBOCK, TEXAS hereinafter called "Owner" and PARKHILL, SMITH & COOPER, INC., hereinafter called the "Engineer', of 4222 85'h Street, Lubbock, Texas a corporation which is duly chartered under the laws of the State of Texas. The original agreement was approved by City Council action on October 23, 2008, Resolution No. 2008 R041S. The purpose of this amendment is to provide additional services to the agreement, namely to include drainage design services that were not included in the original agreement. This amendment will also extend the time of the original agreement to provide for the drainage design services, plus issues related to right-of-way, until December 31, 2009, as stipulated in paragraph LC of Attachment A. Attachment A, Attachment B, Table B-1, and Exhibit A -I to this Amendment No. 1 are herein added to this agreement for engineering services. All attachments hereto are made a part of this amendment for all purposes. Executed in three counterparts (each of which is an original) on behalf of Engineer by its Vice President shown below, and on behalf of Owner by its Mayor (thercunto duly authorized) this 27th day of August , 2009 APPROVE S TO CONTENT: arry Hertel, P. City Engineer APPR,"OVEDAS RM: Mitch Interim City Attorney CITY OF LUBBOCK, TEXAS. Tom Martin Mayor Attest Rebecca aria T City Secretary PARKHILL, SMITH & COOPER, INC. i AdwinE. Attest s, P.E. erry it er, P.E. Vice President Corpo at Associate/Project Manager Resolution No. 2009—RO345 ATTACHMENT A TO AMENDMENT NO. 1 TO AGREEMENT' CITY OF LUBBOCK, TEXAS AND PARKHILL, SMITH & COOPER, INC. FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: Frankford Avenue from 98°' Street to 114'h Street, 98'h Street from Frankford Avenue. to Milwaukee Avenue, and Milwaukee Avenue from 94`h Street to 100'h Street Project No. 92158. A DESCRIPTION OF SCOPE OF SERVICES The scope of services for this Amendment No. 1 is as follows. Work will not proceed until Owner has authorized Engineer in writing to proceed. DESIGN TASK ADDITIONAL SERVICES A. BASIC SERVICES Basic engineering services include: 1. Basic services as defined by the tasks and man-hours in Exhibit A-1, which include additional engineering design and geotechnical services to extend the South Lubbock Drainage System to Lake 94 located at 981h Street and Milwaukee. 2. Deliverables remain unchanged from the original agreement. B. SUPPLEMENTAL SERVICES No Supplemental Services. C. SCHEDULE Schedule is extended to December 31, 2009 to allow for the drainage design and to address issues related to right-uf-way. D. ADDITIONAL SERVICES 1. At the request of the OWNER, the ENGINEER will provide Additional Services as included licrein or upon agreement between OWNER and the ENGINEER defining the extent of such Additional Services and the amount and manner in which ENGINEER will be compensated for such Additional Services. 2. Any work requested by the OWNER that is not included in one of the items listed in any other place will be classified as Additional Services. 3. Additional services may be authorized by a notice -to -proceed in writing from the City Engineer acid addressed to the Engineer. Resolution No. 2009—RO345 ATTACHMENT B TO AMENDMENT NO, I TO AGREEMENT CITY OF LUBBOCK, TEXAS AND PARKHILL, SMITH & COOPER, INC. FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: Frankford Avenue from 981s Street to 114" Street, 98'h Street from Frankford Avenue to Milwaukee Avenue, and Milwaukee Avenue from 90' Street to 100"' Street Project No. 92I5& COMPENSATION Basic Services For these services covered by this Agreement, the Owner agrees to pay the Engineer as follows: A. GENERAL The Engineer will be paid on an hourly rate basis shown in Table B-1 and subcontract personnel services will be billed at cost. Engineer and subcontractor reimbursable expenses will be billed at cost plus 15 percent surcharge. Reimbursable expenses are shown in Table 13-1. 2. The Engineer agrees to use its best efforts to perform services as defined herein within the billing limits stated below. 3. It is understood and agreed that the maximum billings of each of the items listed below are based on the start of Services being authorized not later than September 30, 2009. If start of Basic Engineering Services is not authorized by date given, it is understood and agreed that the upper billing limit will be adjusted accordingly by a supplement to this Agreement. 4. Monthly payments shall be made to the Engineer by the Owner based on Engineer's statement. The statement shall be itemized to indicate the amount of work performed and the associated reimbursable expenses and subcontract costs. 5. The uncontested amount of each statement shall be due and payable upon receipt by the Owner. Carrying charges of 1-1/2 percent per month from the billing date shall be due for accounts that are not paid within 60 days after the billing date. 6. The Engineer shall keep records on the basis of generally accepted accounting practices of costs and expenses and which records shall be available for inspection by Owner during normal business hours. B. BASIC ENGINEERING SERVICES The maximum billed for Basic Engineering Services including personnel services and reimbursable expenses for the Engineer and Subcontractors for Amendment No. I is shown as follows: Basic Basic Personnel Reimbursable Services Expenses Parkhill, Smith & Cooper, Inc. $ 22,857.00 $ 2,317.00 Hugo Reed and Associates, Inc. $ 73,604.00 $ 2,231,00 PaveTex Engineering & Testing, Inc. $ 0.00 $ 6,820.00 f'OTAL AMENDMENT NO. I BASIC SERVICES NOTTO EXCEED $107,828.00 2. The adjusted not to exceed contract amount is as follows: Original contract amount $1,248,788.00 Amendment No. 1 amount $ 107.828.00 Adjusted total contract amount $1,356,616.00 B. SUPPLEMENTAL SERVICES No Supplemental Services. C. ADDITIONAL SERVICES Additional services must be authorized in writing by the Owner. The maximum billed for Additional Services will be determined by mutual consent before the Additional Services are authorized by the Owner. 2. The Engineer shall start the performance of the authorized Additional Services within ten (10) days of receipt of notice to proceed and will complete the Additional Services within the time period determined by mutual consent before the Additional Services are authorized by the Owner. TABLE B-1 PERSONNEL SERVICE RATES AMENDMENT NO. I TO AGREEMENT CITY OF LUBBOCK, TEXAS AND PARKHILL, SMITH & COOPER, INC. FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: Frankford Avenue from 98'h Street to 114`h Street, 98'h Street from Frankford Avenue to Milwaukee Avenue, and Milwaukee Avenue from 941h Street to 100'h Street Project No. 92158. (Hereinafter referred to as the project) COMPENSATION RATES Hourly fees listed herein will apply for the term of this contract. A. Personnel Services I. Rates for personnel services shall remain the same as listed in Table B-I of the original agreement for the project. B. Reimbursable Expenses The following expenses are reimbursable: Reimbursable expenses specific to this Project (for example vehicle mileage, reproduction, toll telephone, parcel shipping, etc.) EXHIBIT A-1 TO AMENDMENT NO. I BASIC SERVICES TASKING, MAN-HOURS, REIMBURSABLES AND SUBCONTRACTORS EXHIBIT A-1 - Amendment No. 1 CITY OF LUBBOCK, TEXAS AMENDMENT #1 - ENGINEERING SERVICES Fran kford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF MAN-HOURS and TASKS - DESIGN AND BID PHASE SERVICES FIRM SUMMARY Basic Personnel Services Direct Expenses 1Fatiihill, Smith & Cooper,, Inc. IN Hugo Reed and Associates; lnc. Grimes d& Associates; Inc. So -Deep, Inc. PaveTex Engineering_ & Testing,_ Inc. 1 of 1 EXHIBIT Awl - Amendment No, 1 CITY OF LUBBOCK, TEXAS AMENDMENT 41 - ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF MAN-HOURS and TASKS - DESIGN AND BID PHASE SERVICES TASK SUMMARY Design Phase Services Firm Worksheet Page(s) 3-5 .. 6-7 8 •-- 9 10 Task Totals Task Description 1 Project Management $ 5,149 $ 17,280 $ $ $ - $ 22,429 2 Surveying $ $ - $ - 3 Utility Location and Accommodation $ $ $ $ 4 Water and Sanitan7 Seeder Design S $ $ - 5 Design and Construction Documents $ 19,290 $ 48,303 $ $ $6,820 $ 74,413 6 Bid Phasc $ - $ $ 7 Lake 94 Analysis $ 734 $ 10,252 $ 10,986 Firm Totals $ 25,174 $ 75,835 $ $ - $ 6,820 $ 107,828 1 of 1 EXHIBIT A 1 - Amendment No. 1 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF MAN-HOURS and TASKS WORKSHEET 1 a.s Task 03-Aug-09 Principal In Charge Program Manager Project Manager Sr. P.E. Prof. Engineer EIT Tech. or Designer Drafter CADD Clerical Total Hours Total Extension f$1 aaac««<«< Rates »»»»>»> $162-00 $137.00 $137.00 $122.00 $105.00 $88.00 $78.00 $71.00 $63.00 Task 1 - Prolact Management A Internal QA/QC Prior to 90°i , 100% & Final Submittals 1 3 4 $452 B Coordination with Subconsultaon Plans and Details m 24 10 34 $3,230 C Review General Notes, Specifications and Special Provisions from subconsultant for congruency with remainder of documents 6 6 $822 D Import and format storm sewer items from subconsultant for inclusion in bid descriptions 909/6, 100%and Final Submittals 1 1 $105 E Generate Opinions of Probable Cost for 90%, 100%, and Final Submittals (sluice gate and inlet stnccfures) 2 1 3 $298 F Coordination on gectechnical 1 1 2 $242 G (Note: No sluice gate housing enclosure or remote gate operation) H I Expenses from PSG Expense Worksheet $0 Task 1 - Project Management Subtotal Hours/Costs 0 0 8 0 31 1 0 10 0 50 S5,149 Task 2 - SunWkn A None for Amendment No. 1 0 $0 B C Expenses from PSG Expense Worksheet $0 Task 2- Surveying Subtotal Hours/Casts 0 0 0 0 0 0 0 0 0 0 So Task 3 - Utility Location and A None for Amendment No. 1 0 $0 B C Expenses from PSG Expense Worksheet I 1$0 Task 3- Ufility Subtotal HoundCosts 0 0 0 0 0 0 0 0 0 0 So 1 of 3 EXHIBIT A-1 - Amendment No. 1 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF MAN-HOURS and TASKS WORKSHEET 1 Parkhill, Smith & Cooper, Inc 03-Aug-09 Task Principal In Charge Program Manager Project Manager Sr. P.E. Prof. Engineer EIT Tech. or Designer Drafter CADD Clerical Total Hours Total Extension ($) <«c«««« Hates »»»>»»> $162.00 $137.00 $137,00 $122.00 $105.00 $88.00 $78.00 $71.00 $63.00 Task 4 - water and Sanitary Sewer Design A Norse tvr Arrterrdmant No. 1 0 $0 B C Ex,zensesfmrn PSC Expense'vVukshout $0 Task 4- Water and Sanitary Sewer Design Hours/Costs 0 0 0 0 0 0 0 0 0 0 $0 Task 5 - Design and Construction Documents A Evaluate subsurface Conditions from geolhecnical testing 2 2 $244 a inlet size coordination with subeonsuftant 1 1 2 $259 C Inlet structural calculations 1 6 7 $752 D Sluice gate structure structural calculations & coord wlsub. 1 6 7 $752 E Inlet detail sheet 90%, 100% & Final submittals 28 26 $1.988 F Sluice gate structure detail sheets (2) (90%, 100%& Final submittals 56 56 $3.976 G Erosion control and grading sheets (2) (901/6, 1001/6 and Final submittals) 56 56 $3,976 H I Calculate structural and erosion quantities 1 4 5 $457 I Extend 98th profile for roadway reconstruction after storm sewer construction (est. 2 sheets) 1 2 28 31 $2,320 J Import and reconfigure upaved roadway typical sections 1 4 5 $406 K Calculate additional roadway quantities, import subconsultant bid quantities and format 1 1 21 4 $384 L Specifications for sluice gate and inlet related structures (90%,1001 and final submittals) 1 2 2 5 $458 M Special Conditions related to sluice gate and inlet structures 1 1 2 $200 N Retrieve, format and transmit detail sheets for subconsultant's use (4 5 sheets French, manhole, connection, bedding details) 2 a 10 $842 p Expenses from PSC Expense Worksheet $2.276 Task 5 - Design and CDs Subtotal HouralCosts 0 1 1 4 8 18 4 0 182 31 220 $19,290 2of3 EXHIBIT A-1 - Amendment No. 1 CITY OF LUBBOCK. TEXAS ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF MAN-HOURS and TASKS WORKSHEET 1 03-Auq-09 Task Principal In Charge Program Manager Project Manager Sr. P.E. Prof. Engineer EIT Tech. or Designer Dratter CADD Clerical Total Hours Total Extension ($) Kcccca<cac<c Rates »»>»»»> $162.00 $137.00 $137 00 $122.00 $105.00 $88.00 $78.00 $71.00 $63.00 Task 6 - Bid Phase Services A None for Amendment No. 1 0 $0 B C Expenses from PSC Expense Worksheet $0 Task 6 - Bid Phase Services Subtotal Hours/Costs 0 $0 Task 7 - Lake 94 Analysis A Coordmale and Duecl Hugo Reed Lake 094A analyses 2 4 6 $694 B 0 $0 C Expenses from PSC Expense Worksheet $40 Task 7- Lake 94 Analysis Subtotal Hours/Costs 0 0 2 0 4 0 0 0 0 6 $734 Subtotal Hours 0 tf4 let1 ' f 192 3 276 174 Subtotal for Worksheet 1 PSC Basic Services so $197 $fom.l i Mittff&dA 3nfA EXHIBIT A-1 - Amendment No.1 CITY OF LUBBOCK, TEXAS AMENDMENT #1 - ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 Drainage Improvements to Add Lake 94A Inlet to SLDIP System ESTIMATE OF MAN-HOURS and TASKS WORKSHEET 2 • @ e • 03-Aug-09 Task Principal In Charge Engr. or Surveying Project Manager Senior Reg. Prof. Land Surveyor Senior Prof. Engineer Prof. Engineer EIT Technician or Survey Crow Manager Senior CARD Technician Survey Crew Total Hours Total Extension ($1 «««<a«cc Rates>»»»»»> $140.00 S127.00 $116.00 $116.00 $105.00 $87.00 $75.00 $75.00 $175.00 Task 1 -Project Management A Internal QA/QC Prior to 90%, 100% and Final Submittals 8 16 24 $2,872 B Coordination with Prime on Plans and Details, Storm Sewer Extension 24 10 34 $3,534 C Review General Notes, Specifications and Special Provisions from Previous Projects for Applicability to this Project (storm sewer, selction of notes, prepare, and verify) 90%, 100% & Final Submittals 2 24 26 $3,038 D Prepare Bid Quantities for Storm Sewer Items 16 8 24 $2,552 E Prepare Bid Tab Items and Descriptions for Storm Sewer Items 8 8 16 $1,624 F Generate Opinions of Probable Cost for 90%, 100% and Fina! Submittals, storm sewer items 8 8 16 $1,624 G Coordination with Land Owner and City Staff on Inlet/Sluice Gate Locations, Types and Aesthetics 4 8 8 1 20 $2,036 Task 1 - Project Management Subtotal HouralCosts 0 14 0 104 0 24 0 18 0 160 $17,280 Task 2-Surveyin A None for Amendment No. 1 0 $0 Task 2- Surveying Subtotal Hours/Costs 0 0 0 0 0 0 0 0 0 0 $0 Task 3 - Utility Location and Accomodation A None for Amendment No. 1 0 $0 Task 3- Utility Subtotal Hours/Costs 0 0 0 0 0 0 0 0 0 0 $0 Task 4 - Water and Salutary Saver Desip A None for Amendment No- 1 0 _71 Task 4- Water and Sanitary Sewer Design Hours/Costs 0 0 0 0 0 0 0 0 0 0 y4 X:1200812693.08tCIVIL198th Frankford Milwaukee Amendment 11FM_98 Amendment No. 1 All Parties Exhibit A-1 Draft2.xls 1 of q EXHIBIT A-1 - Amendment No. 1 CITY OF LUBBOCK, TEXAS AMENDMENT #1 - ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 Drainage Improvements to Add Lake 94A Inlet to SLDIP System ESTIMATE OF MAN-HOURS and TASKS WORKSHEET 2 • - r a 03-Aug-09 Task Principal in Charge iEngr. or Surveying Project Manager Senior Reg. Prof. Land Surveyor Senior Prof. Engineer Prof. Engineer EIT Technician or Survey Crew Manager Senior CADD Technician Survey Crew Total Hours Total Extension l$y Rates »»»»»» $140.00 $127.00 $116.00 $116.00 $105.00 $87.00 $75.00 $75.00 $175.00 Task S - Design and Construction Documents A Establish Alignment of Storm Sewer Line 24 16 40 $4,176 B Hefine Storm Sewer profiles, South Lubbock Drainage Extension 90%, 1001% and Final Submittals 16 16 32 $3,248 C Review Preliminary Profiles with City 4 4 1 4 1 12 $1.320 ❑ prop Inlet Design Coordination with PSC - Hydraulic Modeling to Determine Size and Number of Openings and Coordinate Design Details with Prime 16 8 8 32 $3,152 E Sluice Gate Structure Design - Determine Hydraulic and Operation Requirements and Coordinate Details with Prime 12 4 8 24 $2,340 F Calculate D-Loads for Open Trench Installation of RCP Optional Pipe 4 12 16 $1,508 G Trench Backfili Requirements for Other Installation Methods and Pipe Materials 8 16 24 $2,320 H Determine Utility Conflicts and Relocation Requirements 20 16 8 44 $4,312 Prepare Storm Sewer Plan and Profile Sheets, Roadway Profiles and TiN files importation from Prime, cleanup for drainage versus roadway emphasis, establish initial storm sewer profiles, determine geometries 121 16 60 88 1 $7,284 J Prepare Miscellaneous Drainage Details - File transfers from Prime, Adjustments to previously drawn details for applicability to this project, address plotting Issues, drafting of new details as necessary 0 $0 1. Trenching, Excavation and Backfill Typical Details 4 12 16 $1,364 2. Manholes 4 12 16 $1.364 3. Field connection sheet 2 4 6 $632 K Establish parallel ditch grades where applicable along 9Bth Street and Incorporate into plans 4 8 16 28 $2.360 L Prepare Hydraulic Data Tables and Graphs for Insertion into plans 8 16 1 24 48 $4,120 M Preparation of Plan set for 90%, 100% and Final Submittals 24 24 24 72 $6,672 N O P Expenses from HRA Expense Worlcsheet $2.231 Task 5 - Preparation of Plan and Profile Drawings Subtotal Hours/Costs 01 4 0 162 01 156 0 176 0 498 $48,303 X:1200812693.081CIVIL198th Frankford Milwaukee Amendment 11FM_98 Amendment No. 1 All Parties Exhibit A-1 Draft2.xls 2 of 3 EXHIBIT A-1 - Amendment No. 1 CITY OF LUBBOCK, TEXAS AMENDMENT #1 - ENGINEERING SERVICES Frankford Ave, from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 Drainage Improvements to Add Lake 94A Inlet to SLDIP System ESTIMATE OF MAN-HOURS and TASKS WORKSHEET 2 HUGO REED AND ASSOCIATES,'INC, 03-Aug-09 Task Engr. or Senior Reg. Technician Senior Total Total Principal In Surveying Prof. Land Senior Prof. Prof. EIT or Survey CACC Survey Hours Extension Charge Project Surveyor Engineer Engineer Crew Technician Crew Manager Manager ¢«<aaaaac« Rates »»>>>>>>>> $140.00 $127.00 $116.00 $116.00 $105.00 $87.00 $75.00 $75.00 $175.00 Task 6 - Bid Phase Services A None for Amendment No. 1 0 $0 Task 6- Bid Phase Services Subtotal Hours/Costs 0 0 0 0 0 0 0 0 0 0 $0 Task 7. Lake 94 Analysis A Evaluate Impacts of L094A Inlet on Entire SLIP System 20 32 52 $5,104 B Prepare presentation of results of the hydraulic analyses - Graphs, Tables, etc. 16 24 40 $3,944 C Review Model Results and Alternatives with City and Prime 4 4 a $972 D Consoiidata model aspects, bum to CD for City records 2 2 $232 Task 7 - Lake 94 Analysis Subtotal HourslCosts 0 4 0 42 0 56 0 4 0 102 $10,252 Subtotal Hours 0 22 01 3081 01 236 1 01 1941 0 1 760 $ 75,835 Subtotals for Worksheat 2 HRA Basic Services $ - $ 2,794 $ - 1 $ U,728 1 $ $ 20,532 1 S - 1 $ 14,550 1 $ $ 73,604 XA200812693.WQV1L198th Frankford Milwaukee Amendment 11FM 98 Amendment No. 1 All Parties Exhibit A-1 Draft2.xls 14 of 9 EXHIBIT A-1 - Amendment No.1 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF MAN-HOURS and TASKS WORKSHEET 3 03-Aug-09 Task Principal In Charge Project Manager Senior Prof. Engr. Prof. Engr. EIT Tech. or Designer Drafter CADD Clerical Total Hours Total Extension ($) Rates »»»»»» $135.00 $120.00 $105.00 $85.00 $75.00 $65,00 $50.00 Task t - Project Management A None for Amendment No. 1 0 $0 0 $0 $0 Task 1- Project Management Subtotal Hours/Costs 0 0 0 0 0 0 0 0 0 $0 Task 5 - Design .and Construction Documents A None for Amendment No. 1 0 $0 3 $0 LE $0 Task 5- Design and CDs Subtotal Hours/Costs 0 0 0 01 0 0 0 01 0 $0 Subtotal Hours 0 Q 0 0 0 0 0 0 0$ ` Subtotals for Worksheet 3 Grimes & Assoc. Basic Services $ - $ - $ - $ - $ - $ - $ - $ - $ 1 of EXHIBIT A-1 - Amendment No. 1 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES Franktord Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF MAN-HOURS and TASKS WORKSHEET 4 03-Rug-09 Task Principal In Charge Prof. Engineer Project Manager SUE Field Supervisor SUE Feld Technician CADD/ OA Technician Utility Records Researcher Clerical / Accounting Functions Total Hours Total Extension ($) . <<<c<<< Rates »»»y»»> $153.00 $146.00 $151.00 $106.00 $BB.00 $92.50 $109.00 $73.00 Task 1 - Project Management A None for Amendment No, 1 0 $0 0 $0 $0 Task 1- Project Management Subtotal Hours/Costs 0 0 0 0 0 0 0 0 0 $0 Task 3 - Utility Location and Accomodation A None for Amendment No. 1 0 $0 0 $0 $0 Task 3- Utility Subtotal Hours/Costs 0 0 0 0 0 0 0 0 0 $0 Task 5 - Design and Construction Documents A None for Amendment No. 1 0 $0 0 $0 $0 Task 5- Design and CDs Subtotal Hours/Costs 0 0 0 0 0 0 0 0 0 $0 Subtotal Hours 01 fl, 01 01 4. 01 ol of 0 $0 Subtotals for Worksheet 4 So -Deep Basic Services $ - S $JL $ -,_ Is s $o 1of1 EXHIBIT A-1 - Amendment No. 1 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES Frankford Ave, from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St, to 100th St. - Project #92158 ESTIMATE OF MAN-HOURS and TASKS WORKSHEET 5 • • Task 03-Aug-09 cipal In Charge Project Manager Senior Prof. Engr. Prof. Engr. EIT Tech. or Designer Drafter CADD Clerical Total Hours Total Extension ($j «««««« Hates »»>y»»» $175.00 $59.00 $39.00 Task 1 - Project Management A None in Amendment No, 1 0 $0 0 $0 0 $0 $0 Task 1- Project Management Subtotal Hours/Costs 0 0 0 0 0 0j 0 0 0 $0 Task 5 , Design and Construction Documents A Drilling, testing and reporting C $6,820 Task 5- Design and CDs Subtotal Hours/Costs 0 0 0 0 0 0 0 0 0 $6,820 Sutrtotsl Hours 01 01 01 a 0 0 0 0 0 $6,820 Subtatals for Worksheet 5 PaveTex Basic Services - Design Phase $ - $ - $ - $ - $ - $ - $ $J $6,820 1 of 1 EXHIBIT A-1 - Amendment No. 1 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF DIRECT EXPENSES WORKSHEET 6 M—Ao m-na Direct Expenses city. Unit Unit Price Unit Extension Task i - Project Mane None for Amendment No.1 $0 Task 1 - Project Management Subtotal Hours/Costs $0 With multiplier for reimbursables = 1.15 $0 Task 2 - Surveying None for Amendment No.1 $0 Task 2 - Surveying Subtotal Hours/Costs $0 With multiplier for reimbursables = 1.15 $0 Task 3 - Utility L,ops0olt and AcCamodalion None for Amendment No.1 $0 Task 3 - Utility Subtotal Hours/Costs $0 With multiplier for reimbursables = 1.15 $0 Task 5 - Design and Construction Documents Mileage (Engineers) 10mi/trip x 5 site visits with Geotech Reproduction Plan Plots (Paper) Plan Plots (Mylar) 11 x1 7 Copies (Paper) 8.5xl1 Copies Miscellaneous CADD charges 50 78 48 10 120 184 Miles Square Foot Square Foot Sheets Sheets Hours @ @ @ @ @ 0 $0.585 $0.65 $0.95 $0.20 $0.10 $10.00 per mile per SF per SF per copy per sheet per hour $29 $51 $46 $2 $12 $1,840 Task 5 - Design and CDs Subtotal Hours/Costs $1,980 With multiplier for reimbursables = 1.15 $2,276 1 of 2 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF DIRECT EXPENSES WORKSHEET 6 ° ' 'KHILL, SMITH & COOPER, INC. Direct Expenses Qty. Unit 03-Aug-09 Unit Price Unit Extension Task 6, Bid Phase Services None for Amendment No.1 Task 6 - Bid Phase Services With multiplier for reimbursables = 1.15 $0 $0 Task 7 - Lake 94 Analysis Mileage (Engineers) 20mi/trip x 3 meetings/site visits/etc. 60 Miles @ $0.585 per mile $35 Task 7 - Lake 94 Analysis With multiplier for reimbursables = 1.15 $35 $40 Total PSC Expenses $2,317 2of2 EXHIBIT A-1 - Amendment No. CITY OF LUBBOCK, TEXAS AMENDMENT #1 - ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF DIRECT EXPENSES WORKSHEET 7 HUGO REED AND ASSOCIATES, INC. 03-Aug-09 Subconsultant Expenses Oty Unit Unit Price Total Task 5 - Design and Construction Documents Survey Equipment - Trimble 5800, Trimble 5603 Mileage CARD Charges 194 days miles hours $200.00 $0,505 $10.00 $0 $0 $1,940 Task 5 - Design and Construction Documents With multiplier for reimbursables = 1,15 $1,940 $2,231 Total Hugo Reed and Associates Expenses $2,231 EXHIBIT A-1 - Amendment No. 1 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF DIRECT EXPENSES WORKSHEET 8 Direct Expenses Oty. Unit 03-Aug-09 Unit Price Unit Extension Task 4 - Design and Construction Documents None for Amendment No. 1 $0 Task 4 - Design and CDs Subtotal Hours/Costs With multiplier for reimbursables =1.15 $0 $0 Total Grimes &Associates Expenses $0 EXHIBIT A-1 - Amendment No. 1 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES Frankford Ave. from 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St... Project #92158 ESTIMATE OF DIRECT EXPENSES WORKSHEET 9 03-Aug-09 ,SO -DEEP, Direct Expenses Qty. Unit Unit Price Unit Extension Task 3 - Utility Location and Accomodatlon None far Amendment No. 1 $0 Task 3 - Utility Subtotal Hours/Costs With multiplier for reimbursables = 1.15 $0 $0 Total So -Deep Expenses $0 1 of . Resolution No. 2009-RO345 EXHIBIT A-1 - Amendment No. 1 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES Frankford Ave. froth 98th Street to 114th St, 98th Street from Frankford Ave. to Milwaukee Ave, and Milwaukee Ave. from 94th St. to 100th St. - Project #92158 ESTIMATE OF DIRECT EXPENSES WORKSHEET 10 Engineiering & TestiR9,Inc.03-Aug-09 Direct Expenses Q1y. Unit Unit Price Unit Extension 'Task 5 - Peefgn and Construction ttbcumortte _ + Drilling Charges One test hole 35-toot depth with SPT at 5, 10, 15, 20, 25, 30, and 35-fool depths 1 Each a $700.000 per each $700 One lest hole 25-foot depth with SPT at 5, 10, 15, 20, and 25-foot depths 1 Each a $375.000 per each $375 Air compressor rental 1 Each @ $175.000 per each $175 Drilling rig mobilization 1 Each a $600.000 per each $600 Drilling crew per diem 1 Each (4 $175.000 per each $176 Grout test holes 2 Each ® $100.000 $200 Shelby push tube sampling 2 Each @ $125.000 per each $250 Testing Fees Testing test hole materials Atterberg limits, percent finer than #200 sieve 12 Each 4 $65.00 per each $780 Value of cohesion 1 Each 0 $950.00 per each $950 Triaxial shear test (ASTM D-2850) 1 Each @ $350.00 per each $350 Engineering/Reporting AT&E Engineer's site visit 1 Each 4� $375,00 Each $375 AT&E Engineer's analysis and report 1 Each ® $1,000.00 Each $1,000 Equipment, Barricades, and Miscellaneous Sufficient budget remains in original agreement Task 5 - Design and CDs Subtotal Hours/Costs $5,930 With multiplier for reimbursables - 1.15 $6,820 Total PaveTex Expenses $6,820 1 of i